Você está na página 1de 1

Federal Register / Vol. 70, No.

145 / Friday, July 29, 2005 / Notices 43861

Commission’s Public Reference Room, appropriate action to be taken, but will Anglers filed a rebuttal to PG&E’s
888 First Street, NE., Washington, DC not serve to make protestants parties to answer.
20426. The Order may also be viewed the proceeding. Any person wishing to 2. The Anglers contend that the
on the Commission’s Web site at become a party must file a notice of Ecological Resource Committee
http://www.ferc.gov, using the eLibrary intervention or motion to intervene, as (Committee), created by the licensee,2
link. Enter the docket number excluding appropriate. Such notices, motions, or
will not allow the public to participate
the last three digits in the docket protests must be filed on or before the
in the meetings (other than to attend
number filed to access the document. comment date. Anyone filing a motion
Comments, protests, and interventions to intervene or protest must serve a copy and listen) and to have access to
may be filed electronically via the of that document on the Applicant and Committee documents. The Anglers
internet in lieu of paper. See, 18 CFR all parties to this proceeding. request that the Commission require
385.2001(a)(1)(iii) and the instructions The Commission encourages PG&E to establish requirements and
on the Commission’s Web site under the electronic submission of protests and proceedings for Committee meetings to
‘‘e-Filing’’ link. The Commission interventions in lieu of paper using the provide public participation in all
strongly encourages electronic filings. ‘‘eFiling’’ link at http://www.ferc.gov. matters and access to Committee
Persons unable to file electronically documents.
Magalie R. Salas,
should submit an original and 14 copies 3. The Commission’s regulations
Secretary.
of the protest or intervention to the provide that a complaint may be filed
[FR Doc. E5–4030 Filed 7–28–05; 8:45 am] Federal Energy Regulatory Commission, seeking Commission action against any
BILLING CODE 6717–01–P 888 First Street, NE., Washington, DC person alleged to be ‘‘in contravention
20426. or violation of any statute, rule, order,
This filing is accessible on-line at or other law administered by the
DEPARTMENT OF ENERGY http://www.ferc.gov, using the Commission or for any other alleged
Federal Energy Regulatory ‘‘eLibrary’’ link and is available for wrong over which the Commission may
Commission review in the Commission’s Public
have jurisdiction.’’ 3 The regulations
Reference Room in Washington, D.C.
[Docket No. OR05–8–000] further provide that the complaint must
There is an ‘‘eSubscription’’ link on the
web site that enables subscribers to [c]learly identify the action or inaction
BP Exploration (Alaska) Inc. and BP Oil receive e-mail notification when a which is alleged to violate applicable
Supply Company, Complainants, v. document is added to a subscribed statutory standards or regulatory
ConocoPhillips Transportation Alaska, docket(s). For assistance with any FERC requirements.’’ 4
Inc.; Respondent; Notice of Complaint; Online service, please e-mail 4. The license does not establish
Request for Fast TRACK Processing FERCOnlineSupport@ferc.gov, or call Committee procedures. Nor does it
July 20, 2005. (866) 208–3676 (toll free). For TTY, call require public participation in
Take notice that on June 30, 2005, BP (202) 502–8659. Committee matters.5 Since the
Exploration (Alaska) Inc. and BP Oil Comment Date: 5 p.m. Eastern Time complainants do not allege that PG&E is
Supply Company (collectively, BP) filed on August 1, 2005. in violation of its license, the Federal
a Complaint against ConocoPhillips Magalie R. Salas, Power Act, or the Commission’s
Transportation Alaska Inc. Secretary. regulations, the complaint is dismissed.
(ConocoPhillips) pursuant to section [FR Doc. E5–4042 Filed 7–28–05; 8:45 am] Magalie Salas,
13(1) of the Interstate Commerce Act, 49
BILLING CODE 6717–01–P Secretary.
U.S.C. 13(1), 18 CFR 343.2(c), Rule 206
of the Commission’s Rules of Practice [FR Doc. E5–4056 Filed 7–28–05; 8:45 am]
and Procedures, 18 CFR 395.206(2004). DEPARTMENT OF ENERGY BILLING CODE 6717–01–P
BP requests that the Commission stay
the effective date of ConocoPhillips’ Federal Energy Regulatory
revised proration policy. If the policy is Commission
already effective, BP requests that the 2 Appendix Condition No. 22 of the license

Commission stay further effectiveness of [Project No. 1962–113] required PG&E to establish the Committee in
such proration policy pending a coordination with the parties to the Settlement
determination as to the lawfulness of Pacific Gas and Electric Company; Agreement for the purpose of assisting the licensee
such proration policy, and order Notice Dismissing Complaint in the design of monitoring plans, review and
evaluation of data, and preparation of adaptive
ConocoPhillips to make reparation to BP management measures for implementation by the
July 22, 2005.
for any financial damage BP may suffer licensee as provided in the Settlement Agreement.
as a result of ConocoPhillips’ revised 1. On May 31, 2005, the Anglers
Committee (Anglers) filed a complaint The Anglers previously participated in settlement
proration policy. BP requested fast track discussions regarding the relicensing of the project
processing of the Complaint. against Pacific Gas and Electric but, as stated in their complaint, they chose not to
Subsequently the parties began Company (PG&E), licensee for the Rock become signatories to the Settlement Agreement
settlement discussions, and requested Creek-Cresta Project No. 1962, located because of their disagreement with certain terms
that the time for answers and comments on the North Fork Feather River in Butte and conditions in the agreement. Members of the
be extended to August 1, 2005. and Plumas Counties, California.1 On Committee are limited to the Settlement Agreement
June 21, 2005, PG&E filed an answer to signatories.
Any person desiring to intervene or to 3 See 18 CFR 385.206(a)(2005).
protest this filing must file in the complaint. On July 13, 2005,
4 Id.
accordance with Rules 211 and 214 of 5 However, any material changes in project
1 The Commission issued PG&E a new license for
the Commission’s Rules of Practice and operations during the term of the license will
the Rock Creek-Cresta Project and approved a
Procedure (18 CFR 385.211 and settlement agreement resolving various project- require a license amendment application, public
385.214). Protests will be considered by related issues on October 24, 2001. 97 FERC notice, and a proceeding in which interested
the Commission in determining the ¶ 61,084 (2001). entities will have an opportunity to participate.

VerDate jul<14>2003 17:05 Jul 28, 2005 Jkt 205001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\29JYN1.SGM 29JYN1

Você também pode gostar