25562 Federal Register / Vol. 70, No.

92 / Friday, May 13, 2005 / Notices

Agreement for the period January 1, tendered a filing with Commission an DEPARTMENT OF ENERGY
2004 through December 31, 2004 along application for certification of a facility
with the actual costs incurred by Unitil as a qualifying cogeneration facility Federal Energy Regulatory
Power Corp. by FERC account, pursuant to section 292.207(b) of the Commission
including the calculation of Contract Commission’s regulations. Apex Power. [Docket Nos. ER00–3767–003, et al.]
Release Payments and Administrative
Comment Date: 5 p.m. Eastern Time
Service Charges. Praxair, Inc., et al.; Electric Rate and
Unitil Power Corp. states that a copy on May 20, 2005.
Corporate Filings
of the filing was served upon the New Standard Paragraph
Hampshire Public Utilities Commission. May 9, 2005.
Comment Date: 5 p.m. Eastern Time Any person desiring to intervene or to The following filings have been made
on May 20, 2005. protest this filing must file in with the Commission. The filings are
21. Wisconsin Electric Power Company accordance with Rules 211 and 214 of listed in ascending order within each
the Commission’s Rules of Practice and docket classification.
[Docket No. ER05–923–000] Procedure (18 CFR 385.211 and
Take notice that on April 29, 2005, 1. Praxair, Inc.
385.214). Protests will be considered by
Wisconsin Electric Power Company the Commission in determining the [Docket No. ER00–3767–003]
(Wisconsin Electric) tendered for filing appropriate action to be taken, but will Take notice that on May 2, 2005,
a proposed amendment to an agreement not serve to make protestants parties to Praxair, Inc. (Praxair) filed a supplement
with Alliant Energy Corporation to its currently pending triennial market
the proceeding. Any person wishing to
(Alliant) pursuant to which Wisconsin power update and submitted a revised
Electric provides Alliant Wholesale become a party must file a notice of
intervention or motion to intervene, as market-based tariff to comply with
Distribution Export Service. Wisconsin Investigation of Terms and Conditions
Electric states that the purpose of the appropriate. Such notices, motions, or
protests must be filed on or before the of Public Utility Market-Based Rate
amendment is to extend the term of the Authorizations, 105 FERC ¶ 61,218
agreement, to increase the rate comment date. Anyone filing a motion
to intervene or protest must serve a copy (2003), on reh’g, 107 FERC 61,175
Wisconsin Electric charges for the (2004) and Reporting Requirements for
service and to provide for invoicing of of that document on the Applicant. On
Changes of Status for Public Utilities
calculated losses which is provided or before the comment date, it is not
with Market-Based Rate Authority, 110
under Wisconsin Electric’s Rate necessary to serve motions to intervene
FERC ¶ 61,097 (2005).
Schedule FERC No. 102. Wisconsin or protests on persons other than the Comment Date: 5 p.m. Eastern Time
Electric requests an effective date of Applicant. on May 23, 2005.
May 1, 2005. The Commission encourages
Wisconsin Electric states that copies 2. Southern California Edison Company
electronic submission of protests and
of this filing have been served upon [Docket No. ER02–2263–003]
Alliant, the Michigan Public Service interventions in lieu of paper using the
Commission and the Public Service ‘‘eFiling’’ link at http://www.ferc.gov. Take notice that, on May 2, 2005,
Commission of Wisconsin. Persons unable to file electronically Southern California Edison Company
Comment Date: 5 p.m. Eastern Time should submit an original and 14 copies (SCE) submitted a notification of change
on May 20, 2005. of the protest or intervention to the in status and a revised market-based
Federal Energy Regulatory Commission, tariff sheet reflecting the reporting
22. Black Hills Power, Inc. 888 First Street, NE., Washington, DC requirements adopted by the
[Docket No. ER05–924–000] 20426. Commission in Order No. 652,
Take notice that on April 29, 2005, Reporting Requirement for Changes in
This filing is accessible on-line at
Black Hills Power, Inc. (Black Hills Status for Public Utilities with Market-
http://www.ferc.gov, using the Based Rate Authority, 110 FERC
Power), filed a notice of cancellation of ‘‘eLibrary’’ link and is available for
its open access transmission tariff on ¶ 61,097 (2005).
review in the Commission’s Public SCE states that copies of the filing
file with the Commission as Black Hills
Reference Room in Washington, DC. were served on all parties in Docket No.
