30974 Federal Register / Vol. 70, No.

103 / Tuesday, May 31, 2005 / Notices

Manufacturing Co., Ltd., No. 21, Si The Department of Justice (DOJ), Review, United States Department of
Chou Road, Si Hai Village, Ta Yuan Executive Office for Immigration Justice.
Hsiang, Tao-yuan Hsien, Taiwan. Review (EOIR) has submitted the (4) Affected public who will be asked
(c) Thomas S. Fusco, Esq., Office of following information collection request or required to respond, as well as a brief
Unfair Import Investigations, U.S. to the Office of Management and Budget abstract: Primary: An individual
International Trade Commission, 500 E (OMB) for review and approval in submitting an appeal or motion to the
Street, SW., Suite 401, Washington, DC accordance with the Paperwork Board of Immigration Appeals. Other:
20436, who shall be the Commission Reduction Act of 1995. The proposed None. Abstract: The information on the
investigative attorney, party to this information collection is published to fee waiver request form is used by the
investigation; and obtain comments from the public and Board of Immigration Appeals to
(3) For the investigation so instituted, affected agencies. Comments are determine whether the requisite fee for
the Honorable Sidney Harris is encouraged and will be accepted for a motion or appeal will be waived due
designated as the presiding ‘‘sixty days’’ until August 1, 2005. This to an individual’s financial situation.
administrative law judge. process is conducted in accordance with (5) An estimate of the total number of
Responses to the amended complaint 5 CFR 1320.10. respondents and the amount of time
and the notice of investigation must be If you have comments especially on estimated for an average respondent to
submitted by the named respondents in the estimated public burden or respond: It is estimated that 1,500
accordance with section 210.13 of the associated response time, suggestions, respondents will complete the form
Commission’s Rules of Practice and or need a copy of the proposed annually with an average of one hour
Procedure, 19 CFR 210.13. Pursuant to information collection instrument with per response.
19 CFR 201.16(d) and 210.13(a), such instructions or additional information, (6) An estimate of the total public
responses will be considered by the please contact MaryBeth Keller, General burden (in hours) associated with the
Commission if received not later than 20 Counsel, Executive Office for collection: There are an estimated 1,500
days after the date of service by the Immigration Review, U.S. Department of total burden hours associated with this
Commission of the amended complaint Justice, Suite 2600, 5107 Leesburg Pike, collection annually.
and the notice of investigation. Falls Church, Virginia 22041; telephone: If additional information is required
Extensions of time for submitting (703) 305–0470. contact: Brenda E. Dyer, Department
responses to the amended complaint Written comments and suggestions Clearance Officer, United States
and the notice of investigation will not from the public and affected agencies Department of Justice, Justice
be granted unless good cause therefor it concerning the proposed collection of Management Division, Policy and
shown. information are encouraged. Your Planning Staff, Patrick Henry Building,
Failure of a respondent to file a timely comments should address one or more Suite 1600, 601 D. Street, NW.,
response to each allegation in the of the following four points: Washington, DC 20530.
amended complaint and in this notice —Evaluate whether the collection of Dated: May 25, 2005.
may be deemed to constitute a waiver of information is necessary for the Brenda E. Dyer,
the right to appear and contest the proper performance of the functions Department Clearance Officer, United States
allegations of the amended complaint of the agency, including whether the Department of Justice.
and this notice, and to authorize the information will have practical utility; [FR Doc. 05–10728 Filed 5–27–05; 8:45 am]
administrative law judge and the —Evaluate the accuracy of the agency’s BILLING CODE 4410–30–P
Commission, without further notice to estimate of the burden of the
the respondents, to find the facts to be proposed collection of information,
as alleged in the amended complaint including the validity of the
and this notice and to enter a final NUCLEAR REGULATORY
methodology and assumptions used;
determination containing such findings, COMMISSION
—Enhance the quality, utility, and
and may result in the issuance of a clarity of the information to be [Docket Nos. 50–344, License No. NPF–1
limited exclusion order or cease and collected; and and 72–017, License No. SNM–2509]
desist order or both directed against the —Minimize the burden of the collection
respondent. Portland General Electric Company;
of information on those who are to
Notice of Termination of Trojan
Issued: May 24, 2005. respond, including through the use of
Nuclear Plant Facility Operating
Marilyn R. Abbott, appropriate automated, electronic,
License No. NPF–1
Secretary of the Commission. mechanical, or other technological
[FR Doc. 05–10704 Filed 5–27–05; 8:45 am] collection techniques or other forms AGENCY: Nuclear Regulatory
of information technology, e.g. Commission.
BILLING CODE 7020–02–M
permitting electronic submission of ACTION: Notice of termination of the
responses. Portland General Electric Company
Overview of This Information (PGE) Trojan Nuclear Plant (TNP)
DEPARTMENT OF JUSTICE Collection Facility Operating (Possession Only)
License, No. NPF–1.
Executive Office for Immigration (1) Type of Information Collection:
Review Extension of a currently approved SUMMARY: The Nuclear Regulatory
collection. Commission (NRC) is noticing the
Agency Information Collection (2) Title of the Form/Collection: Fee termination of the TNP Facility
Activities: Proposed Collection; Waiver Request. Operating (Possession Only) License,
Comments Requested (3) Agency form number, if any, and No. NPF–1, (NRC Docket No. 50–344),
the applicable component of the located near Portland, Oregon.
ACTION: 60-day notice of information
Department of Justice sponsoring the Background: The TNP facility is
collection under review: fee waiver
collection: Form Number: Form EOIR located in Columbia County, Oregon,
request.
26A. Executive Office for Immigration approximately 42 miles north of

