1. Executive Summary 04
2. Existing Conditions Analysis 05
3. Planning Framework 09
4. Near-term Improvements 15
5. Long-term Strategies 21
6. Next Steps 25
Appendix

A. Test Fit for 440 Essex Street


B. Test Fit for Truell Site & 372 Essex Street
C. Test Fit for Public Safety Academy
D. Development Catalogue

December 2014

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Figure 1 A historical postcard shows


Essex Street during the 1950s as a
thriving commercial street.

December 2014

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Executive Summary
The City of Lawrence faces challenges and opportunities common
to many medium-sized post-industrial cities in Massachusetts.
Since March 2014, Utile has worked with
MassDevelopment and the City of Lawrence to
study revitalization strategies for the west side of
downtown. Its economy, which once prospered
on a foundation of manufacturing, has shifted
into a service-oriented one. Immigrants, predominantly from the Dominican Republic and
Puerto Rico, have brought new diversity and vitality, but this creates new demands on the Citys
social services. The area near the commuter rail
station has seen a recent spate of residential and
commercial development centered around the
former mills, but these developments have yet
to have a visible impact beyond their immediate
surroundings.
Downtown West, the target of this planning
studies, is emblematic of these conditions.
Formerly a center of the Citys commercial life,
it has seen a downturn along with the Citys
larger manufacturing economy. The generous
and architecturally distinctive retail streetscape
remains substantially intact, but many of the
storefronts are vacant or populated by struggling, transient businesses. In recent years,
a growing number of ethnic businesses have
begun to slowly repopulate the area, but they
struggle against the areas ebbing drawing power
and poor perception. A number of important
institutions, exemplified by the Northern Essex
Community College, are beginning to play an
important role in shaping the area, but their
relationship to the surrounding area needs to be
carefully considered.
Another aspect of the study is brownfields.
Downtown West was part of an environmental
analysis, conducted by Weston and Sampson,
that examined potential environmental contamination across all parcels in the area. This information has yet to be comprehensively catalogued

December 2014

and crossed referenced with ownership and


vacancy. A part of this planning studys responsibility was to examine and consolidate brownfield information for the City as it prepares a
redevelopment strategy for these parcels.
Understanding of Issues
The planning team considered these planning
issues, and developed a few understandings of
the planning context. One, market-driven pressure for large housing and commercial development is limited in Downtown West, at least in the
short term; development that leverages the needs
and ambitions of area institutions is a much
more feasible development proposition. Two,
there is significant energy and will for grassroots, small-scale entrepreneurial investment,
even as it struggles against regulatory hurdles
and poor perceptions; the City should strategically deploy its limited resources to foster this
activity.
Recommendations
These findings led to two types of planning
recommendations, predicated on a close partnership between the City, the institutions, and
individual business and property owners. The
short-term recommendations should be spearheaded by the City, and are focused on improving access, parking, streetscape, and general
perceptions. The long-term recommendations
are by nature more speculative; these include
potential re-use scenarios for vacant main
street type commercial buildings, institutional
expansions on vacant sites, and changes to the
property taxation and regulations governing
development. These recommendations are the
shared responsibility of the City, institutions,
and individual property and business owners,
and require an ongoing dialogue between these
three parties.

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Existing Conditions Analysis


The study area is located on the west side of
downtown, bounded by Broadway to the west,
Haverhill Street to the north, Lawrence Street
to the east, and the Merrimack River to the
south. Essex Street, one of the central focuses of the study, cuts through the study area.
The planning team also examined existing
conditions in the larger urban design zone of
influence to better understand the planning
context of the study.
Demographics, Transportation, and Land Use
A post-industrial city that has in recent years
welcomed diverse groups of immigrants,
Lawrence is a city in demographic transition.
The median income in the City at large is
substantially lower than the median state-wide
income, reflecting the economic challenges the

City faces. This is especially true of the areas


near downtown and the study area.
Downtown West historically has not been,
and still is not, a major residential area. Instead,
it is dominated by commercial and institutional
uses, with the only significant residential population concentrated at Sagamore Village and
Essex Towers.
Given the lack of a large residential population within its walking distance, the vitality of
Downtown West and Essex Street in particular
depends less on providing neighborhood-scale
services than providing amenities that serve a
city- and potentially region-wide population.
This also depends heavily on a transportation
infrastructure that can effectively bring people
to the area.

Figure 2 Reflecting the economic


challenges facing the wider City of
Lawrence, the median income level
in the Downtown West study area is
significantly below state average. As
a predominantly business and institutional district, the study area also
contains a relatively small resident
population.

December 2014

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Figure 3 The Buckley Garage and


Transportation Center is a focal point
of service for the MRVTA, with hourly
or half-hourly service to surrounding
cities; the recently initiated downtown
shuttle has stops on Essex Street,
and serves a more local population.
These are important transportation
assets that the study area could
leverage.

In terms of transportation, the study area is


well-served by the Buckley Transportation
Center and Garage, a focal point of service for
the MRVTA, with half-hourly or hourly services
to other cities in the Merrimack River Valley
region. The recently started downtown shuttle
passes through the study area along Broadway
and Essex Street, and serves an important role
for the local population.
The Lawrence MBTA commuter rail station
has recently been a locus of development activities focused on the conversion of industrial loft
buildings. However, due the distance between
the study area and the commuter rail station
(twenty minutes on foot), there has been limited
spillover.

December 2014

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Brownfield Sites
Brownfields are vacant, abandoned, or underutilized industrial or commercial properties where
expansion, redevelopment, or improvement is
complicated by real or perceived environmental contamination and liability. A part of this
planning exercise is to identify and catalogue
brownfield sites in the study area, so that the
City and other public agencies can target them
for remediation and redevelopment.
The planning team carefully examined the
brownfield report produced by Weston and
Sampson in 2013, and mapped all the potential
brownfield sites in the study area and categorized them in terms of the type and severity of
contamination. This map is shown in Appendix
D. Concurrently, the planning team compiled all
the parcel information into an easy-to-use and
easy-to-understand development parcel catalogue for the City to conduct developer outreach.

December 2014

Figure 4 Based on information from the 2008


Weston & Sampson Brownfield Inventory, the planning team mapped out the brownfield sites in the
study area as well the range of their potential contamination. These sites are the first priority in terms
of ground-up development, and form the basis for
the development parcel catalogue in Appendix D.

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Figure 5 Important institutional


anchors and major recent developments in the study area. Planning for
Downtown West must leverage the
existing strength and momentum of
these anchors.

Institutions
Downtown West is home to several local and
regional institutions that have in recent years
played an increasingly important role. These
include the Lawrence Y, the Greater Lawrence
Community Action Council, and the Northern
Essex Community College (NECC). The latter
has played an especially active role, and its new
El Hefni Allied Health and Technology Center
(which opened in early 2014) has had a transformative impact on the cityscape in this part of the
City.
The future success of Downtown West depends as much on the vitality of its commercial
enterprise as it does on its successful and symbiotic relationship with these institutions. For
example, a growing student and faculty population at NECC could activate retail and increase
demand for nearby housing. Major institutions,
in partnership with the City, can also spearhead
efforts to reclaim vacant and underutilized
properties and undertake public realm enhancements. This is especially important when
there is little market-driven demand for these
activities.

City of Lawrence & MassDevelopment

December 2014

Downtown West Planning Study, Lawrence, Massachusetts

Planning Framework
Lawrence faces numerous social and economic challenges, but it has strong urban design
bones, with a well-proportioned main street
(Essex Street), a regular street grid, historic
buildings, open space resources such as the
Common and the canal, and strong transit
connections to Boston and other cities in the
Merrimack Valley.
Downtown West has several important anchors:
the Northern Essex Community College, the
YMCA, and the Buckley Transportation Center
and Garage. In addition to these assets, the urban fabric and small, entrepreneurial businesses
of Essex Street are a strong foundation for revitalizing this part of downtown Lawrence.
Leveraging these assets will require tackling
several challenges. The City, and property and
business owners, can immediately undertake
short-term improvements. Long-term allocation
of the Citys and institutions limited resources
should be guided by broader redevelopment and
economic development goals.
The market for commercial or residential
development, whether as new development or
renovations of the existing building stock, is not
strong enough to drive redevelopment in this
area. Rather, by fostering small-scale, short-term
improvements, the City can set the stage for
longer-term redevelopment goals.

December 2014

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Figure 6 Scope area of the Canal


District Strategic Master Plan

Previous Plans
Canal District Strategic Master
Plan (2008)
Background and Goals
The Canal District Strategic Master Plan was
jointly undertaken by the City of Lawrence and
MassDevelopment in 2008, and was a comprehensive, big-picture exercise to envision
the future for a large area of central Lawrence
straddling the Merrimack River and North
Canal. The study area is shown in Figure 6, and
overlaps with the southern half of the Downtown
West study area.
The Canal District Plan sought to discover
development opportunities for housing, job
growth, and economic development; it aimed
to identify key private development sites and
their potential futures, as well as the key public
investments necessary to support these developments. It also proposed regulatory implementation tools to support these development efforts.
Summary of Recommendations

Future land use concept: Essex Street
should be enhanced as the main mixed-use
spine. The river and canal edge should become the focus of new residential develop-

10

December 2014

ment. The area south of the river, particularly in the southwest quadrant of the study
area, is and should remain light industrial.
Parking and circulation: Methuen Street
should serve as the secondary access
streets for parking and back of house functions, while Essex and Canal Streets should
be enhanced as address streets. The main
bridges crossing the Merrimack River need
to be improved and made attractive as gateways into the city.
Public realm: the Canal and River waterfronts should be made attractive with waterfront esplanades. Additional streetscape
improvements should be made to Essex,
Merrimack, Union, Broadway, and General
Streets.
Priority development sites: the Master Plan
highlighted particular sites as places where
new development would have the greatest
visibility and impact.

