Você está na página 1de 2

Federal Register / Vol. 70, No.

28 / Friday, February 11, 2005 / Notices 7255

Substances (OPPTS) are continuing the (iii) Enhance the quality, utility, and information; and transmit or otherwise
existing request for critical use clarity of the information to be disclose the information.
exemption applications for methyl collected; and Dated: February 2, 2005
bromide, under the Clean Air Act (CAA) (iv) Minimize the burden of the
Drusilla Hufford,
and in accordance with U.S. obligations collection of information on those who
Director, Stratospheric Protection Division,
under the Montreal Protocol on are to respond, including through the
Office of Air and Radiation.
Substances that Deplete the Ozone use of appropriate automated electronic,
[FR Doc. 05–2713 Filed 2–10–05; 8:45 am]
Layer (Protocol). The information is mechanical, or other technological
BILLING CODE 6560–50–P
collected so that the U.S. government collection techniques or other forms of
can submit a technically valid methyl information technology, e.g., permitting
bromide critical use exemption electronic submission of responses.
Burden Statement: ENVIRONMENTAL PROTECTION
nomination to the Ozone Secretariat of AGENCY
the United Nations Environment The annual burden is reported in this
Programme on an annual basis. Since notice by annual respondent burden. [ER–FRL–6660–5]
2002, this information has primarily This estimate includes the time needed
been collected through agricultural to read the CAA request for Environmental Impact Statements and
consortia, though individuals have also applications, process, compile, and Regulations; Availability of EPA
submitted applications. If an applicant review the requested data for accuracy Comments
indicates that the application contains and appropriateness, generate
Availability of EPA comments
Confidential Business Information (CBI), application correspondence, and store,
prepared pursuant to the Environmental
that information will be treated as such file, and maintain the information. This
Review Process (ERP), under Section
by EPA. Responses to the collection of ICR renewal does not include any
309 of the Clean Air Act and Section
information are required in order for burden for third-party or public
102(2)(c) of the National Environmental
users to obtain a critical use exemption disclosures that were not previously
Policy Act, as amended. Requests for
benefit. reviewed and approved by OMB.
EPA estimated approximated 80% of copies of EPA comments can be directed
In 2003, EPA created separate to the Office of Federal Activities at
the respondents would be pre-plant or
applications for methyl bromide pre- (202) 564–7167.
soil users, with the remaining 20%
plant users and post-harvest users in An explanation of the ratings assigned
being post-harvest users. EPA also
order to facilitate data collection as the to draft environmental impact
initially calculated individual and
pre-plant and post-harvest fumigation statements (EISs) was published in the
consortia burden. The annual burden
contexts differ. In 2005, EPA is Federal Register dated April 2, 2004 (69
hours for this collection of information
considering proposing to format both FR 17403).
were initially estimated and
the pre-plant and post-harvest
summarized as follows, as stated in a Draft EISs
applications to more closely resemble
notice published in the Federal Register
the forms for the nominations required ERP No. D–AFS–D65031–PA Rating
on June 27, 2001 (66 FR 34181):
by the Methyl Bromide Technical Respondents/affected entities: 200. LO, Martin Run Project, To Implement
Options Committee (MBTOC), an Estimated total number of potential Management Direction as Outlined in
advisory body to the Parties to the respondents: 200. Allegheny National Forest Plan,
Protocol. Frequency of response: Annual. Bradford Ranger District, Allegheny
An agency may not conduct or Estimated total/average number of National Forest, Warren and McKean
sponsor, and a person is not required to responses for each respondent: 1. Counties, PA.
respond to, a collection of information Estimated total annual burden hours: Summary: EPA does not object to the
unless it displays a currently valid OMB 25,000. preferred alternative.
control number. The OMB control Estimated total annual burden costs: ERP No. D–AFS–J65425–00 Rating
numbers for EPA’s regulations in 40 $1,500,000. EC2, Black Hills National Forest Land
CFR are listed in 40 CFR part 9. EPA seeks comment on the above and Resource Management Plan Phase II
EPA initially calculated that 95% of summary. EPA may revise the Amendment, Proposal to Amend the
users would apply with a consortia and calculations based on the critical use 1997 Land and Resource Management
the remaining 5% would apply exemption applications received Plan, Custer, Fall River, Lawrence,
independently. EPA also calculated annually between 2002–2004. Meade, and Pennington Counties, SD
each user’s burden prior to submitting Burden means the total time, effort, or and Crook and Weston Counties, WY.
data to a consortia. EPA encourages the financial resources expended by persons Summary: EPA expressed
electronic submission of CUE to generate, maintain, retain, or disclose environmental concerns because the
applications. or provide information to or for a Preferred Alternative may cause adverse
Federal agency. This includes the time impacts to water quality, aquatic, and
The EPA would like to solicit needed to review instructions; develop, terrestrial resources, and recommends
comments to: acquire, install, and utilize technology that the Final EIS include quantitative
(i) Evaluate whether the proposed and systems for the purposes of analysis of water and air quality, and
collection of information is necessary collecting, validating, and verifying provisions for greater natural resource
for the proper performance of the information, processing and and water quality protection.
functions of the Agency, including maintaining information, and disclosing ERP No. D–AFS–L65473–OR Rating
whether the information will have and providing information; adjust the LO, Rogue River-Siskiyou National
practical utility; existing ways to comply with any Forest, Special Use Permits for Outfitter
(ii) Evaluate the accuracy of the previously applicable instructions and and Guide Operations on the Lower
Agency’s estimate of the burden of the requirements; train personnel to be able Rogue and Lower Illinois Rivers, Gold
proposed collection of information, to respond to a collection of Beach Ranger District, Rogue River-
including the validity of the information; search data sources; Siskiyou National Forest, Curry County,
methodology and assumptions used; complete and review the collection of OR.

