Você está na página 1de 2

21400 Federal Register / Vol. 70, No.

79 / Tuesday, April 26, 2005 / Notices

textile safeguard quotas, and textile permit entry to goods in an amount equal to SUMMARY: The United States Army
quotas on non-WTO countries without 5 percent of the applicable base safeguard Intelligence and Security Command has
agreements in place for 2005. (See 69 FR limit. For each succeeding period, beginning prepared an Environmental Assessment
on the 29th of the month, and extending
72181). That notice referred to a (EA) of the potential environmental
through the 28th of the following month, to
previous notice, published on June 25, permit entry to goods in an amount equal to consequences of constructing a new
2004, which reminded the public that 5 percent of the applicable base safeguard U.S. Army Intelligence and Security
CITA has the right to permanently deny, limit, until all shipments in excess of the Command Information Dominance
or to stage entry of overshipments of safeguard limit have been entered. Center (IDC) building addition at a
textile quotas. (See 69 FR 35586). This The Committee for the Implementation of previously developed site on Fort
notice is to inform the public that Textile Agreements has determined that this Belvoir, VA. This Environmental
overshipments of merchandise subject action falls within the foreign affairs Assessment has been prepared pursuant
exception to the rulemaking provisions of 5
to any China textile safeguard limits to the National Environmental Policy
U.S.C. 553(a)(1).
shall be subject to delayed and staged Sincerely, Act (NEPA); the Council on
entry, in a manner similar to the James C. Leonard III, Environmental Quality regulations
procedure explained in the December Chairman, Committee for the implementing the NEPA; Department of
13, 2004 notice and letter. In the Implementation of Textile Agreements. Defense (DoD) Directive 6050.1;
absence of bilateral agreement with the [FR Doc. E5–1976 Filed 4–25–05; 8:45 am] Environmental Effects in the United
Government of the People’s Republic of BILLING CODE 3510–DS–S States of DoD Actions; and instructions
China establishing limits beyond the implementing NEPA.
expiration date of safeguard quotas, any The U.S. Army Intelligence and
overshipments of those quotas shall be DEPARTMENT OF DEFENSE Security Command (INSCOM) has
subject to the following procedure: identified a requirement to construct a
1.) Entry will not be allowed until Department of the Air Force HQ USAF building addition to accommodate its
one month after the expiration date Scientific Advisory Board IDC. Construction and operation of the
of the safeguard quota. IDC facility conforms to Fort Belvoir’s
2.) At that time, only 5 percent of AGENCY: Department of the Air Force, current Master Planning strategy. HQ
the base limit will be allowed entry DoD. INSCOM and Fort Belvoir have
for a one month period beginning ACTION: Notice of meeting. thoroughly reviewed the Proposed
on that date. Action, Action Alternatives, a No
3) An additional 5 percent will be SUMMARY: Pursuant to Public Law 92–
463, notice is hereby given of the Action Alternative to the Proposed
allowed entry monthly until all Action, and environmental
overshipments are allowed entry. forthcoming meeting of the Air Force
Scientific Advisory Board Domain consequences associated with each.
A textile safeguard limit on socks Based on this review and consideration
from China in Categories 332/432/ Integration Study. The purpose of this
meeting is to gather information of all relevant factors, HQ INSCOM and
632part has been in place since October Fort Belvoir have determined and
29, 2004, and extends through October pertinent to the Domain Integration
Study and to caucus regarding findings concluded that the Proposed Action will
28, 2005. (See 69 FR 63371). Any not have direct, indirect, or
overshipments of this limit shall be and recommendations. Because
classified and contractor-proprietary cumulatively significant impacts on the
subject to delayed and staged entry as surrounding human environment. An
described above, and as provided information will be discussed, this
meeting will be closed to the public. Environmental Impact Statement,
specifically in the accompanying therefore, is not required and will not be
directive to the Commissioner of U.S. DATES: 10–13 May 2005.
prepared. HQ INSCOM and Fort Belvoir
Customs and Border Protection. The ADDRESSES: Rosslyn, VA. will consider public comment and
base limit for the socks quota for FOR FURTHER INFORMATION CONTACT: concerns prior to making a final
October 29, 2004–October 28, 2005 can Major Kyle Gresham, Air Force determination to proceed with the
be found on the web at http:// Scientific Advisory Board Secretariat, proposed action.
otexa.ita.doc.gov/ under ‘‘Summary of 1180 Air Force Pentagon, Rm 5D982, INSCOM evaluated six alternatives to
Agreements.’’ Washington DC 20330–1180, (703) 697– meet requirements for an expanded IDC
James C. Leonard III, 4808. facility. These alternatives included: a
Chairman, Committee for the Implementation Albert Bodnar, no action alternative (status quo);
of Textile Agreements. Air Force Federal Register Liaison Officer.
renovation of existing HQ INSCOM
facilities; renovation of other
Committee for the Implementation of Textile [FR Doc. 05–8267 Filed 4–25–05; 8:45 am]
Agreements
government facilities; lease of off-post
BILLING CODE 5001–05–P
facilities in the general vicinity of Fort
April 21, 2005. Belvoir; construction of new facilities
Commissioner of Customs, on Fort Belvoir; and construction of an
Department of the Treasury, Washington, DC DEPARTMENT OF DEFENSE
addition to existing HQ INSCOM
20229.
Dear Commissioner: This directive Department of the Army facilities on Fort Belvoir. Several
provides instructions on permitting entry to possible locations were considered in
goods shipped in excess of the China textile Availability of the Final Draft this evaluation, with each alternative
safeguard limit on socks in categories 332/ Environmental Assessment for the being evaluated for mission support and
432/632part, which covers goods exported Construction of a Building Addition To economic, environmental, and security
from China during the October 29, 2004 - Accommodate the U.S. Army considerations. It is anticipated that
October 28, 2005 period. For all shipments Intelligence and Security Command construction will begin in Fiscal Year
exported from China that exceed that limit, Information Dominance Center (FY) 2008. Project completion is
you are directed to deny entry until
November 29, 2005, subject to the following
anticipated in FY2010.
AGENCY: Department of the Army, DoD.
procedure. From November 29 through DATES: The agency must receive
ACTION: Notice of availability.
December 28, 2005, you are directed to comments on or before May 26, 2005.