Tools for Implementation


As the key implementation strategy, the Master
Plan calls for the City to make critical regulatory changes to anticipate and ease future
development. This includes zoning changes, title
clearance, as well as establishing DIF and Urban
Renewal Districts.

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Figure 7 Recommended public


improvements

Figure 8 Priority development sites

11

December 2014

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Open Space Plan (2009)


Background and Goals
The Open Space Plan was prepared by
Groundwork Lawrence, under contract with
the City, and submitted to the Commonwealth
in 2009 as the required once-every-seven-year
update.
Summary of Recommendations
The Open Space Plan calls for enhanced improvements to several important open spaces all over the City. Of particular interest to
Downtown West is the increased maintenance to
ONeill Park and Campagnone Common. In addition, echoing the Canal District Master Plan, it
calls for enhanced sidewalk along Canal Street,
and a potential trail that wraps around North
Canal and the Merrimack River.

ULI North Canal District TAP


Report (2013)
Background and Goals
The ULI TAP report focused on a smaller subset

12

December 2014

Figure 9 Improvements identified in


the Open Space Plan

of the larger scope area considered by previous


planning around the Canal. It placed particular emphasis on resolving the development
challenges facing Lawrences stock of large
mill buildings, and aimed to develop low-cost,
actionable strategies that the City and private
owners can implement easily.
Summary of Findings and Recommendations
The report identified several key challenges for
the redevelopment of mill buildings: their size
and floor plates are often ill-suited for modern
use; large capital investments such as freight
elevators are cost-prohibitive; and many properties lack space for parking, even as some private
parking in nearby areas are under-utilized.

Public realm: Similar to the Canal District
Strategic Master Plan, the TAP report proposed making public realm improvements
as armatures for future growth, much
of this along the Canal. Other proposed
improvements include connections between the City and the canal. Recognizing

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

the Citys limited financial resources, the


report called for limited improvements
at first, such as better lighting to foster a
sense of safety.
Parking and circulation: the report recognizes the paradoxical problem of not
enough parking for mill buildings on
the one hand, and insufficiently utilized
private parking elsewhere. To address
this, the report called for a comprehensive
parking study to explore possibilities such
as a shared parking model. The report also
called on the City to enforce its existing
parking fees.
Wayfinding and signage: the report proposed inexpensive wayfinding and signage
to foster a stronger district identity.
Engagement: the report recognized that
the Citys resources alone are limited. A
fundamental revitalization strategy involves ongoing outreach to private owners
and area institutions, in order to combine
and leverage their individual efforts into
something much larger.
Regulatory implementation: the report
called for the City to ease development process, by fast track permitting and appointing a Development Point Person.

Contextualizing the Downtown


West Study within Previous
Efforts
The Downtown West Planning Study builds
upon the knowledge and insights gained from
previous planning efforts described above.
Between the Canal District Master Plan, the
ULI Tap Report, and this study, a few important
common themes emerge:
Small Public Realm Improvements Creates
Perception of Change
Both the Canal District Master Plan and the
TAP Report advance the idea of a public realm
armature that builds off of and in turn enforces development momentum. Improving lighting,
having better signage, and other small improvements to the public realm play an important
role in creating visible change and improving
perception of the area.
While previous studies focused on the Canal
and its relationship to the mill buildings, the
Downtown West Study focuses more on the

13

December 2014

public realm around businesses on Essex Street


and institutions such as NECC. A key part of the
study is about ensuring a good state of repair in
the public realm, and adding everyday amenities
such as bench seating, which not only signals
visible change but also immediately contributes
to the quality of life. Another important part of
the public realm are the store facades, and this
study recommends ways in which individual
business owners can improve their storefronts.
In the long run, the public realm improvements proposed in the Canal District Strategic
Master Plan, the TAP Report, and this study are
complementary. The Downtown West district
does not live in a vacuum. The public realm connections proposed in the previous studies will
serve to better link the Downtown West study
area to the Canal District and the commuter rail
station, areas of active development in recent
years; these linkages will serve to connect the
business and institutional populations on Essex
Street, the mill buildings, and the residential
development around the station, and will one
day bring greater development momentum to
Downtown West.
Intelligently Resolving Parking Shortage
Both the Canal District Master Plan and the
TAP Report refer to the shortage (or at least
perceived shortage) of parking in the area. The
Canal District Strategic Master Plan of 2008
called for the construction of additional parking near downtown. This recommendation may
be problematic, however, when applied to the
Downtown West study area. Not only are large
parking structures expensive and detrimental
to the urban fabric, they are also potentially unnecessary. Depending on the nature and timing
of parking demand, there is the opportunity to
intelligently share and better utilize existing
parking resources in the study area.
The TAP Report is a step in the right direction by calling for a parking study that explores
alternative management practices, such as
district shared parking. The Downtown West
Planning Study goes a step further, and breaks
down the problem of parking into the issue of
access (the existing one-way system makes many
parking lots hard to access), the issue of management and pricing (street parking should be more
expensive than lot parking), and the issue of
maintenance (important parking resources such
as the Buckley Garage is in a poor state of repair,
and discourage potential users). Rather than
building more parking, this combined approach

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

should go a long way towards addressing the perceived parking shortage.


The Importance of Outreach
All planning studies, including this
one, recognize the limited capacity of
the City to undertake projects alone.
An important part of future success
is effectively engaging private owners and especially area institutions,
so that their individual goals can be
effectively cross-fertilized, and their
efforts combined.
Many recommendations of the
Downtown West Study piggyback on
the ongoing evolution of the NECC,
and the future vitality of Essex Street
business depend on a significant part
on the ongoing commitment of NECC
to the area. In addition, the study also
tries to involve small business owners
in improving the physical surroundings of the area, with the Storefront
Improvement Brochure being the
most visible part of the effort.

14

December 2014

Figure 10 (Above) Scope area of the


North Canal Distrct TAP Report

Figure 11 (Below) Recommended


public improvements

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Near-Term Improvements
One-Way to Two-Way Conversions
As a result of post-war traffic engineering,
Downtown West today contains a road network made up of many one-way streets. In the
immediate study area, Franklin, Hampshire,
Amesbury, and Lawrence Streets are one-way in
the north-south direction, forming bi-directional pairs, and Common Street is one-way going
east. Essex Street was one-way until recently,
when it was converted back to two-way.
This predominantly one-way system is problematic for several reasons. First, it is confusing
for drivers, especially first-time visitors. This is
especially true for Amesbury Street, where visitors coming from the south are suddenly diverted upon entering the district, when they could
easily continue through to the Buckley Garage.
Second, one-way streets make it more difficult to
traverse the side streets off of Essex Street, and
lead to the park lots on these streets under-utilized. Finally, one-way streets tend to encourage
faster traffic, and have an adverse impact on
pedestrian safety and business vitality. Vikash
V. Gayah, an assistant professor at Pennsylvania
State University, has conducted extensive
research about one-way versus two-way streets
and believes that two-way conversions may ease
traffic congestion. (For more detailed information, see Gayah, V.V. & Daganzo, C.F. Analytical
Capacity Comparison of One-Way and Two-Way
Signalized Street Networks. Transportation
Research Record, No. 2301. 2012, pp. 7685.
DOI: 10.3141/2301-09)
For these reasons, a number of cities and
towns have been converting one-way streets into
two-way streets in recent years. Among them
are Louisville, Kentucky; Dallas, Texas; Denver,
Colorado; Sacramento, California; Tampa,
Florida; and Lowell, Massachusetts.
The planning team recommends that a
systematic study for converting one-way to
two-way streets be undertaken, beginning with
Amesbury Street. This should be then extended to the ladder streets perpendicular to Essex
Street.

15

December 2014

Figure 12 The existing system of one-way streets (A) is confusing for visitors, and contributes
to parking being inaccessible. The City can investigate a phased approach to converting
these streets to two-way, starting with Amesbury and Canal Streets (B), and culminating in all
the ladder streets perpendicular to Essex Street.

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Parking Improvements
Adequate, well-located, and well-managed parking is key to the success of downtown business
districts. Currently, in the vicinity of Essex
Street, there are several large parking lots as well
as the Buckley Garage. There is also significant
on-street parking capacity. To make this a greater asset to Downtown West, the planning team
recommends that the City undertake several
management enhancements:
Better signposting for off-street parking lots: To address the perception among
certain residents and visitors that parking
is difficult to find, better signposting for
off-street parking lots should be installed.
These should be of a uniform and recognizable design, and clearly identify important
information such as rate and opening hours.
The one-way to two-way conversion mentioned above should also make it easier for
visitors to find parking. The two efforts may
be timed to coincide.
Improvements to Buckley Garage: With
improvements and proper maintenance,
Buckley Garage could become a much better-utilized parking resource and a revenue
generator. The City has already under-

16

December 2014

taken short-term improvements, such as


removing abandoned vehicles; in the longer-term, the City should consider making
physical upgrades, such as better lighting,
a super-graphic treatment on the outer
blank wall or other facade improvements,
and accessibility enhancements. The City
should also consider the new Massachusetts
Percentage for the Arts Program for the
facade or the interior waiting areas of the
Buckley Garage.
Pricing: As a matter of urban planning best
practice, on-street parking spaces along
Essex Street should be made available first
and foremost to retail customers. Parking
pricing for these spaces should discourage
employee parking, and encourage frequent
turn-over and retail patronage.
Figure 13 Revamping parking pricing
and signage are part of a coordinated
strategy to improve parking utilization. On-street parking should ideally
be dedicated to retail customers,
and its pricing should encourage
frequent turn-over. On the other hand,
off-street parking should be cheaper
to encourage longer-term use. Better
sign-posting, combined with street directionality changes recommended in
the previous section, will help visitors
to find parking more efficiently.

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Figure 14 Revamping parking pricing


and signage are part of a coordinated
strategy to improve parking utilization. On-street parking should ideally
be dedicated to retail customers,
and its pricing should encourage
frequent turn-over. On the other hand,
off-street parking should be cheaper
to encourage longer-term use. Better
sign-posting, combined with street
directionality changes recommended
in the previous section, will help visitors to find parking more efficiently.
For the facade, the City might pursue
funding through the newly-announced Massachusetts Percentage
for the Arts Program.