VerDate jul<14>2003 17:18 Feb 10, 2005 Jkt 205001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\11FEN1.SGM 11FEN1
7256 Federal Register / Vol. 70, No. 28 / Friday, February 11, 2005 / Notices

Summary: EPA conducted a limited potentially significant impacts to human Implementation, Endangered Species
review of the Draft EIS and does not health. Recent sampling conducted by Act, OR and WA.
object to the proposed project. EPA indicates that off-highway vehicle Summary: No formal comment letter
ERP No. D–BOP–D80031–WV Rating users in the project area are exposed to sent to the preparing agency.
EC2, Southern West Virginia Proposed substantially higher amounts of asbestos ERP No. F–NPS–D39027–00
Federal Correctional Institution, Four than was assumed in the DEIS. EPA Chesapeake Bay Special Resource Study
Alternatives Sites in Southern West recommends that BLM wait until EPA (SRS), To Conserve and Restore
Virginia: Boone County, Mingo County, completes its forthcoming exposure Chesapeake Bay, New Unit of the
Nicholas County, and McDowell evaluation, use it to recalculate the National Park System, MD, VA, PA and
County, WV. health risk, and incorporate this DC.
Summary: EPA expressed information into a Revised or Summary: EPA does not object to the
environmental concerns because of Supplemental EIS. The Revised or selection of the preferred alternative.
secondary and cumulative impacts with Supplemental DEIS should also analyze ERP No. F–NPS–F08011–WI
all alternatives, and requested that these a full array of reasonable alternatives Arrowhead-Weston Transmission Line
issues be evaluated in the Final EIS. and mitigation measures in order to to Right-of-Way Crossing of the St. Croix
Also, EPA asked that the Final EIS avoid or reduce these impacts, National Scenic Riverway, U.S. Army
provide documentation to verify including complete closure of the area COE Section 10 and 404 Permits,
completion of the mitigation specified Washburn County, WI.
and full dry season closure.
in the 404 permit. Summary: EPA’s previous issues have
ERP No. D–CGD–K03027–CA Rating Final EISs been addressed, therefore EPA has no
EC2, Cabrillo Port Liquefied Natural Gas ERP No. F–AFS–J65419–MT Gallatin objection to the proposed action.
(LNG) Deepwater Port, Construction and National Forest, Main Boulder Fuels Dated: February 8, 2005.
Operation an Offshore Floating Storage Reduction Project, Implementation, Robert W. Hargrove,
and Regasification Unit (FSRU), Gallatin National Forest, Big Timber Director, NEPA Compliance Division, Office
Application for License, Ventura and Ranger District, Big Timber, Sweetgrass of Federal Activities.
Los Angeles Counties, CA. and Park Counties, MT. [FR Doc. 05–2707 Filed 2–10–05; 8:45 am]
Summary: EPA expressed Summary: While EPA support BILLING CODE 6560–50–P
environmental concerns about impacts reducing fuels and fire risk, we continue
to air quality, the analysis for General to have some concerns about the
Conformity, and the availability of potential for adverse impacts of the ENVIRONMENTAL PROTECTION
emission reduction credits. EPA proposed actions on water quality, AGENCY
requested that additional information be fisheries, and riparian habitats.
provided on the potential impacts and [ER–FRL–6660–4]
ERP No. F–AFS–L65454–OR Diamond
risks from emergency/accidental Lake Restoration Project, Improve Water Environmental Impact Statements;
