BU3 Form - People

Work codes for consentrating project:


Area
1 Column

2 Cleaning structural steel

3 Cleaning columns

4 Painting columns

5 Painting Structural Steel

Daily Time Sheet -Operational Employee/Crew


Department / Crew :
Date

Supervisor
:

Superintendent

Sub area
1 Walkways

No

Id Number

80002407

Name
RIYANTO

Position
Store Assistant

Status

Time in

Time out

Mile Point

Area

Sub Area

Activity

DS

06.00

18.00

MP74

29

2 Laydown

1 Gabion wall behind office

2 Re-arrange laydown yard

3 Temporary fabrication facility


4 Laydown pad concrete

5 Temporary power supply

9
10
11
12

3
3 Main line

4
5

1 Install scaffold

13

2 Clean pipe line

14

3 Identify defects

15

4 Repair defects

16
17

4 All area

18
19

20

21
22

23

10

24
25
26

11

27
28

12

29
30

13

31
32

14

33

15
34
35

16

36
37

17

38

18
39

19

40

20

41

42

Prepared by,

Rechecked and Confirm by,

Approved by,

Acknowledge and Confirm by,

43
44
45
46
47

Foreman

Dept. SPV/SUPT

Dept. Head/MGR

HR MGR/SUPT

48

Name

Name

Name

Name

49

Activity
Fabricate steel structure

50 QA Field

Erect steel structure

51 QA Office

Demolish steel structure, grating etc.

52 Handover Document

Erect scaffolding

53 Project Control/ Planner/ Scheduler

Demolish scaffolding

54 Document Control

Cleaning steel structure

55 Drafting

Cleaning tank

56 Electrical demolish

Cleaning pipe

57 Install cable ladder / tray

Painting steel structure

58 Install support / bracket

Painting tank

59 Fabricate ladder / tray

Painting pipe

60 Install conduit

Excavation

61 Install cable

Levelling and compacting

62 Install field device

Demolish existing concrete

63 Install panel / DB

Formwork and rebar

64 Cable termination

Pouring concrete

65 Pre-commissioning

Install gabion basket

66 Commissioning

Put rock in gabion basket

67 Internal Report (LCI)

Install wall, ceiling and roof

68 External Report (PTFI)

Install floor tile, wall tile, ablution,

69 Internal Meeting (LCI)

skirting, vinyl

70 External Meeting (PTFI)

Install door and window

71 Input data of plant & equipment

Painting wall, ceiling, door and window

72 Equipment control

Demolish& relocation existing roof,

73 Machinary maintenance

wall, door, window, etc.

74 Input data for administration

Install furniture

75 Accounting

Delivery material

76 Maintenance of power supply

Lifting material
Issue material
Issued and return tools
stock control
Survey Topografhy
Survey Traverse
Calculation of Survey Data
Staking out coordinate position of
Site Plan ,Grid Line
Setting Bow Plank
Marking for position of Foundation
Monitoring for excavation
Setting and Levelling Ancor Bolt
Levelling Top Concrete ( checking
before pouring concrete)
Survey Plumbnes
Marking elevation of top Floor
and centre of grid line
Marking position of room, window,
door,celling ,ect
marking monitoring
Surveying for as built Drawing data
Safety induction and training
Supervising and monitoring
Input data for safety
Site inspection and testing
Field and documentation audit

and temporary lighting

Prepare permit and 5.4.3 document

BU3 Form - People

Work codes for consentrating project:


Area
1 Column

2 Cleaning structural steel

3 Cleaning columns

4 Painting columns

5 Painting Structural Steel

Daily Time Sheet -Operational Employee/Crew


Department / Crew :
Date

Supervisor
:

