Federal Register / Vol. 70, No.

81 / Thursday, April 28, 2005 / Notices 22033

Vedula Sarma at (202) 502–6190, or e- the particular application to which the i. FERC Contact: Sergiu Serban at
mail address: vedula.sarma@ferc.gov. filing refers. All documents (original (202) 502–6211 or
j. Deadline for filing comments and or and eight copies) should be filed with: sergiu.serban@ferc.gov.
motions: May 20, 2005. Magalie R. Salas, Secretary, Federal j. Deadline for filing scoping
k. Description of Request: Louisville Energy Regulatory Commission, 888 comments: May 31, 2005.
Gas & Electric Company propose to First Street, NE., Washington, DC 20426. All documents (original and eight
rehabilitate one of the existing generator A copy of any motion to intervene must copies) should be filed with Magalie R.
units by rewinding generator and the also be served upon each representative Salas, Secretary, Federal Energy
wicket gate, restoring the draft tube, of the Applicant specified in the Regulatory Commission, 888 First
replacing discharge ring liner and particular application. Street, NE., Washington, DC 20426.
runner. The proposal would increase p. Agency Comments—Federal, State, The Commission’s Rules of Practice
the nameplate rating of the rehabilitated and local agencies are invited to file and Procedure require all intervenors
unit from 10.04 MW to 13.077 MW, and comments on the described application. filing documents with the Commission
the hydraulic capacity of the unit would A copy of the application may be to serve a copy of that document on
increase from 4,400 cfs to 5,297 cfs. The obtained by agencies directly from the each person on the official service list
increase in maximum hydraulic Applicant. If an agency does not file for the project. Further, if an intervenor
capacity of the project would be 2.5%. comments within the time specified for files comments or documents with the
l. Locations of the Application: A of filing comments, it will be presumed to Commission relating to the merits of an
the application is available for have no comments. One copy of an issue that may affect the responsibilities
inspection and reproduction at the agency’s comments must also be sent to of a particular resource agency, they
Commission’s Public Reference Room, the Applicant’s representatives. must also serve a copy of the document
located at 888 First Street, NE., Room q. Comments, protests and on that resource agency.
2A, Washington, DC 20426, or by calling interventions may be filed electronically Scoping comments may be filed
(202) 502–8371. This filing may also be via the Internet in lieu of paper. See, 18 electronically via the Internet in lieu of
viewed on the Commission’s Web site at CFR 385.2001(a)(1)(iii) and the paper. The Commission strongly
http://www.ferc.gov using the instructions on the Commission’s Web encourages electronic filings. See 18
‘‘eLibrary’’ link. Enter the docket site at http://www.ferc.gov under the ‘‘e- CFR 385.2001(a)(1)(iii) and the
number excluding the last three digits in Filing’’ link. instructions on the Commission’s Web
the docket number field to access the site (http://www.ferc.gov) through the
document. You may also register online Magalie R. Salas, Commission’s eLibrary using the
at http://www.ferc.gov/docs-filing/ Secretary. ‘‘Documents & Filing’’ link.
esubscription.asp to be notified via e- [FR Doc. E5–2014 Filed 4–27–05; 8:45 am] k. This application is not ready for
