Revision
Edited calculation for effective depth "d" in cells K78 and M78 to increase clear distance between
rebar layers from 2.0 inches to 2.5 inches. Also edited language in J78 description. This also
required an edit to H130 and H131 where the skin reinforcing spacing is calculated.
Edited cells K83 and M83 so that the tension controlled outcome is set to "NO" if the rebar grade is
above 60 ksi. The ACI 318 code is unclear about the tension control limit for bars above Grade 60.
All bars 60 ksi and below are valid for this template. Edited language in J78 description. Also
edited J43 and J53 to give no value for Et if rebar is higher than 60 ksi yield.
Edited cells K109, M109, K110, M110 so that Sd will not give an error if both the service and
ultimate moments are entered as zero. Likewise for cells F122, F123 related to service and
ultimate shears. Added a user note in cell P20 to explain what happens if a "DIV/0!" error appears.
If ultimate is entered with a value, but a zero is entered for service, this will produce the "DIV!0!"
error.
Page 2 of 5
South Hartford
Grit & Screening building
176810
Grit & Screening building
Beam B1 & B2
Owner
Plant
Project No.
Title
Computed By
Unit
Date
File No.
Verified By
AKJ
10/19/15
NV
Date
Page
of
60.0
4.0
2.0
2.0
24.0
48.0
Bottom Cover =
Top Cover =
Beam width (b) =
Beam depth (h) =
ksi
ksi
in
in
in
in
Bottom Reinforcing =
Top Reinforcing =
Stirrup Reinforcing =
Skin (Side Face) Reinforcing =
6
6
#4
2
213 k-ft
125 k-ft
275 k-ft (not including the Sd factor)
160 k-ft (not including the Sd factor)
71.6 k
92.6 k (not including the Sd factor)
-#6
Two Layers
-#5
Two Layers
@ 12 in Single Stirrup
- # 5 EF
DESIGN SKETCH
Use 24 in. x 48 in. beam with:
6 - # 6 BOTTOM REINF,
6 - # 5 TOP REINF,
# 4 @ 12" SINGLE STIRRUPS
2 - # 5 EA FACE SIDE REINF
6 - # 5 LAYERED
# 4 @ 12 SINGLE STIRRUPS
48 "
2 - # 5 EACH FACE
6 - # 6 LAYERED
24 "
Mn+ =
T actual =
(req'd.) =
actual =
actual =
504
0.056
0.0018
8.38
9.13
2.64 in^2
6 - # 6 LAYERED
Mu + =
k-ft
>=
minimum
=
>=
T
(w/o Sd factor)
<
275 k-ft
0.005
prov'd.) =
in
in
2.50 in
20.22 in
>=
<=
min =
max =
0.0025
O.K.
O.K.
O.K.
O.K.
O.K.
0.0018
O.K.
O.K.
O.K.
O.K.
O.K.
Mn- =
T actual =
(req'd.) =
actual =
actual =
359
0.081
0.0010
8.56
9.19
1.86 in^2
6 - # 5 LAYERED
Mu - =
k-ft
>=
minimum
=
>=
T
(w/o Sd factor)
<
160 k-ft
0.005
prov'd.) =
in
in
2.50 in
24.64 in
>=
<=
min =
max =
SHEAR SUMMARY
Av =
Vn =
Av (min.) =
s max =
Shear capacity
Minimum stirrup area
Maximum stirrup spacing
0.40 in^2
164.0 k
0.24 in^2
21.7 in
# 4 @ 12 SINGLE STIRRUPS
>=
Vu =
>=
Av =
s=
<
92.6 k
0.40 in^2
12 in
O.K.
O.K.
O.K.
h=
actual =
48 in
12.0 in
Page 3 of 5
O.K.
Owner
Plant
Project No.
Title
South Hartford
Grit & Screening building
176810
Grit & Screening building
Beam B1 & B2
Computed By
Unit
Date
File No.
Verified By
AKJ
10/19/15
NV
Date
Page
of
Flexure
Bot
8.04
0.85
Top
8.04
0.85
Effective Depth (d) for single layer reinf = h - cover - stirrup dia - 1/2 bar dia =
in
Effective Depth (d) for double layer reinf = h - cover - stirrup dia - bar dia - 2.5"/2 =
43.42 in
Distance from compression face to centroid of extreme layer of tension steel, d t =
45.09 in
As (prov'd.) =
2.64 in^2
c = Asfy / (0.85bf'c1) =
2.28 in
T = 0.003*(dt-c)/c =
0.056
Tension controlled section for fy <= 60 ksi, (T >= 0.005)
YES
(calc) = (0.85 f'c/fy) * (1-(sqrt(1-((2*Mu*12/(.85*.9*b*d^2*f'c)))) = 0.0014
(min) =
3*(f'c)1/2/ fy = 0.0032
and
200/(fy*1000) = 0.0033
and
1.33*(calc) = 0.0018
controlling case, (req'd) = 0.00182
As (req'd) =(req'd)*b*d =
1.89 in^2
(Prov'd.) = As (Prov'd.)/(b*d) = 0.0025
Mn = 0.9*As*fy*(d-0.5*(As*fy/0.85*f'c*b))*(1/12) =
504.3 k-ft
k = ((*n)2+2**n)1/2-*n =
0.183
j = 1-k/3 =
0.939
fs = Ms/(As*j*d) =
24 ksi
Per ACI 318, fs need not be greater than 2/3*fy =
40 ksi
Per ACI 318, maximum spacing, s, = 15*(40/fs) - 2.5*cov =
20.3 in
Per ACI 318, maximum spacing, s, = 12*(40/fs) =
20.2 in
Actual bar c-c spacing, s =
9.13 in
Bar horizontal clear spacing =
8.38 in
Larger of 2.5 inches or 3*db =
2.50 in
Horizontal clear spacing not less than 2.5 inches or 3*db
YES
Bar horizontal c-c spacing adequate to meet ACI 318
YES
ACI 350, strain gradient amplification factor =
ACI 350, fs max for normal environmental exposure =
ksi
ACI 350, fs max for severe environmental exposure =
ksi
ACI 350, fs max need not exceed
ksi
ACI 350, fs max need not be less than
ksi
ACI 350 controlling case, fs max =
ksi
ACI 350 = factored moment / unfactored moment =
ACI 350 Environmental Durability Factor, Sd, = fy/fs (>= 1.0) =
43.57
45.16
1.86
1.61
0.081
YES
0.0008
0.0032
0.0033
0.0010
0.00105
1.09
0.0018
358.9
0.155
0.948
19
40
25.8
24.6
9.19
8.56
2.50
YES
YES
in
in
in
in^2
in
in^2
k-ft
ksi
ksi
in
in
in
in
in
ksi
ksi
ksi
ksi
ksi
(NA)
(NA)
(NA)
(NA)
(NA)
(NA)
(NA)
(NA)
Shear
Av =
0.40
98.9
0.23
0.24
65.1
395.5
164.0
in^2
k
in^2
in^2
k
k
k
ksi
ksi
(NA)
(NA)
(NA)
(NA)
(NA)
0.0 k
k
(NA)
(NA)
21.7 in
in
in
21.7 in
(NA)
(NA)
Page 4 of 5
48 in
20.2 in
in
6.1 in
5.9 in
Owner
Plant
Project No.
Title
South Hartford
Grit & Screening building
176810
Grit & Screening building
Beam B1 & B2
Computed By
Unit
Date
File No.
Verified By
AKJ
10/19/15
NV
Date
Page
of
Page 5 of 5
2 per face
12.0 in
O.K.