Você está na página 1de 3

ER E S U M

Atif Hasan Jalali


H#402, St#4,Sector G-9/3 Islamabad, Pakistan
Cell: 0092-312-5200051,03315596662
E-mail: atifjalali@hotmail.com

EDUCATION

OBJECTIVE: To join a dynamic and progressive organization offering ample opportunities for
diversified experience. Seeking a position that will ensure continued professional growth, offered
by an environment in which advancement is based on the strength of individual contribution to
the realization of organization goals.

BS Electrical (Telecommunication) Engineering


Feb 2005Sep 2009
Intermediate (F.S.C)
20022004
Matriculation

PROFESSIONAL EXPERIENCE

2000-2002

68%

COMSATS Institute of Information & Technology, Islamabad


1 st Division
Model college for Boys F-10/3 Islamabad
1 st Division
Bahria college E-8 Islamabad.

Employment Netkom Technologies (FROM May 2012 to Present):

1) Installation of 3G (1+0, 1+1) MW links Ufone optimization project

3G Training on Microwave and achieved certification on first attempt for


installation & commissioning by Huawei

Links installation RTN 910,950A


Installation of Dish, ODU, IDU
Placing labels on sites according to link
Commissioning of MW links
Achieving required RSL according to the given link budget
Perform traffic shifting of sites
Configuring Ethernet services for 3G link
Troubleshooting of MW links
Dismantling of MW links

2) Installation of SDR (software defined radio) according to Telenor standards which includes
following:

Follow the Telenor HSSE standards


Place RRUs at the right place on tower
Routing of power and fiber cables from RRU to BBU so that no crossing
occurs between both the cables
Ties should be placed at proper interval and in crossed pattern so that power
and fiber remains firm in their position
SDR and all equipment should be at the same level horizontally
SDR channels should be tighten properly with lock nuts and washers
Cables beneath the SDR should be coiled properly

Fiber cable rings for extra fiber sector wise should be made on horizontal ladder
Power cable routing should be at the side near to door inside SDR
complete Swap within the downtime provided

3)Installation of MW links Telenor Vega project

PROFESSIONAL EXPERIENCE

Links installation ipaso link 200,400,1000


Installation of Dish, ODU, IDU

Placing labels on sites near and far end


Configuration of IDU using IP Address \\172.17.254.253
Entering site name, TX, RX frequency, modulation scheme, power and other
parameters etc
Achieving required RSL according to the given link budget

4)Survey of MW links Mobilink Mega project

Carrying out LOS survey of sites


Check tower loading ,were dish is to be installed on tower
Check that there is no obstacle between two towers where dish is to be
installed
Check free breakers ,idu space available
Check exsisting idus and no of E1s currently configured on site

5)Installation of MW & BSS on Mobilink Mega project

Links installation RTN 905(1A & 2A),950A,980


Installation of Dish, ODU, IDU
Placing labels on sites according to link
Commissoning of MW links
Achieving required RSL according to the given link budget
Performing sites cutover
Dismantling of MW links

Cut Over of microwave and BSS.


BTS Commissioning and installation
Installation of Huawei BTS3900, BTS3900A, DBS3900, Power Cube ICC 500,
Power Cube ICC200.
Used site master for VSWR and power issues.
Survey of transmission for shifting indoor to outdoor.
Swapping indoor and outdoor BTS into Huawei 3900A
LTE commission on site through UMPT card by using LMT software.
Media testing from BSC to site through ping tool.
Quality Check during the site installation according to clients
standard.
Documentation of Sites as standards.
PAT of Rollout sites and microwave links

6)installation of MW links CMPAK project

Links installation RTN 910,950,950A


Installation of Dish, ODU, IDU
Placing labels on sites according to link
Commissoning of MW links
Achieving required RSL according to the given link budget
Performing sites cutover
Dismantling of MW links

Employment (FROM September 2010 TO May 2012):

Network Operation Centre (NOC) O&M Department of Huawei.

Projects

Providing LEVEL-I support to customer (PTML, PMCL, PTCL, WARID,


Witribe, Telenor, CMPAK, Roshan Telecom) related to all
Productlines (NSS, BSS, Transmission, Microwave, etc)

Registration of all issues for warranty support and assigning it to concern


Engineer and taking updates of issue and finding the Root Cause until its resolution

Keeping record for all issues and maintaining a summary for all Networks

Activity monitoring of activities carried out in customer network.

BS FINAL YEAR PROJECT

Performance and Evaluation of Transport Protocols for Multimedia Applications over


Heterogeneous Network (FYP)
SEMESTER PROJECTS

Water level indicator


Signal amplifier using Micro-Controllers
Antenna designing and Analysis using HFSS/AWR
AM receiver

DATAPERSONAL

COMPUTER SKILLS

Microsoft Office, MATLAB, Kiel Compiler, HFSS, Packet Tracer, AWR.

Date of Birth:

15TH July 1985

NIC #

61101-7285761-5

Domicile

Punjab

Martial Status

Single

Nationality

Pakistani

Você também pode gostar