mail of new filings and issuances BILLING CODE 6717–01–P environmental analysis at this time.
related to this or other pending projects. l. Description of the Project: The
For assistance, call 1–866–208–3676 or existing Norway-Oakdale Hydroelectric
e-mail FERCOnlineSupport@ferc.gov, DEPARTMENT OF ENERGY Project consists of the Norway
for TTY, call (202) 502–8659. A copy is development and the Oakdale
also available for inspection and Federal Energy Regulatory development and has a combined
reproduction at the address in item (h) Commission installed capacity of 16.4 megawatts
above. [P–12514–000] (MW). The project produces an average
m. Individuals desiring to be included annual generation of 65,000 megawatt-
on the Commission’s mailing list should Northern Indiana Public Service hours (MWh). All power is dispatched
so indicate by writing to the Secretary Company; Notice of Scoping Meetings directly into the local grid and is used
of the Commission. and Site Visits and Soliciting Scoping within the East Central Area Reliability
n. Comments, Protests, or Motions to Comments Coordination Agreement.
Intervene—Anyone may submit The Norway development includes
April 21, 2005. the following constructed facilities: (1)
comments, a protest, or a motion to
intervene in accordance with the Take notice that the following A 915-foot-long dam consisting of (a) a
requirements of Rules of Practice and hydroelectric application has been filed 410-foot-long, 34-foot-maximum-height
Procedure, 18 CFR 385.210, .211, .214. with the Commission and is available earth fill embankment with a concrete
In determining the appropriate action to for public inspection: core wall; (b) a 225-foot-long, 29-foot-
a. Type of Application: Original Major high concrete gravity overflow spillway
take, the Commission will consider all
License. with flashboards; (c) a 120-foot-long, 30-
protests or other comments filed, but b. Project No: 12514–000.
only those who file a motion to c. Date Filed: June 28, 2004. foot-high concrete gated spillway with
intervene in accordance with the d. Applicant: Northern Indiana Public three 30-foot-wide, 22-foot-high
Commission’s Rules may become a Service Company (NIPSCO). spillway gates; (d) an 18-foot-wide, 30-
party to the proceeding. Any comments, e. Name of Project: Norway-Oakdale foot-high trash sluice housing with one
protests, or motions to intervene must Hydroelectric Project. 8-foot-wide, 11-foot-high gate; and (e) a
be received on or before the specified f. Location: On the Tippecanoe River 142-foot-long, 64-foot-wide powerhouse
comment date for the particular in Carroll and White counties, Indiana. integral with the dam containing four
application. The project does not affect Federal vertical Francis turbine-generating units
o. Filing and Service of Responsive lands. with a rated head of 28 feet, total
Documents—Any filings must bear in g. Filed Pursuant to: Federal Power hydraulic capacity of 3,675 cubic feet
all capital letters the title Act, 16 U.S.C. 791(a)–825(r). per second (cfs), and a total electric
‘‘COMMENTS’’, h. Applicant Contact: Jerome B. output of 7.2 MW; (2) a 10-mile-long,
‘‘RECOMMENDATIONS FOR TERMS Weeden, Vice President Generation; 10-foot average depth, 1,291-acre
AND CONDITIONS’’, ‘‘PROTEST’’, OR Northern Indiana Public Service reservoir; (3) a 2-mile-long, 69,000-volt
‘‘MOTION TO INTERVENE’’, as Company; 801 East 86th Avenue; transmission line; and (4) appurtenant
applicable, and the Project Number of Merrillville, IN 46410; (219) 647–5730. facilities.

