KG 1
A decision was made to demolish the existing erecting the lower part of the ramp – the
ski-jumping facilities, which no longer met section in contact with the ground – as well as
modern requirements, and to erect a new ski the lift tower and the structures at the head of
jump within a year, before the next contest in the jump. At the same time, two other sections
February 2001. In addition to creating a geom- of the structure were prefabricated: the ski
etry that would reflect present-day techniques jump tower with its glazed canopy, and the
in this sport, a stadium was required with upper part of the ramp – a slenderly dimen-
space for 38,000 spectators. In view of the sioned steel structure. The load-bearing
short construction period, the work was divided members along the steepest part of the ramp,
into a number of stages that could be executed including the transparent wind-protection,
parallel to each other. Questions relating to were attached at right angles, thereby reducing
jumping and production techniques were the amount of site welding. The prefabricated
clarified on site with the help of a full-size model steel structure was transported to the site on
of the actual track along the gradient. Based heavy-duty lorries for preassembly. It was then
on calculations, this three-dimensional line hoisted on to the previously erected columns
determined the form of the ski jump. The next and rigidly fixed to the lift tower, which serves
step comprised laying the foundations and as a means of bracing.