VerDate jul<14>2003 16:14 May 27, 2005 Jkt 205001 PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 E:\FR\FM\31MYN1.SGM 31MYN1
Federal Register / Vol. 70, No. 103 / Tuesday, May 31, 2005 / Notices 30975

Portland, Oregon. TNP began with the approved LTP; and (ii) The FSS The purpose of this meeting is to
commercial operation in May 1976. The and associated documentation, review selected digital instrumentation
reactor output was rated at 3411 MWt including an assessment of dose and control research projects and
with an approximate net electrical contributions associated with parts related matters. The Subcommittee will
output rating of 1130 MWe. The nuclear released for use before approval of the hear presentations by and hold
steam supply system was a four-loop LTP, demonstrate that the facility and discussions with representatives of the
pressurized water reactor designed by site have met the criteria for Office of Nuclear Regulatory Research
Westinghouse Electric Corporation. TNP decommissioning in 10 CFR Part 20, and other interested persons regarding
was shut down for the last time on Subpart E. Therefore, NRC is this matter. The Subcommittee will
November 9, 1992. terminating TNP Facility Operating gather information, analyze relevant
In August 1999, PGE submitted its License No. NPF–1. issues and facts, and formulate
License Termination Plan (LTP) for the FOR FURTHER INFORMATION CONTACT: See proposed positions and actions, as
TNP facility. Under the provisions of 10 the application dated December 20, appropriate, for deliberation by the full
CFR 50.82(a)(10), the NRC approved the 2004, and the Safety Evaluation Report, Committee.
LTP by license amendment dated available for public inspection at the Members of the public desiring to
February 12, 2001. PGE conducted Commission’s Public Document Room provide oral statements and/or written
decommissioning activities at TNP in comments should notify the Designated
(PDR), located at One White Flint North,
accordance with the approved LTP from Federal Official, Mr. Michael R.
Public File Area O1 F21, 11555
February 2001 to December 2004. In Snodderly (telephone 301–415–6927) or
Rockville Pike (first floor), Rockville,
accordance with the approved LTP, the the Cognizant Staff Engineer, Mr. Eric A.
Maryland. Publicly available records
licensee conducted final status surveys Thornsbury (telephone 301–415–8716),
will be accessible electronically from
(FSSs) to demonstrate that the facility five days prior to the meeting, if
the Agency-wide Documents Access and
and site meet the criteria for possible, so that appropriate
Management System’s (ADAMS) Public
unrestricted release as presented in 10 arrangements can be made. Electronic
Electronic Reading Room on the Internet
CFR 20.1402. Details of the FSS results recordings will be permitted.
at the NRC Web site, http://
were submitted to the NRC in 10 Further information regarding this
separate FSS reports (FSSRs). www.nrc.gov/reading–rm/adams.html
meeting can be obtained by contacting
PGE submitted an application for (ADAMS Accession Nos. ML050030054,
the Designated Federal Official or the
termination of the TNP Facility and ML050680345). Persons who do not
Cognizant Staff Engineer between 7:30
Operating (Possession Only) License, have access to ADAMS or who
a.m. and 4:15 p.m. (e.t). Persons
No. NPF–1, on December 20, 2004. The encounter problems in accessing the