VerDate jul<14>2003 13:32 Apr 25, 2005 Jkt 205001 PO 00000 Frm 00012 Fmt 4703 Sfmt 4703 E:\FR\FM\26APN1.SGM 26APN1
Federal Register / Vol. 70, No. 79 / Tuesday, April 26, 2005 / Notices 21401

ADDRESSES: For additional information above. The proposed action will not be imposed on contractors, offerors or
or to submit written comments, contact implemented before this date. member of the public.
Commander, USAINSCOM, 8825 Dated: April 19, 2005. Thomas G. Keller,
Beulah Street, Building 2444, Attn: Thomas J. Boyle,
IALO–E, Fort Belvoir, VA 22060. Col, USAF, DCS, Passenger and Personal
Colonel, GS, Assistant Chief of Staff, G–4. Property.
FOR FURTHER INFORMATION CONTACT: Ms. [FR Doc. 05–8284 Filed 4–25–05; 8:45 am] [FR Doc. 05–8282 Filed 4–25–05; 8:45 am]
Susan Roeder, Environmental Protection BILLING CODE 3710–08–M BILLING CODE 3710–08–M
Specialist, (703) 428–4520, e-mail:
smroede@inscom.army.mil.
DEPARTMENT OF DEFENSE DEPARTMENT OF DEFENSE
SUPPLEMENTARY INFORMATION: The intent
of this project is to provide HQINSCOM Department of the Army Department of the Army; Corps of
with increased space that supports Engineers
expanding intelligence missions and Publication of Families First Business
associated personnel increases, Rules Intent To Prepare a Draft Supplemental
particularly for the IDC. the proposed Environmental Impact Statement for
IDC project provides a multi-story, AGENCY: Department of the Army, DOD. the Brevard County (Mid-Reach) Shore
multi-purpose, 233,000 gross square foot ACTION: Notice. Protection Project Located in Brevard
facility, to include all required County, FL
mechanical, electrical, fire protection, SUMMARY: The Military Surface
redundant power and information Deployment and Distribution Command AGENCY: Department of the Army, U.S.
systems. It will also include the (SDDC), as the Department of Defense Army Corps of Engineers, DoD.
installation of physical security and (DOD) Traffic Manager for the ACTION: Notice of intent.
access control systems. A unique Household Goods and Personal Property
Program, is announcing the publication SUMMARY: The U.S. Army Corps of
requirement of the IDC is its need for
of the Families First Business Rules for Engineers, Jacksonville District, intends
larger, open work areas which must also
review and comment. to prepare a Draft Supplemental
allow the flexibility of periodic
This announcement is being made to Environmental Impact Statement
reconfiguration. The typical, economical
afford the public an opportunity to (DSEIS) for the Brevard County (Mid-
structural design of a 30 foot by 30 foot
review and comment on the business Reach) Shore Protection Feasibility
structural column grid is inadequate for
rules changes before commencing Study. The study will focus on 7.6 miles
the IDC. A minimum 30′ by 45′ grid is
Families First. The business rules will of developed shoreline, also referred to
required. Other key components of this
be posted to the SDDC Web site located as the ‘‘Mid-Reach’’, from the south end
facility include the following: secure
at http://www.sddc.army.mil, under of Patrick Air Force Base to just north
facility space; specialized operations
Families First. The site offers industry of Indialantic. Ongoing erosion
space; special equipment storage;
access to updates on the business rules problems are endangering the shoreline
