Escolar Documentos
Profissional Documentos
Cultura Documentos
(Unconstrained)
ATTACHMENT E
(2015 $ in thousands)
Project
1
2
3
4
5
6
7
Cost Estimate
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
Palmdale Airport
Bicycle/Pedestrian Connector from the Palmdale Regional Airport
High Desert Corridor from SR 14 to 50th Street East
People Mover from PTC to the Palmdale Regional Airport
RVB Roadway Improvements from 15th Street East to 50th Street East
Rancho Vista Grade Separation Project from Fairway Drive to 15th Street East
34
ATTACHMENT E Page 1 of 2
$
$
$
$
$
$
Subtotal $
1,604,000
60,000
8,350
30,000
1,800,000
2,550,000
6,052,350
$
$
$
$
$
$
Subtotal $
5,000
10,325
5,000
50,000
5,000
2,450
77,775
$
$
$
$
$
$
$
$
Subtotal $
175,000
450,000
50,000
75,000
250
1,120,000
135,000
90,000
TBD
2,095,250
$
$
$
$
$
Subtotal $
50,000
670,000
100,000
75,000
100,000
995,000
ATTACHMENT E
(2015 $ in thousands)
Project
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
Cost Estimate
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
Union Station
Los Angeles Union Station-40 year component State of Good Repair Cost
Southern California Regional Interconnector Project (Metrolink Run-Through)
Union Station Linkages Program (Connect US Action Plan)
Union Station Master Plan (USMP) Stage 2A Multi Modal Passenger Concourse
USMP Enabling Development (Stage 2C)
USMP Enabling Development and Open Space Network (Stage 2E and 2F)
USMP Perimeter Improvements (Stage 1)
USMP Relocated Patsaouras Bus Plaza (Stage 2B)
74
75
GRAND TOTAL
ATTACHMENT E Page 2 of 2
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Subtotal $
170,000
20,000
5,000
45,000
5,000
15,000
29,000
383,000
150,000
35,000
75,000
12,000
41,000
25,000
50,000
4,000
50,000
86,000
1,200,000
$
$
$
$
$
$
$
$
Subtotal $
21,800
200,000
160,000
6,000
50,015
440,000
66,000
173,710
1,117,525
$
$
$
$
$
$
$
$
Subtotal $
$
106,260
150,000
26,000
300,000
12,000
114,000
31,111
770,000
1,509,371
13,047,271