Você está na página 1de 6

Revision No.

Page No.

Jobs Safety Analysis

0
of

Effective Date

JSA NO : ____- PILING WORKS


Cadangan 1 Blok AnexBaru Hospital 10 Tingkat Dan Kerja- Location:
KerjaPengubahsuaianBesertaTambahanKepada
Blok
Hospital
Sedia
Ada
DenganTempatLetakKereta Terbuka Dan 1 Unit PencawangElektrik TNB, Diatas PT 799
Dan PT 1031, Mukim 7, JalanPerdaUtama, SeberangPerai Tengah, Pulau Pinang
Project

Title

Task/Activity: PILING

WORKS

This SWMS/JSA has been developed and


approved by: ________________________
Position: __________________ Date: _ / __ /

Resources Trades Involved:


Equipment Used: MOBILE CRANE, 900TON JACKPILE, GEN SET, WELDING SET , GRINDER
Recomende personal protective equipment : safety helmet, safety boot ( steeltoe/steelcap ), face shield ( welding work ), safety jacket (depend on
work type. Exp : welding ), safety glasses, hand glove, fire extinguisher
Safety Legislation:

Code/s Of Practice (COP) Applicable To The Works

Revision No.
Page No.

Jobs Safety Analysis


Item
1

Job Steps

Hazards

General planning

1. Traffic problem.

Mobilization of rig.

2. Poor Access.

Mobilization ,
Unloading and
Assembly of rig

Effects

Risk Rating

Serious Illness
/ Injury Major
Damage

n
L

Controls
1. Traffic control by signalman
with
flag.

1. Slips, trips and falls;


abrasions, strains and
sprains; manual handling
injuries such as back
damage.

Fatality/
Permanent
Disability

12

1.Work area to be kept clear at all


times no storing of materials
and/or rubbis

2. Load unbalance.

Fatality/
Permanent
Disability

2 Piling rig seating on 2 nos. of steel


plates.
2.1 Usage of crane for lifting
activities.
2.2 Usage of tagline to guide load.

3. Plant overturn

Fatality/
Permanent
Disability

12

3. Sufficient ground preparation


3.1 Ensure crane is tested and
thoroughly examined.
3.2 Ensure crane operator is a
competent person.

Serious Illness
/ Injury
Major
Damage

5. Pile lifting zone to be cleared when


lifting is in progress.
5.1

4 Deformed wire rope and


sling.
5. Fall of equipment /
materials

Effective Date

2 Access ways and unloading


zone
identified.
2

0
of

All wire rope and sling are to be


inspected prior to usage.

Responsible
Person

Revision No.
Page No.

Jobs Safety Analysis


Item

Job Steps

Hazards

Lifting of pile and


placing into casing
prior to be driven to
the design depth.

Effects

Risk Rating

Low

1. Fall of material due to


snapping of wire rope or
unsecured placement in
the casing.

Controls

7. Ensure no flammable material at


welding site. Provide extinguisher to be
on site
1. Ensure wire rope and sling are
examined and tested. Homemade
splice is prohibited.
1.1 Area to be kept clear other than
responsible person for the task.

2. Struck by lifted pile

M
1.2 Pile to be driven only after it has
been well secured into the casing
and confirmed by responsible
person.
2. Obstruction free ground work
area.
2.1 Care in lifting and
maneuvering of
Pile. Usage of tag line to
control
the swinging of pile.

4.

Welding of pile joints


for continuation of

Effective Date

6. Potential fire

3.

0
of

1.Burn on body parts


specifically face cause by

1. Welder to be certified and

Responsible
Person

Revision No.
Page No.

Jobs Safety Analysis


Item

Job Steps
driving

Hazards

Effects

Risk Rating

Controls

exposure to welding arc

experienced.

2. Fire caused by welding


sparks

Full face shield with smoked

Glass and welding glove


2. Fire extinguisher to be on site.
2.1 Ensure no flammable materials at
the work area.

5.

Personnel Protection

1. Personnel injury

6.

Monitor Compliance

The Project Manager or the appointed


personal shall on a weekly basis audit
this procedure.

7.

Records.

Copy of the JSA to be retain in the site


safety file by the contractor.

1. All site personnel shall at all times


wear the minimum Personnel
Protection Equipment

Remarks / Precaution to be taken not captured in the JSA :


Personnel, Duties and
Responsibilities
(Supervisory staff and
others):

1. Competent machinery operators


2. Competent Piling Supervisors

Effective Date

1.1 Welder must wear proper PPE.

Qualifications and
experience required to
complete the task:

0
of

Training Required to Complete Work:

1. Safety Supervisor to ensure compliance to


the JSA at all times.

Responsible
Person

Revision No.
Page No.

Jobs Safety Analysis


3. Welder and Piling crew

0
of

Effective Date
2. JSA to be briefed to all workers involved in
the activity and recorded.

Engineering Details/Certificates/Workcover Approvals:

This SWMS/JSA has been developed through consultation with our employees and has been read & signed by all employees undertaking the works:
Print Names

RISK MATRIX.
Probability
Consequence
Minor illness /injury
Minor Damage

Signature

Practically
Impossible
1

Date

Print Names

Signature

Date

Not likely to Occur

Could occur i.e


heard of
happening

Know To Occur i.e


Has Happened in
The Past.

Know To Be A
Common Or
Repeating Occurrence

Revision No.
Page No.

Jobs Safety Analysis

0
of

Effective Date

Moderate illness /Injury


Damage

10

Serious Illness / Injury


Major Damage

12

15

Fatality/Permanent
Disability

12

16

20

Low ( L:1-3 )

Medium ( M:4-8 )

High ( H:9-20 )

Minor illness /injury Minor Damage

Required first Aid Treatment : repairable / immediate replacement

Moderate illness /Injury Damage

Out patient / 4 days and less MC: repairable but limited workdays

Serious Illness / Injury Major Damage

Warded / temporary disability / more than 4 days MC irreparable / total lost

Fatality/Permanent Disability

Fatality within 1 year /Permanent disability

Você também pode gostar