Escolar Documentos
Profissional Documentos
Cultura Documentos
14000 litres
L=
B=
=
5
3
2.15
0
2.15
14 cubic metres
m
m
m
m
m
Design Parameters :
Grade of Concrete =
M 20
Reinforcement =
Fe 415
Permissible Stresses in Concrete( Table 1 IS 3370 Part II -1981)
Permissible Compressive Stress due to bending
cbc
Permissible Tensile Stress due to bending
tbc
t
Permissible Direct Tensile Stress
v
Permissible Shear Stress
7 MPa
1.7 MPa
1.2 MPa
1.7 MPa
Design constants:
Modular Ratio = m= 280/(3xcbc)
150 MPa
150 MPa
150 MPa
190 MPa
150 MPa
175 MPa
175 MPa
13.33
k = mcbc/(mcbc+st) =
0.3836
0.3294
0.2887
forst=
for st=
for st=
150 Mpa
190 Mpa
230 Mpa
j = 1-k/3 =
0.8721
0.8902
0.9038
forst=
for st=
for st=
150 Mpa
190 Mpa
230 Mpa
Q = 0.5 x k x j xcbc =
1.1708
1.0263
0.9131
forst=
for st=
for st=
150 Mpa
190 Mpa
230 Mpa
kN/m3
kN/m3
Deg =
kN/m2
0.3073
0.5585 rad
SHORT WALL:
(a.)
Size of panel:
height
a=
width
b=
b/a =
1.395
Moment Coefficients (From Table 3 of IS 3370 - Part-IV)
(I.)
Vertical moment Coefficient (-)ve
Vertical moment Coefficient (+)ve
2.15 M
3M
0.06
0.016
(ii.)
Case ( I.)
5.963 KNm
Mv(+ve) =
ax(+ve) * w *a3 =
1.590 KNm
Mh(-ve) =
ay(-ve) * w *a3 =
3.975 KNm
Mh(-ve) =
ay(+ve) * w *a3 =
2.087 KNm
Case (ii.)
0.04
0.021
10.757 kN/m2
Mv(-ve) =
ax(-ve) * p *a2 =
2.983 KNm
Mv(+ve) =
ax(+ve) * p *a2 =
0.796 KNm
Mh(-ve) =
ax(-ve) * p *a2 =
1.989 KNm
Mh(-ve) =
ax(+ve) * p *a2 =
1.044 KNm
d = sqrt(M/Q*1000)
d required =
Thickness of the wall provided
=
Maximum Design Vertical Moment =
Ast(ver) =
71.4 mm
175 mm
5.963025
Max Ver.Moment/(st*j*d)
Ast(ver) =
314.35 sqmm
Spacing of #10 bars Reqd=
Providing
#10 @
200
Maximum Design Horizontal Moment =
Ast(hor) =
249.719 mm
397.5 sqmm
mm c/c
3.975 kNm
Ast(hor) =
225.09 sqmm
Spacing of #10 bars Reqd=
Providing
#10 @
200
mm c/c
322.051 mm
397.5 sqmm
487.500 sqmm
1000
397.5
175
AX2
1339843750
4411057.5
Iself
446614583
0
0
397.5
184802.35
16170205.6
Yt=AX/A =
Itop =Iself+AX2
1344254807.5
446614583
87.5 mm
Ina = Itop-Ayt^2 =
Zt = Ina/Yt =
ft,fb = M/Zt =
1790869390.83
375976398.646
4296873.12738
1.388
mm4
mm4
mm3
Mpa <1.7MPa
57.7813 KN.
385.2
Total Ast =
610.30 sqmm
Spacing of #10 bars Reqd=
Providing
#10 @
125
sqmm
128.625 mm
628 sqmm
mm c/c
0.303 MPa
1000
AX
15312500
232297.2
1122769.8
16667567
Yt=AX/A =
Itop =Iself+AX2
AX^2
1339843750
6968916
162801621
1509614287
Iself
446614583
0
0
446614583
628
87.5 mm
Ina = Itop-Ayt^2 =
Zt = Ina/Yt =
Check for Stresses:
fb =M/Z =
ft = T/A =
1956228870.33 mm4
497816757.833 mm4
5689334.37524 mm3
0.70 N/sqmm
0.30 N/sqmm
0.664 <1.0
Safe
LONG WALL :
(a.) Size of panel:
height
a=
width
b=
b/a =
2.33
Moment Coefficients (From Table 3 of IS 3370 - Part-IV)
(I.)
