Você está na página 1de 2

16792 Federal Register / Vol. 70, No.

62 / Friday, April 1, 2005 / Notices

• State (System stores answer to • Will Apply (System stores optional statement (EIS) on a proposed action to
required entry: which state or territory survey entry: Will the user apply for address forest health and hazardous
the user is from) food stamps) fuels concerns within the 14,800 acre
• Number of Children (System stores • Tool Ease (System stores optional planning area known as the BLT
required entry: number of children in survey entry: Was the tool easy to use) Vegetation Project. The planning area is
the household) • Changed Mind (System stores located in the Upper Little Deschutes
• Number of Elderly (System stores optional survey entry: Did the result of Watershed, which includes the upper
required entry: number of elderly the screening change the likelihood that reaches of the Little Deschutes River; it
members in the household) the user will apply for benefits) is located in T.25–26 S, R. 61⁄2E; T. 25–
• Migrant Workers (System stores • Completed Survey (System stores 26 S, R. 7E; T. 24S, R. 8 E. The
required entry: is anyone in the tool output: Was a survey completed alternatives will include the proposed
household a seasonal or migrant farm (partially, in full or not at all) action, no action, and additional
worker) • Comments (System stores optional alternatives that respond to issues
• Homeless (System stores required survey entry: User comments) generated through the scoping process.
entry: is the household homeless or The agency will give notice of the full
living in a shelter) Estimate of Burden
environmental analysis and decision
• User Type (System stores required Pre-Screening Tool Component Burden making process so interested and
entry: who is using the tool)
• User Referral (System stores Affected Public: Potential food stamp affected people may participate and
required entry: how the user heard applicants and those using the tool on contribute to the final decision.
about the tool) their behalf. DATES: Comments concerning the scope
• Amount (System stores tool output: Estimated Number of Respondents: of the analysis must be received by 30
if user was eligible to receive benefits 264,000 per year. days following the date that this notice
Number of Responses per appears in the Federal Register.
and if so the estimated range of benefits)
Since food stamp eligibility and Respondent: 1.
Total Number of Annual Responses: ADDRESSES: Send written comments to
benefit amount may vary by location, Phil Cruz, District Ranger, Crescent
264,000.
FNS makes it clear that the tool is only Estimated Time per Response: 10 Ranger District, PO Box 208, Crescent,
an estimator, and the household will minutes. Oregon 97733.
need to contact the local agency to Estimated Total Annual Burden: FOR FURTHER INFORMATION CONTACT:
determine actual eligibility and the 44,000 hours. Chris Mickle, Environmental
appropriate benefit amount.
Survey Component Burden Coordinator, Crescent Ranger District,
FNS does not retain any specific
PO Box 208, Crescent, Oregon 97773,
identifying information like last names, Affected Public: Potential food stamp phone (541) 433–3200. E-mail
social security numbers, birthdays, etc applicants and those using the tool on lcmickle@fs.fed.us.
about the household itself in the tool; their behalf.
however, the system does request the Responsible Official: The responsible
Estimated Number of Respondents: official will be Leslie Weldon, Forest
following information during the initial 251,000 per year.
process in which the user enters data: Supervisor, Deschutes National Forest,
Number of Responses per
• The State in which the user resides; PO Box 1654 Hwy 20 East, Bend, OR
Respondent: 1.
• Whether the user is using the tool Total Number of Annual Responses: 97701.
for personal reasons or on behalf of 251,000. SUPPLEMENTARY INFORMATION:
others; Estimated Time per Response: 1 Purpose and Need. Current conditions
• If they are using it on the behalf of minute. on the landscape indicate that forests
others; the user will be asked to identify Estimated Total Survey Annual are moving toward late seral stages, with
him/herself (e.g., relative of a person in Burden: 4,183 hours. stand structure becoming more complex
need, advocacy organization, faith-based Estimated Total Pre-Screening Tool and more susceptible to stand
group, etc.) using a drop down menu. Annual Burden + Estimated Total replacement events. Stands once
Note: The above information is not Survey Annual Burden: 48,183. dominated by large trees (greater than
retained once the user logs out of the system. Dated: March 28, 2005. 21 inches in diameter) have a steadily
The second component is a formal Jerome A. Lindsay, increasing amount of smaller trees. In
survey appended to this tool. This Acting Administrator, Food and Nutrition many areas the large trees do not
information will help FNS to determine Service. dominate the forest sufficiently to
the degree of usage, the need for [FR Doc. 05–6489 Filed 3–31–05; 8:45 am] provide adequately for species that
modifying the tool and potential areas BILLING CODE 3410–30–P
depend on late- and old-structure
for further study. habitat. Overcrowding and competition
The optional Survey Component with the young, smaller trees are
consists of responses to the following DEPARTMENT OF AGRICULTURE causing the large-tree component to
items: decline. This may occur slowly through
• Gender (System stores optional Forest Service insect/disease outbreaks, or more
survey entry: User gender) rapidly through large-scale fire events.
• Zip Code (System stores optional BLT Vegetation Management Project, In addition to unhealthy conditions
survey entry: User zip code) Deschutes National Forest, Klamath for large trees, mortality resulting from
• Current Food Stamp Participation County, OR insect and disease outbreaks has created
(System stores optional survey entry: Is AGENCY: Forest Service, USDA. dead fuel build up. High levels of
user currently receiving food stamp ACTION:Notice of intent to prepare an blowdown in some areas increase the
benefits) environmental impact statement. fuel loadings. Some lodgepole pine
• Past Food Stamp Participation stands have an overstory that is in poor
(System stores optional survey entry: SUMMARY: The USDA, Forest Service, condition, with heavy mistletoe in some
Has user ever received food stamps) will prepare an environmental impact cases. This poses a condition that could