Superintendent

Sub area
1 Walkways

No

Id Number

80004404

Name
SUTISNA BIN MARNA

Position
Steel Erection FM

Status

Time in

Time out

Mile Point

Area

Sub Area

Activity

DS

06.00

18.00

MP74

2 Laydown

1 Gabion wall behind office

2 Re-arrange laydown yard

3 Temporary fabrication facility

V99179

TARSIM

4 Laydown pad concrete

Steel Erection L/H

5 Temporary power supply

80002350

V85586

BUSRIYONO

Welder

SADAM

Welder

9
10
11
12

3 Main line

1 Install scaffold

13

2 Clean pipe line

14

3 Identify defects

15

4 Repair defects

16

80003338

SLAMET RIYADI

Welder

80002355

ASEP SUNARYA

Steel Erection

80003102

USMADI

Steel Erection

20

V120461

ASEP SAEPUDIN

Steel Erection

21

V120802

ADE FATULAH APRIANSYAH

Steel Erection

17
4 All area

18
19

22
23

24

10

25
26

11

27
28

12

29
30

13

31
32

14

33

15
34
35

16

36
37

17

38

18
39

19

40

20

41

42

Prepared by,

Rechecked and Confirm by,

Approved by,

Acknowledge and Confirm by,

43
44
45
46
47

Foreman

Dept. SPV/SUPT

Dept. Head/MGR

HR MGR/SUPT

48

Name

Name

Name

Name

49

Activity
Fabricate steel structure

50 QA Field

Erect steel structure

51 QA Office

Demolish steel structure, grating etc.

52 Handover Document

Erect scaffolding

53 Project Control/ Planner/ Scheduler

Demolish scaffolding

54 Document Control

Cleaning steel structure

55 Drafting

Cleaning tank

56 Electrical demolish

Cleaning pipe

57 Install cable ladder / tray

Painting steel structure

58 Install support / bracket

Painting tank

59 Fabricate ladder / tray

Painting pipe

60 Install conduit

Excavation

61 Install cable

Levelling and compacting

62 Install field device

Demolish existing concrete

63 Install panel / DB

Formwork and rebar

64 Cable termination

Pouring concrete

65 Pre-commissioning

Install gabion basket

66 Commissioning

Put rock in gabion basket

67 Internal Report (LCI)

Install wall, ceiling and roof

68 External Report (PTFI)

Install floor tile, wall tile, ablution,

69 Internal Meeting (LCI)

skirting, vinyl

70 External Meeting (PTFI)

Install door and window

71 Input data of plant & equipment

Painting wall, ceiling, door and window

72 Equipment control

Demolish& relocation existing roof,

73 Machinary maintenance

wall, door, window, etc.

74 Input data for administration

Install furniture

75 Accounting

Delivery material

76 Maintenance of power supply

Lifting material
Issue material
Issued and return tools
stock control
Survey Topografhy
Survey Traverse
Calculation of Survey Data
Staking out coordinate position of
Site Plan ,Grid Line
Setting Bow Plank
Marking for position of Foundation
Monitoring for excavation
Setting and Levelling Ancor Bolt
Levelling Top Concrete ( checking
before pouring concrete)
Survey Plumbnes
Marking elevation of top Floor
and centre of grid line
Marking position of room, window,
door,celling ,ect
marking monitoring
Surveying for as built Drawing data
Safety induction and training
Supervising and monitoring
Input data for safety
Site inspection and testing
Field and documentation audit

and temporary lighting

Prepare permit and 5.4.3 document

BU3 Form - People

Work codes for consentrating project:


Area
1 Column

2 Cleaning structural steel

3 Cleaning columns

4 Painting columns

5 Painting Structural Steel

Daily Time Sheet -Operational Employee/Crew


Department / Crew :
Date

Supervisor
:

Superintendent

Sub area
1 Walkways

No

Id Number

Name

80002440

HERU GUNAWAN

Position

Status

Time in

Time out

Mile Point

Area

Sub Area

Activity

2 Laydown

HSE Assistant

1 Gabion wall behind office

2 Re-arrange laydown yard

3 Temporary fabrication facility

80002445

SAMINO

4 Laydown pad concrete

HSE Assistant

5 Temporary power supply

9
10
11
12

3
3 Main line

4
5

1 Install scaffold

13

2 Clean pipe line

14

3 Identify defects

15

4 Repair defects

16
17

4 All area

18
19

20

21
22

23

10

24
25
26

11

27
28

12

29
30

13

31
32

14

33

15
34
35

16

36
37

17

38

18
39

19

40

20

41

42

Prepared by,

Rechecked and Confirm by,

Approved by,

Acknowledge and Confirm by,

43
44
45
46
47

Foreman

Dept. SPV/SUPT

Dept. Head/MGR

HR MGR/SUPT

48

Name

Name

Name

Name

49

Activity
Fabricate steel structure

50 QA Field

Erect steel structure

51 QA Office

Demolish steel structure, grating etc.

