By Mr.Krisada Chavananand
Chairman of Thai Palm Oil Industry, FTI board member
IMPACT, Bangkok
8 September 2011
Contents
Background information of palm oil plantation and
Industry in Thailand
Current Problems of Palm Oil Industry
Future Overview
Future Challenging and Trend of Down Steam Opportunity
CDM projects development in Thailand
Conclusion
Year
Plantation area
(rai)
Mature area
(rai)
2006
2,953,924
2,374,202
6,715,036
2.828
2007
3,200,276
2,663,252
6,389,983
2.399
2008
3,676,096
2,884,720
9,270,510
3.214
2009
3,888,403
3,187,000
8,162,379
2.561
2010
4,077,000
,
,
3,553,000
,
,
8,223,000
,
,
2.315
2011 1/
4,285,000
3,754,740 1/
9,119,720 1/
2.430
*** 80%
80% of plantations in Thailand are small farmer. ***
3
Year 2011
North Area
-Mature Area 8,380 Rai
-FFB
5,860 Tons
North-Eastern Area
-Mature Area 45,860 Rai
-FFB
44,900 Tons
Central Area
-Mature Area 396,910 Rai
-FFB
944,470 Tons
Southern Area
8,124,490 Tons
Mature
area (rai)
FFB Produced
(Ton FFB)
Crude Oil
(Ton FFB)
CPO yield
(Ton-CPO/rai)
(Ton
CPO/rai)
2006
2,374,202
6,518,380
1,167,126
0.4916
2007
2,663,252
6,150,365
1,051,089
0.3946
2008
2,884,720
9,165,303
1,543,761
0.5352
2009
3,187,000
,
,
8,032,513
,
,
1,345,245
,
,
0.4221
2010
3,553,000
7,845,850
1,287,510
0.3624
2011 1/
3,754,740 1/
9,119,720 1/
1,546,056 1/
0.4118
Year 2011
2011,, total 76 Crushing Mills in Thailand,
Total Production Capacity 2,791 Tons/hr
2007
2011
%Change
Mill
Capacity
Mill
Capacity
Mill
Capacity
Southern
54
2,187
70
2,594
30%
19%
Central
32
62
0%
94%
North-Eastern
Eastern
62
135
Total
59
2,281
76
2,791
New Area
0%
118%
29%
22%
** From Year 2007 to 2011, Total palm oil mill increased 29%**
Palm Plantation
80% of Plantations in Thailand are small farmers.
Low FFB p
production yield,
y
, (~
( 2.625 Ton-FFB/rai))
Poor Quality Seeding
Improperly of palm plantation management, less
fertilizer apply and take care.
Barrier: in term of Policy Implementation with several
small farmers holder, it is very difficult to stimulate
and implement.
If Government
Government strategy
strategy not well appropriated planning
and having good long term vision, it will difficult to
success.
** Advantage: when having Good Policy launch, it will create large effects and
give benefits down steam to many Grassroots stakeholders. **
2007
2011
59
76
2,281
2,791
production (t-FFB/yr)
16,423,200
20,095,200
6,389,983
9,119,720
61%
55%
Finally, Operation Cost higher than other country, cant compete in world market
11
12
40.0%
Productionyield(TonFFB/Rai)
3.000
2.500
2.000
30.0%
20.0%
Low
L
production
d ti yield
i ld when
h compare with
ith other
th country
t
Production yield fluctuates year by year
10.0%
1.500
0.0%
1.000
-10.0%
0.500
-20.0%
0 000
0.000
Production
yield
(T
Ton-FFB/Rai)
Production yield
(Ton
-FFB/Rai)
%FFByieldFluctuation
-30 0%
-30.0%
2006
2007
2008
2009
2010
2011
Year
Year
Yes, it could looks as problems. But vice versa,
It also could be looks as an opportunity for
improving through GAP (Good Agriculture Practice)
13
N
to Promote
r m
higher
g r cooperation
p r
n between
w n
Need
mills and farmer
14
18.00%
80
17 50%
17.50%
70
60
17.00%
50
16.50%
40
16.00%
30
15.50%
15.00%
%CPOyieldpertFFB
No.ofmillPOMs
14.50%
2006
2007
20
Other country,
average CPO yield
> 19%
2008
2009
2010
10
2011
Year
15
5.00
4.50
4.00
3.50
3.00
2.50
2.00
Thailand, average
2.727 Ton-CPO/ha
1.50
1.00
0.50
CPOyield(TonCPO/ha.)