classrooms; server room; wellness room
and information on the various Phases infrastructure within the study area. In
and showers; cafeteria; mechanical/
of the program. cooperation with Brevard County, the
utility rooms; bathrooms; training area;
DATES: The business rules were released
study will evaluate alternative solutions
storage areas; library; office space; and
on April 21, 2005, and posted to the that will maximize shore protection
administrative support areas. Other
SDDC Web site on April 22, 2005. while minimizing environmental
required support facilities to be built
comments must be submitted on or impacts.
include walks, curbs and gutters,
surface parking, site improvements, before May 26, 2005. ADDRESSES: U.S. Army Corps of
HVAC, and power generation ADDRESSES: Comments may be sent by Engineers, Planning Division,
equipment. e-mail to the following address: http:// Environmental Branch, P.O. Box 4970,
The IDC Environmental Assessment is www.sddc.army.mil/frontDoor/ Jacksonville, FL 32232–0019.
available for public review at 0,1865,OID=4--7319-13197--13197-- FOR FURTHER INFORMATION CONTACT: Mr.
Directorate of Installation Support, 00.html or by courier to: Headquarters, Paul E. Stodola, by e-mail
Environmental and Natural Resource Surface Deployment and Distribution Paul.E.Stodola@saj02.usace.army.mil or
Division (9430 Jackson Loop, Suite 107, Command, Attn: SDPP–PD, Room by telephone at (904) 232–3271.
Fort Belvoir, VA). It is also available at 10N35–29 (Judith Tarbox), Hoffman SUPPLEMENTARY INFORMATION: a.
the following four Fairfax County Public Building II, 200 Stovall Street, Proposed Action. The Brevard County,
Library local branches: John Marshall Alexandria, VA 22332–5000. FL, (Mid-Reach) Shore Protection
Branch (6209 Rose Hill Drive, FOR FURTHER INFORMATION CONTACT: Ms. Feasibility Study was authorized by
Alexandria, VA); Lorton Branch (9520 Judith Tarbox at (703) 428–3004 or e- Section 418 of the Water Resources and
Richmond Hwy., Lorton, VA); mail at TarboxJudith@sddc.army.mil. Development act of 2000 (Pub. L. 106–
Sherwood Hall Branch (2501 Sherwood 541). The entire 7.6-mile length of the
Hall Lane, Alexandria, VA); and Regulation Flexibility Act Mid-Reach shoreline has been critically
Kingstowne Branch (6500 Landsdowne This action is not considered rule eroded with 62% of its oceanfront
Centre, Alexandria, VA). A copy of this making within the meaning of development anticipated to be lost to
notice and the Environmental Regulatory Flexibility Act, 5 USC 601– storm damage during the next 50 years.
Assessment cab be viewed on the World 612. Placement of beach quality sand from
Wide Web at http:// various sources along the Mid-Reach
www.inscom.army.mil. Interested Paperwork Reduction Act will be evaluated with the intent of
parties are invited to submit written The Paperwork Reduction Act, 44 providing the greatest opportunity of
comments for consideration during the USC 3051 et seq., does not apply shoreline protection. Environmental
30-day public comment period which because no information collection or considerations will be addressed in a
closes on the date specified in DATES record keeping requirements are DSEIS, which will supplement the

VerDate jul<14>2003 11:52 Apr 25, 2005 Jkt 205001 PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 E:\FR\FM\26APN1.SGM 26APN1

Você também pode gostar