44604 Federal Register / Vol. 70, No.

148 / Wednesday, August 3, 2005 / Notices

Corporation, et al, 112 FERC ¶61,027 DEPARTMENT OF ENERGY Reference Room in Washington, DC.
(2005). There is an ‘‘eSubscription’’ link on the
Federal Energy Regulatory Web site that enables subscribers to
The refund effective date in Docket
Commission receive email notification when a
No. EL05–132–000, established
pursuant to section 206(b) of the FPA, [Docket No. RP05–519–000] document is added to a subscribed
docket(s). For assistance with any FERC
will be 60 days from the date of
Florida Gas Transmission Company; Online service, please email
publication of this notice in the Federal
Notice of Proposed Changes in FERC FERCOnlineSupport@ferc.gov, or call
Register. (866) 208–3676 (toll free). For TTY, call
Gas Tariff
Magalie R. Salas, (202) 502–8659.
July 29, 2005.
Secretary. Take notice that on July 22, 2005, Magalie R. Salas,
[FR Doc. 05–15386 Filed 8–2–05; 8:45 am] Florida Gas Transmission Company Secretary.
BILLING CODE 6717–01–P (FGT) tendered for filing as part of its [FR Doc. E5–4185 Filed 8–2–05; 8:45 am]
FERC Gas Tariff, Third Revised Volume BILLING CODE 6717–01–P
No. 1, the following tariff sheets, to
DEPARTMENT OF ENERGY become effective August 1, 2005:
Seventy-First Revised Sheet No. 8A, DEPARTMENT OF ENERGY
Federal Energy Regulatory Sixty-Third Revised Sheet No. 8A.01,
Commission Sixty-Third Revised Sheet No. 8A.02, Federal Energy Regulatory
Twenty-Third Revised Sheet No. 8A.04, Commission
[Project 11301–010] Sixty-Sixth Revised Sheet No. 8B,
[Project No. 7264]
Fifty-Ninth Revised Sheet No. 8B.01,
Fall Line Hydro Company, Inc.; Notice Fifteenth Revised Sheet No. 8B.02.
Fox River Paper Company, N.E.W.
Rejecting Request for Rehearing FGT states that the tariff sheets listed Hydro, Inc.; Notice of Authorization for
above are being filed pursuant to section Continued Project Operation
July 29, 2005. 27.A.2.b of the general terms and
conditions of FGT’s tariff, which July 7, 2005.
On July 18, 2005, Fall Line Hydro
provides for flex adjustments to FGT’s On January 22, 2003, Fox River Paper
Company, Inc. filed a request for
base fuel reimbursement charge Company and N.E.W. Hydro, Inc.,
rehearing of a June 8, 2005, Commission
percentage. licensees for the Middle Appleton Dam
staff order denying extension of time to
Any person desiring to intervene or to Project No. 7264, filed an application for
commence construction for the Carters a new or subsequent license pursuant to
protest this filing must file in
Reregulation Dam Project No. 11301. the Federal Power Act (FPA) and the
accordance with Rules 211 and 214 of
The project is located at the U.S. Army the Commission’s Rules of Practice and Commission’s regulations thereunder.
Corps of Engineers’ Carters Reregulation Procedure (18 CFR 385.211 and Project No. 7264 is located on the Fox
Dam and Reservoir on the Cossawattee 385.214). Protests will be considered by River in Outagamie County, Wisconsin.
River near the town of Calhoun, in the Commission in determining the The license for Project No. 7264 was
Murray County, Georgia. appropriate action to be taken, but will issued for a period ending June 30,
Pursuant to section 313(a) of the not serve to make protestants parties to 2005. Section 15(a)(1) of the FPA, 16
Federal Power Act, 16 U.S.C. 8251(a), an the proceeding. Any person wishing to U.S.C. 808(a)(1), requires the
aggrieved party must filed a request for become a party must file a notice of Commission, at the expiration of a
rehearing within thirty days after the intervention or motion to intervene, as license term, to issue from year to year
issuance of the Commission’s Order, in appropriate. Such notices, motions, or an annual license to the then licensee
this case no, later than July 8, 2005. protests must be filed in accordance under the terms and conditions of the
with the provisions of Section 154.210 prior license until a new license is
Because the 30-day rehearing deadline
of the Commission’s regulations (18 CFR issued, or the project is otherwise
is statutory based it cannot be extended
154.210). Anyone filing an intervention disposed of as provided in section 15 or
and Fall Line Hydro Company, Inc.’s
or protest must serve a copy of that any other applicable section of the FPA.
request for rehearing must be rejected as If the project’s prior license waived the
document on the Applicant. Anyone
untimely. applicability of section 15 of the FPA,
filing an intervention or protest on or
This notice constitutes final agency before the intervention or protest date then, based on section 9(b) of the
action. Requests for rehearing by the need not serve motions to intervene or Administrative Procedure Act, 5 U.S.C.
Commission of this rejection notice may protests on persons other than the 558(c), and as set forth at 18 CFR
be filed within 30 days of the date of Applicant. 16.21(a), if the licensee of such project
issuance of this notice, pursuant to 18 The Commission encourages has filed an application for a subsequent
CFR 385.712. electronic submission of protests and license, the licensee may continue to
interventions in lieu of paper using the operate the project in accordance with
Magalie R. Salas, ‘‘eFiling’’ link at http://www.ferc.gov. the terms and conditions of the license
Secretary. Persons unable to file electronically after the minor or minor part license
[FR Doc. E5–4164 Filed 8–2–05; 8:45 am] should submit an original and 14 copies expires, until the Commission acts on
BILLING CODE 6717–01–P of the protest or intervention to the its application. If the licensee of such a
Federal Energy Regulatory Commission, project has not filed an application for
888 First Street, NE., Washington, DC a subsequent license, then it may be
20426. required, pursuant to 18 CFR 16.21(b),
This filing is accessible on-line at to continue project operations until the
http://www.ferc.gov, using the Commission issues someone else a
‘‘eLibrary’’ link and is available for license for the project or otherwise
review in the Commission’s Public orders disposition of the project.