Power & Light Company FERC Electric
There is an ‘‘eSubscription’’ link on the ER02–2263.
Tariff Original Volume No. 2 in Docket
No. OA96–75–000, effective October 15, web site that enables subscribers to Comment Date: 5 p.m. Eastern Time
2003 (Black Hills Power OATT). Black receive e-mail notification when a on May 23, 2005.
Hills Power states that the Black Hills document is added to a subscribed
docket(s). For assistance with any FERC 3. Southern California Water Company
Power OATT has been superseded by
the Joint Open Access Transmission Online service, please e-mail [Docket No. ER02–2400–003]
Tariff of Black Hills Power, as Joint FERCOnlineSupport@ferc.gov, or call Take notice that, on May 2, 2005,
Tariff Administrator, Basin Electric (866) 208–3676 (toll free). For TTY, call Southern California Water Company
Power Cooperative, and Powder River (202) 502–8659. (SCWC) submitted a compliance filing
Energy Corporation on file with FERC in pursuant to the Commission’s April 1,
Linda Mitry,
Docket No. ER03–1354. Black Hills 2005 letter order directing SCWC to
Power requests an effective date of Deputy Secretary. amend its market-based tariff to
October 15, 2003. [FR Doc. E5–2372 Filed 5–12–05; 8:45 am] incorporate language required by the
Comment Date: 5 p.m. Eastern Time BILLING CODE 6717–01–P Commission in Reporting Requirement
on May 20, 2005. for Changes in Status For Public
Utilities With Market-Based Rate
23. Apex Power, LLC
Authority, Order No. 652, 110 FERC
[Docket No. QF05–99–000] ¶ 61,097 (2005).
Take notice that on April 29, 2005, SCWC states that copies of the filing
Apex Power, LLC, (Apex Power) were served on parties on the official

VerDate jul<14>2003 15:59 May 12, 2005 Jkt 205001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:\FR\FM\13MYN1.SGM 13MYN1
Federal Register / Vol. 70, No. 92 / Friday, May 13, 2005 / Notices 25563

service list in the above-captioned order issued December 28, 2004 in New District No. 1 of Snohomish County, and
proceeding. York Independent System Operator, Intalco Aluminum Corporation.
Comment date: 5 p.m. Eastern Time Inc., 109 FERC ¶ 61,367 (2004). Comment Date: 5 p.m. Eastern Time
on May 23, 2005. Comment Date: 5 p.m. Eastern Time on May 23, 2005.
on May 23, 2005.
4. Entergy Services, Inc. 12. Westar Energy, Inc.
[Docket No. ER03–171–005]
8. ISO New England Inc. and New
[Docket No. ER05–925–000]
England Power Pool
Take notice that on May 2, 2005, Take notice that on May 2, 2005,
Entergy Services, Inc. (Entergy [Docket No. ER05–531–002] Westar Energy, Inc. (Westar) submitted
Services), on behalf of Entergy Take notice that on May 2, 2005, ISO changes to Westar’s Open Access
Mississippi, Inc. (Entergy Mississippi), New England Inc. (the ISO) and the New Transmission Tariff, FERC Electric
tendered for filing an amendment to England Power Pool (NEPOOL) Tariff, Second Revised Volume No. 5
Entergy Services’ November 7, 2002 Participants Committee jointly (Westar OATT) in order to update its
filing of a unilaterally executed submitted a compliance filing pursuant Schedules 1, 2, 3, 5, 6, 7, and 8, and
Interconnection and Operating to the Commission’s order issued March Attachment H and to incorporate a new
Agreement between Entergy Mississippi 31, 2005 in Docket No. ER05–531–000, Attachment H–1 that sets forth a
and South Mississippi Electric Power New England Power Pool and ISO New formula to be used annually to update
Association (SMEPA) under the 1979 England Inc., 110 FERC ¶ 61,396 (2005). rates for transmission service on the
Interconnection Agreement between The ISO and NEPOOL state that Westar system. Westar proposes an
Entergy Mississippi and SMEPA, in copies of the filing were served on effective date of July 1, 2005 for the
response to the Commission’s letter parties on the official service list in the changes to the Westar OATT, which is
requesting further information issued on above-referenced proceeding, as well as, sixty days from the date of filing.