17

December 2014

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Streetscape improvements (including connector space)


The planning team recommends that streetscape improvements to Essex and surrounding
streets be undertaken in two steps. The first step
involves basic state of repair improvements
to lighting and general pavement conditions.
Numerous store owners as well as NECC students and faculty have relayed how inadequate
lighting and poor pavement conditions (particularly on Common Street and the cross streets
around the campus) contribute to a poor perception of safety. Addressing these conditions
will go a long way towards addressing that
perception.
Additional improvements to the area should
focus on creating amenities complementary to
its retail and institutional character. Particular
emphasis should be placed on creating street
seating around retail nodes and bus stops (for
the new downtown shuttle). The 15 sidewalk
width on the north side of Essex Street generally

provides sufficient clearance for bench seating;


where there is not enough clearance, and particularly at key intersections, the city can explore
adding curb extensions or semi-permanent
parklets. (Parklets are small spaces, usually
extending off sidewalks, that provide amenities.
Typically, parklets are the size of several parking
spaces.)
Whereas baseline streetscape improvements should happen all along Essex Street
and surrounding streets, a few key open spaces
should be more intensively designed and programmed to provide anchors of activity on Essex
Street. The greatest opportunity exists on the
connector space that joins the new NECC El
Hefni Health & Technology Center on Common
Street to Essex Street. Currently a vacant lot
but a recipient of a MassWorks grant, the space
should become an active plaza-like space, complete with outdoor lighting, ample seating, and
potential outdoor retail that feeds off of adjacent
businesses.
Figure 15 The potential scope for
public realm improvement includes
ensuring a good state of repair on
Essex, Common, and the cross
streets in between. Greater investment should be made to key open
spaces such as the connector space
in front of the new NECC building.

18

December 2014

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Figure 16 Essex Street (as shown at


the intersection of Hampshire, above)
will benefit from targeted streetscape
improvements, such as lighting, street
furniture, and better storefronts.

19

December 2014

Figure 17 The connector space


(shown below) on Essex Street,
leading to the El Hefni Health &
Technology Center, should be a
well-designed and programmed pla-

za that links the activity of the college


to Downtown Lawrence.

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Storefront Improvements
Reinvigorating Essex Street as a retail destination will be a long-term project, involving
not only incubating new businesses but also
strengthening existing ones. Whereas streetscape improvements will improve the quality
of public realm, storefront improvements will
enhance the appeal of retail. The two efforts,
requiring collaboration between the City and
private property owners, must work in tandem.
Together they will result in a more vital main
street and will address perceptions about pedestrian safety on Essex Street.
Storefront improvement does not mean imposing a uniform aesthetic on the entire street;
rather, it needs to embrace and respect the kind
of diversity that marks a truly vibrant district
(such as on Broadway). It should also recognize
the limited resources businesses and/or property owners might have for making physical
improvements. To that end, the planning team
recommends that the City disseminate a set

of storefront improvement guidelines that


advises store owners on a number of discrete,
inexpensive improvement projects. This includes
visually decluttering the storefront (especially
windows), new signage possibilities, seating, and
planter boxes.
Concurrently, the City should explore revamping its existing storefront improvement
program so that its resources can be disbursed
to a larger number of smaller storefronts.
Rather than directing $20,000 to a very limited number of storefronts, the same funding
can be available for smaller amenities like new
signage and planter boxes over a wider swath of
the street. Program funding should be tied to a
review according to the Storefront Improvement
Guidelines.

Figure 18 The Storefront


Improvement Brochure contains
information on how to improve a
storefront at a relatively low cost. This
information should be widely distributed to business owners in Downtown
West, and can be tied to a potential
outreach strategy by the City to foster
a closer working relationship with
business owners.

Principles for a
Better Storefront

Principles for a
Better Storefront
1

Think of the 2' zone immediately outside your


storefront as an extension of your storefront.
Consider enhancing it with seating and
planters; otherwise, keep it clean and free of
obstructions.

Maximize transparent areas along the


storefront; where possible, stores should aim

Think of the 2' zone


immediately
outside your
to have exposures
on two streets.
storefront as3anWhere
extension
storefront.
the depth ofof
the your
storefront
zone
exceeds 4', consider incorporating cafe-type
Consider enhancing
it with
seating
and
seating, with
approval
from the city.
planters; otherwise,
it clean
free of
visual clutter
such as and
excessive
4 Minimizekeep
signage. Temporary signs and fliers
obstructions. window
should be concentrated in one area near the

Maximize transparent
areas along the
5 Store signs are a key part of your business'
image.
See detailedstores
guidelines should
on the flip aim
storefront; where
possible,
side.
to have exposures on two streets.

Where the depth of the storefront zone


When thinking about your storefront, walk across the
exceeds 4', street
consider
and take aincorporating
look at your storefront.cafe-type
Consider it
the perspective of a person walking or driving by.
seating, withfrom
approval
from
therepresent
city. the type
Does
the storefront
accurately

serviceclutter
is being provided?
Minimize visual
such as excessive
Is it welcoming to passersby?
window signage.
and catch
fliers
Does theTemporary
signage, windows,signs
and/or displays
the eye?
should be concentrated
in
one
area
near
What does the storefront look like as one walks the
entrance. down the sidewalk? From a passing car?

Store signs are a key part of your business'


image. See detailed guidelines on the flip
side.

entrance.

Helpful Hints and Suggestions

of business? Can you tell what is being sold or what

Helpful Hints and Suggestions


When thinking about your storefront, walk across the
2014
and December
take a look
at your storefront. Consider it
from the perspective of a person walking or driving by.

20
street

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Long-Term Strategies
While improvements to streetscape, parking,
and storefronts can be undertaken relatively
quickly, activating vacant properties and sites
and turning them into economically productive
uses will be a much longer-term task that requires regulatory and financial support as well
as ingenuity and risk-taking on the part of the
City and the private and institutional sectors.
The following section highlights some potential
long-term strategies.
Like many downtown main streets of a
similar vintage, Downtown West, and Essex
Street in particular, is home to a large number of
mid-rise commercial buildings. These buildings
typically have ample architectural character,

but lack modern amenities and are difficult and


expensive to bring into compliance with modern
building regulations. This is particularly true
for the upper floors, since inhabiting them requires the installation of elevators and a second
means of egress, which are difficult to install
both in terms of their cost and the required
space.

Figure 19 The vacant


building at 440 Essex
Street is typical of many
of the older main street
commercial buildings
in Lawrence, and
other mill cities in the
northeast.

21

December 2014

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Upper Floor Re-use


The planning team took 440 Essex Street, a
commercial building with vacant upper floors,
as a case study to understand the reuse potential of such buildings. The building was chosen
because it has typical dimensions for a main
street commercial building, is of architectural
interest, and is owned by a property owner interested in redevelopment.
The challenge of redeveloping such a building is as much programmatic as physical and
financial. In an inactive real estate market such
as downtown Lawrence, there is limited appetite
for market-rate multi-family housing. (Although
a concurrent housing study, underway by the
City, has identified a shortage of housing units
in the city.) The planning team looked at NECCoriented programsstudent/faculty housing, or
administrative offices.
The floor plans shown here represent a range
of options for the upper floors. Common to all
configurations are a new elevator, and two separate egress stairs that are compliant with build-

ing code. All options achieve approximately a


75% net-to-gross ratio.
While these test fits demonstrate the reuse
feasibility of these main street commercial
buildings from a physical design point of view,
they leave the financial questions unanswered.
New elevators are especially expensive to install,
and can be prohibitive in a market with weak
demand. Available financing programs may
be either inadequate to cover the gap, and/or
difficult to navigate for developers with limited
experience. While understanding and enhancing
these programs is outside the immediate scope
of this project, they are a key area for future
explorations.

Figure 20 Potential floor plans for a


residential conversion of 440 Essex
Street. See Appendix A for detailed
metrics.

22

December 2014

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Vacant Storefront as Incubator Spaces


A long-term strategy to revitalize Downtown
West as a commercial/retail district could begin
with re-purposing vacant or under-utilized
storefront spaces on the ground floor. Compared
to renovating the upper floors, this would
require relatively insignificant investment, and
can rapidly bring people and activities to the
street level.
The nature of the temporary use can be
varied. Vacant storefronts can host temporary
or semi-permanent retail, and can provide an
inexpensive entry point for local entrepreneurs
in Lawrence. They can also host classrooms and
walk-in offices associated with local non-profit
institutionsfor career and skills development
and child care, for example. They can also provide inexpensive office space for small startups.
The City can help fill vacant storefronts in
two ways. It may provide regulatory relief for
temporary occupancy; it may also facilitate connections between property owners and prospective tenants. The City may, for example, keep a
regularly updated dossier of vacant storefronts
that is publicly advertised. The City may also
organize outreach events that target potential
temporary retail tenants, especially among minority entrepreneurs for whom language barrier
might be an issue.

Figure 21 Vacant storefronts contribute to a perception of an unsafe area,


which was mentioned in public meetings and in focus groups with NECC
staff and students. If these storefronts
were occupied, even temporarily, it
could help address the perceived
public safety issues.

Figure 22 The Truell site was studied


as a potential redevelopment. Two
options were developed for the Truell
site, with the renovation of 372 Essex
Street and the potential redevelopment of nearby low-rise buildings.

Comm

on S t

Essex

St
Truell site

372
Essex
St
Am
es
ry
bu
St

Methe

23

December 2014

un St

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

way to a second, smaller vacant parcel west on


Essex Street. This option achieves much greater
efficiency, and allows a relatively inexpensive
way to access the upper floors in the existing
building at 372 Essex Street.

Redeveloping Brownfield Sites


The planning team looked at two additional sites
to understand their potential for redevelopment.
These can be considered as transformative
developments--large, one-off investments tied to
the plans of the City and key local institutions
that may generate a positive impact on a large
area.

