Escolar Documentos
Profissional Documentos
Cultura Documentos
Celemetrix 2015
Slide 0
Discussion Agenda
1.
2.
3.
HFC
2.
FTTP
3.
FTTN
Celemetrix 2015
Slide 1
Celemetrix Overview
Service, Repair,
Calibration
Equipment
Rental
Availability
Productivity
Reliability
Compliance
Training
Productivity
Optimise
Develop
Compliance
Professional
Services
Celemetrix 2015
Slide 2
NBN Architecture
Celemetrix 2015
Slide 3
Celemetrix 2015
Slide 4
Celemetrix 2015
Slide 5
Wireless
Technology
SDU
MDU
National Connections
Satellite
320,000
Fixed Wireless
430,000
FTTP
2,890,000
HFC
3,270,000
FTTN
5,100,000
Wireline
Celemetrix 2015
Slide 6
Celemetrix 2015
Slide 7
Celemetrix 2015
Slide 8
FTTN Architecture
Telephone Exchange
Node
Pillar
(Existing)
Optical Fibre
Copper Pairs
Celemetrix 2015
Slide 9
FTTP
FTTN
Distance
N (20Km max)
Technology
Y
(VDSL Vs G.FAST)
Insulation Resistance
Water/Moisture
Laterals/Multis
Y (Unterminated
TAPS/Customer connect)
Pair/Coax Quality
In home cabling
Gauge/Type
Y ( Changes distance/speed)
Y
(-10% VDSL power reduction)
Load coils
Celemetrix 2015
HFC
Slide 10
Triple Play
Celemetrix 2015
Slide 11
Celemetrix 2015
Slide 12
FTTP Architecture
Carriers
Premises
FDH
ONT
Splitter
OLT
1310nm Upstream Voice/Data
1490nm Downstream
Voice/Data
ONT
1550nm Downstream RF
Video
Celemetrix 2015
Slide 13
Transit
Fibre Network
(TFN)
Distribution
Fibre Network
(DFN)
AJL
MPT
UNDERGROUND
AERIAL
Local
Fibre Network
(LFN)
FIBRE
DISTRIBUTION
HUB
(FDH)
Celemetrix 2015
FITS
MPT
Slide 14
FTTP Architecture
Transit Fibre Network
TFN
DFN
LFN
FDH
FAN
1310nm
1490nm
MPT
POI
1 customer per
fibre after FDH
1550nm
TSS
TJL
DSS
DJL
HSD
HSL
LJL
LSS
AJL
MSS
MPT
SDS
1 to 32
customers/ fibre
PCD
FWO
NTD
LFN
CUSTOMER PREMISES
Celemetrix 2015
Slide 15
FTTP Architecture
CORNING Fibre Distribution Hub (FDH) 432, 576 and 864
Fibres
Celemetrix 2015
Slide 16
FTTP Architecture
MultiPort Terminal
Celemetrix 2015
Slide 17
Celemetrix 2015
Slide 18
HFC Architecture
Celemetrix 2015
Slide 19
HFC Architecture
Celemetrix 2015
Slide 20
HFC Architecture
Celemetrix 2015
Slide 21
Celemetrix 2015
Slide 22
Cabinet
Pillar
(Existing)
Main Pairs
Telephone Exchange
Branch Pairs
B Pairs
Operational Pairs
O Pairs
Copper Network
Node
Pillar
(Existing)
Optical Fibre
DFN Cable
Copper Pairs
FTTN Network
192-384 Customers
Celemetrix 2015
Slide 23
Branch
Branch
SAM 1
HSD
12F
FTTN
NODE
MPT
MPT
Branch
MPT
HSD
12F
FTTN
NODE
Exchange/FAN
DFN
576F
Trunk
DSS Branch
72F
DJL
DJL
FTTN
NODE
Branch
MPT
DFN
288F
Trunk
DJL
HSD
12F
FTTN
NODE
DFN
288F
Trunk
Celemetrix 2015
Slide 24
Copper Cabling
Cable Sizes (Pairs)
4200
3000
2700
2400
1800
600
400
300
200
100
1400
50
1200
30
1000
10
800
Conductor
Resistance/km Loop
Metres/1ohm Loop
0.32mm
427.5
2.34
267.2
3.74
0.51mm
164.4
6.08
106.9
9.35
O.71mm
88.0
11.4
53.44
18.71
1.27mm
26.72
37.43
Celemetrix 2015
Slide 25
Quality Is Everything
Celemetrix 2015
Slide 26
Quality Is Everything
Celemetrix 2015
Slide 27
Quality Is Everything
Celemetrix 2015
Slide 28
FTTN Cabinet
Celemetrix 2015
Slide 29
Customer
O Pairs
NODE
Existing
Copper
Jumper
New Copper
Jumpers
Pillar
Celemetrix 2015
Slide 30
Short Circuit
Open Circuit
Contacting Conductors
Earthed Conductor
Low Insulation Resistance
High Voltage Breakdowns
Split Pair
Rectified Split Pair
Lateral Connection
Buildout on an Unloaded Pair
Buildout Faults on Loaded Pairs
Coil connected to Unloaded Pair
Coil Faults on Loaded Pairs
Celemetrix 2015
Slide 31
Short Circuit
2.
Open Circuit
3.
Contacting Conductors
Pair 1
Pair 2
4.
Earthed Conductor
Celemetrix 2015
Slide 32
6.
7.
Split Pair
Pair 1
Pair 1
Pair 2
Pair 2
Celemetrix 2015
Slide 33
9.
Pair 1
Pair 2
Pair 2
Bridge Tap
Pair
Buildout (Capacitor)
Celemetrix 2015
Slide 34
Celemetrix 2015
Slide 35
Test Equipment
EXFO Maxtester 635 - Application
Application
MAX-635
Data Testing
Multi-Play
IPTV Testing
Web Browser
Ethernet Link verification
xDSL
Ethernet
Copper
Celemetrix 2015
Slide 36
Celemetrix 2015
Slide 37
Celemetrix 2015
Slide 38
Celemetrix 2015
Slide 39
Celemetrix 2015
Slide 40
Global Directions
FTTdp Fibre To The distribution point
Why:
New technology
Smaller footprint
Use of existing infrastructure pits, pipes etc
Migration simplicity FTTN, FTTP etc
Cost
Bandwidth performance
Architectural simplicity fast, affordable and simple
Celemetrix 2015
Slide 41
Celemetrix 2015
Slide 42
1050mm
230mm
FDH
Joint
Size
FJL
485mm
650mm
Celemetrix 2015
Slide 43
Celemetrix 2015
Slide 44
Celemetrix 2015
Slide 45
Workforce Enablement
Celemetrix 2015
Slide 46
Workforce Enablement
Challenge
Multiple technologies
Scale
Standards
Drives
Requirement for additional resources
Upskilling of existing resources
Certification compliance management
Celemetrix 2015
Slide 47
Workforce Enablement
Resource acquisition options
1. FTE
2. Contract
3. Labour hire
Celemetrix 2015
Slide 48
Workforce Enablement
Workforce readiness & certification
1. Celemetrix is NBN certified Project Athena panel supplier
2. Celemetrix is Telstra certified
3. RTO Registered Training Organisation (Government funding)
Celemetrix 2015
Slide 49
Celemetrix 2015
Slide 50