Escolar Documentos
Profissional Documentos
Cultura Documentos
SUBJECT : #
PROJECT : #
CONTRACT : #
SAFETY CALC.: #
CALC. No. #
REV.
DATE
#REF!
#REF!
6 of 45
ORIGINATOR CHECKER
#REF!
APPROVER
#REF!
#REF!
Length
Width
Lx =
Lx1 =
Lz =
1.850
0.750
2.000
Lz1 =
0.750
Hpc =
h1
1.50 m
100 - 99
1.000 m
Height
Hp =
Length
lx
1.300 m
0.75 m
Width
lz
=
=
0.75 m
0.80 m
Pedestal Details
Size of Column/Pedestal
1200
400
P1
P2
400
650
1850
C.L of Fdn
Z
P3
400
400
750
C.L of Fdn
2000
(U/S of base plate)
EL
100.300
EL
100.000
H.P.P
750x750
EL
99.000
EL
97.500
1500
H =2.80
40 thk Grout
As the column centre line is located in line with the centre of the piles P1 & P2 and placed in between the piles. So,
considered the pile cap acting like a two pile cap with pile P1 & P2 tied with the another pile P3.
Based on the above assumption, super structure loads i.e., vertical load(Fy), horizontal loads in z-direction(Fz) and respective
moment(Mx) are transferred through piles P1 & P2 and remaining loads horizontal loads in x-direction(Fx) and respective
moment(Mz) are transferred through piles P1, P2 & P3.
Page :
SUBJECT : #
PROJECT : #
CONTRACT : #
SAFETY CALC.: #
CALC. No. #
Pile Details
S.No
1
2
3
Pile No.
P1
P2
P3
z
m
0.400
1.600
1.000
3.000
REV.
DATE
#REF!
#REF!
ORIGINATOR CHECKER
#REF!
#REF!
7 of 45
APPROVER
#REF!
x
m
0.400
0.400
1.450
2.250
n=
n1 =
3
2
(x )/n
0.750
=
=
(z )/n =
x1 - x3
1.050 m
z1 - z2
1.200 m
1.000
Zzz
Zxx =
Area of Pedestal
10 kN/m2
Apc =
=
=
Apd =
=
=
As =
=
=
W pc =
=
=
W pd =
=
=
Ws =
=
=
W sur =
Lz*Lx1+0.5*(Lz+Lz1)*(Lx-Lx1)
2*0.75+0.5*(2+0.75)*(1.85-0.75)
3.01 m2
lz * lx
0.75*0.75
0.56 m2
Apc -Apd
3.01-0.5625
2.45 m2
Apc*Hpc*c
(3.01*1.5*24)
108.45 kN
Apd*Hp*c
(0.56*1.3*24)
17.55 kN
As*h1*s
(2.45*1*18)
44.10 kN
10*As
=
=
10*2.45
24.50 kN
W pc+W s+W pd
=
=
108.45+44.1+17.55
170.1 kN
=
=
108.45+44.1+17.55+24.5
194.6 kN
(Lz*Lx1*Lx1/2+0.5*(Lz+Lz1)*(Lx-Lx1)*(Lx1+1/3*((2*Lz1+Lz)/
(Lz+Lz1)))/ (Lz*Lx1*Lx1/2+0.5*(Lz+Lz1)*(Lx-Lx1))
Page :
SUBJECT : #
PROJECT : #
CONTRACT : #
SAFETY CALC.: #
CALC. No. #
Load Calculations
REV.
DATE
#REF!
#REF!
8 of 45
ORIGINATOR CHECKER
APPROVER
#REF!
#REF!
#REF!
C.G of the pile group and the pile cap are closer to each other. So, consider the 50% of the dead weight due to self weight of
the pile cap and soil weight transferring through pile P3 and remaining 50% equally shared by piles P1 and P2.
