Você está na página 1de 1

50316 Federal Register / Vol. 70, No.

165 / Friday, August 26, 2005 / Notices

time on the specified comment date. It DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY


is not necessary to separately intervene
again in a subdocket related to a Federal Energy Regulatory Federal Energy Regulatory
compliance filing if you have previously Commission Commission
intervened in the same docket. Protests [Docket Nos. EL00–95–000 and EL00–98–
will be considered by the Commission [Docket Nos. ER02–1656–000, ER02–1656– 000]
in determining the appropriate action to 026]
be taken, but will not serve to make San Diego Gas & Electric Company,
protestants parties to the proceeding. California Independent System Complainant, v. Sellers of Energy and
Anyone filing a motion to intervene or Operator Corporation; Notice of Ancillary Services Into Markets
protest must serve a copy of that Technical Conference Operated by the California
document on the Applicant. In reference Independent System Operator and the
August 22, 2005. California Power Exchange,
to filings initiating a new proceeding,
interventions or protests submitted on In accordance with the directive of Respondents; Investigation of
or before the comment deadline need the July 1, 2005 Order on Further Practices of the California Independent
not be served on persons other and the Amendments to the California System Operator and the California
Applicant. Independent System Operator’s Power Exchange; Notice of Technical
Comprehensive Market Redesign Conference (Listen-Only Call-In
The Commission encourages Number)
Proposal,1 Federal Energy Regulatory
electronic submission of protests and
Commission (Commission) staff will August 22, 2005.
interventions in lieu of paper, using the
convene a technical conference to On August 16, 2005, the Commission
FERC Online links at http://
explore tariff issues related to demand issued a notice informing parties that
www.ferc.gov. To facilitate electronic
response options, including special case the Federal Energy Regulatory
service, persons with Internet access
nodal pricing. In addition to demand Commission staff will convene a
who will eFile a document and/or be
response generally, and special case technical conference to finalize the
listed as a contact for an intervenor
nodal pricing in particular, participants template for submission of cost filings,
must create and validate an
should also come prepared to discuss as discussed in San Diego Gas & Electric
eRegistration account using the
the issue of wholesale load choosing to Co. v. Sellers of Energy & Ancillary
eRegistration link. Select the eFiling
opt out of Load Aggregation Points Services, et al., 112 FERC ¶ 61,1176
link to log on and submit the
(LAP).2 (2005).
intervention or protests.
The technical conference, which all This technical conference will be held
Persons unable to file electronically on August 25, 2005, at the Federal
parties may attend, will be held in San
should submit an original and 14 copies Energy Regulatory Commission, 888
Francisco, California, on Tuesday,
of the intervention or protest to the First Street, NE., Washington, DC 20426,
September 13, 2005, at 9 a.m. (PST) at
Federal Energy Regulatory Commission, beginning at 9 a.m. (EST) in the
the Renaissance Parc 55 Hotel, 55 Cyril
888 First St. NE., Washington, DC Commission Meeting Room.
Magnin Street, San Francisco, California
20426. By this notice, we announce further
94102; (415) 392–8000.
The filings in the above proceedings that a listen-only telephone line will be
For further information, contact provided for interested parties to call-in
are accessible in the Commission’s
Heidi.Werntz@FERC.gov; (202) 502– and listen to the telephone conference.
eLibrary system by clicking on the
8910. Below is the call-in information for the
appropriate link in the above list. They
listen-only conference call:
are also available for review in the Linda Mitry,
Commission’s Public Reference Room in Date: August 25, 2005.
Deputy Secretary.
Washington, DC. There is an Time: 9 a.m. EDT.
[FR Doc. E5–4696 Filed 8–25–05; 8:45 am]
eSubscription link on the web site that Toll-free Number: 888–390–0678.
enables subscribers to receive e-mail
BILLING CODE 6717–01–P Passcode: 5848040.
notification when a document is added For more information about the
to a subscribed dockets(s). For conference, please contact: Heidi
assistance with any FERC Online Werntz, Office of General Counsel,
service, please e-mail Federal Energy Regulatory Commission,
FERCOnlineSupport@ferc.gov or call at (202) 502–8910 or
Heidi.Werntz@ferc.gov.
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659. Magalie R. Salas,
Secretary.
Linda Mitry,
[FR Doc. E5–4700 Filed 8–25–05; 8:45 am]
Deputy Secretary.
BILLING CODE 6717–01–P
[FR Doc. E5–4669 Filed 8–25–05; 8:45 a.m.]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY

Western Area Power Administration


1 California Independent System Operator, Inc., Boulder Canyon Project; Rate Order
112 FERC ¶ 61,013 at P 39 (2005). No. WAPA–120
2 See id. at P 37 (‘‘[E]ach wholesale customer

should have the option of establishing, as a separate AGENCY:Western Area Power


zone, the set of nodes where it receives energy). Administration, DOE.

VerDate jul<14>2003 16:18 Aug 25, 2005 Jkt 205001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\26AUN1.SGM 26AUN1

Você também pode gostar