March 31, 2005. to the governors and state regulatory Westar states it has served a copy of
Comment Date: 5 p.m. Eastern Time commissions in the New England states. this filing on each of the affected
on May 23, 2005. The ISO and NEPOOL further state that customer and state commissions.
electronic copies were submitted to the Comment Date: 5 p.m. Eastern Time
5. Midwest Independent Transmission
NEPOOL Participants Committee on May 23, 2005.
System Operator, Inc. and PJM
members, which constitute the ISO’s
Interconnection, L.L.C. 13. Midwest Independent Transmission
Governance Participants.
[Docket No. ER04–375–021] Comment Date: 5 p.m. Eastern Time System Operator, Inc.
Take notice that on May 2, 2005, the on May 23, 2005. [Docket No. ER05–926–000]
Midwest Independent Transmission 9. Michigan Electric Transmission Take notice that on May 2, 2005, the
System Operator, Inc. (Midwest ISO) Company, LLC Midwest Independent Transmission
and PJM Interconnection, L.L.C. (PJM),
[Docket No. ER05–704–001] System Operator, Inc. (Midwest ISO)
submitted revisions to the Joint
submitted a Large Generator
Operating Agreement between the Take notice that on May 2, 2005
Interconnection Agreement among
Midwest ISO and PJM in compliance Michigan Electric Transmission
Zilkha Renewable Energy Midwest IV,
with the Commission’s order issued Company, LLC (METC) submitted
LLC, Interstate Power and Light
March 3, 2005 in Midwest Independent certain information intended to
Company, a wholly-owned subsidiary of
Transmission System Operator, Inc., supplement its March 14, 2005 filing in
Alliant Energy Corporation, and the
110 FERC ¶ 61,226 (2005). Docket No. ER05–704–000.
Comment Date: 5 p.m. Eastern Time Midwest ISO.
Comment Date: 5 p.m. Eastern Time
on May 23, 2005. on May 23, 2005. Midwest ISO states that a copy of this
filing was served on Zilkha Renewable
6. Midwest Independent Transmission 10. KRK Energy Energy Midwest IV, LLC and Interstate
System Operator, Inc. [Docket No. ER05–713–002] Power and Light Company.
[Docket Nos. ER04–691–036; EL04–104–034; Take notice that on May 2, 2005, KRK Comment Date: 5 p.m. Eastern Time
ER04–106–007] Energy submitted an amendment to it on May 23, 2005.
Take notice that on May 2, 2005, as April 15, 2005 filing in Docket No. 14. PJM Interconnection, L.L.C.
amended on May 3, 2005, the Midwest ER05–713–001
Independent Transmission System [Docket No. ER05–927–000]
Comment Date: 5 p.m. Eastern Time
Operator, Inc. (Midwest ISO) submitted on May 23, 2005. Take notice that on May 2, 2005, PJM
a compliance filing pursuant to the Interconnection, L.L.C. (PJM), submitted
11. Puget Sound Energy, Inc. for filing an executed interconnection
Commission’s order issued April 15,
2005 in Midwest Independent [Docket No. ER05–861–001] service agreement (ISA) and an executed
Transmission System Operator, Inc., Take notice that on May 2, 2005, construction service agreement (CSA)
111 FERC ¶ 61,043 (2005). Powerex Corp. (Powerex) submitted for among PJM, the Harrisburg Authority,
Comment Date: 5 p.m. Eastern Time filing a Certificate of Concurrence with and PPL Electric Utilities. PJM requests
on May 23, 2005. respect to Puget Sound Energy, Inc.’s a waiver of the Commission’s 60-day
April 26, 2005 filing of an amendment notice requirement to permit a March
7. New York Independent System 31, 2005 effective date for the ISA and
Operator, Inc. to the agreement for a Temporary Puget
Sound Area and Northern Intertie CSA.
[Docket No. ER05–119–000] Redispatch Pilot Program in Docket No. PJM states that copies of this filing
Take notice that on May 2, 2005, New ER05–861–000. were served upon the parties to the
York Independent System Operator, Inc. Powerex states that copies of the filing agreements and the state regulatory
(NYISO) submitted a Report on Status of have been provided to Bonneville Power commissions within the PJM region.
Voltage Support Service Enhancements Administration, Puget Sound Energy, Comment Date: 5 p.m. Eastern Time
in compliance with the Commission’s and City of Seattle, Public Utility on May 23, 2005.