VerDate jul<14>2003 16:00 Apr 27, 2005 Jkt 205001 PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 E:\FR\FM\28APN1.SGM 28APN1
22034 Federal Register / Vol. 70, No. 81 / Thursday, April 28, 2005 / Notices

The Oakdale development includes Scoping Meetings environmental expertise and concerns
the following constructed facilities: (1) Commission staff will conduct two are encouraged to attend the meetings
A 1,688-foot-long dam consisting of (a) public scoping meetings in the project and to assist Commission staff in
a 126-foot-long, 58-foot maximum- area to solicit comments and viewpoints defining and clarifying the issues to be
height east concrete buttress and slab the public may wish to offer concerning addressed in the EA.
dam connecting the left abutment to the project effects associated with the Magalie R. Salas,
powerhouse; (b) a 114-foot-long, 70-foot- Norway and Oakdale developments.
wide powerhouse integral with the dam Secretary.
The evening meeting will focus on input [FR Doc. E5–2020 Filed 4–27–05; 8:45 am]
containing three vertical Francis from the public, and the morning
turbine-generating units with a rated meeting will focus on resource agency
BILLING CODE 6717–01–P
head of 42 to 48 feet, total hydraulic concerns. We invite all interested
capacity of 3,200 cfs and a total electric agencies, nongovernmental
output of 9.2 MW; (c) an 18-foot-wide DEPARTMENT OF ENERGY
organizations, Native American tribes,
structure containing a nonfunctional and individuals to attend one or both of Federal Energy Regulatory
fish ladder and a gated trash sluice; (d) the meetings to help us identify the Commission
an 84-foot-long ogee-shaped concrete scope of environmental issues to be
gated spillway with two 30-foot-wide, analyzed in the EA. The times and [Docket No. ER02–1656–000]
22-foot-high vertical lift gates; (e) a 90- locations of these meetings are as
foot-long, six bay concrete gravity California Independent System
follows: Operator Corporation; Notice of FERC
siphon-type auxiliary spillway; and (f) a
1,260-foot-long, west earth embankment Public Scoping Meeting Staff Attendance
with a maximum height of 58 feet and Date: May 18, 2005. April 19, 2005.
a 30-foot-wide crest; (2) a 10-mile-long, Time: 7 p.m. (c.s.t.). The Federal Energy Regulatory
16-foot-average depth, 1,547-acre Place: Best Western Brandywine Commission (Commission) hereby gives
reservoir; and (3) appurtenant facilities. Complex. notice that on April 21, 22 and 29, 2005,
m. A copy of the application is Address: 728 South Sixth Street,
members of its staff will attend
available for review at the Commission Monticello, IN 47960.
workshops on Resource Adequacy
in the Public Reference Room or may be Agency Scoping Meeting: hosted by the California Public Utilities
viewed on the Commission’s Web site at Commission (CPUC). The workshops
http://www.ferc.gov using the Date: May 19, 2005.
Time: 10 a.m. will take place in Commission
‘‘eLibrary’’ link. Enter the docket Courtroom A of the CPUC, located at
Place: Best Western Brandywine
number, excluding the last three digits 505 Van Ness Avenue, San Francisco,
Complex.
in the docket number field (P–12514), to Address: 728 South Sixth Street, CA 94102.
access the document. For assistance, Monticello, IN 47960. Sponsored by the CPUC, the meeting
contact FERC Online Support at Copies of the Scoping Document is open to the public, and staff’s
FERCOnlineSupport@ferc.gov; call toll- (SD1) outlining the subject areas to be attendance is part of the Commission’s
free at (866) 208–3676; or, for TTY, call addressed in the EA will be available at ongoing outreach efforts. The meeting
(202) 502–8659. A copy is also available the scoping meetings or may be viewed may discuss matters at issue in Docket
for inspection and reproduction at the on the Commission’s Web site at No. ER02–1656–000.
address in item h above. http://www.ferc.gov using the For Further Information Contact:
You may also register online at ‘‘eLibrary’’ link [see item (m) above]. Katherine Gensler at
http://www.ferc.gov/esubscribenow.htm These meetings are posted on the katherine.gensler@ferc.gov; (916) 294–
to be notified via e-mail of new filings Commission’s calendar located on the 0275.
and issuances related to this or other Internet at http://www.ferc.gov/
pending projects. For assistance, contact Magalie R. Salas,
EventCalendar/EventsList.aspx along
FERC Online Support. with other related information. Secretary.
n. Scoping Process: The Commission Objectives: At the scoping meetings, [FR Doc. E5–2033 Filed 4–27–05; 8:45 am]
intends to prepare a single staff will (1) Summarize the BILLING CODE 6717–01–P
environmental document in accordance environmental issues tentatively
with the National Environmental Policy identified for analysis in the EA; (2)
Act. The environmental assessment (EA) solicit from the meeting participants all ENVIRONMENTAL PROTECTION
will consider both site-specific and available information, especially AGENCY
cumulative environmental effects and empirical data, on the resources at issue;
reasonable alternatives to the proposed [AMS–FRL–7905–3]
(3) encourage statements from experts
action. and participants on issues that should
Site Visit: NIPSCO and the California State Motor Vehicle
be analyzed in the EA, including Pollution Control Standards; Notice of
Commission staff will conduct a project viewpoints in opposition to, or in
site visit on May 18, 2005. We will meet Within-the-Scope Determination for
support of, the staff’s preliminary view; Amendments to California’s Low
at the Norway Powerhouse and then (4) determine the resource issues to be
proceed to the project power plants. Site Emission Vehicle Standards (‘‘LEV II’’)
addressed in the EA; and (5) identify
visitors will be responsible for their own those issues that do not require a AGENCY: Environmental Protection
transportation. Anyone with questions detailed analysis. Agency (EPA).
regarding the site visits, including Procedures: The meetings will be ACTION: Notice regarding within-the-
directions, should contact Mike Canner recorded by a stenographer and become scope determination.
of NIPSCO at (219) 956–5163. part of the formal record of the
Date: Wednesday, May 18, 2005. Commission proceeding on the project. SUMMARY: The California Air Resources
Time: 8:45 am (c.s.t.). Individuals, organizations, resource Board (CARB) requested that EPA
Place: Norway Powerhouse. agencies, and Indian tribes with confirm CARB’s finding that two sets of

VerDate jul<14>2003 16:00 Apr 27, 2005 Jkt 205001 PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:\FR\FM\28APN1.SGM 28APN1