releases of LNG or natural gas. EPA also Quality and the Recreational Fishery, Notice of Availability
requested additional information on Umpqua National Forest, Diamond Lake
several NPDES permitting issues, Ranger District, Umpqua River Basin, Responsible Agency: Office of Federal
impacts to waters of the U.S., and Douglas County, OR. Activities, General Information (202)
compliance with the Safe Drinking Summary: No formal comment letter 564–7167 or http://www.epa.gov/
Water Act. was sent to the preparing agency. compliance/nepa/.
ERP No. DS–GSA–D81027–MD Rating ERP No. F–BIA–J02044–WY Wind Weekly receipt of Environmental Impact
EC1, U.S. Food and Administration River Natural Gas Field Development Statements.
(FDA) Consolidation, Updated and New Project, Construction, Drilling and Filed January 31, 2005 through February
Information, Constructing a New Production Operation of Natural Gas 4, 2005.
Eastern Access Road and over Paint Wells, Fremont County, WY. Pursuant to 40 CFR 1506.9.
Branch, Construct Additional Facilities Summary: No formal comment letter EIS No. 050044, Draft EIS, BLM, WY,
to Support Expanded Program, was sent to the preparing agency. Jonah Infill Drilling Project, Propose
Relocating The Day Care Center, Federal ERP No. F–CGD–G39040–LA Gulf to Expand Development of Natural
Research Center at White Oak, Silver Landing Deepwater Port License Gas Drilling, Sublette County, WY.
Spring, Montgomery, MD. Application for Construct of a Comment Period Ends: April 12,
Summary: EPA expressed Deepwater Port and Associated 2005. Contact: Carol Kruse (307) 367–
environmental concerns about the Anchorages in the Gulf of Mexico, 5352.
proposed project’s impacts on stream South of Cameron, LA. EIS No. 050045, Final EIS, AFS, AZ,
banks and water quality within the Summary: EPA continues to express Coconino, Kaibab, and Prescott
Federal Research Center, and requested concern regarding air modeling issues National Forest, Integrated Treatment
that additional information, including and cumulative impacts. of Noxious and Invasive Weeds.
adoption of stringent mitigation ERP No. F–FHW–F40413–IL US Route Implementation, Coconino, Mojave
measures and stream valley re- 20 (FAP 301) Project, Construction from and Yavapai Counties, AZ. Wait
vegetation, be provided in the Final EIS IL Route 84 north of Galena to Bolton Period Ends: March 14, 2005. Contact:
to address these issues. Road northwest of Freeport, Funding, Charles Ernst (928) 635–8317.
ERP No. D1–BLM–K65158–CA Rating NPDES Permit and U.S. Army COE EIS No. 050046, Draft Supplement,
**3, Clear Creek Resource Management Section 404 Permit Issuance, Jo Davies BLM, MT, Golden Sunlight Mine Pit
Area Plan Amendment, Hollister and Stephenson Counties, IL. Reclamation Alternatives. Updated
Resource Management Plan, Summary: Since EPA’s previous Information, Operating Permit No.
Implementing the Decision Made in the concerns have been resolved, EPA has 00065 and Plan-of-Operation #MTM
1999 CCMA ROD, San Benito and no objection to the action as proposed. 82855, Whitehall, Jefferson County,
Fresno Counties, CA. ERP No. F–NOA–L91024–00 Puget MT. Comment Period Ends: April 12,
Summary: The Draft EIS does not Sound Chinook Harvest Resource 2005. Contact: David Williams (406)
adequately assess the project’s Management Plan (RMP) 2004–2009, 533–7655.

VerDate jul<14>2003 17:18 Feb 10, 2005 Jkt 205001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\11FEN1.SGM 11FEN1

Você também pode gostar