Figure 23 The Truell


site redevelopment
Option 2 occupies the
vacant Truell site, rehabilitates the adjacent
building (372 Essex
Street) and redevelops
the low-rise buildings to
the west of the site.

Truell Site
The Truell site is a vacant City-owned site near
the intersection of Essex Street and Amesbury
Street. The adjacent building at 372 Essex Street
is currently being investigated as a potential
office conversion. As one of the larger sites in
Downtown West in close proximity to NECC,
the site offers a prime opportunity for NECCrelated housing.
The planning team developed two options.
Detailed plans, elevations and associated metrics are shown in Appendix B.
Option 1 assumes a stand-alone development,
consisting of retail on the ground floor and
three floors of residential use above. Option
2 assumes a much larger development footprint that extends over the adjoining buildings
(requiring acquisition and demolition), all the

Me

Am

b
es

ur

St

Es

24

Public Safety Center


The planning team conceptually studied a combined police/public safety academy on several
vacant sites north of Common Street. Detailed
plans and metrics are shown in Appendix C.
The planning team took as its precedent the
Schoolcraft College public safety academy in
Michigan. To achieve the desired square footage
of roughly 30,000 to 40,000 sf, two options
were developed. Both options follow an overarching urban design logic of extending a central
campus walkway on axis with the existing entrances to the NECC El Hefni Allied Health and
Technology Center. This central spine will serve
as an important urban design framework for the
future evolution of the campus.

December 2014

se
xS

th e

un

St

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Next Steps
To realize the recommendations
contained in this study, the planning team recommends that a
number of relatively discrete,
near-term projects be undertaken first, in order to create
visible change and generate
momentum.
These include quick-win improvements:
Improving Buckley Garage: Beyond the
removal of abandoned vehicles, which took
place in fall 2014, the City can begin to study
options for new wayfinding and signage, and
possible renovation scenarios to the ground
level and the exterior.
Better wayfinding and pricing for offstreet parking lots and on-street parking:
Signposting for off-street lots can help address the perceived problems about parking.
In addition, parking pricing should differ
for on-street spaces on Essex Street, parking
on side streets, and parking in lots and the
Buckley Garage.
One-way to two-way street conversion:
The City, in conjunction with the MPO, can
more carefully investigate the conversion of
one-way to two-way streets, beginning with
Amesbury Street.
Finalize and distribute information outreach tools: The City can time the public
distribution of the Storefront Improvement
Guidelines brochure with a potential revamp
of its storefront improvement program as
recommended in this report.
The longer-term recommendations in this report
are necessarily more opportunistic, and more
tied to the emerging plans of institutions, the
private sector, and state and local agencies.
The responsibility matrix shows how various
entities can contribute to the vision contained
in this report; an ongoing conversation between

25

December 2014

these entities, through platforms such as the


Lawrence Partnership, is key to ensuring a productive collaboration.
While outside the scope of this planning study,
the City should also investigate additional
regulatory tools to advance development in
Downtown West. These potential tools include:
Urban Renewal District: (Re)establishing
an Urban Renewal District that includes
Downtown West could be particularly important for the assembly, remediation and
preparation of development sites in the area
in anticipation of larger development opportunities tied to NECC, the City, or the State.
Local Historic District: The City should
investigate a historic district for the Essex
Street commercial corridor, among other
historic preservation measures. (This may be
an extension of the existing federal historical district.) A local historic district provides the City with enforceable authority to
protect the turn-of-the-century architectural
character of the street. Private developers
can more easily access federal and state
historic tax credits, which can help fill the
financing gaps for projects. In addition,
certain properties owned by the City and
non-profit institutions become eligible for
grants from the Massachusetts Preservation
Projects Fund when available;
Housing Development Incentive Program
(HDIP): HDIP is aimed at promoting market-rate residential growth in Gateway
Cities, and provides local property tax
relief and state tax benefits related to the
rehabilitation of existing properties. This is
especially pertinent to a long-term re-use
strategy for the upper floors of main street
commercial buildings along Essex Street.
As a first step, the City needs to designate a
Housing Development Zone and develop a
plan for promoting housing within this zone
for DHCD approval.
Deferred property tax increases for
improvements.

City of Lawrence & MassDevelopment

Downtown West Planning Study, Lawrence, Massachusetts

Figure 24 This responsibility matrix


shows how the City, the State, area
institutions and the private sector can
work together to achieve the goals
highlighted in this report.

26

December 2014

City of Lawrence & MassDevelopment

Downtown West Planning Study

Appendix A: Test Fit for


440 Essex Street
The building located at 440 Essex Street is typical of many main street commercial buildings
along Essex Street in terms of its architectural
character and dimensions. Like many of its
type, finding an economically productive use
for the building has proven a challenge. The
dimensions of the upper floor plates do not lend
themselves easily to residential conversion; this
is further complicated by the entry/egress and
accessibility requirements in modern building codes, which are triggered by any major
renovation.
The planning team studied three options
for the reuse of the buildings. Scenario 1 results in commercial space on the ground floor
and two-bedroom units on Levels 2 through 5.
Scenario 2 assumes a different configuration of
fire stairs to satisfy the egress requirements, and
results in a mix of one- and two-bedroom units.
Finally, Scenario 3 studies the potential for office spaces on the upper floors. All three scenarios incorporate elevators to satisfy accessibility
requirements.
Option 1 shows one potential configuration for the elevator and two means
of egress. This configuration allows
for the creation of two equally sized
residential units on the upper floors.

Net/Gross Ratio

75%

Leaseable Retail

2,050 sq. ft.

Residential Units
One-Bedroom
Two-Bedroom

i Appendix

8
4
4

City of Lawrence & MassDevelopment

Downtown West Planning Study

Option 2 shows a different potential


configuration for the elevator and two
means of egress. This configuration
creates a mixture of two-bedroom and
studio units.

Net/Gross Ratio

76%

Leaseable Retail

1,960 sq. ft.

Residential Units
Studio
Two-Bedroom

12
8
4

Option 3 shows how the building can


be configured as offices on the upper
floors.

Net/Gross Ratio

75%

Leaseable Retail

2,050 sq. ft.

Leaseable Office

8,200 sq. ft.

ii Appendix

City of Lawrence & MassDevelopment

Downtown West Planning Study

Appendix B: Test Fit for Truell


Site & 372 Essex Street
The Truell site is an important piece of Cityowned real estate on Essex Street. Its redevelopment will have a major impact, physical and
perceptual, on the streetscape. The planning
team explored several redevelopment possibilities for the site, based on varying levels of
City and State agency involvement and extent of
property acquisition.
The schemes result in a mixed-use commercial/residential building, with up to 70 residential units and 20,000 sq. ft. of ground-level commercial space. The building will also contribute
to the public realm of the district by creating
connections between Essex Street and the parking lots behind, and restoring the integrity of
the street wall.

Essex Street elevation

iii Appendix

City of Lawrence & MassDevelopment

Downtown West Planning Study

Option 1 represents the less intensive


scheme, where only the City-owned
parcel is redeveloped.

FAR
Net/Gross Ratio
Floor Area (Gross)
Residential (Net)
Commercial (Net)
Back-of-House
Residential Units

3.6
78.6%
26,850 sq. ft.
15,750 sq. ft.
4,700 sq. ft.
1,200 sq. ft.
18

Option 2 represents a larger development scheme that involves the acquisition of additional buildings on Essex
Street. This scheme results in 58
residential units and 17,500 sq. ft. of
commercial space on the ground floor
(with the acquisition of one additional building, the numbers grow to 70
units and 20,000 sq. ft., respectively).
The scheme also involves the rehabilitation of the Truell Building. This
is an efficient scheme because the new
and rehabilitated buildings can share
the same two means of egress.

FAR
Net/Gross Ratio
Floor Area (Gross)
Residential (Net)
Commercial (Net)
Back-of-House
Residential Units

iv Appendix

City of Lawrence & MassDevelopment

4.5
85.9%
89,900 sq. ft.
57,000 sq. ft.
17,500 sq. ft.
3,100 sq. ft.
58

Downtown West Planning Study

Appendix C: Test Fit for Public


Safety Center

The development of the public safety


complex presents the opportunity
to create important urban design
connections. The Downtown West
planning study looked primarily at
the block bounded by Lowell Street
on the north, Common Street on the
south, Amesbury on the east, and
Hampshire Street on the west.

v Appendix

The notion of a public safety complex in


Lawrence has been a topic of discussion for
some time. Several parcels in Downtown West
has been put forward as candidate sites. In this
study, the planning team specifically looked
at the block bounded by Lowell, Amesbury,
Common, and Hampshire Street, and developed
concept-level schemes that test the feasibility of
a public safety center tied to the NECC.
As shown by the schemes, a public safety
center building on this site offers some potential advantages: it can create a connection, on
axis with the NECC Health Science building,
that will serve as the spine that unifies future
NECC development; it can take advantage of
the available parking in existing lots and the
Buckley Garage; it can also restore an east-west
mid-block connection between Hampshire and
Amesbury Streets.
The City has commissioned a team to further
analyze options for a Lawrence Regional Public
Safety Center. This study is a collaboration of
City of Lawrence, Northern Essex Community
College, the Executive Office of Public Safety,
and the Commonwealth Executive Office of
Administration and Finance, with support from
the business community through the Lawrence
Partnership.

City of Lawrence & MassDevelopment

Downtown West Planning Study

The Lawrence Regional Public


Safety Center Study immediately followed the Downtown West
Planning Study.
It was a partnership between the
City of Lawrence, Northern Essex
Community College, the Executive
Office of Public Safety, and the
Executive Office of Administration
& Finance.
During this study, two options
were developed, which are shown
on this page.
Option 1 shows a single
58,000-square-foot building, north of
Lowell Street, across from the block
studied during the Downtown West
Planning Study (see facing page). This
option would have parking adjacent
and additional parking across the
street.