VerDate jul<14>2003 15:59 May 12, 2005 Jkt 205001 PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:\FR\FM\13MYN1.SGM 13MYN1
25564 Federal Register / Vol. 70, No. 92 / Friday, May 13, 2005 / Notices

15. Duke Energy Corporation 19. Idaho Power Company 22. Baltimore Gas and Electric
[Docket No. ER05–928–000]
Company, Constellation Power Source
[Docket No. ER97–1481–009]
Generation, Inc., Calvert Cliffs Nuclear
Take notice that, on May 2, 2005, Take notice that on May 2, 2005, Power Plant, Inc., Constellation Energy
Duke Energy Corporation, on behalf of Idaho Power Company (Idaho Power) Commodities Group, Inc. (f/k/a
Duke Electric Transmission, submitted a Notice of Change in Status Constellation Power Source, Inc.),
(collectively, Duke), submitted revised pursuant to the Commission’s Order Handsome Lake Energy, LLC,
tariff sheets in compliance with Order issued March 3, 2005 in Idaho Power University Park Energy, LLC, Holland
No. 2003–B, Standardization of Co., 110 FERC ¶ 61,219 (2005) and Energy , LLC, Wolf Hills Energy, LLC,
Interconnection Agreements and Order No. 652, Reporting Requirements Big Sandy Peaker Plant, LLC, Nine Mile
Procedures, 109 FERC ¶ 61,287. Duke Point Nuclear Station, LLC, High Desert
for Changes in Status for Public Utilities
requests as effective date of January 19, Power Project, LLC, Constellation
with Market-Based Authority, 110 FERC
2005 NewEnergy, Inc., Constellation Energy
¶ 61,097 (2005).
Duke states that copies of the filing Commodities Group Maine, LLC (f/k/a
were served on all Open Access Idaho Power Company states that Constellation Power Source Maine,
Transmission Tariff customers as well copies of the filing were served on LLC), Power Provider LLC and R.E.
as the North Carolina and South parties on the official service list. Ginna Nuclear Power Plant, LLC
Carolina Public Service Commissions. Comment Date: 5 p.m. Eastern Time [Docket Nos. ER99–2948–004, ER00–2918–
Comment Date: 5 p.m. Eastern Time on May 23, 2005. 004, ER00–2917–004, ER05–261–001, ER01–
on May 23, 2005. 556–003, ER01–557–003, ER01–558–003,
20. The Empire District Electric ER01–559–003, ER01–560–003, ER01–1654–
16. Premcor Generating LLC Company 006, ER01–2641–004, ER02–2567–004,
ER05–728–001, ER01–1949–004 and ER04–
[Docket No. ER05–929–000] [Docket Nos. ER99–1757–009] 485–001]
Take notice that on May 2, 2005, Take notice that, on May 2, 2005, The Take notice that on May 2, 2005, the
Premcor Generating LLC, tendered for Empire District Electric Company above-captioned entities (Constellation
filing a Notice of Cancellation pursuant (Empire) submitted a compliance filing MBR Entities) filed a Notice of Change
to 18 CFR 35.15 to reflect the pursuant to the Commission’s order in Status and revised market-based rate
cancellation of its FERC Electric Service issued March 3, 2005 in The Empire tariff sheets to incorporate the reporting
Tariff, Rate schedule FERC No. 1, District Electric Company, 110 FERC requirements adopted by the
Original Sheet Nos. 1–3. ¶ 61,214 (2005). Commission in Order No. 652,
Premcor Generating LLC states that Reporting Requirement for Change in
Empire states that copies of the filing Status for Public Utilities with Market-
copies of this filing were served upon
were served on wholesale customers in Based Rate Authority, 110 FERC
the public utility’s jurisdictional
Empire’s control area in the Southwest ¶ 61,097 (2005).
customers, Premcor Power Marketing
LLC and Tennessee Valley Authority. Power Pool, Inc., parties on the official The Constellation MBR Entities state
service list, and the appropriate state that copies of this notification were
Comment Date: 5 p.m. Eastern Time commissions. served upon all persons on the service
on May 23, 2005.
Comment Date: 5 p.m. Eastern Time lists in the above-captioned dockets.
17. Black Hills Colorado, LLC on May 23, 2005. Comment Date: 5 p.m. Eastern Time
on May 23, 2005.