52 Handover Document

Erect scaffolding

53 Project Control/ Planner/ Scheduler

Demolish scaffolding

54 Document Control

Cleaning steel structure

55 Drafting

Cleaning tank

56 Electrical demolish

Cleaning pipe

57 Install cable ladder / tray

Painting steel structure

58 Install support / bracket

Painting tank

59 Fabricate ladder / tray

Painting pipe

60 Install conduit

Excavation

61 Install cable

Levelling and compacting

62 Install field device

Demolish existing concrete

63 Install panel / DB

Formwork and rebar

64 Cable termination

Pouring concrete

65 Pre-commissioning

Install gabion basket

66 Commissioning

Put rock in gabion basket

67 Internal Report (LCI)

Install wall, ceiling and roof

68 External Report (PTFI)

Install floor tile, wall tile, ablution,

69 Internal Meeting (LCI)

skirting, vinyl

70 External Meeting (PTFI)

Install door and window

71 Input data of plant & equipment

Painting wall, ceiling, door and window

72 Equipment control

Demolish& relocation existing roof,

73 Machinary maintenance

wall, door, window, etc.

74 Input data for administration

Install furniture

75 Accounting

Delivery material

76 Maintenance of power supply

Lifting material
Issue material
Issued and return tools
stock control
Survey Topografhy
Survey Traverse
Calculation of Survey Data
Staking out coordinate position of
Site Plan ,Grid Line
Setting Bow Plank
Marking for position of Foundation
Monitoring for excavation
Setting and Levelling Ancor Bolt
Levelling Top Concrete ( checking
before pouring concrete)
Survey Plumbnes
Marking elevation of top Floor
and centre of grid line
Marking position of room, window,
door,celling ,ect
marking monitoring
Surveying for as built Drawing data
Safety induction and training
Supervising and monitoring
Input data for safety
Site inspection and testing
Field and documentation audit

and temporary lighting

Prepare permit and 5.4.3 document

BU3 Form - People

Work codes for consentrating project:


Area
1 Column

2 Cleaning structural steel

3 Cleaning columns

4 Painting columns

5 Painting Structural Steel

Daily Time Sheet -Operational Employee/Crew


Department / Crew :
Date

Supervisor
:

Superintendent

Sub area
1 Walkways

No

Id Number

80002831

Name
FITRA KUSUMA

Position

Status

Time in

Time out

Mile Point

Area

Sub Area

Activity

2 Laydown

Scaffolder L/H

1 Gabion wall behind office

2 Re-arrange laydown yard

3 Temporary fabrication facility

80002522

AGUS SUBHAN MAULANA

4 Laydown pad concrete

Scaffolder

5 Temporary power supply

80005263

HENDRIK PAJAN

Scaffolder

80004463

HARIYONO

Scaffolder

9
10
11
12

3 Main line

1 Install scaffold

13

2 Clean pipe line

14

3 Identify defects

15

4 Repair defects

16
17

4 All area

18
19

20

21
22

23

10

24
25
26

11

27
28

12

29
30

13

31
32

14

33

15
34
35

16

36
37

17

38

18
39

19

40

20

41

42

Prepared by,

Rechecked and Confirm by,

Approved by,

Acknowledge and Confirm by,

43
44
45
46
47

Foreman

Dept. SPV/SUPT

Dept. Head/MGR

HR MGR/SUPT

48

Name

Name

Name

Name

49

Activity
Fabricate steel structure

50 QA Field

Erect steel structure

51 QA Office

Demolish steel structure, grating etc.