VerDate jul<14>2003 15:22 Aug 02, 2005 Jkt 205001 PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 E:\FR\FM\03AUN1.SGM 03AUN1
Federal Register / Vol. 70, No. 148 / Wednesday, August 3, 2005 / Notices 44605

If the project is subject to section 15 16.21(a), if the licensee of such project Any person desiring to intervene or to
of the FPA, notice is hereby given that has filed an application for a subsequent protest this filing must file in
an annual license for Project No. 7264 license, the licensee may continue to accordance with Rules 211 and 214 of
is issued to Fox River Paper Company operate the project in accordance with the Commission’s Rules of Practice and
and N.E.W. Hydro, Inc. for a period the terms and conditions of the license Procedure (18 CFR 385.211 and
effective July 1, 2005 through June 30, after the minor or minor part license 385.214). Protests will be considered by
2006, or until the issuance of a new expires, until the Commission acts on the Commission in determining the
license for the project or other its application. If the licensee of such a appropriate action to be taken, but will
disposition under the FPA, whichever project has not filed an application for not serve to make protestants parties to
comes first. If issuance of a new license a subsequent license, then it may be the proceeding. Any person wishing to
(or other disposition) does not take required, pursuant to 18 CFR 16.21(b), become a party must file a notice of
place on or before July 1, 2006, notice to continue project operations until the intervention or motion to intervene, as
is hereby given that, pursuant to 18 CFR Commission issues someone else a appropriate. Such notices, motions, or
16.18(c), an annual license under license for the project or otherwise protests must be filed in accordance
section 15(a)(1) of the FPA is renewed orders disposition of the project. with the provisions of Section 154.210
automatically without further order or If the project is subject to section 15 of the Commission’s regulations (18 CFR
notice by the Commission, unless the of the FPA, notice is hereby given that 154.210). Anyone filing an intervention
Commission orders otherwise. an annual license for Project No. 2194 or protest must serve a copy of that
If the project is not subject to section is issued to FPL Energy Maine Hydro document on the Applicant. Anyone
15 of the FPA, notice is hereby given LLC for a period effective July 1, 2005 filing an intervention or protest on or
that Fox River Paper Company and through June 30, 2006, or until the before the intervention or protest date
N.E.W. Hydro, Inc. are authorized to issuance of a new license for the project need not serve motions to intervene or
continue operation of the Middle or other disposition under the FPA, protests on persons other than the
Appleton Dam Project No. 7264 until whichever comes first. If issuance of a Applicant.
such time as the Commission acts on its new license (or other disposition) does The Commission encourages
application for subsequent license. not take place on or before July 1, 2006, electronic submission of protests and
notice is hereby given that, pursuant to interventions in lieu of paper using the
Magalie R. Salas,
18 CFR 16.18(c), an annual license ‘‘eFiling’’ link at http://www.ferc.gov.
Secretary. Persons unable to file electronically