[Docket No. ER05–930–000]
21. Tampa Electric Company, Panda
Standard Paragraph
Take notice that on May 2, 2005, Gila River, L.P., Union Power Partners,
Black Hills Colorado, LLC submitted a L.P., TECO EnergySource, Inc., Any person desiring to intervene or to
Notice of Succession, notifying the Commonwealth Chesapeake Company, protest this filing must file in
Commission that it has succeeded, by L.L.C., TPS Dell, LLC, TPS McAdams, accordance with Rules 211 and 214 of
reason of name change, to the market- LLC and TECO–PANDA Generating the Commission’s Rules of Practice and
based rate wholesale power sales rate Company, L.P. Procedure (18 CFR 385.211 and
schedule of Indeck Colorado, LLC, FERC 385.214). Protests will be considered by
Electric Rate Schedule No. 1, together [Docket Nos. ER99–2342–007, ER01–931– the Commission in determining the
with service agreements thereunder. 011; ER01–930–011;. ER96–1563–024; ER99– appropriate action to be taken, but will
Black Hills requests an effective date of 415–010; ER02–510–007;. ER02–507–007; not serve to make protestants parties to
ER02–1000–002] the proceeding. Any person wishing to
June 29, 2000.
Comment Date: 5 p.m. Eastern Time Take notice that, on May 2, 2005, become a party must file a notice of
on May 23, 2005. Tampa Electric Company, Panda Gila intervention or motion to intervene, as
River, L.P., Union Power Partners, L.P., appropriate. Such notices, motions, or
18. Midwest Independent Transmission protests must be filed on or before the
TECO Energy Source, Inc., TPS Dell,
System Operator, Inc. comment date. Anyone filing a motion
LLC, TPS McAdams, LLC, and TECO-
[Docket No. ER05–932–000] PANDA Generating Company, L.P. to intervene or protest must serve a copy
of that document on the Applicant. On
Take notice that on May 2, 2005, the submitted a filing in compliance with
or before the comment date, it is not
Midwest Independent Transmission the Commission’s Order issued March 3,
necessary to serve motions to intervene
System Operator, Inc. (Midwest ISO) 2005, in Tampa Electric Company, et
or protests on persons other than the
filed proposed revisions to its Open al., 110 FERC ¶ 61,206 (2005). Applicant.
Access Transmission and Energy Comment Date: 5 p.m. Eastern Time The Commission encourages
Markets Tariff to clarify certain on May 23, 2005. electronic submission of protests and
provisions of the Tariff. interventions in lieu of paper using the
Comment Date: 5 p.m. Eastern Time ‘‘eFiling’’ link at http://www.ferc.gov.
on May 23, 2005. Persons unable to file electronically

VerDate jul<14>2003 15:59 May 12, 2005 Jkt 205001 PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 E:\FR\FM\13MYN1.SGM 13MYN1
Federal Register / Vol. 70, No. 92 / Friday, May 13, 2005 / Notices 25565

should submit an original and 14 copies Copies of the Committee Charter will planned to work with stakeholders to
of the protest or intervention to the be filed with the appropriate evaluate one or more of the approaches
Federal Energy Regulatory Commission, committees of Congress and the Library submitted in comments on the proposal.
888 First Street, NE., Washington, DC of Congress. As a result of the situation
20426. FOR FURTHER INFORMATION CONTACT: assessment, EPA agreed to establish a
This filing is accessible on-line at Marion Kelly, Engineering and Analysis Federal Advisory Committee to obtain
http://www.ferc.gov, using the Division, MC4303T, Environmental input from the stakeholder groups
‘‘eLibrary’’ link and is available for Protection Agency, 1200 Pennsylvania regarding detection and quantitation
review in the Commission’s Public Ave., NW., Washington, DC 20460; procedures and their use in the
Reference Room in Washington, DC. Telephone number: (202) 566–1045; Fax analytical methods in Clean Water Act
There is an ‘‘eSubscription’’ link on the number: (202) 566–1053; e-mail address: programs. On December 29, 2004 (69 FR
web site that enables subscribers to Kelly.Marion@epa.gov. 77972), EPA published a notice
receive email notification when a SUPPLEMENTARY INFORMATION: In 1999,
announcing a public meeting on the
document is added to a subscribed several industry groups filed suit against Situation Assessment and to request
docket(s). For assistance with any FERC EPA (Alliance of Automobile nominations to the Federal Advisory
Online service, please email Manufacturers v. EPA, DC Cir., No. 99– Committee.