52 Handover Document

Erect scaffolding

53 Project Control/ Planner/ Scheduler

Demolish scaffolding

54 Document Control

Cleaning steel structure

55 Drafting

Cleaning tank

56 Electrical demolish

Cleaning pipe

57 Install cable ladder / tray

Painting steel structure

58 Install support / bracket

Painting tank

59 Fabricate ladder / tray

Painting pipe

60 Install conduit

Excavation

61 Install cable

Levelling and compacting

62 Install field device

Demolish existing concrete

63 Install panel / DB

Formwork and rebar

64 Cable termination

Pouring concrete

65 Pre-commissioning

Install gabion basket

66 Commissioning

Put rock in gabion basket

67 Internal Report (LCI)

Install wall, ceiling and roof

68 External Report (PTFI)

Install floor tile, wall tile, ablution,

69 Internal Meeting (LCI)

skirting, vinyl

70 External Meeting (PTFI)

Install door and window

71 Input data of plant & equipment

Painting wall, ceiling, door and window

72 Equipment control

Demolish& relocation existing roof,

73 Machinary maintenance

wall, door, window, etc.

74 Input data for administration

Install furniture

75 Accounting

Delivery material

76 Maintenance of power supply

Lifting material
Issue material
Issued and return tools
stock control
Survey Topografhy
Survey Traverse
Calculation of Survey Data
Staking out coordinate position of
Site Plan ,Grid Line
Setting Bow Plank
Marking for position of Foundation
Monitoring for excavation
Setting and Levelling Ancor Bolt
Levelling Top Concrete ( checking
before pouring concrete)
Survey Plumbnes
Marking elevation of top Floor
and centre of grid line
Marking position of room, window,
door,celling ,ect
marking monitoring
Surveying for as built Drawing data
Safety induction and training
Supervising and monitoring
Input data for safety
Site inspection and testing
Field and documentation audit

and temporary lighting

Prepare permit and 5.4.3 document

BU3 Form - People

Work codes for consentrating project:


Area
1 Column

2 Cleaning structural steel

3 Cleaning columns

4 Painting columns

5 Painting Structural Steel

Daily Time Sheet -Operational Employee/Crew


Department / Crew :
Date

Supervisor
:

Superintendent

Sub area
1 Walkways

No

Id Number

80002886

Name
NANA TARYANA

Position

Status

Time in

Time out

Mile Point

Area

Sub Area

Activity

2 Laydown

Mason L/H

1 Gabion wall behind office

2 Re-arrange laydown yard

3 Temporary fabrication facility

80002614

AHMAD JEJEN

4 Laydown pad concrete

Mason

5 Temporary power supply

80003086

WAWAN ERNAWAN

9
10
11
12

Mason
3 Main line

4
5

1 Install scaffold

13

2 Clean pipe line

14

3 Identify defects

15

4 Repair defects

16
17

4 All area

18
19

20

21
22

23

10

24
25
26

11

27
28

12

29
30

13

31
32

14

33

15
34
35

16

36
37

17

38

18
39

19

40

20

41

42

Prepared by,

Rechecked and Confirm by,

Approved by,

Acknowledge and Confirm by,

43
44
45
46
47

Foreman

Dept. SPV/SUPT

Dept. Head/MGR

HR MGR/SUPT

48

Name

Name

Name

Name

49

Activity
Fabricate steel structure

50 QA Field

Erect steel structure

51 QA Office

Demolish steel structure, grating etc.

52 Handover Document

Erect scaffolding

53 Project Control/ Planner/ Scheduler

Demolish scaffolding

54 Document Control

Cleaning steel structure

55 Drafting

Cleaning tank

56 Electrical demolish

Cleaning pipe

57 Install cable ladder / tray

Painting steel structure

58 Install support / bracket

Painting tank

59 Fabricate ladder / tray

Painting pipe

60 Install conduit

Excavation

61 Install cable

Levelling and compacting

62 Install field device

Demolish existing concrete

63 Install panel / DB

Formwork and rebar

64 Cable termination

Pouring concrete

65 Pre-commissioning

Install gabion basket

66 Commissioning

Put rock in gabion basket

67 Internal Report (LCI)

Install wall, ceiling and roof

68 External Report (PTFI)

Install floor tile, wall tile, ablution,

69 Internal Meeting (LCI)

skirting, vinyl

70 External Meeting (PTFI)

Install door and window

71 Input data of plant & equipment

Painting wall, ceiling, door and window

72 Equipment control

Demolish& relocation existing roof,

73 Machinary maintenance

wall, door, window, etc.