Vertical moment Coefficient (ax-)ve
(ii.)
Case ( I.)
Case (ii.)
628
175
2.15 M
5M
S
0.1
0.01234
0.06924
0.027
9.938 KNm
Mv(+ve) =
ax(+ve) * w *a3 =
1.226 KNm
Mh(-ve) =
ay(-ve) * w *a3 =
6.881 KNm
Mh(+ve) =
ay(+ve) * w *a3 =
2.683 KNm
10.76 kN/m2
Mv(-ve) =
ax(-ve) * p *a2 =
4.972 KNm
Mv(+ve) =
ax(+ve) * p *a2 =
0.614 KNm
Mh(-ve) =
ax(-ve) * p *a2 =
3.443 KNm
Mh(-ve) =
ax(+ve) * p *a2 =
1.343 KNm
d = sqrt(M/Q*1000)
d required =
Thickness of the wall provided
=
92.13 mm
175 mm
9.938
Max Ver.Moment/(st*j*d)
Ast(ver) =
524.010071 sqmm
Spacing of #12 bars Reqd=
Providing
#12 @
125
215.84 mm
904.8 sqmm
mm c/c
6.88 kNm
Ast(hor) =
389.70 sqmm
Spacing of #12 bars Reqd=
Providing
#10 @
150
290.22 mm
523.33 sqmm
mm c/c
487.50 sqmm
1000
904.8
175
Iself
446614583
0
0
446614583
904.8
87.5 mm
Ina = Itop-Ayt^2 =
Zt = Ina/Yt =
ft,fb = M/Zt =
2028514057.58
517841240.081
5918185.60093
1.679
mm4
mm4
mm3
Mpa <1.7MPa
34.67 KN.
231.13 sqmm
Total Ast =
620.83 sqmm
Spacing of #10 bars Reqd=
Providing
# 10 @
125
mm c/c
126.445 mm
628 sqmm
0.182 N/sqmm
1000
175
628
175
Iself
446614583
0
0
446614583
628
87.5 mm
1937087581.1 mm4
478675468.553 mm4
5470576.78347 mm3
Ina = Itop-Ayt^2 =
Zt = Ina/Yt =
Check for Stresses:
fb =M/Z =
1.26
ft = T/A =
0.18
X/Permissile compressive stress + (M/Z)/Permissible tensile stress
(fb/fb')+(ft/ft') =
0.89 <1.0
Safe
Lx =
Ly =
Ly/Lx =
Load Calculations:
Upward Pressure =
3.4
5.4
1.59
FOR LY/LX=1.67
x1=
0.089
B.M
Mx(-ve) =
x1*w*Lx^2 =
Mx(+ve) =
x2*w*Lx^2 =
My(+ve) =
y1*w*Lx^2 =
11.6 KN/sqm
One longe edge continuous
x2 = 0.067
Mu(kNm)
Ast
11.89
534.55
8.95
402.42
5.74
258.27
y2 = 0.043
Spacing
146.852
195.072
194.566
Depth required =
sqrt(M/Q*1000) =
Thickness of the slab provided
=
Ast =
100.76 mm
200 mm
Max Moment/(st*j*d)
Ast =
542.86 sqmm
Spacing of #10 bars Reqd=
Providing
#10 @
150
mm c/c
144.605 mm
530 sqmm
542.857 sqmm
1000
530
200
AX
20000000
202581.9
1104398.1
21306980
Yt=AX/A =
Itop =Iself+AX2
Ina = Itop-Ayt^2 =
Zt = Ina/Yt =
ft,fb = M/Zt =
AX^2
2000000000
6280038.9
186643278.9
2192923317.8
Iself
666666667
0
0
666666667
100 mm
2859589984.47
728891984.467
7288919.84467
1.631
mm4
mm4
mm3
Mpa <1.7MPa
530
150 mm
5
3.75
1
9.75
KN/sqm
KN/sqm
KN/sqm
KN/sqm
y = 0.056
0.1
Mx(+) =
Moment
9.8286
KNm
Ast
365.2400 sqmm
My(+) =
5.5040
KNm
204.53442 sqmm
91.6152117961
Ast =
365.24 sqmm
Spacing of #8 bars Reqd=
137.64 mm
Providing
#8 @
125
mm c/c
Ast =
204.53 sqmm