Option 1

Option 2

Option 2 shows a potential campus


approach, with 100,000 sq. ft. of
floor space in a single building. The
primary building would be in the
center of the block studied during the
Downtown West Planning Study (see
facing page). Option 2 continues the
pedestrian connection from Essex
Street, through the El-Hefni Allied
Health & Technology Center building.
This scheme also shows a restored
cross connection between Hampshire
and Amesbury Streets through the
new building, which would link with
other NECC buildings.
Images from the LAWRENCE REGIONAL PUBLIC
SAFETY CENTER STUDY, courtesy of the City of
Lawrence. The Lawrence Regional Public Safety
Center Study was conducted by Icon Architecture.

vi Appendix

City of Lawrence & MassDevelopment

Downtown West Planning Study

Appendix D: Development
Parcel Catalogue

Information from the 2008 Weston & Sampson


Brownfield Study is compiled into a single
comprehensive inventory, showing all potentially contaminated sites in the Downtown West
study area. These form the basis of the inventory
of development parcels. Detailed information
is available on a parcel-by-parcel basis on the
pages that follow.
Several of these potentially contaminated parcels have seen recent development. These are:

5

266 Broadway *

CVS

12

464 Essex St. *

Mixed-use retail and


housing

18

195 Lowell St. *

Nicks restaurant

26

414 Common St. *

NECC El Hefni Building

vii Appendix

City of Lawrence & MassDevelopment

Downtown West Planning Study

Source

300 Canal Street

283 Lowell Street

2 Hampshire / 400
Canal Street

365 Essex Street

266 Broadway *

100 Lowell

381 Common Street

431 Common Street

78-80 Tremont Street

10

6 Broadway

11

2 Lawrence St.

12

464 Essex St. *

13

101 Amesbury St.

14

38 Lawrence St.

15

30-36 Lawrence St.

16

7-11 Broadway

17

444 Canal St.

18

195 Lowell St. *

19

92 Broadway

20

120 Amesbury

21

290 Common St.

22

65 Lowell St.

23

232 Common St.

24

265 Lowell St.

25

264 Lowell St.

26

414 Common St. *

27

372 Essex St.

28

55 Lowell St.

Federal
CERLIS

Fed RCRA
- LQG

Fed RCRA
- SQG

Fed ERNS
(EPA)

State
CERLIS

State
Leaky
Tank List

State
Leaky
Tank List

Non-Brownfield Development Sites


29

372 Essex

30

440 Essex

31

491 Essex

* Site has recently been developed.

viii Appendix

City of Lawrence & MassDevelopment

Local
Brownfields

Lawrence
Downtown West
Planning Study
Parcel Catalogue

utile

Lawrence Downtown West Planning Study

Parcel Catalogue

Development Opportunity
treet

rhill S
Area: 264,689 sf / 6.08
/ Haveacres
110

Campagnon
e Common
Current Owner: Pacific
Mills
Acquisition LLC

t
l Stree
Cana

Am

Stree

14

Jackson Street

ence

Lawr

Current Zoning: I2-General Industrial Park District,



Reviviendo Gateway District Overlay
Site Address: 300 Canal Street

ur

b
es
et
tre
yS

Common Street

et
tre
ry S

Amesbur

Environmental Contamination: Fed ERNS (EPA),


Federal
CERLIS
15

13

23
21

Essex Street
Appleton Street

27

11

29

eph

Jos

Merrimack River
sey

Ca

17

dge

Bri

Duck Bridge

Pemberton Park

Lawrence Downtown West Planning Study

Parcel Catalogue

Development Opportunity
Area: 71,055 sf / 1.63 acres
Current Zoning: I2-General Industrial Park District
l

rhil

Site Address: 283 Lowell Street

dw
oa
Br

e
Hav

Current Owner: Law Realty Trust

ay

Environmental Contamination: Fed RCRA - LQG

or

110 /

to

Lo

eet
Str
Lawr

Str

ll
we

et
re
St

hill

r
ave

et

ence

/H

11

22

t
ee
21

ire
sh

ee
Str

ee

Str

18

26

n
Fra
klin

ee

o
mm

27

et

Str

24

e
Str

11

12

Co
25

oa

Br
ay

dw
19

23

mp

ll

Com

Ha

we

15

tr
ry S

Lo

13

Amesbur

dS

for

ad

Br

14

28

e
tre

Campagn

Stree

20

10

et

tre

xS

se
Es

n
ue

ee

Str

th

Me

29

Have

Lawrence Downtown West Planning Study

Parcel Catalogue

Development Opportunity
ps
m
Ha

Area: 5,124 sf / 0.12 acres

ex

Ess

Environmental Contamination: Fed RCRA - LQG


ence

Lawr

hill

22

23

et
21

Essex Street

mp

ire

Str

Appleton Street

e
tre

sh

ell

Common Street

Ha

w
Lo

15

tre
ry S

ee

26

lin
nk

Fra
27

Str

et

ee

o
mm

th

Me

13

Amesbur

St

S
uen

14

28

Stree

20

t
ree

Campagnone Common

tree

Jackson Street

Current Owner: 6-12 Hampshire Street LLC


t

ee
Str

et
re

Site Address: 2 Hampshire / 400 Canal Street

t
Stretertee

St

verhill

Ha
110 /

re
hi

Current Zoning: B3-Main Business District

e
Str

11

12

Co

et

tre

xS

se
Es

n
ue

ee

Str

th

Me

29

l
na

et

re

St

Pemberton Park
eph

Jos

Merrimack River

Duck Bridge

16

Ca

Lawrence Downtown West Planning Study

Parcel Catalogue

Development Opportunity
Area: 7,040 sf / 0.16 acres
Current Zoning: B3-Main Business District

on
omm

Site Address: 365 Essex Street

Stree

Am
ur

b
es

Current Owner: P J C Realty Co. Inc.

yS
et
tre

Environmental Contamination: Fed RCRA - SQG


treet

rhill S

Have
110 /

Common Street

t
ee

23
21

Ha

Essex Street

mp

ire

Str

Appleton Street

e
tre

sh

ell

15

tr
ry S

ow

13

Amesbur

22

Stree

14

ee

26
27

et

n
mo

e
Str

Co

Jackson Street

ence

Lawr

20
28

Campagnone Common

eet
x Str

Esse

11

12

et

tre

xS

sse

en

u
eth

ee

Str

Lawrence Downtown West Planning Study

Parcel Catalogue

Development Opportunity
Area: 16,746 sf / 0.38 acres
Current Zoning: B2-Secondary Business District
Site Address: 266 Broadway

Current Owner: CVS 1786 MA LLC

ay

Trem

dw
oa
Br

tree

S
ont

Environmental Contamination: Fed RCRA - SQG

t
tree

ll S
erhi

Hav

110 /

et

tre

0/

11

ence
Lawr

ll S

hi
ver

Ha

t
22

ee
21

s
mp

ee
Str

hir

et

tre

eS

ll

23

Ha

we

15

tr
ry S

Lo

13

Amesbur

dS

for

ad

Br

14

28

e
tre

t
Stree

20

10

Camp

18

4
26

lin

nk

Fra

o
mm

et

27

et

e
Str

24

e
Str

12

11

Lawrence Downtown West Planning Study

Parcel Catalogue

Development Opportunity
Area: 27,053 sf / 0.62 acres
Current Zoning: B3-Main Business District

l
Lowel

Site Address: 100 Lowell Street

Street

Current Owner: City of Lawrence


Environmental Contamination: State Tank List - UST/
AST, Fed RCRA - SQG

treet

S
Valley
t

l Stree

averhil

H
110 /

Lawr

Ha

S
ence

0/

11

e
Str

22

15

Common Street

e
tre
ry S

23

21

Ha

et

Essex Street

mp
ire

ee

Str

Lo

Appleton Street

e
Str

sh

ll
we

13

Amesbur

for

ad

Br

14

28

treet

20

et

Campagnone Common

18

26

lin
nk

Fra
27

e
Str

ee

et

mo

Co

tr
nS

Jackson Street

et

tre

ll S

hi
ver

11

12

oa

Br

ee

Str

Lawrence Downtown West Planning Study

Parcel Catalogue

Development Opportunity
Area: 22,485 sf / 0.52 acres
Current Zoning: B3-Main Business District
Site Address: 381 Common Street

treet

S
Valley

Current Owner: County of Essex


Environmental Contamination: Fed ERNS (EPA)

sh

mp

Ha
t

reet

on St

Comm

et

tre

S
ire

l Stree

averhil

H
110 /

Lawr

ence

/H

22

15

Common Street
23

et
21

Ha

Essex Street

mp
ee

Str

Lo

Appleton Street

e
Str

ire
sh

ll
we

13

tre
ry S

et

e
Str

Amesbur

for

ad

14

28

Stree

20

et

Campagnone Common

26

lin

nk

Fra
27

ee

t
ee

Str

tr
nS

mo

Co

Jackson Street

et

tre

ll S

hi
ver

11

12

x
sse

ee

Str

et

tre

nS

ue

Lawrence Downtown West Planning Study

Parcel Catalogue

Development Opportunity
Area: 109,692 sf / 2.52 acres
Current Zoning: B3-Main Business District

t
ree

Low

ps
m
Ha

St
ell

Site Address: 431 Common Street

re

hi

Current Owner: 431 Common Street Realty Trust

St

Environmental Contamination: State Tank List - UST/


AST, State Leaky Tank List - LUST/LAST, State and Tribal
Equivalent CERLIS, Fed ERNS (EPA)

e
re

et

St

St

22

Common Street
23
21

Essex Street

mp

ee

Str

Appleton Street

e
tre

ire
sh

ell

15

Ha

w
Lo

13

et
tre
ry S

18

26

lin

nk

Fra
27

et

Str

t
ee

24

o
mm

e
Str

11

12

Co
25

a
dw
oa

Br

et

tre

xS

sse

19

eet
Str

14

28

Amesbur

for

ad

t
ree

Campagnone Common

Stree

20

Br

11

ence

/H

Com

e
re

Lawr

Str

n
mo

Jackson Street

lin

k
an
Fr

hill

r
ave

treet

rhill S

Have
110 /

Me

th

n
ue

ee

Str

e
Str

22

a
Br
Parcel Catalogue

Essex Street
7
4
26

nk
Fra

Current Zoning: I2-General Industrial Park District


e
Str
lin

Site Address: 6 Broadway


et

27

et
Stre
l
a
n
Ca

12

ay
dw
oa
Br

ree

dw a y
oa
Br

mo

om

11

ee

tr
nS

Current Owner: EssexC Co.