FERCOnlineSupport@ferc.gov, or call 1420) as a result of EPA revisions of a Participants: The Committee will be
(866) 208–3676 (toll free). For TTY, call test used to measure mercury composed of approximately 20
(202) 502–8659. concentrations at low levels, and in members. As required by the Federal
October, 2000, EPA entered into a Advisory Committee Act, the FACDQ
Linda Mitry, will be, balanced in terms of points of
Deputy Secretary. Settlement Agreement that required
EPA to assess and revise procedures to view represented and the scope of the
[FR Doc. E5–2373 Filed 5–12–05; 8:45 am] activities of the Committee. A full-time
determine detection and quantitation
BILLING CODE 6717–01–P
limits under EPA’s CWA programs by EPA employee will act as the
November 1, 2004. Designated Federal Official who will be
On March 12, 2003, EPA published responsible for providing the necessary
ENVIRONMENTAL PROTECTION two notices in the Federal Register. One staffing, operations, and support for the
AGENCY announced the availability of a Committee. The committee members
Technical Support Document that will be comprised of qualified senior-
[FRL–7912–8]
described EPA’s reassessment of level professionals from diverse sectors
detection and quantitation concepts and throughout the United States from
Establishment of a Federal Advisory among, but not limited to, State
Committee to Examine Detection and procedures (68 FR 11791), and the
second proposed revisions to the MDL government; environmental
Quantitation Approaches in Clean professionals; regulated industry;
Water Act Programs and ML definitions and procedures (68
FR 11770). environmental laboratories; Publicly
AGENCY: Environmental Protection Many of the 126 comments EPA Owned Treatment Works; and the
Agency (EPA). received in response to the Federal environmental community. Establishing
Register notices were critical of the a balanced membership with a diversity
ACTION: Notice; Establishment of FACA
assessment and proposed revisions. of policy experience, knowledge, and
Committee and Meeting Announcement. judgment, will be an important
Rather than proceeding with the
SUMMARY: As required by the Federal revisions, EPA decided to contract with consideration in the selection of
Advisory Committee Act, we are giving a neutral third party to conduct a members. EPA also plans to use
notice that the Environmental situation assessment to explore the technical experts who will be available
Protection Agency is establishing the feasibility and design of a stakeholder to provide technical assistance to the
Federal Advisory Committee on process. This decision was announced Committee. Such experts will not be
Detection and Quantitation Approaches in a Federal Register notice dated members of the Committee and will not
and Uses in Clean Water Act Programs. September 15, 2004. participate in the Committee’s
The purpose of this Committee is to In October and November 2004, deliberations.
evaluate and recommend detection and Triangle Associates, Inc. of Seattle, a Dated: April 18, 2005.
quantitation procedures for use in EPA’s neutral third party contractor, Benjamin H. Grumbles,
analytical methods programs for conducted the situation assessment Assistant Administrator for Water.
compliance monitoring under 40 CFR through phone interviews with 37 [FR Doc. 05–9718 Filed 5–12–05; 8:45 am]
part 136. The Committee will analyze representatives of Federal and State BILLING CODE 6560–50–P
and evaluate relevant scientific and agencies, industry, environmental
statistical approaches, protocols, review groups, municipal wastewater treatment
data and interpretations of data using plants, environmental laboratories, and ENVIRONMENTAL PROTECTION
current and recommended approaches. organizations that establish testing AGENCY
The major objectives are to provide methods and standards.
advice and recommendations to the EPA On November 8, 2004, EPA published [ER–FRL–6663–4]
Administrator on policy issues related a notice of document availability giving
Environmental Impact Statements and
to detection and quantitation and EPA’s revised assessment of detection
Regulations; Availability of EPA
scientific and technical aspects of and quantitation concepts and
Comments
procedures for detection and procedures (69 FR 64704), and
quantitation. We have determined that published a notice withdrawing the Availability of EPA comments
this is in the public interest and will March 12, 2003, proposal (69 FR 64708). prepared pursuant to the Environmental
assist the Agency in performing its The withdrawal stated that a vast Review Process (ERP), under section
duties under the Clean Water Act, as majority of commenters did not favor 309 of the Clean Air Act and Section
amended. the proposed revisions, and that EPA 102(2)(c) of the National Environmental

VerDate jul<14>2003 15:59 May 12, 2005 Jkt 205001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 E:\FR\FM\13MYN1.SGM 13MYN1

Você também pode gostar