time on the specified comment date. It DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY
is not necessary to separately intervene again in a subdocket related to a Federal Energy Regulatory Federal Energy Regulatory compliance filing if you have previously Commission Commission intervened in the same docket. Protests [Docket Nos. EL00–95–000 and EL00–98– will be considered by the Commission [Docket Nos. ER02–1656–000, ER02–1656– 000] in determining the appropriate action to 026] be taken, but will not serve to make San Diego Gas & Electric Company, protestants parties to the proceeding. California Independent System Complainant, v. Sellers of Energy and Anyone filing a motion to intervene or Operator Corporation; Notice of Ancillary Services Into Markets protest must serve a copy of that Technical Conference Operated by the California document on the Applicant. In reference Independent System Operator and the August 22, 2005. California Power Exchange, to filings initiating a new proceeding, interventions or protests submitted on In accordance with the directive of Respondents; Investigation of or before the comment deadline need the July 1, 2005 Order on Further Practices of the California Independent not be served on persons other and the Amendments to the California System Operator and the California Applicant. Independent System Operator’s Power Exchange; Notice of Technical Comprehensive Market Redesign Conference (Listen-Only Call-In The Commission encourages Number) Proposal,1 Federal Energy Regulatory electronic submission of protests and Commission (Commission) staff will August 22, 2005. interventions in lieu of paper, using the convene a technical conference to On August 16, 2005, the Commission FERC Online links at http:// explore tariff issues related to demand issued a notice informing parties that www.ferc.gov. To facilitate electronic response options, including special case the Federal Energy Regulatory service, persons with Internet access nodal pricing. In addition to demand Commission staff will convene a who will eFile a document and/or be response generally, and special case technical conference to finalize the listed as a contact for an intervenor nodal pricing in particular, participants template for submission of cost filings, must create and validate an should also come prepared to discuss as discussed in San Diego Gas & Electric eRegistration account using the the issue of wholesale load choosing to Co. v. Sellers of Energy & Ancillary eRegistration link. Select the eFiling opt out of Load Aggregation Points Services, et al., 112 FERC ¶ 61,1176 link to log on and submit the (LAP).2 (2005). intervention or protests. The technical conference, which all This technical conference will be held Persons unable to file electronically on August 25, 2005, at the Federal parties may attend, will be held in San should submit an original and 14 copies Energy Regulatory Commission, 888 Francisco, California, on Tuesday, of the intervention or protest to the First Street, NE., Washington, DC 20426, September 13, 2005, at 9 a.m. (PST) at Federal Energy Regulatory Commission, beginning at 9 a.m. (EST) in the the Renaissance Parc 55 Hotel, 55 Cyril 888 First St. NE., Washington, DC Commission Meeting Room. Magnin Street, San Francisco, California 20426. By this notice, we announce further 94102; (415) 392–8000. The filings in the above proceedings that a listen-only telephone line will be For further information, contact provided for interested parties to call-in are accessible in the Commission’s Heidi.Werntz@FERC.gov; (202) 502– and listen to the telephone conference. eLibrary system by clicking on the 8910. Below is the call-in information for the appropriate link in the above list. They listen-only conference call: are also available for review in the Linda Mitry, Commission’s Public Reference Room in Date: August 25, 2005. Deputy Secretary. Washington, DC. There is an Time: 9 a.m. EDT. [FR Doc. E5–4696 Filed 8–25–05; 8:45 am] eSubscription link on the web site that Toll-free Number: 888–390–0678. enables subscribers to receive e-mail BILLING CODE 6717–01–P Passcode: 5848040. notification when a document is added For more information about the to a subscribed dockets(s). For conference, please contact: Heidi assistance with any FERC Online Werntz, Office of General Counsel, service, please e-mail Federal Energy Regulatory Commission, FERCOnlineSupport@ferc.gov or call at (202) 502–8910 or Heidi.Werntz@ferc.gov. (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Magalie R. Salas, Secretary. Linda Mitry, [FR Doc. E5–4700 Filed 8–25–05; 8:45 am] Deputy Secretary. BILLING CODE 6717–01–P [FR Doc. E5–4669 Filed 8–25–05; 8:45 a.m.] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY
Western Area Power Administration
1 California Independent System Operator, Inc., Boulder Canyon Project; Rate Order 112 FERC ¶ 61,013 at P 39 (2005). No. WAPA–120 2 See id. at P 37 (‘‘[E]ach wholesale customer
should have the option of establishing, as a separate AGENCY:Western Area Power
zone, the set of nodes where it receives energy). Administration, DOE.
VerDate jul<14>2003 16:18 Aug 25, 2005 Jkt 205001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\26AUN1.SGM 26AUN1