25

23
21

et

18

Lawrence
Downtown West Planning Study
Common
Street

Appleton Street

Lo

Area: 48,018 sf / 1.10 acres

15

t
ee

et

e
Str

e
Str
ire

ll
we

sh
mp
Ha

Development Opportunity

13

Str

ry
Amesbur

rd

dfo

14

28

re e t

20

et

t
Environmental Contamination:
x S Fed ERNS
3 (EPA)
se
Es

19

et

tre

nS

e
thu

Me

29

et

tre

16

S
al

Pemberton Park

an

Merrimack

eph

Jos
sey
dge

Bri

30

Ca

17

adw

Bro
ay

10

Lawrence Downtown West Planning Study

10

Parcel Catalogue

Development Opportunity
Area: 3,910 sf / 0.09 acres
Current Zoning: R3-Residential District

tree

Site Address: 78-80 Tremont Street

ont S
Trem

Current Owner: City of Lawrence


Environmental Contamination: Fed ERNS (EPA)

110 /

et

tre

Ha

S
ence

0/

hi
ver

Lawr

ll S

11

et

e
Str

22

t
21

s
mp

et

et

tre
eS

hir

e
Str

18

Co
23

Ha

ll

we

15

e
tre
ry S

Lo

13

Amesbur

for

ad

Br

14

28

Campag

treet

20

10

Hav

4
26

Fra

11

nk

Lawrence Downtown West Planning Study

Parcel Catalogue

11

Development Opportunity
Area: 40,225 sf / 0.92 acres
Current Zoning: I2-General Industrial Park District
Site Address: 2 Lawrence Street
Law

Current Owner: Downtown Lawrence Parking


Association
et
ill Stre
verhand
a
Environmental Contamination:
State
Tribal
H
/
110
Equivalent CERLIS

c
ren

ry

tree

bu

eS

es
Am

e
re
St
t

Stree

13

Amesbur

15

Common Street

e
tre
ry S

23

l
Cana

Stree

14

Jackson Street

ence

Lawr

20

Campagnone Common

21

Essex Street
Appleton Street

7
4
26
27

11

12

en

3
t

ee

Str

12

et

29

Lawrence Downtown West Planning Study

12

Parcel Catalogue

Development Opportunity
Area: 4,025 sf / 0.09 acres
Current Zoning: B3-Main Business District
Site Address: 464 Essex Street

21

Essex Street

ire
sh

Appleton Street

ee

Str

Lo

18

26

n
Fra
klin

27

ee

Str

tr
nS

t
ee

mo

Co

et

Common Street
23

mp

et

e
Str

tre

15

Ha

ll
we

13

et
tre
ry S

11

12

oa

Br

x
sse

dw

ee

Str

ay

19

eS
hir
ps

22

eet
x Str

Esse

e
Str

Amesbur

for

14

28

Campagnone Common

Stree

20

ad

ence

Ha

et

Br

Jackson Street

et

Lawr

0/

11

Environmental Contamination: State and Tribal


Equivalent CERLIS

tre

ll S

hi
ver

Ha

t
Stree et
m/oHnaverhill Stre
m
o
C 110

Current Owner: Cloutier Essex Realty Trust

et

tre

nS

e
thu

Me

29

et

tre

16

S
al

an

Pemberton Park

Merrimack13River

Lawrence Downtown West Planning Study

Parcel Catalogue

13

Development Opportunity
Area: 55,365 sf / 1.27 acres
Current Zoning: B3-Main Business District
Site Address: 101 Amesbury Street

treet
nce S

tre
Ames b u r y S

Environmental Contamination: State Leaky Tank List LUST/LAST, State and Tribal Equivalent CERLIS

Stree

Lawre

ll
Lowe

Current Owner: Whippoorwill Realty Trust

et

eet
n Str

mo
Com
t

l Stree

averhil

H
110 /

13

Amesbur

22

15

Common Street

tre
ry S

23

et

21

Ha

Essex Street

mp

et

treet

14

sh
ire

ee

Str

Appleton Street

e
Str

Jackson Street

S
ence

Lawr

20
28

Campagnone Common

26

14
t

27

11

Lawrence Downtown West Planning Study

14

Parcel Catalogue

Development Opportunity
Area: 21,693 sf / 0.50 acres
Current Zoning: B3-Main Business District
Site Address: 38 Lawrence Street

Lawre

Current Owner: Lawrence YWCA

treet
nce S

Environmental Contamination: State Tank List - UST/


AST, State Leaky Tank List - LUST/LAST, State and Tribal
Equivalent CERLIS

on
omm

C
110 /

t
Stree

Amesbur

22

13
15

Common Street

et
tre
ry S

Haver

Campagnone Common

nce
14

eet
hill Str

Jackson Street

e
Lawr

20
28

Stree

23

Ha

21

sh

mp

Essex Street
ee

Str

Appleton Street

ire

7
4

26

ee
Str

27

11

15

Lawrence Downtown West Planning Study

Parcel Catalogue

15

Development Opportunity
Area: 5,182 sf / 0.12 acres
Current Zoning: B3-Main Business District

Lawre

Site Address: 30-36 Lawrence Street

treet
nce S

Current Owner: Deacy Building Realty Trust LLC


Environmental Contamination: State Leaky Tank List LUST/LAST, State and Tribal Equivalent CERLIS

110 /

t
Stree

13

Amesbur

22

Campagnone Common

15

Common Street

tr
ry S

23

ee

Jackson Street

ence
14

treet

hill S
Haver

Lawr

20
28

on
omm

21

sh

mp

Essex Street
ee

Str

Appleton Street

ire

7
t

4
26
27

ee

1612

11

Stree

Lawrence Downtown West Planning Study

16

110 /

Development Opportunity
Lawr

sf / 1.67 acres

ence

20

14

22

23

et

18

Essex Street
Appleton Street

Lo

21

ay
dw
oa
Br

et

e
Str
ire

ll
we

sh
mp
Ha

Environmental Contamination: State Leaky Tank List LUST/LAST, State and Tribal Equivalent CERLIS
e
Str

Common Street

et
tre
nS

Stre

uen
Meth

15

et
tre
ry S

Current Owner: Pacific VIII Realty Trust

et

13

Ca

26

lin

nk

27

Str
ee
t

o
mm

12

Co
25

oa
Br

x
sse

dw

ee

Str

ay

19

11

ee

tr
nS

et

tre

S
nal

Fra

24

li
nk

7-11 Broadway

a
Fr

28

e
Site dAddress:
Str
for
d
a
Br

Amesbur

et

Campagnone Common

Stree

Current Zoning: I2-General Industrial Park District

10

Jackson Street

et
tre
ill S
h
r
Area:
ve 72,638
Ha
0/
11

Parcel Catalogue

eet

l Str
averhil

n
ue

ee

Str

th

Me

29

et

16

tre

lS

a
an

Pemberton Park

Merrim

Jos
eph
sey
Bri

30

Ca

17

dge

ree

17
9

110 /

hill St

Haver

Lawr

17

ence

Development Opportunity
t

22

14

13
Area: 44,736 sf / 1.03
acres

ry
Amesbur

28

Campagnone Common

Stree

20

et
tre

S
nal

15

Current Zoning: I2-General Industrial Park District Common Street

Ca

23

e
Str

Lawrence Downtown West Planning Study

Jackson Street

Parcel Catalogue

21

sh
mp
Ha

Appleton Street

et

Environmental Contamination:
State and Tribal
4
26 CERLIS
Equivalent
27

o
mm

h
ort

et

tre

lS
ana

Pemberton
Park

11

ee

tr
nS

Essex Street

Current Owner: Kid-Start Inc.

e
Str
ire

et

Site Address: 444 Canal Street

12

Co

k
a c
m
r r i
M e

ee

tr
xS

se

Es

n
ue

ee

Str

th

Me

r
v e
i
R

29

l
na

re

St

Pemberton Park

eph

Jos

Merrimack River
sey
dge

Bri

30

Ca

17

a
dw

a
Bro

18

Duck Bridge

16

et

Lawrence Downtown West Planning Study

18

Parcel Catalogue

Development Opportunity
Area: 9,871 sf / 0.23 acres

in
kl
an
Fr

Current Zoning: B3-Main Business District


t

Stree

et
re
St

ord
Conc

Site Address: 195 Lowell Street


Current Owner: Lous Custom Exhaust Inc.
Environmental Contamination: State Leaky Tank List LUST/LAST

ay
Lawr

Ha

ence

0/

11

dw

oa
Br

et

tre

ll S

hi
ver

e
Str

22

Common Street
23

t
21

Ha

et

mp
ire

t
ee

Str

Appleton Street

e
Str

sh

ll

we

15

e
tre
ry S

Lo

13

Amesbur

for

ad

Br

14

28

et

Campagnone Common

Stree

20

10

et

l Stre

l
Lowe

18

4
26

lin

nk

Fra
t
ee

27

ee

tr
nS

Str

24

mo

Co

11

12

25

ay

dw

oa

Br
19

l Stree

averhil

H
110 /

x
sse

ee

Str

Me

et

tre

nS

e
thu

19

Lawrence Downtown West Planning Study

Parcel Catalogue

19

Development Opportunity
Area: 5,886 sf / 0.14 acres
t

l Stree

averhil

oa
Br

Current Zoning: B3-Main Business District

H
110 /

ay
dw

Site Address: 92 Broadway

ence

State Leaky Tank List 20

e
Str

22

t
21

sh
Str
ee

26

klin

27

11

ee

Str

tr
nS

t
ee

mo

Co

12

25

oa

Br

x
sse

dw

ee

Str

ay

19

Appleton Street

ire

n
Fra

Common Street
23

mp

e
Str

18

24

Com

Ha

ll

we

et

reet

St
mon
15

e
tre
ry S

Lo

13

Amesbur

for

ad
Br

14

28

et

Campagnone Common

Stree

Environmental
LUST/LAST
10

a
/H
10
1
Contamination:

Lawr

ver

et

tre

nS

e
thu

Me

29

et

tre

16

S
al

Pemberton Park

an

eph

Jos
sey

17

Ca

20

Jackson Street

et

tre
Current Owner: AJ Wolff RealtyhiLLC
ll S

Lawrence Downtown West Planning Study

20

Parcel Catalogue

Development Opportunity
Area: 33,333 sf / 0.77 acres

Site Address: 120 Amesbury

Bradford

Current Owner: KLM Inc.