0.00
2006
2007
2008
2009
2010
2011
Year
Year
5.00
MPOB, average = 3.973 Ton-CPO/ha
4.50
4.00
3 50
3.50
**Thailand
Thailand, have to increase
production yield +45.7%**
3.00
2.50
2.00
1.50
1.00
0.50
CPOyield(TonCPO/ha.)
0.00
2006
2007
2008
2009
2010
2011
Year
Year
17
Future Overview
Demand-Supply Equation
?
18
Environmental Product
Oleo chemical Industry
Renewable Energy
gy
Biogas / Biomass Power Plant
Biodiesel oil
Exploitation of
Carbon Emissions
Project developer / Seller
19
WASTE UTILIZATION
Turn Waste to Renewable
Energy Power Producer
Biogas plant
BiomassPower
powerplant
plant
Biomass
20
10
Waste water
7,200,000 m3
Fiber
1,680,000 ton
EFB
2,640,000 ton
COD
%CH4
55 - 65%
LHV
21
%moisture
58.6%
LHV
7,240 kJ/kg
Turn Waste to
Renewable Energy Potential
Biogas Potential
Source
POME
Amount
7,200,000 m3 181,440,000
1,058,400
402.2
Biomass Potential
2,640,000
MWThermal / yr
GWhElect/a
5,309,333
1,061.9
* MW electricity calculated at 20% efficiency of power plant, op. 24hr and 300 days
22
11
Trang, 4
Prachup, 1
Chonburi,
1
Chumporn,
6
Suratthani,
18
Krabi, 16
No of mill in Status
No.
Operating
On going
5
4
12
11
13
1
28
18
23
24
12
Province
No.Mill
Suratthani
12
Krabi
Trang
Chumporn
Suratthani
9
4
3
2
Total No.
of plant
Total Capacity
Installed (MW)
PPA (kW)
28
58 3
58.3
46 8
46.8
1
1
3
16.9
15.7
2
1
23.9
15.9
6
2
11.7
9.0
46
110.8
87.4
Krabi
Suratthani
Total plant
Source: VSPP_status_Aug2011, EPPO+PEAs information
Nakornprathom
,1
Srakaew, 1
Krabi,, 3
Prach p 1
Prachup,
Trang, 1
Chumporn,
3
Suratthani,
3
26
13
Province
Krabi
Chumporn
Suratthani
Prachuapkhirikhan
District area
MW sale
Kaopranum
Thasae
Prasaeng
Bangsaphannoi
8.5
8
2.2
1
19.7
Total
27
VSPP Status
Biomass from POMs
COD and operation
Province
No.Mill
Total No.
of plant
Total Capacity
Installed (MW)
PPA (kW)
Krabi
Suratthani
Chumporn
Prachuapkhirikhan
1
1
1
1
26.0
19.7
2
1
1
1
1
55
41.5
2
1
20.5
19.6
13
101.5
80.8
Chumporn
Trang
Signed PPA & waiting for
Suratthani
COD
Nakornprathom
S k
Srakaew
Waiting for sign PPA
28
Krabi
Suratthani
Total plant
14
29
CDM developement
WW.treatment
Solid waste handling
Fuel replacement
Grid replacement
Future of Thai Palm oil Industry, September 8, 2011
30
15
Biogas = 21 projects,
from POMs = 14 Projects.
CERs issued = 2 Projects
Biomass = 8 projects,
from Palm residue = 1 Projects
31
Conclusion
Conclusion.
16