54416 Federal Register / Vol. 70, No.

177 / Wednesday, September 14, 2005 / Notices

3.4 Summary This exemption is effective upon 397–4209, or 301–415–4737 or by e-mail


Based upon the review of the issuance. to pdr@nrc.gov.
licensee’s exemption request to credit Dated at Rockville, Maryland, this 2nd day Dated at Rockville, Maryland, this 8th day
soluble boron during DSC loading, of September, 2005. of September, 2005.
unloading, and handling in the CCNPP For the Nuclear Regulatory Commission. For the Nuclear Regulatory Commission.
SFP, the NRC staff concludes that Ledyard B. Marsh, Robert E. Martin,
pursuant to 10 CFR 50.12(a)(2) the Director, Division of Licensing Project Senior Project Manager, Section 1, Project
licensee’s exemption request is Management, Office of Nuclear Reactor Directorate II, Division of Licensing Project
acceptable. However, the NRC staff Regulation. Management, Office of Nuclear Reactor
places the following limitations and/or [FR Doc. 05–18193 Filed 9–13–05; 8:45 am] Regulation.
conditions on the approval of this BILLING CODE 7590–01–P [FR Doc. 05–18195 Filed 9–13–05; 8:45 am]
exemption: BILLING CODE 7590–01–P
1. This exemption is limited to the
loading, unloading, and handling of the NUCLEAR REGULATORY
DSC for only the TN NUHOMS–32P at COMMISSION NUCLEAR REGULATORY
CCNPP. COMMISSION
[Docket No. 50–395]
2. This exemption is limited to the [Docket No. 50–244]
loading, unloading, and handling in the South Carolina Electric & Gas
DSC at CCNPP of Combustion Company; Notice of Withdrawal of R.E. Ginna Nuclear Power Plant, LLC;
Engineering 14x14 fuel assemblies that Application for Amendment to Facility R.E. Ginna Nuclear Power Plant; Notice
had maximum initial, unirradiated U– Operating License of Public Meeting To Obtain Comments
235 enrichments of 4.5 weight percent. on Request Regarding Proposed
The U.S. Nuclear Regulatory Release of Part of Site for Unrestricted
4.0 Conclusion Commission (the Commission) has Use
Accordingly, the Commission has granted the request of South Carolina
determined that, pursuant to 10 CFR Electric & Gas Company (the licensee) to AGENCY: U.S. Nuclear Regulatory
50.12(a), the exemption is authorized by withdraw its January 14, 2003, Commission.
law, will not present an undue risk to application for proposed amendment to ACTION: Notice of public meeting.
the public health and safety, and is Facility Operating License No. NPF–12
consistent with the common defense for the Virgil C. Summer Nuclear SUMMARY: The U.S. Nuclear Regulatory
and security. Also, special Station, Unit No. 1, located in Fairfield Commission (NRC) is conducting a
circumstances are present. Therefore, County, South Carolina. meeting, pursuant to Section 50.83,
the Commission hereby grants the The proposed amendment would ‘‘Release of part of a power reactor
licensee an exemption from the have revised the Technical facility or site for unrestricted use,’’ of
requirements of 10 CFR 50.68(b)(1) for Specifications pertaining to emergency Part 50 of Title 10 of the Code of Federal
the loading, unloading, and handling of core cooling systems (ECCS); exclusion Regulations (10 CFR), for purpose of
the components of the Transnuclear of safety injection pumps from the obtaining comments from the public on
NUHOMS–32P dry cask storage requirement to vent ECCS pumps. the proposed release of part of the R.E.
system at CCNPP. However, since the The Commission had previously Ginna Nuclear Power Plant (Ginna
licensee does not have an NRC- issued a Notice of Consideration of Plant) site, located in Wayne County,
approved methodology for evaluating Issuance of Amendment published in New York.
changes to the analyses or systems the Federal Register on March 4, 2003 DATES: The public meeting will be held
supporting this exemption request, the (68 FR 10281). However, by letter dated on Wednesday, September 28, 2005,
NRC staff’s approval of the exemption is June 22, 2005, the licensee withdrew the from 6 p.m. to 8 p.m. at the Ginna Plant
restricted to those specific design and proposed change. Training Center, 1517 Lake Road
operating conditions described in the For further details with respect to this Ontario, NY 14519.
licensee’s December 21, 2004, action, see the application for Travel Information: From Rochester,
exemption request. The licensee may amendment dated January 14, 2003, and take Interstate I–590 towards RT–590.
not apply the 10 CFR 50.59 process for the licensee’s letter dated June 22, 2005, Road name changes to SR–590. At exit
evaluating changes to specific which withdrew the application for 10B, take Ramp (Right) onto SR–104
exemptions. Any changes to the design license amendment. Documents may be towards RT–104/Webster. Turn LEFT
or operation of (1) the dry cask storage examined, and/or copied for a fee, at the (North) onto CR–102 (Lakeside Road).
system, (2) the SFP, (3) the fuel NRC’s Public Document Room (PDR), Turn RIGHT (East) onto CR–101 (Lake
assemblies to be stored, (4) the boron located at One White Flint North, Public Road). Follow Lake Road to the Ginna
dilution analyses, or (5) supporting File Area 01 F21, 11555 Rockville Pike Information Center.
procedures and controls, regardless of (first floor), Rockville, Maryland. Notification of Attendance: It is
whether they are approved under the Publicly available records will be strongly encouraged that prospective
general Part 72 license or perceived to accessible electronically from the participants contact NRC prior to the
be conservative, will invalidate this Agencywide Documents Access and meeting to ensure adequate
exemption. Upon invalidation of the Management Systems (ADAMS) Public accommodations and to expedite the
exemption, the licensee will be required Electronic Reading Room on the Internet required visitor processing. Contact
to comply with NRC regulations prior to at the NRC Web site, http:// Shannine DiMora, telephone: (315) 524–
future cask loadings. www.nrc.gov/reading-rm/adams/html. 6935; e-mail: sjd1@nrc.gov, and submit
Pursuant to 10 CFR 51.32, the Persons who do not have access to participant name and affiliated
Commission has determined that the ADAMS or who encounter problems in organization by September 23, 2005.
granting of this exemption will not have accessing the documents located in Also, it is suggested that attendees limit
a significant effect on the quality of the ADAMS, should contact the NRC PDR the amount of personal items and
human environment (70 FR 51853). Reference staff by telephone at 1–800– electronic devices brought into the

VerDate Aug<18>2005 16:17 Sep 13, 2005 Jkt 205001 PO 00000 Frm 00067 Fmt 4703 Sfmt 4703 E:\FR\FM\14SEN1.SGM 14SEN1