Street

Environmental Contamination: State Tank List UST/AST

ll
Lowe

110 /

S
ence

Ha

14

22

t
21

Essex Street

s
mp

et

4
26

Fra
l

nk

Appleton Street

et

tre
eS

hir

e
Str

L
18

Common Street
23

Ha

ll

15

e
tre
ry S

e
ow

13

Amesbur

for

ad

e
Str

treet

20
28

Campagnone Common

Jackson Street

et

et

Br

eet

Lawr

0/

11

t
Stree

hill Str

Haver

tre

ll S

hi
ver

esbury Street
Am

Current Zoning: B3-Main Business District

21

Lawrence Downtown West Planning Study

Parcel Catalogue

21

Development Opportunity
Area: 9,589 sf / 0.22 acres
Current Zoning: B3-Main Business District
Site Address: 290 Common Street

reet

ry
bu

es

t
tree

Am

Environmental Contamination: State Tank List UST/AST

ce S
ren

Current Owner: Massachusetts Electric Co.

Law

on St

m
Com

13

Amesbur

22

t
Stree

14

28

15

Common Street

e
tre
ry S

23

6
Ha

21

Essex Street

mp
ire
sh

Appleton Street

Str
t
ee

4
26
27

ee

tr
nS

Esse

Jackson Street

ence
Lawr

20

Campagnone Common

mo

12

et

tre
xS
se 22
s
E

11

et

x Stre

11

e
re
St

l Stree

verhil
0 / Ha

Lawrence Downtown West Planning Study

22

Parcel Catalogue

Development Opportunity
Area: 27,507 sf / 0.63 acres
Current Zoning: B3-Main Business District
Site Address: 65 Lowell Street

reet

t
rd S
onco

Current Owner: City of Lawrence


mp
Ha

Environmental Contamination: State Tank List UST/AST

sh
ire
St
ree
t
110 /

S
ence

Ha

e
Str

22

t
21

Essex Street

mp

et

sh
ire

ee

Str

Appleton Street

e
Str

18

Common Street
23

Ha

ll

15

e
tre
ry S

e
ow

13

Amesbur

for

ad

Br

14

28

treet

20

et

Campagnone Common

26

Fra
lin

nk

ee

ee

Str

tr
nS

mo

Jackson Street

et
Lawr

0/

11

eet

hill Str

Haver

tre

ll S

hi
ver

reet

ll St

e
Low

27

11

23

Lawrence Downtown West Planning Study

Parcel Catalogue

23

Development Opportunity
Area: 9,391 sf / 0.22 acres
Current Zoning: B3-Main Business District

Reviviendo Gateway District Overlay
Site Address: 232 Common Street
Common

Lawrence Street

Current Owner: Parkview Commons LLC


Environmental Contamination: State Tank List UST/AST

treet

14

Campagnone Common

Jackson Street

S
ence

Lawr

20

Essex Str
eet

eet

hill Str

aver
10 / H

Amesbur

13
15

tr
ry S

Common Street

ee

23
21

Essex Street
Appleton Street

7
4
26
27

24

11

Street

Lawrence Downtown West Planning Study

24

Parcel Catalogue

Development Opportunity
Area: 15,005 sf / 0.34 acres
Current Zoning: I2-General Industrial Park District

ay
dw

oa
Br

Site Address: 265 Lowell Street


Current Owner: Two Sixty-Five Lowell Street Trust

110 /

Environmental Contamination: State Tank List UST/AST


et

tre

Ha

e
Str

22

et
21

mp

et

sh

e
Str

ire
t
ee

Str

18

4
26

n
Fra
klin
t
ee

27

ee

tr
nS

Str

24

mo

Co

11

12

25

oa

Br

x
sse

dw

ee

Str

ay

19

Comm
23

Ha

ll

we

15

tre
ry S

Lo

14

13

Amesbur

for

ad

Br

Lowe

28

et

Campagnon

Stree

eet
ll Str

20

10

ence

0/

hi
ver

Lawr

ll S

11

hi

Haver

et

tre

nS

e
thu

Me

29
16

et

tre

lS

25
Pemberton Park

Lawrence Downtown West Planning Study

Parcel Catalogue

25

Development Opportunity
Area: 4,257 sf / 0.10 acres

Site Address: 264 Lowell Street

ay
dw

oa
Br

Current Zoning: I2-General Industrial Park District


treet
ell S

Low

Current Owner: Fulton Street Corp.

Ha

ence

0/

11

St

22

15

Common Street
23

t
21

Ha
mp
ire

Str

Appleton Street

e
Str

sh

ll

we

Lo

13

e
tre
ry S

et

14

28

Amesbur

for

ad

Br

t
ree

Campagnone Common

Stree

20

10

ee

18

26

Fra
lin

nk
ee

n
mo

ee
Str

27

Str

24

Co

11

12

25

oa
Br
ay

et

tre

xS

sse

dw
19

3
et

tre

nS

e
thu

Me

29

et

tre

16

S
al

an

Pemberton Park

Jos

26

eet

hill Str

Haver

Lawr

t
Environmental Contamination: State Tank List
ee Str
hill
UST/AST
r
e
v

110 /

eph

Lawrence Downtown West Planning Study

26

Parcel Catalogue

Development Opportunity
Area: 38,600 sf / 0.89 acres
Current Zoning: B3-Main Business District
Site Address: 414 Common Street
Comm

Environmental Contamination: Local Brownfields


verhill

ence
15

Common Street
23

t
21

Ha

Essex Street

s
mp

et
tre

eS

18

Appleton Street

e
tre

hir

ell

w
Lo

13

e
tre
ry S

22

4
26

Fra
lin
nk

27

Str

et

t
ee

o
mm

et

x Stre

Esse

St

Amesbur

for

ad

Br

14

28

Stree

20

t
ree

Campagnone Common

Jackson Street

av

ee
Str

Lawr

0/

11

ee

Str

Street

ire
sh
mp

Ha

Ha
110 /

ill
erh

reet

on St

Current Owner: City of Lawrence

e
Str

11

12

Co

et

tre

xS

wa

se
Es

Me

th

n
ue

ee

Str

27

Lawrence Downtown West Planning Study

Parcel Catalogue

27

Development Opportunity
Area: 7,523 sf / 0.17 acres
Current Zoning: B3-Main Business District
Site Address: 372 Essex Street
Current Owner: City Of Lawrence

et

x Stre

Esse

treet

Environmental Contamination: Local Brownfields/ Haverhill S

Ha
sh

mp

Essex Street
t
ee

Str

Appleton Street

ire

7
4
26
27

ee

mo

Co

Common Street
23
21

tr
nS

e
re
St

t
15

e
tre
ry S

treet

en S

u
Meth

13

Amesbur

22

Stree

14

Jackson Street

ence

Lawr

20
28

Campagnone Common

ry
bu

es

Am

110

11

12

x
sse

ee

Str

et

tre

nS

e
thu

Me

29

28

Lawrence Downtown West Planning Study

28

Parcel Catalogue

Development Opportunity
Area: 35,975 sf / 0.83 acres
Current Zoning: B3-Main Business District

Current Owner: Massachusetts Nursing Homes



LTD Partner
Environmental Contamination: Local Brownfields

ll
Lowe

110 /

S
ence

e
Str

Amesbur

for

ad

Br

14

28
22

Common Street
23
21

Essex Street

mp
sh
ire

7
et

e
Str

Appleton Street

e
Str

18

15

Ha

ll

e
ow

13

et
tre
ry S

et

treet

20

et

Campagnone Common

Jackson Street

et

Ha

Stree

eet

Lawr

0/

11

Street

hill Str

Haver

tre

ll S

hi
ver

Bradford

et
d Stre
oncor

Site Address: 55 Lowell Street

4
26

Fra
lin

nk
Str

ree

27

11

29

Lawrence Downtown West Planning Study

Parcel Catalogue

29

Development Opportunity
110 /

eet

hill Str

Haver

Area: 50,619 sf / 1.16 acres

Lawr

Campagnone Common

Stree

20

14
Current Owner: Cougar Realty
LLC

ry
t

na

Ca

e
re

h
ort

e
tre
lS

St

23

mp
Ha
sh

ee

Str

Appleton Street

ire

7
t

4
26
27

11

ee
Str

Co

Essex Street

n
mo

21

bu

15

et
tre
ry S

lS
ana

13

Environmental Contamination: State and Tribal


Common Street
Equivalent CERLIS

22

tree

Amesbur

28

es
Am

ence

Site Address: 400 Canal Street

Jackson Street

Current Zoning: I2-General Industrial Park District

12

x
sse

ee

Str

et

tre

nS

e
thu

Me

29

S
al

Pemberton Park

an

Merrimack River

eph

Jos
sey

Ca

17

Bri

30

dge

30

Duck Bridge

et

tre

16

20

14

28

St

13

Area: 31,473
sf / 0.72 acres
22

15

Common Street

Current Zoning: I2-General Industrial Park District


et
21

Essex Street

Current Owner: Essex Co.


et

nk
Fra

11

ay

e
Str
lin

et

tre

nS

et

o
mm

27

dw
oa
Br

26
Environmental Contamination:
State and Tribal
Equivalent CERLIS

12

Co

lS

a
an

t
ree
et

al

rth

n
Ca

re
St

No

et

tre

xS

wa

se
Es

Appleton Street

e
Str
ire

ell

w
Lo

Site Address: 454 North Canal Street


sh
mp
Ha

e
tre

23

e
Str

Parcel Catalogue

t
ree

Campagnone Common

Stree

Development Opportunity
ry
Amesbur

for

30

ence

Jackson Street

Lawrence Downtown West Planning Study

av

ad

Br

ee

Str

Lawr

0/

11

ill
erh

n
ue

ee

Str

th

Me

29
16

l
na

et

re

St

Pemberton Park

Jos

Merrimack River

eph
sey

Ca

17

Bri

30

dge

ay

adw

Bro

31

Lawrence Downtown West Planning Study

Parcel Catalogue

Use Table
P

Permitted.