VerDate jul<14>2003 17:15 Mar 31, 2005 Jkt 205001 PO 00000 Frm 00002 Fmt 4703 Sfmt 4703 E:\FR\FM\01APN1.SGM 01APN1
Federal Register / Vol. 70, No. 62 / Friday, April 1, 2005 / Notices 16793

impede development of a health Limited’’ by the Oregon Department of reviewers of a draft EIS must structure
understory. Environmental quality. Activities their participation in the environmental
In some parts of the project area, proposed must improve conditions in review of the proposal so that it is
homes and personal property lie the stream, or at least ensure that the meaningful and alerts an agency to the
adjacent to Forest land, creating what is conditions are not further degraded. reviewer’s position and contentions
known as ‘‘wildland-urban interface.’’ • Wildlife Habitat: Within the project [Vermont Yankee Nuclear Power Corp.
There is a need to reduce hazardous area, treatment aimed at improving v. NRDC, 435 U.S. 519, 553 (1978)].
fuels in those areas to increase the forest health conditions and reducing Also, environmental objections that
ability to control wildfire. This will fuels have the potential to reduce could be raised at the draft EIS stage but
improve safety for firefighters and certain attributes important to some that are not raised until after completion
residents and reduce the risk of high species of wildlife habitat. of the final EIS may be waived or
intensity fire destroying private • Special Forest Products: The project dismissed by the courts [City of Angoon
property as well as important forest area includes habitat and popular v. Harris, 490 F. Supp. 1334, 1338 (E.D.
habitats. harvesting areas for matsutake Wis. 1980)]. Because of these court
Specifically, the purpose and need of mushrooms. Vegetation and/or fuels rulings, it is very important that those
the proposed action is to: treatments have the potential to affect interested in this proposed action
—Reduce stand density where it is too matsutake growing conditions, both
participate by the close of the 45-day
high to promote development of large beneficially and adversely.
Comment. Public comments about comment period so that substantive
tree structure. comments and objections are made
—Reduce the level of hazardous fuels this proposal are requested in order to
assist in identifying issues, determine available to the Forest Service at a time
including ladder and surface fuels. when it can meaningfully consider them
Return fire to the ecosystem. how to best manage the resources, and
to focus the analysis. Comments and respond to them in the final EIS.
—Improve conditions in lodgepole pine
received to this notice, including names To assist the Forest Service in
where the overstory is in poor
and addresses of those who comment, identifying and considering issues and
condition because of mistletoe or
will be considered part of the public concerns on the proposed action,
other diseases or insects.
record on this proposed action and will comments on the draft EIS should be as
—Maintain or improve late and old
be available for public inspection. specific as possible. It is also helpful if
structured stands, and reduce the risk
Comments submitted anonymously will comments refer to specific pages or
to the ecosystem posed by large-scale,
be accepted and considered; however, chapters of the draft statement.
catastrophic outbreaks of insects,
those who submit anonymous Comments may also address the
disease, and fire.
comments will not have standing to adequacy of the draft EIS of the merits
—Address fire hazard in the wildland-
appeal the subsequent decision under of the alternatives formulated and
urban interface by creating fuel breaks
36 CFR parts 215 and 217. Additionally, discussed in the statement. Reviewers