planning to attend this meeting are
application states that PGE has documents located in ADAMS, should
urged to contact one of the above named
completed remaining radiological contact the NRC PDR Reference staff by
individuals at least two working days
decommissioning and FSSs of the TNP telephone at 1–800–397–4209, 301–
prior to the meeting to be advised of any
facility and site in accordance with the 415–4737 or by e-mail to pdr@nrc.gov.
potential changes to the agenda.
NRC-approved LTP, and the FSSs Dated in Rockville, Maryland this 23rd day
Dated: May 24, 2005.
demonstrate that the facility and site of May, 2005.
Michael L Scott,
meet the criteria for decommissioning For the Nuclear Regulatory Commission.
and release of the site for unrestricted Branch Chief, ACRS/ACNW.
Andrew Persinko,
use that are stipulated in 10 CFR part [FR Doc. E5–2735 Filed 5–27–05; 8:45 am]
Acting Deputy Director, Decommissioning
20, subpart E. Directorate, Division of Waste Management BILLING CODE 7590–01–P
The NRC conducted a number of and Environmental Protection, Office of
performance-based in-process Nuclear Material Safety and Safeguards.
inspections of the licensee’s FSS [FR Doc. E5–2734 Filed 5–27–05; 8:45 am] NUCLEAR REGULATORY
program during the decommissioning COMMISSION
BILLING CODE 7590–01–P
process. The purpose of the inspections
was to verify that the FSS was being Sunshine Act Meeting
conducted in accordance with of the NUCLEAR REGULATORY AGENCY HOLDING THE MEETINGS: Nuclear
commitments made by the licensee in COMMISSION Regulatory Commission.
the LTP, and to evaluate the quality of
DATES: Weeks of May 30, June 6, 13, 20,
the FSS by reviewing the FSS Advisory Committee on Reactor
27, July 4, 2005.
procedures, methodology, equipment, Safeguards; Meeting of the
PLACE: Commissioners’ Conference
surveyor training and qualifications, Subcommittee on Digital
document quality control, and survey Instrumentation and Control Systems; Room, 11555 Rockville Pike, Rockville,
data supporting the FSSRs. In addition, Notice of Meeting Maryland.
the NRC conducted a number of STATUS: Public and Closed.
independent confirmatory surveys to The ACRS Subcommittee on Digital MATTERS TO BE CONSIDERED:
verify the FSS results obtained and Instrumentation and Control Systems
will hold a meeting on June 14–15, Week of May 30, 2005
reported by the licensee. Confirmatory
surveys consisted of surface scans for 2005, Room T–2B1, 11545 Rockville Tuesday, May 31, 2005
beta and gamma radiation, direct Pike, Rockville, Maryland.
2 p.m. Discussion of Security Issues
measurements for total beta activity, and The entire meeting will be open to
(Closed—Ex. 1) (This meeting was
collection of smear samples for public attendance.
originally scheduled for June 1st).
determining removable radioactivity The agenda for the subject meeting
levels. shall be as follows: Wednesday, June 1, 2005
The NRC staff reviewed the FSS Tuesday, June 14, 2005—8:30 a.m. until 9:30 a.m. Briefing on Threat
Report and concludes that: (I) the close of business. Environment Assessment (Closed—
Dismantlement and decontamination Wednesday, June 15, 2005—1 p.m. until Ex. 1) (This meeting was originally
activities were performed in accordance the close of business. scheduled for May 25th).

VerDate jul<14>2003 16:14 May 27, 2005 Jkt 205001 PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 E:\FR\FM\31MYN1.SGM 31MYN1