22034 Federal Register / Vol. 70, No.

81 / Thursday, April 28, 2005 / Notices

The Oakdale development includes Scoping Meetings environmental expertise and concerns
the following constructed facilities: (1) Commission staff will conduct two are encouraged to attend the meetings
A 1,688-foot-long dam consisting of (a) public scoping meetings in the project and to assist Commission staff in
a 126-foot-long, 58-foot maximum- area to solicit comments and viewpoints defining and clarifying the issues to be
height east concrete buttress and slab the public may wish to offer concerning addressed in the EA.
dam connecting the left abutment to the project effects associated with the Magalie R. Salas,
powerhouse; (b) a 114-foot-long, 70-foot- Norway and Oakdale developments.
wide powerhouse integral with the dam Secretary.
The evening meeting will focus on input [FR Doc. E5–2020 Filed 4–27–05; 8:45 am]
containing three vertical Francis from the public, and the morning
turbine-generating units with a rated meeting will focus on resource agency
BILLING CODE 6717–01–P
head of 42 to 48 feet, total hydraulic concerns. We invite all interested
capacity of 3,200 cfs and a total electric agencies, nongovernmental
output of 9.2 MW; (c) an 18-foot-wide DEPARTMENT OF ENERGY
organizations, Native American tribes,
structure containing a nonfunctional and individuals to attend one or both of Federal Energy Regulatory
fish ladder and a gated trash sluice; (d) the meetings to help us identify the Commission
an 84-foot-long ogee-shaped concrete scope of environmental issues to be
gated spillway with two 30-foot-wide, analyzed in the EA. The times and [Docket No. ER02–1656–000]
22-foot-high vertical lift gates; (e) a 90- locations of these meetings are as
foot-long, six bay concrete gravity California Independent System
follows: Operator Corporation; Notice of FERC
siphon-type auxiliary spillway; and (f) a
1,260-foot-long, west earth embankment Public Scoping Meeting Staff Attendance
with a maximum height of 58 feet and Date: May 18, 2005. April 19, 2005.
a 30-foot-wide crest; (2) a 10-mile-long, Time: 7 p.m. (c.s.t.). The Federal Energy Regulatory
16-foot-average depth, 1,547-acre Place: Best Western Brandywine Commission (Commission) hereby gives
reservoir; and (3) appurtenant facilities. Complex. notice that on April 21, 22 and 29, 2005,
m. A copy of the application is Address: 728 South Sixth Street,
members of its staff will attend
available for review at the Commission Monticello, IN 47960.
workshops on Resource Adequacy
in the Public Reference Room or may be Agency Scoping Meeting: hosted by the California Public Utilities
viewed on the Commission’s Web site at Commission (CPUC). The workshops
http://www.ferc.gov using the Date: May 19, 2005.
Time: 10 a.m. will take place in Commission
‘‘eLibrary’’ link. Enter the docket Courtroom A of the CPUC, located at
Place: Best Western Brandywine
number, excluding the last three digits 505 Van Ness Avenue, San Francisco,
Complex.
in the docket number field (P–12514), to Address: 728 South Sixth Street, CA 94102.
access the document. For assistance, Monticello, IN 47960. Sponsored by the CPUC, the meeting
contact FERC Online Support at Copies of the Scoping Document is open to the public, and staff’s
FERCOnlineSupport@ferc.gov; call toll- (SD1) outlining the subject areas to be attendance is part of the Commission’s
free at (866) 208–3676; or, for TTY, call addressed in the EA will be available at ongoing outreach efforts. The meeting
(202) 502–8659. A copy is also available the scoping meetings or may be viewed may discuss matters at issue in Docket
for inspection and reproduction at the on the Commission’s Web site at No. ER02–1656–000.
address in item h above. http://www.ferc.gov using the For Further Information Contact:
You may also register online at ‘‘eLibrary’’ link [see item (m) above]. Katherine Gensler at
http://www.ferc.gov/esubscribenow.htm These meetings are posted on the katherine.gensler@ferc.gov; (916) 294–
to be notified via e-mail of new filings Commission’s calendar located on the 0275.
and issuances related to this or other Internet at http://www.ferc.gov/
pending projects. For assistance, contact Magalie R. Salas,
EventCalendar/EventsList.aspx along
FERC Online Support. with other related information. Secretary.
n. Scoping Process: The Commission Objectives: At the scoping meetings, [FR Doc. E5–2033 Filed 4–27–05; 8:45 am]
intends to prepare a single staff will (1) Summarize the BILLING CODE 6717–01–P
environmental document in accordance environmental issues tentatively
with the National Environmental Policy identified for analysis in the EA; (2)
Act. The environmental assessment (EA) solicit from the meeting participants all ENVIRONMENTAL PROTECTION
will consider both site-specific and available information, especially AGENCY
cumulative environmental effects and empirical data, on the resources at issue;
reasonable alternatives to the proposed [AMS–FRL–7905–3]
(3) encourage statements from experts
action. and participants on issues that should
Site Visit: NIPSCO and the California State Motor Vehicle
be analyzed in the EA, including Pollution Control Standards; Notice of
Commission staff will conduct a project viewpoints in opposition to, or in
site visit on May 18, 2005. We will meet Within-the-Scope Determination for
support of, the staff’s preliminary view; Amendments to California’s Low
at the Norway Powerhouse and then (4) determine the resource issues to be
proceed to the project power plants. Site Emission Vehicle Standards (‘‘LEV II’’)
addressed in the EA; and (5) identify
visitors will be responsible for their own those issues that do not require a AGENCY: Environmental Protection
transportation. Anyone with questions detailed analysis. Agency (EPA).
regarding the site visits, including Procedures: The meetings will be ACTION: Notice regarding within-the-
directions, should contact Mike Canner recorded by a stenographer and become scope determination.
of NIPSCO at (219) 956–5163. part of the formal record of the
Date: Wednesday, May 18, 2005. Commission proceeding on the project. SUMMARY: The California Air Resources
Time: 8:45 am (c.s.t.). Individuals, organizations, resource Board (CARB) requested that EPA
Place: Norway Powerhouse. agencies, and Indian tribes with confirm CARB’s finding that two sets of

VerDate jul<14>2003 16:00 Apr 27, 2005 Jkt 205001 PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 E:\FR\FM\28APN1.SGM 28APN1