Pile-P1 Pile-P2 Pile-P3
Foundation dead weight on piles * -170.1*0.25
= Without Surcharge Load(Fd) 42.53*
42.53 85.05
With Surcharge Load(Fsd)
** -194.6*0.25
48.65** 48.65 97.3
Each support is checked for all the unfactored load combinations and only critical load cases are summarised.
a) Loads at the top of pedestal
STAAD
S.No
Load comb
NodeNo.
1
2
3
4
603
629
603
649
FX
kN
62.00
60.50
82.27
0.50
1300
1300
1200
1400
FY
kN
FZ
kN
-62.00
-60.60
-1.00
-82.00
1032.70
-866.00
723.00
-561.50
MX
kNm
MY
kNm
MZ
kNm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Max.Vertical
Min.Vertical
Max.Hor
Min.Hor
MZB = MZ - FX * H
FZB = FZ
S.No
STAAD
NodeNo.
Load comb
FXB
FYB
FZB
MXB
MYB
MZB
kN
kN
kN
kNm
kNm
kNm
603
1300
62.00
1032.70
-62.00
-173.60
0.00
-173.60
629
1300
60.50
-866.00
-60.60
-169.68
0.00
-169.40
603
1200
723.00
0.00
-230.36
649
1400
-1.00
-82.00
-2.80
82.27
0.50
-229.60
0.00
-1.40
-561.50
110
= FYB/n1 + Fsd - MXB/Zxx - MZB/(Zzz*n1)
= CHECK N.No. & L.C
= CHECK kN
P2
P3
Fsd - MZB/(Zzz)
Pmax
Pmax,allow
kN
kN
S.No
STAAD
NodeNo.
Load comb
603
1300
792.34
503
262.64
792.3
870.0
Safe!
2
3
4
629
603
649
1300
1200
1400
-162.29
522.18
-40.1
-445.09
517.52
-422.77
258.64
316.7
98.64
258.6
522.2
870.0
870.0
Safe!
Safe!
98.6
870.0
Safe!
P1
The Pile capacity increased by 25%, as the critical loads are combination of the wind loads
Check
Page :
SUBJECT : #
PROJECT : #
CONTRACT : #
SAFETY CALC.: #
CALC. No. #
REV.
DATE
#REF!
#REF!
9 of 45
ORIGINATOR CHECKER
#REF!
APPROVER
#REF!
#REF!
110
= FYB/n1 + Fd - MXB/Zxx - MZB/(Zzz*n1)
= CHECK N.No. & L.C
= ECK N.No. & kN
= FYB/n1 + Fd + MXB/Zxx - MZB/(Zzz*n1)
P2
Fd + MZB/(Zzz)
S.No
1
2
3
STAAD
NodeNo.
Load comb
603
629
603
1300
1300
1200
Pmin
Pmin,allow
P1
P2
P3
kN
kN
786.22
-168.41
516.06
496.88
-451.21
511.4
-80.29
-76.29
-134.35
-80.3
-451.2
-450.0
-450.0
Safe!
Unsafe!
-134.4
-450.0
Safe!
Check
Safe!
-428.9
-450.0
4
649
1400
-46.22
-428.89
83.72
The Pile capacity increased by 25%, as the critical loads are combination of the wind loads
The tension capacity of the piles at node 12 need to increase by increasing the length of the reinforcement in the pile.
c) Check for shear capacity of the pile
Resultant Horizontal Force
12
, L.C
Node No.
Min compressive load, P1
127
= Sqrt((Fx/n)^2 + (Fz /n1)^2)
= CHECK N.No. & L.C
= CHECK kN
P2
P3
= Fx/n
= CHECK N.No. & L.C
= CHECK kN
STAAD
NodeNo.
Load comb
1
2
603
629
603
S.No
Hmax
Hmax,allow
Check
1300
1300
P1
37.26
36.4
P2
37.26
36.4
P3
20.67
20.17
kN
37.3
kN
87.0
36.4
87.0
Safe!
1200
27.43
27.43
27.43
27.4
87.0
Safe!
The Pile capacity increased by 25%, as the critical loads are combination of the wind loads
Safe!