3.4 Summary This exemption is effective upon 397–4209, or 301–415–4737 or by e-mail
Based upon the review of the issuance. to pdr@nrc.gov. licensee’s exemption request to credit Dated at Rockville, Maryland, this 2nd day Dated at Rockville, Maryland, this 8th day soluble boron during DSC loading, of September, 2005. of September, 2005. unloading, and handling in the CCNPP For the Nuclear Regulatory Commission. For the Nuclear Regulatory Commission. SFP, the NRC staff concludes that Ledyard B. Marsh, Robert E. Martin, pursuant to 10 CFR 50.12(a)(2) the Director, Division of Licensing Project Senior Project Manager, Section 1, Project licensee’s exemption request is Management, Office of Nuclear Reactor Directorate II, Division of Licensing Project acceptable. However, the NRC staff Regulation. Management, Office of Nuclear Reactor places the following limitations and/or [FR Doc. 05–18193 Filed 9–13–05; 8:45 am] Regulation. conditions on the approval of this BILLING CODE 7590–01–P [FR Doc. 05–18195 Filed 9–13–05; 8:45 am] exemption: BILLING CODE 7590–01–P 1. This exemption is limited to the loading, unloading, and handling of the NUCLEAR REGULATORY DSC for only the TN NUHOMS–32P at COMMISSION NUCLEAR REGULATORY CCNPP. COMMISSION [Docket No. 50–395] 2. This exemption is limited to the [Docket No. 50–244] loading, unloading, and handling in the South Carolina Electric & Gas DSC at CCNPP of Combustion Company; Notice of Withdrawal of R.E. Ginna Nuclear Power Plant, LLC; Engineering 14x14 fuel assemblies that Application for Amendment to Facility R.E. Ginna Nuclear Power Plant; Notice had maximum initial, unirradiated U– Operating License of Public Meeting To Obtain Comments 235 enrichments of 4.5 weight percent. on Request Regarding Proposed The U.S. Nuclear Regulatory Release of Part of Site for Unrestricted 4.0 Conclusion Commission (the Commission) has Use Accordingly, the Commission has granted the request of South Carolina determined that, pursuant to 10 CFR Electric & Gas Company (the licensee) to AGENCY: U.S. Nuclear Regulatory 50.12(a), the exemption is authorized by withdraw its January 14, 2003, Commission. law, will not present an undue risk to application for proposed amendment to ACTION: Notice of public meeting. the public health and safety, and is Facility Operating License No. NPF–12 consistent with the common defense for the Virgil C. Summer Nuclear SUMMARY: The U.S. Nuclear Regulatory and security. Also, special Station, Unit No. 1, located in Fairfield Commission (NRC) is conducting a circumstances are present. Therefore, County, South Carolina. meeting, pursuant to Section 50.83, the Commission hereby grants the The proposed amendment would ‘‘Release of part of a power reactor licensee an exemption from the have revised the Technical facility or site for unrestricted use,’’ of requirements of 10 CFR 50.68(b)(1) for Specifications pertaining to emergency Part 50 of Title 10 of the Code of Federal the loading, unloading, and handling of core cooling systems (ECCS); exclusion Regulations (10 CFR), for purpose of the components of the Transnuclear of safety injection pumps from the obtaining comments from the public on NUHOMS–32P dry cask storage requirement to vent ECCS pumps. the proposed release of part of the R.E. system at CCNPP. However, since the The Commission had previously Ginna Nuclear Power Plant (Ginna licensee does not have an NRC- issued a Notice of Consideration of Plant) site, located in Wayne County, approved methodology for evaluating Issuance of Amendment published in New York. changes to the analyses or systems the Federal Register on March 4, 2003 DATES: The public meeting will be held supporting this exemption request, the (68 FR 10281). However, by letter dated on Wednesday, September 28, 2005, NRC staff’s approval of the exemption is June 22, 2005, the licensee withdrew the from 6 p.m. to 8 p.m. at the Ginna Plant restricted to those specific design and proposed change. Training Center, 1517 Lake Road operating conditions described in the For further details with respect to this Ontario, NY 14519. licensee’s December 21, 2004, action, see the application for Travel Information: From Rochester, exemption request. The licensee may amendment dated January 14, 2003, and take Interstate I–590 towards RT–590. not apply the 10 CFR 50.59 process for the licensee’s letter dated June 22, 2005, Road name changes to SR–590. At exit evaluating changes to specific which withdrew the application for 10B, take Ramp (Right) onto SR–104 exemptions. Any changes to the design license amendment. Documents may be towards RT–104/Webster. Turn LEFT or operation of (1) the dry cask storage examined, and/or copied for a fee, at the (North) onto CR–102 (Lakeside Road). system, (2) the SFP, (3) the fuel NRC’s Public Document Room (PDR), Turn RIGHT (East) onto CR–101 (Lake assemblies to be stored, (4) the boron located at One White Flint North, Public Road). Follow Lake Road to the Ginna dilution analyses, or (5) supporting File Area 01 F21, 11555 Rockville Pike Information Center. procedures and controls, regardless of (first floor), Rockville, Maryland. Notification of Attendance: It is whether they are approved under the Publicly available records will be strongly encouraged that prospective general Part 72 license or perceived to accessible electronically from the participants contact NRC prior to the be conservative, will invalidate this Agencywide Documents Access and meeting to ensure adequate exemption. Upon invalidation of the Management Systems (ADAMS) Public accommodations and to expedite the exemption, the licensee will be required Electronic Reading Room on the Internet required visitor processing. Contact to comply with NRC regulations prior to at the NRC Web site, http:// Shannine DiMora, telephone: (315) 524– future cask loadings. www.nrc.gov/reading-rm/adams/html. 6935; e-mail: sjd1@nrc.gov, and submit Pursuant to 10 CFR 51.32, the Persons who do not have access to participant name and affiliated Commission has determined that the ADAMS or who encounter problems in organization by September 23, 2005. granting of this exemption will not have accessing the documents located in Also, it is suggested that attendees limit a significant effect on the quality of the ADAMS, should contact the NRC PDR the amount of personal items and human environment (70 FR 51853). Reference staff by telephone at 1–800– electronic devices brought into the