Escolar Documentos
Profissional Documentos
Cultura Documentos
/q
p:/
htt
2012
FACILITY PLANNING -II
Full Marks : 70
pap
wb
er.
1.
ii)
Renewable energy
b)
Non-renewable energy
c)
Nuclear energy
d)
Solar energy.
7227(N)
in
a c.
ut .
b)
c)
d)
[ Turn over
CS/BHMCT(N)/SEM-7/HM-705/2012-13
iii)
/q
p:/
htt
iv)
b)
Heat pump
c)
d)
Weather conditions
b)
Fuels
c)
d)
all of these.
pap
by
wb
er.
v)
a)
setting
the
compressor
to
the
highest
condensing temperature
b)
d)
7227(N)
in
a c.
ut .
vi)
c)
a)
Snakes
b)
Chemicals
c)
Bricks
d)
Pure water.
CS/BHMCT(N)/SEM-7/HM-705/2012-13
/q
p:/
htt
vii)
a)
b)
Front Office
c)
Lobby
d)
Lodging Room.
c)
pap
ix)
a)
b)
2R
c)
3R
d)
4R.
wb
er.
x)
a)
44-55 %
c)
65-75 %
b)
55-65 %
d)
15-25 %.
in
a c.
ut .
GROUP B
3 5 = 15
2.
3.
4.
7227(N)
[ Turn over
CS/BHMCT(N)/SEM-7/HM-705/2012-13
5.
/q
p:/
htt
6.
GROUP C
( Long Answer Type Questions )
Answer any three of the following.
7.
3 15 = 45
pap
8.
10 + 5
wb
er.
b)
Mumbai
c)
in
a c.
ut .
a)
7227(N)