Escolar Documentos
Profissional Documentos
Cultura Documentos
Note: Please indicate your answers appropriately. Round / tick mark the right choice in objective type of
questions and verbal statements in few subjective type questions.
1) It is a scheduling software based on synchronous manufacturing that develops a schedule around the
bottleneck of the operation:
______________________________________________________________________________________
______________________________________________________________________________________
5) What are the difficulties that are faced in scheduling personnel in services industry?. Mention two such
difficulties.
A) ________________________________________________________________________________
B) ________________________________________________________________________________
6) This condition based maintenance detects and diagnoses faults and it helps in planned maintenance
based on the equipment condition. This type of maintenance is called as
A) ___________________________________________________________________________
B) ___________________________________________________________________________
C) ___________________________________________________________________________
9) The scheduling which is concerned with a set of activities that are subject to precedence constraints,
specifying which jobs have to be completed before a given job is allowed to start its processing in
minimum amount of time is
A)
B)