B. Commercial

PSR

Use

R3

B2

SPSR

Permitted with site plan review by the Planning Board pursuant to Articles VII and VIII.
Special permit by Board of Appeals with site plan review by the Planning Board pursuant
to Articles VII and VIII.

Adult uses

NO

SPSR NO

Assembly/function halls

NO

SPSR SPSR SPSR

SPSA

Special permit and site plan approval by Planning Board pursuant to Articles VII and VIII.

Athletic field

SPSR NO

Automatic teller machine not part of existing structure

SPSR SPSR SPSR SPSR

Automobile or other vehicle sales, and service, new, and accessory


sale of used vehicles, so long as such accessory sale of used
vehicles does not take up more than 50% of the developed lot
area.

NO

NO

NO

SPSR

Automobile or other vehicle sales, and service, used

NO

NO

NO

NO

Awnings and Canopies

Bank, main

NO

SPSR

Bank, branch

NO

SPSR

Bars and cafes

NO

SPSR SPSR SPSR

Billboards

NO

NO

Billiards or pool parlor

NO

SPSR SPSR SPSR

Book bindery

NO

NO

Bowling alley

NO

Carwash

NO

SPSR NO

Conference center

NO

SPSR SPSR NO

Convenience store

SPSR P

Drive-through facility

NO

SPSR SPSR SPSR

Frozen food locker

NO

Garage, filling station, or vehicle storage/impoundement facility

NO

SPSR NO

Hotel/motel

NO

SPSA SPSR SPSA

Liquor stores and liquor sales

NO

SPSR SPSR

Massage parlor

NO

NO

NO

NO

Massage therapy

NO

Mixed use

NO

Monument works

NO

SPSR NO

NO

Office

NO

Parking garage or lot

NO

SPSR SPSR SPSR

Planned unit development

NO

SPSA SPSA SPSA

Public transit passenger station

NO

SPSR SPSR SPSR

Recreational use (Commercial)

NO

SPSR SPSR SPSR

NO

Prohibited.

A. Agriculture
Use

R3

B2

B3

I2

Agriculture on 5 acres +

Horticulture on 5 acres +

Floriculture on 5 acres +

Viticulture on 5 acres +
Structures accessory to agriculture, horticulture, floriculture, and
viticulture on 5 acres +

32

B3

NO

NO

P
NO

I2
SPSR
SPSR

NO

SPSR
P
P
NO

Lawrence Downtown West Planning Study

Parcel Catalogue

Use Table
B. Commercial

B. Commercial

Use

R3

B2

B3

I2

Recreational use (Public)

SPSR SPSR NO

Use

R3

B2

B3

I2

SPSR

Roofing Shop

NO

NO

Rehabilitation of commercial uses and mixed use development

NO

SPSA SPSA SPSA SPSA

Temporary parking for other uses

SPSR NO

NO

NO

Retail sales establishment

NO

Self-service laundromat; dry clean establishments; hand laundry

SPSR P

NO

NO

Retail service establishment

NO

Shopping center

NO

SPSR SPSR

Restaurants

NO

NP

NO

SPSR

NO

NO

NO

Temporary parking for other uses

SPSR NO

NO

NO

Storage, outdoor
Telephone exchange building, electric sub-station, or other similar
public facility

NO

Roofing Shop

NO

SPSR NO

SPSR

Self-service laundromat; dry clean establishments; hand laundry

SPSR P

NO

NO

Theater

NO

SPSR SPSR SPSR

Shopping center

NO

SPSR SPSR

Undertaking establishment

SPSR SPSR NO

NO

Storage, outdoor
Telephone exchange building, electric sub-station, or other similar
public facility

NO

NP

NO

SPSR

Upholstery shop

NO

NO

NO

SPSR NO

SPSR

Theater

NO

SPSR SPSR SPSR

Undertaking establishment

SPSR SPSR NO

NO

Upholstery shop

NO

NO

Drive-through facility

NO

SPSR SPSR SPSR

Frozen food locker

NO

Garage, filling station, or vehicle storage/impoundement facility

NO

SPSR NO

Hotel/motel

NO

SPSA SPSR SPSA

Liquor stores and liquor sales

NO

SPSR SPSR

Massage parlor

NO

NO

NO

NO

Massage therapy

NO

Mixed use

NO

Monument works

NO

SPSR NO

NO

Office

NO

Parking garage or lot

NO

SPSR SPSR SPSR

Planned unit development

NO

SPSA SPSA SPSA

Public transit passenger station

NO

SPSR SPSR SPSR

Recreational use (Commercial)

NO

SPSR SPSR SPSR

Recreational use (Public)

SPSR SPSR NO

Rehabilitation of commercial uses and mixed use development

SPSA SPSA SPSA SPSA

Retail sales establishment

NO

Retail service establishment

NO

Restaurants

NO

NO
NO

NO

P
NO

SPSR

33

Lawrence Downtown West Planning Study

Parcel Catalogue

Use Table
C. Industrial

D. Institutional

Use

R3

B2

B3

I2

Use

R3

Accessory uses to scientific development and/or research


Accessory uses to manufacturing or wholesale use:
- Garage for storage and repair of motor vehicles used in
connection with principal

NO

NO

NO

SPSR

Charitable, philanthropic, and eleemosynary institution

SPSA SPSA SPSA NO

Church or other place of worship, religious denomination or sect

SPSR SPSR SPSR SPSR

- Employees athletic field and facilities

B2
P

B3
P

I2
P

NO

NO

NO

Club or lodge

NO

NO

NO

Community garage

SPSA NO

SPSR SPSR SPSR NO

NO

NO

- Employees in-house day care

NO

NO

NO

Day care facility, adult

- Employees restaurant

NO

NO

NO

Day care facility, child

SPSR SPSR SPSR SPSR

NO

NO

NO

Day care child home facility

Freight handling or operations


Commercial hazardous waste and infectious waste disposal and
transfer

NO

NO

NO

NO

Dormitory, private

NO

NO

NO

NO

Dormitory, non-profit or public

NO

NO

NO

NO

Federal use

Heliport
Indoor warehouse and recovery of used automobile and machine
parts

NO

NO

NO

SPSR

Fraternity or sorority house

SPSA NO

NO

NO

NO

Halfway house and group home with educational component

NO

Hospice

NO

NO

NO

NO

NO

Hospital

SPSA NO

NO

NO

Municipal use

Museum

SPSR SPSR SPSR SPSR

Rest home

SPSA NO

NO

NO

Sanitarium
School, college, library, or accessory educational building or
structure, non-profit or public

SPSA NO

NO

NO

State use

- Showroom for display of products

Junkyards
Lumber yard
Manufacturing, processing, fabrication, assembly

NO
NO
NO
NO

NO
NO
NO
NO

NO
NO
NO
NO

Refuse treatment and disposal subject to Ch. 111, Sec. 150 A


NO
Research and development facility, research laboratory or research
facilities for scientific or medical research
NO

NO

NO

SPSR

NO

NO

SPSR

Printing establishment

NO

SPSR SPSR SPSR

Publishing Establishment

NO

NO

NO

SPSR

Sand, gravel pit, quarry, or soil removal

NO

NO

NO

NO

Sign-making establishment

NO

SPSR NO

NO

Warehouse

NO

NO

NO

Wholesale sales

NO

NO

NO

Sand, gravel pit, quarry, or soil removal

NO

NO

NO

NO

Sign-making establishment

NO

SPSR NO

NO

Warehouse

NO

NO

NO

Wholesale sales

NO

NO

NO

34

Lawrence Downtown West Planning Study

Parcel Catalogue

Use Table
E. Residential and Accessory
Use

R3

B2

B3

I2

- Fence, hedge or enclosure wall

NO

- Garage community

SPSA NO

NO

NO

- Garage Private

NO

- Shed or storage building

NO

- Swimming pool

NO

- Off-street parking

SPSR SPSR SPSR

- Or other accessory uses

Accessory uses:

NO

Assisted living

SPSA SPSA SPSA SPSA

Home occupation

Lodging house and guest house

SPSA SPSA SPSA NO

Conversion of existing dwelling

SPSA NO

NO

NO

Group home, halfway house, non-educational

SPSA NO

NO

NO

Mobile home
Reconstruction of pre-existing non-conforming residential use,
building or structure

NO

NO

NO

Rehabilitation of one or two unit structure

Rehabilitation of multi-family structure

SPSA SPSA SPSA SPSA

Residence, single family

NO

Residence, two family

NO

Residence, multi family

SPSA SPSA SPSA SPSA

Substantial addition to an existing dwelling

SPSA NO

NO

NO

Temporary mobile home

NO

SPSA SPSA SPSA SPSA


SPSA SPSA SPSA

35

Você também pode gostar