Você está na página 1de 9

PHILIPPINE NATIONAL POLICE

The PNP
TEST AND EVALUATION PROCEDURES MANUAL

Produced by:

Directorate for Research and Development


National Headquarters, Philippine National Police
1st Edition, 2008

[DILG MESSAGE]

[CPNP MESSAGE]

Republic of the Philippines


Department of Interior and Local Government

NATIONAL POLICE COMMISSION


N AT I O N A L H E A D Q U A R T E R S , P H I L I P P I N E N AT I O N A L P O L I C E

D I R E C T O R AT E F O R R E S E A R C H A N D D E V E LO P M E N T

Camp Crame, Quezon City

DIRECTORS MESSAGE

To achieve the objective of continuously upgrading and


determining the quality of our move, shoot, communicate and
investigative capabilities, every pfficer and unit of the PNP has to
undertake measures of strengthening these priorities.
The Plans and Program Section is successful in its endeavor to
come up with a ready material that can be used as a guide by every
PNP user.
From this compilation, individuals or group can better understand
how materiel or equipment quality can be determined.
I hope therefore, that through this manual, we can continue
foster a better performance and advance in our quest for effective and
effiicient law and order and public safety functions.

RAY D RODEROS
Police Director

Republic of the Philippines


Department of Interior and Local Government

NATIONAL POLICE COMMISSION


N AT I O N A L H E A D Q U A R T E R S , P H I L I P P I N E N AT I O N A L P O L I C E

D I R E C T O R AT E F O R R E S E A R C H A N D D E V E LO P M E N T

Camp Crame, Quezon City

[FOREWORD]
This 2008 Edition of various test and evaluations procedures
manual is another significant manifestation of the commitment of our
personnel who are striving harder everyday to further improve the kind
and quality of our services.
This manual showcases the compilation of procedures in
determining the quality of materials and equipment procured by the
PNP for the betterment of performance and endeavor to pursue
operational effectiveness.
This development indeed adds another milestone in the modest
achievement of this Section.

BENJAMIN S SURATOS
Police Superintendent
Chief, Plans & Program
Section

[ACKNOWLEDGEMENT]

TABLE OF CONTENTS
Chapter 1 ------------------------------------------------------------------

Introduction

History of DRD

Chapter 2 ------------------------------------------------------------------

Weapons, Transportation and Communications Division

Weapons Section

Definition of Terms

DRD Technical Committee and Team (s)

Policy Guidelines

11

Test and Evaluation Procedures

14

Memorandum Circular Number 2007 -01


Policy Guidelines in the Conduct of Eligibility Test
for Grenade Launcher 40mm

14

Policy Guidelines in the Conduct of Acceptance Test


for Grenade Launcher 40mm

18

Memorandum Circular Number 2006-01


Policy Guidelines in the Conduct of Eligibility Test
for Shotgun 12 Gauge
Policy Guidelines in the Conduct of Acceptance Test
for Shotgun 12 Gauge
Memorandum Circular Number 2005-04
Policy Guidelines in the Conduct of Eligibility Test
for Pistols
Policy Guidelines in the Conduct of Acceptance Test
for Pistols
Memorandum Circular Number 2005-06
Policy Guidelines in the Conduct of Eligibility Test
for Rifles
Policy Guidelines in the Conduct of Acceptance Test
for Rifles
Memorandum Circular Number 2004-05
Policy Guidelines in the Conduct of Eligibility Test
for Ordnance Equipment and Supplies

21
26

30
40

45
54

58

(for Small Arms Pistols & Revolvers)

58

(for Shoulder Weapons Rifles)

68

(for Rifle 5.56 Magazine, Box Type, Aluminum or Plastic)

73

(for Ammunition Small Arms)

79

(for Explosives and Pyrotechnics)

81

Policy Guidelines in the Conduct of Acceptance Test


for Ordnance Equipment and Supplies

83

(Functional Test for Firearms)

85

(Functional Test for Rifle Grenade 40mm)

86

(Functional Test for Magazines of Rifles and Pistols)

86

(Funtional Test for Other Ordnance Equipment)

87

Transportation Section

87

Definition of Terms

87

DRD Technical Committee and Team(s)

91

Policy Guidelines

94

Test and Evaluation Procedures

96

Memorandum Circular Number 2005-07


Policy Guidelines in the Conduct of Eligibility
and Acceptance Tests for Patrol Jeeps

96

Memorandum Circular Number 2005-03


Policy Guidelines in the Conduct of Eligibility
and Acceptance Tests for Patrol Jeeps

103

Memorandum Circular Unnumbered


Policy Guidelines in the Conduct of Eligibility and
Acceptance Tests for Patrol Jeeps (Diesel, 4x2/4x4)

109

Communications Section

117

Memorandum Circular Number DRD-2004-01


Test and Evaluation (T&E) Procedures for Multi-Trunked
Radio System (MTRS) and Other Similar Equipment

117

Memorandum dated December 6, 2008


Policy Guidelines in the Conduct of Eligibility/Post Bid Evaluation
and Acceptance Tests for Global Positioning System (GPS)

125

Chapter 3 ------------------------------------------------------------------

130

Clothing and Criminalistic Edquipment Division

130

Memorandum Circular Number DRD 2007-01


Policy Guidelines in the Conduct of Eligibility/Post
Qualification Evaluation and Acceptance Tests
Sample Test Parameter Based on Specifications
(for Clothing/Fabric Material)

131
134
134

(for Shoe Material)

135

Other Test Parameter Conducted inCCED

139

References

140

List of Tables

142

Table 1. Sampling Plan, Normal Inspection Level II

142

Table 2. Acceptance Quality Level (AQL)


Military Standard 105-E,General Inspection Level II

143

Table 3. Military Standard 105-E, Sampling Plan


Special Inspection Level S-2/General Inspection Level I

144

Table 4. Acceptance Quality Level (AQL) Criteria


Military Standard 105-E, Normal Inspection (AQL 6.5 )

145

Annex 1. Ammunition Requirements

146

Annex 2. Inspection T&E Multi-Trunked Radio System (MTRS) and


Other Similar Equipment General Examination

147

Annex 3. Inspection T&E Multi-Trunked Radio System (MTRS)


Programming and Instrumentation (T&E) Acceptance Result

148

Annex 4. Inspection/T&E for Multi-Trunked Radio System (MTRS)


Adverse Condition Test

149

Annex 5. Inspection/T&E Multi-trunked Radio System (MTRS)


Operating Range

150

Annex 6. Trunked Central Controller (T&E) Acceptance Result

151

Você também pode gostar