DEPARTMENT OF ENERGY k. Description of Application: motion to intervene in accordance with
Susquehanna Electric Company (SEC) the requirements of Rules of Practice Federal Energy Regulatory has requested Commission approval of a and Procedure, 18 CFR 385.210. Commission variance of the minimum flow 385.211, and 385.2114. In determining requirement of the project license. Due the appropriate action to take, the Notice of Temporary Variance Request to drought conditions and low river and Soliciting Comments, Motions To Commission will consider all protests flows in the Susquehanna River, SEC filed, but only those who file a motion Intervene, and Protests requests that it be allowed immediately to intervene in accordance with the August 17, 2005. to include plant leakage of about 800 Commission’s Rules may become a Take notice that the following cubic feet per second (cfs) in the party to the proceeding. Any protests or hydroelectric application has been filed required minimum flow discharge until motions to intervene must be received with the Commission and is available September 14, 2005, or until flow conditions improve where the on or before the specified deadline date for public inspection: for the particular application. a. Type of Application: Request for Conowingo Project no longer requires Temporary Variance of Minimum Flow leakage be included as part of the Filing and Service of Responsive Requirement. minimum flow requirement. According Documents—Any filings must bear in b. Project No.: 405–064. to the license, for the period June 1 all capital letters the title c. Date Filed: August 15, 2005. through September 14, annually, SEC ‘‘COMMENTS’’, ‘‘RECOMMENDATION d. Applicant: Susquehanna Electric must provide a minimum flow release FOR TERMS AND CONDITIONS’’, Company and PECO Energy Power (not including leakage) below the dam ‘‘PROTESTS, OR MOTION TO Company. of 5,000 cfs, or inflow (as measured at INTERVENE’’, as applicable, and the e. Name of Project: Conowingo the USGS gage at Marietta, PA), Project Number of the particular Project. whichever is less. During the fall period, application to which the filing refers. f. Location: On the Susquehanna September 15 through November 30, Any of the above-named documents River, in Harford and Cecil Counties, SEC is required to release a minimum must be filed by providing the original Maryland, and York and Lancaster flow of 3,500 cfs not including leakage, Counties, Pennsylvania. The project and the number of copies provided by or inflow to the project whichever is does not utilize federal or tribal lands. less, as measured at the Marietta gage. the Commission’s regulations to: The g. Filed Pursuant to: 18 CFR 4.200. The SEC is concerned about the Secretary, Federal Energy Regulatory h. Applicant Contact: Brian J. ability of the Conowingo Project to Commission, 888 First Street, NE., McManus, Attorney for Susquehanna maintain an adequate pond level and Washington, DC 20426. A copy of any Electric Company and PECO Energy storage capacity during the current low motion to intervene must also be served Power Company, Jones Day, 51 flow period. Maintaining storage is upon each representative of the Louisiana Avenue, NW., Washington, necessary for generation and to ensure Applicant specified in the particular DC 20001–2113, (202) 879–3939. an adequate water supply for application. i. FERC Contact: Robert H. Grieve, recreational and consumptive uses of Agency Comments—Federal, state, robert.grieve@ferc.gov, (202) 502–8752. the Conowingo Reservoir to include j. Deadline for filing comments, and local agencies are invited to file operation of Peach Bottom Atomic comments on the described application. motions to intervene and protest: Power Station and Muddy Run Pumped September 16, 2005. A copy of the application may be Storage Project. Including plant leakage Please include the project number (P– obtained by agencies directly from the in the minimum flow discharge will 405–064) on any comments or motions contribute to the maintenance of these Applicant. If an agency does not file filed. All documents (original and seven project water uses during this low flow comments within the time specified for copies) should be filed with: Magalie R. period. During the period of the filing comments, it will be presumed to Salas, Secretary, Federal Energy minimum flow variance the SEC will have no comments. One copy of an Regulatory Commission, 888 First conduct daily monitoring of the agency’s comments must also be sent to Street, NE., Washington, DC 20426. Susquehanna River below the project for the Applicant’s representatives. Comments, protests, and interventions potential environmental effects. If any Magalie R. Salas, may be filed electronically via the abnormal or adverse conditions are Internet in lieu of paper, see 18 CFR observed the SEC will promptly notify Secretary. 385.2001(a)(1)(iii) and the instructions the Maryland Department of Natural [FR Doc. E5–4605 Filed 8–22–05; 8:45 am] on the Commission’s Web site under the Resources. BILLING CODE 6717–01–P ‘‘e-filing’’ link. The Commission l. Locations of the Application: Copies strongly encourages electronic filings. of this filing are on file with the Please include the project number (P– Commission and are available for public 405–064) on any comments or motions inspection. This filing may be viewed filed. on the Commission’s Web site at The Commission’s Rules of Practice http:www.ferc.gov using the ‘‘FERRIS’’ and Procedure require all intervenors link. Enter the docket number excluding filing documents with the Commission the last three digits in the docket to serve a copy of that document on number field to access the document. each person in the official service list For assistance call (202) 502–8222 or for for the project. Further, if an intervenor TTY (202) 208–1659. files comments or documents with the m. Individuals desiring to be included Commission relating to the merits of an on the Commission’s mailing list should issue that may affect the responsibilities so indicate by writing to the Secretary of a particular resource agency, they of the Commission. must also serve a copy of the document Protests or Motions to Intervene— on that resource agency. Anyone may submit a protest or a
VerDate Aug<18>2005 15:03 Aug 22, 2005 Jkt 205001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\23AUN1.SGM 23AUN1