Type-2 Residence
Unit Area of Proposed Type-3: 57.70 Sqm.
Circulation Area: 17.87 Sqm.
Total Area: 75.57 Sqm.
Ground Floor: Stilt Parking
Each Floor (1st to 8th floor): 12 Nos. Residence
Total Flats: 8x12=96
Total Plinth Area: 12x75.57=906.84 Sqm. Per floor
No. of Staircase: 03 Nos.
No. of Lift: 03 Nos.
Total No. of Columns: 108 Nos.
Latitude: 26.876576
Longitude: 80.962259
Residential Building
Educational Building
Institutional Building
Industrial Building/Commercial Building
Other Types of buildings
Site clearance.
Surveying and layout.
Excavation.
Bar binding and positioning of foundation steel.
Concreting.
Wall construction.
Beam and Columns.
Finishing and whitewashing.
EXCAVATION: Excavation work on the site was being done by the JCB
Machines and excavated soil was transferred using dumpers.
Raft footing or Mat footing: This is a footing that covers the entire area
under the structure. This footing is used when very heavy loads of
building are to be transmitted to the underlying soil having very low
and differential bearing capacities. Due to its rigidity, it minimizes
differential settlement. There are several types of raft foundation in
use. The most common types are; the flat slab and the slab-beam
types
Raft footings are provided in following cases
When the ground water table is high, rafts are often placed over
piles to control buoyancy.
When isolated footings for column overlap on each other.
When total area of footing slab is more than50% of total area.
Where underground flooring is required this type of footing is
provided and it serves as footing as well as floor.
10
11
following
materials/machines/
12
FLY ASH: At the site, a small amount of fly ash was also being used
which is produced by burning of coal in thermal power plants.
13
Reducers
Plasticizers
Super plasticizers
Air entraining agents
Bonding admixtures
14
15
Quality Control
Quality control is the part of quality management that ensures
products and service comply with requirements. It is a work method
that facilitates the measurement of the quality characteristics of a
unit, compares them with the established standards, and analyses the
differences between the results obtained and the desired results in
order to make decisions which will correct any differences.
16
17
Contribution
I was present at the site while the plastering process of the eight
floor and water tank construction at the roof of the building was going
on.
These are photos of that work.
What I have learnt/Saw in this Industrial Training: There are many things
which I have learnt from this training at this site and these are
How the building construction process is done. Detailed process
described in this report.
Which difficulties are arises during the construction process like
work not started at right time, funding problem in middle of
project, explaining the work to the layman, power cut etc.
Do all the work according to the plan and follow the Indian
Standards.
Prepare a record even a very small thing or process.