around subdivisions. pursuant to 7 CFR 1.279d), any person may wish to refer to the Council on
—Take advantage of opportunities may request the agency to withhold a Environmental Quality Regulations for
resulting from vegetation management submission from the public record by implementing the procedural provisions
activities that offset costs and provide showing how the Freedom of of the National Environmental Policy
products to stimulate the economy. Information Act (FOIA) permits such Act at 40 CFR 1503.3 in addressing
Proposed Action. The proposed confidentiality. Persons requesting such these points.
actions are intended to sustain, confidentiality should be aware that,
enhance, and protect long-term In the final EIS, the Forest Service is
under FOIA, confidentiality may be required to respond to substantive
productivity and resiliency of the forest granted in only very limited
ecosystem, maintain and enhance comments received during the comment
circumstances, such as to protect trade period for the draft EIS. The Forest
wildlife habitat, recreational secrets. The Forest Service will inform
opportunities, and quality scenic values, Service is the lead agency and the
the requester of the agency’s decision responsible official is the Forest
and address concerns within the regarding the request for confidentiality,
wildland/urban interface. Proposed Supervisor, Deschutes National Forest.
and where the request is denied, the The responsible official will decide
actions include selection harvest, agency will return the submission and
commercial thinning, small tree where, and whether or not to thin
notify the requester that the comments stands, salvage excess dead and dying
thinning and ladder fuels reduction, may be resubmitted with or without
activity fuels treatments, and prescribed lodgepole pine, and apply natural fuels
name and address within a specified treatments. The responsible official will
underburning to treat natural fuels. number of days.
Issues. The following is a list of also decide how to mitigate impacts of
A draft EIS will be filed with the
concerns or issues related to the these actions and will determine when
Environmental Protection Agency (EPA)
proposed action that the and how monitoring of effects will take
and available for public view by April,
interdisciplinary team has identified. place.
2006. The EPA will publish a Notice of
Other issues arise from public input. Availability (NOA) of the draft EIS in The BLT Vegetation Project decision
Where issues cannot be resolved the Federal Register. The final EIS is and the reasons for the decision will be
through project design or mitigation, scheduled to be available July, 2006. documented in the record of decision.
they may be the basis for developing The comment period on the draft EIS That decision will be subject to Forest
alternatives to the Proposed Action. will be 45 days from the date the EPA Service Appeal Regulations (35 CFR
• Soil Productivity: Maintenance of publishes notice of availability in the part 215).
soil productivity is an important Federal Register. Dated: March 28, 2005.
objective for management of National The Forest Service believes, at this
Leslie A.C. Weldon,
Forest lands. early stage, it is important to give
• Water Quality and Fish Habitat: reviewers notice of several court rulings Forest Supervisor, Deschutes National Forest.
The Little Deschutes River is listed on to public participation in the [FR Doc. 05–6442 Filed 3–31–05; 8:45 am]
the 2002 303(d) list as ‘‘Water Quality environmental review process. First, BILLING CODE 3410–11–M

VerDate jul<14>2003 17:15 Mar 31, 2005 Jkt 205001 PO 00000 Frm 00003 Fmt 4703 Sfmt 4703 E:\FR\FM\01APN1.SGM 01APN1

Você também pode gostar