74 Input data for administration

Install furniture

75 Accounting

Delivery material

76 Maintenance of power supply

Lifting material
Issue material
Issued and return tools
stock control
Survey Topografhy
Survey Traverse
Calculation of Survey Data
Staking out coordinate position of
Site Plan ,Grid Line
Setting Bow Plank
Marking for position of Foundation
Monitoring for excavation
Setting and Levelling Ancor Bolt
Levelling Top Concrete ( checking
before pouring concrete)
Survey Plumbnes
Marking elevation of top Floor
and centre of grid line
Marking position of room, window,
door,celling ,ect
marking monitoring
Surveying for as built Drawing data
Safety induction and training
Supervising and monitoring
Input data for safety
Site inspection and testing
Field and documentation audit

and temporary lighting

Prepare permit and 5.4.3 document

BU3 Form - People

Work codes for consentrating project:


Area
1 Column

2 Cleaning structural steel

3 Cleaning columns

4 Painting columns

5 Painting Structural Steel

Daily Time Sheet -Operational Employee/Crew


Department / Crew :
Date

Supervisor
:

Superintendent

Sub area
1 Walkways

No

Id Number

80002446

Name
SAMAN B KARMAN

Position

Status

Time in

Time out

Mile Point

Area

Sub Area

Activity

2 Laydown

Mason

1 Gabion wall behind office

2 Re-arrange laydown yard

3 Temporary fabrication facility

80002453

TABRONI

4 Laydown pad concrete

Mason

5 Temporary power supply

9
10
11
12

3
3 Main line

4
5

1 Install scaffold

13

2 Clean pipe line

14

3 Identify defects

15

4 Repair defects

16
17

4 All area

18
19

20

21
22

23

10

24
25
26

11

27
28

12

29
30

13

31
32

14

33

15
34
35

16

36
37

17

38

18
39

19

40

20

41

42

Prepared by,

Rechecked and Confirm by,

Approved by,

Acknowledge and Confirm by,

43
44
45
46
47

Foreman

Dept. SPV/SUPT

Dept. Head/MGR

HR MGR/SUPT

48

Name

Name

Name

Name

49

Activity
Fabricate steel structure

50 QA Field

Erect steel structure

51 QA Office

Demolish steel structure, grating etc.

52 Handover Document

Erect scaffolding

53 Project Control/ Planner/ Scheduler

Demolish scaffolding

54 Document Control

Cleaning steel structure

55 Drafting

Cleaning tank

56 Electrical demolish

Cleaning pipe

57 Install cable ladder / tray

Painting steel structure

58 Install support / bracket

Painting tank

59 Fabricate ladder / tray

Painting pipe

60 Install conduit

Excavation

61 Install cable

Levelling and compacting

62 Install field device

Demolish existing concrete

63 Install panel / DB

Formwork and rebar

64 Cable termination

Pouring concrete

65 Pre-commissioning

Install gabion basket

66 Commissioning

Put rock in gabion basket

67 Internal Report (LCI)

Install wall, ceiling and roof

68 External Report (PTFI)

Install floor tile, wall tile, ablution,

69 Internal Meeting (LCI)

skirting, vinyl

70 External Meeting (PTFI)

Install door and window

71 Input data of plant & equipment

Painting wall, ceiling, door and window

72 Equipment control

Demolish& relocation existing roof,

73 Machinary maintenance

wall, door, window, etc.

