COMMISSIONING PROCEDURE METHOD STATEMENT FOR


FIREHOSERACKS&FIREHOSEREEL.

PrecommissioningProcedureforFireHoseRack&
FireHoseReel
1. Ensure that the Hose Rack & Hose Reel installation is
completeandmechanicalcompletionisapproved.
2. Ensure that all drawings are approved by the civil
defenseauthority.
3. Ensure that no damage has occurred between
mechanicalcompletion&precommissioning.
4. Repairalldamagestotheequipmentpaintfinish.
5. CheckthattheFireFightingpipingnetworkiscomplete
with proper valves, drains, vents, strainers, pressure
reducingvalves&instrumentsinplace.
6. EnsurethattheFireFightingnetworkispressuretested
andapproved.
7. Ensurethatfutureprovisionconnectiontothehosereels

areinstalledandpluggedsuitably.
8. Ensure that the Fire cabinets & hose reels are installed
in line with approved shop drawings & relevant method
statement.
9. Ensure fire extinguishers are installed as per approved
shopdrawings.
10. Ensurethatthefirecabinetdoorcanbefullyopened.
11. Ensure that the fire pumps are commissioned & the
systemisunderpressure.
12. Ensure that the supervisory control valve for the fire
hose cabinet is installed & electrically connected to fire
alarmsystem.
13. Ensurethatallvalvesareproperlytagged&identified.

CommissioningProcedureforFireHoseRack&Fire
HoseReel
1. Ensurethatalltheprecommissioningchecksarecarried
outsuccessfully.
2. Open the supervisory isolation valve for the fire hose
cabinet & allow the water to flow into landing valve &
hosereel.
HoseReel
1. Pull out the hose from the hose reel to a length of
approximately 3 meters & ensure that the automatic
valveopens&thefirealarmsignalisgenerated.

2. Ensurethatthecompletelengthofhosewillopeninall
directions only by pulling the nozzle without even
touchingthehosereel.
3. Adjust the nozzle to set the required throw / flow of
water.
4. Checkforanyleakageinthehosereelconnections.
5. Check the pressure in the PRV down stream which
shouldbe65psi.
HoseRack
1. Pullthehosefromthehoserack.
2. Openthelandingvalve&checkthewaterflowfromthe
nozzle.
3. Checkifthefirealarmsignalisgenerated.
4. Check for any leakage in the hose connection / pipe
joints.

FireFightingSystems Testing&
Commissioning
COMMISSIONINGPROCEDURE FIREHOSE
RACKS FIREHOSEREEL. method
statement PRECOMMISSIONING TESTING

Webmaster
ViewallpostsbyWebmaster

RelatedPosts
MethodStatementForInstallationOfSteamBoilers
MethodStatementfortheInstallationofCalorifier
MethodStatementForInstallationofHVACSupply,

Return&ExhaustDucts,Dampers,FireDampersand
AccessDoors
MethodStatementForInstallation,PressureTesting&
InsulationofChilledWaterPipingValvesand
Accessories
MethodStatementForInstallationOfGICladdingFor
HVACDuctwork&Pipework

Testing&

MethodStatement

CommissioningOf

ForTesting

FireFightingSystem

Precommissioning&

Hosereel&Sprinkler

Commissioningof

System

FuelOilPumps

Searchthissite...
Search

AboutTheAuthor

BrowseByCategories:
CivilMethodStatements
ElectricalMethod
Statements
FireFightingSystems
HVACMethod
Statements
Oil&GasSystems

PlumbingMethod
Statements
TechnicalGuides
Testing&Commissioning

"Werecommend
theseProject
Management
Templatesfor
deliveringyour
projects
successfully."

RecentUploads:
MethodofStatementFor
InstallationofHot&Cold
DomesticWaterSupply
PipeSystem
MethodStatementFor
InstallationOfSteam
Boilers
MethodStatementfor
theInstallationof
Calorifier
MethodStatementFor
InstallationofHVAC
Supply,Return&Exhaust
Ducts,Dampers,Fire

DampersandAccess
Doors
MethodStatementFor
Installation,Pressure
Testing&Insulationof
ChilledWaterPiping
ValvesandAccessories
MethodStatementFor
InstallationofElectrical
WaterHeaters
MethodStatementFor
InstallationOfAir
HandlingUnitsAHUs
MethodOfStatementFor
CleaningFlushingAnd
PassivationOfChilled
WaterPiping
MethodStatementFor
InstallationOfGI
CladdingForHVAC
Ductwork&Pipework
MethodStatementFor
FieldJointInsulationof
PreInsulatedChilled
WaterPipe

Copyright2015

Allrightsreserved

Você também pode gostar