under section 15(a)(1) of the FPA is
[FR Doc. 05–15394 Filed 8–2–05; 8:45 am] renewed automatically without further should submit an original and 14 copies
BILLING CODE 6717–01–P order or notice by the Commission, of the protest or intervention to the
unless the Commission orders Federal Energy Regulatory Commission,
otherwise. 888 First Street, NE., Washington, DC
DEPARTMENT OF ENERGY If the project is not subject to section 20426.
15 of the FPA, notice is hereby given This filing is accessible on-line at
Federal Energy Regulatory
that FPL Energy Maine Hydro LLC is http://www.ferc.gov, using the
Commission
authorized to continue operation of the ‘‘eLibrary’’ link and is available for
[Project No. 2194] Bar Mills Project No. 2194 until such review in the Commission’s Public
time as the Commission acts on its Reference Room in Washington, DC.
FPL Energy Maine Hydro LLC; Notice application for subsequent license. There is an ‘‘eSubscription’’ link on the
of Authorization for Continued Project Web site that enables subscribers to
Operation Magalie R. Salas, receive email notification when a
Secretary. document is added to a subscribed
July 7, 2005.
[FR Doc. 05–15392 Filed 8–2–05; 8:45 am] docket(s). For assistance with any FERC
On June 30, 2003, FPL Energy Maine
Hydro LLC, licensee for the Bar Mills BILLING CODE 6717–01–U Online service, please email
Project No. 2194, filed an application for FERCOnlineSupport@ferc.gov, or call
a new or subsequent license pursuant to (866) 208–3676 (toll free). For TTY, call
DEPARTMENT OF ENERGY (202) 502–8659.
the Federal Power Act (FPA) and the
Commission’s regulations thereunder. Federal Energy Regulatory Magalie R. Salas,
Project No. 2194 is located on the Saco Commission Secretary.
River in York County, Maine. [FR Doc. 05–15387 Filed 8–2–05; 8:45 am]
The license for Project No. 2194 was
[Docket No. RP02–361–053] BILLING CODE 6717–01–P
issued for a period ending June 30,
2005. Section 15(a)(1) of the FPA, 16 Gulfstream Natural Gas System, L.L.C.;
U.S.C. 808(a)(1), requires the Notice of Negotiated Rate DEPARTMENT OF ENERGY
Commission, at the expiration of a
license term, to issue from year to year July 7, 2005. Federal Energy Regulatory
an annual license to the then licensee Take notice that on June 30, 2005, Commission
under the terms and conditions of the Gulfstream Natural Gas System, L.L.C.
[Docket No. RP05–440–000]
prior license until a new license is (Gulfstream) tendered for filing as part
issued, or the project is otherwise of its FERC Gas Tariff, Original Volume High Island Offshore System, L.L.C.;
disposed of as provided in section 15 or No. 1, Original Sheet No. 8.01r, Notice of Tariff Filing
any other applicable section of the FPA. reflecting an effective date of August 1,
If the project’s prior license waived the 2005. July 7, 2005.
applicability of section 15 of the FPA, Gulfstream states that copies of its Take notice that on July 1, 2005, High
then, based on section 9(b) of the filing have been mailed to all affected Island Offshore System, L.L.C., tendered
Administrative Procedure Act, 5 U.S.C. customers and interested state for filing as part of its FERC Gas Tariff,
558(c), and as set forth at 18 CFR commissions. Third Revised Volume No. 1, the

VerDate jul<14>2003 15:22 Aug 02, 2005 Jkt 205001 PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 E:\FR\FM\03AUN1.SGM 03AUN1