74 Input data for administration

Install furniture

75 Accounting

Delivery material

76 Maintenance of power supply

Lifting material
Issue material
Issued and return tools
stock control
Survey Topografhy
Survey Traverse
Calculation of Survey Data
Staking out coordinate position of
Site Plan ,Grid Line
Setting Bow Plank
Marking for position of Foundation
Monitoring for excavation
Setting and Levelling Ancor Bolt
Levelling Top Concrete ( checking
before pouring concrete)
Survey Plumbnes
Marking elevation of top Floor
and centre of grid line
Marking position of room, window,
door,celling ,ect
marking monitoring
Surveying for as built Drawing data
Safety induction and training
Supervising and monitoring
Input data for safety
Site inspection and testing
Field and documentation audit

and temporary lighting

Prepare permit and 5.4.3 document

BU3 Form - People

Work codes for consentrating project:


Area
1 Column

2 Cleaning structural steel

3 Cleaning columns

4 Painting columns

5 Painting Structural Steel

Daily Time Sheet -Operational Employee/Crew


Department / Crew :
Date

Supervisor
:

Superintendent

Sub area
1 Walkways

No

Id Number

80002537

Name
BUKHORI MEP

Position
Electrician L/H

Status

Time in

Time out

Mile Point

Area

Sub Area

Activity

DS

06.00

18.00

MP74

76

2 Laydown

1 Gabion wall behind office

2 Re-arrange laydown yard

3 Temporary fabrication facility

80002990

DADAN KUSWARA

4 Laydown pad concrete

Electrician L/H

5 Temporary power supply

80002905

SAHRONI LCI

9
10
11
12

Electrician
3 Main line

4
5

1 Install scaffold

13

2 Clean pipe line

14

3 Identify defects

15

4 Repair defects

16
17

4 All area

18
19

20

21
22

23

10

24
25
26

11

27
28

12

29
30

13

31
32

14

33

15
34
35

16

36
37

17

38

18
39

19

40

20

41

42

Prepared by,

Rechecked and Confirm by,

Approved by,

Acknowledge and Confirm by,

43
44
45
46
47

Foreman

Dept. SPV/SUPT

Dept. Head/MGR

HR MGR/SUPT

48

Name

Name

Name

Name

49

Activity
Fabricate steel structure

50 QA Field

Erect steel structure

51 QA Office

Demolish steel structure, grating etc.

52 Handover Document

Erect scaffolding

53 Project Control/ Planner/ Scheduler

Demolish scaffolding

54 Document Control

Cleaning steel structure

55 Drafting

Cleaning tank

56 Electrical demolish

Cleaning pipe

57 Install cable ladder / tray

Painting steel structure

58 Install support / bracket

Painting tank

59 Fabricate ladder / tray

Painting pipe

60 Install conduit

Excavation

61 Install cable

Levelling and compacting

62 Install field device

Demolish existing concrete

63 Install panel / DB

Formwork and rebar

64 Cable termination

Pouring concrete

65 Pre-commissioning

Install gabion basket

66 Commissioning

Put rock in gabion basket

67 Internal Report (LCI)

Install wall, ceiling and roof

68 External Report (PTFI)

Install floor tile, wall tile, ablution,

69 Internal Meeting (LCI)

skirting, vinyl

70 External Meeting (PTFI)

Install door and window

71 Input data of plant & equipment

Painting wall, ceiling, door and window

72 Equipment control

Demolish& relocation existing roof,

73 Machinary maintenance

wall, door, window, etc.

74 Input data for administration

Install furniture

75 Accounting

Delivery material

76 Maintenance of power supply

Lifting material
Issue material
Issued and return tools
stock control
Survey Topografhy
Survey Traverse
Calculation of Survey Data
Staking out coordinate position of
Site Plan ,Grid Line
Setting Bow Plank
Marking for position of Foundation
Monitoring for excavation
Setting and Levelling Ancor Bolt
Levelling Top Concrete ( checking
before pouring concrete)
Survey Plumbnes
Marking elevation of top Floor
and centre of grid line
Marking position of room, window,
door,celling ,ect
marking monitoring
Surveying for as built Drawing data
Safety induction and training
Supervising and monitoring
Input data for safety
Site inspection and testing
Field and documentation audit

and temporary lighting

Prepare permit and 5.4.3 document