Habesha Construction Materials Development S.

C
Basic Assumptions

Assumptions and Basis for Projection


Working days per month

26

Working days

312

per annum

Number of shifts

per day

Working hours

per shift

Theoretical production capacity

Furnitue, Fixtures & wood products

Capacity utilization

Product mix

150 M2/shift

Year 1

65% of attainable capacity

Year 2

75% of attainable capacity

Year 3

85% of attainable capacity

Year 4

95% of attainable capacity

Year 5

100% of attainable capacity

Furnitue, Fixtures & wood products Superior


Fine
Normal

Market segmentation

local market

Selling price

100% of production

Superior

1,000 Birr/M2

Fine

750 Birr/M2

Normal

500 Birr/M2

Employees benefit

3% of wage and salaries

Traveling expense

10% of AS & SMS wage & salary

Professional Expense(Legal, Audit, consultancy etc)

20,000

Birr/annum

Land lease expenses

20,000

Birr/annum

Stationary & P.T.T

40,000

Birr/annum

###

Birr/annum

Miscellaneous Expense
Dividend

90% of net income

Promotional Expense

1% of annual revenue

Electric charge

0.4736 Birr/kwh + 134 service charge

Water charge

3.8 Birr/M3
Diesel

Fuel cost

Regular
Oil & lubricant

Insurance rate

fire, lightening & floud


Vehicle

10.4 Birr/litter
19 Birr/litter
10% of fuel cost
1.5% of building & machinery cost
4% of vehicle cost
5% For Building
10% For machinery & equipment
20% For vehicle & pre-production

Depreciation & amortization rate

20% For furniture & fixture


25% Computer & accessories
20% For land improvement
25% For computer & accessories
2% For building & furniture
5% For machinery & equipment

Repair & maintainace

1% For furniture & fixture


10% For vehicle
10% For machinery & equipment

Spare parts

Exchange rate

5% For vehicle
As of October 15, 2012
Fuel And Lubricants

Yearly Increase in Expenses

Tax Rate
Average inflation
Discount Rate
Grace Period On Repayment of Loan
Interest rate on long term loan
Loan repayment year

23.78 Birr/Euro
1.1

Raw Material

1.1

Labor Salary

1.1

General Increase in Costs


Forex Depr.

18.36 Birr/USD

1.1
1
30%
21.5%
12%
0 year(s)
9%
5 year(s)

46800

Habesha Construction Materials Development S.C


Investement Breakdown

Fixed and other pre-operational expenditure


Description

Planned

Total

Amount in Birr

Amount in Birr

Building and Civil Works

5,940,000

5,940,000

Machinery and equipment

7,427,115

7,427,115

Motor Vehicles

1,700,000

1,700,000

Office furniture & fixtures


Pre operating expense

259,000

259,000

1,210,000

1,210,000

Total Fixed investment required

16,536,115

working capital
Total investment required

1,379,434

1,379,434

17,915,549

17,915,549

Investment Structure
Capital contribution

8,957,775

Loan

8,957,775

Total initial investment

USD

17,915,549
968,408

42

Habesha Construction Materials Development S.C


Investement Breakdown

42

Habesha Construction Materials Development S.C


Investement Breakdown

42

Habesha Construction Materials Development S.C


Investement Breakdown

42

Habesha Construction Materials Development S.C


Investement Breakdown

42

Habesha Construction Materials Development S.C


Investement Breakdown

42

Habesha Construction Materials Development S.C


Working Capital Determination

Working Capital Requirements


Minimum Requirements of Current Assets and Liabilities
(a) Accounts receivable
(b) Inventory
local raw material
Imported raw material
Spare Parts
Work-in-progress
Finished Products
(c) Cash in Hand (petty cash)
(d) Accounts payable

60

Days at operating costs

14
90
15
2
7
15
30

of the annual cost of the material


of the annual cost of the material
Days @ plant cost
Days@ plant cost + administrative overheads
Days of total production cost less(Raw material, utility & depreciation)
Days for raw material & utilities

Working Capital Determination


Coverage

Inv't

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Year 8

Year 9

Year 10

60

219,146
###

219,146
1,494,260

281,867
###

318,420
###

360,526
###

400,947
###

417,891
###

435,682
###

454,363
###

473,978
###

494,573
###

14
90
2
7
120
15

257,220
###
24,263
101,574
275,904
440,733

257,220
1,111,202
24,263
101,574
275,904
440,733

277,497
###
37,384
152,454
303,494
619,328

314,496
###
40,360
165,138
318,669
657,240

351,496
###
43,652
179,258
334,602
699,226

369,995
###
47,299
194,616
351,333
743,795

388,495
###
49,664
204,082
368,899
753,069

407,920
###
52,147
214,022
387,344
783,982

428,316
###
54,754
224,458
406,711
816,441

449,732
###
57,492
235,416
427,047
850,523

472,218
###
60,366
246,922
448,399
886,308

###

###

###

###

###

###

###

###

###

524,136

313,253

325,390

224,703

159,593

188,747

198,185

208,094

218,499

###
229,456

###
149,172

###
149,817

###
82,359

###
83,071

###
87,224

###
91,585

###
96,165

###
100,973

###

###

###

###

###

###

###

###

###

CURRENT ASSETS
Accounts Receivable
Inventory
Raw Material
local raw material
imported raw material
Work-in-progress
Finished Products
Spare parts
Cash in hand(Petty cash)
Total Current Assets

###

2,430,044

Increase in current Assets

CURRENT LIABILITIES
Accounts Payable
Increase in current liabilities

30

###

1,050,610

WORKING CAPITAL
Net working Capital

###

Existing Working Capital

Increase in working capital

###

1,379,434

294,680

164,082

175,573

142,343

76,522

101,523

106,599

111,929

117,526

Habesha Construction Materials Development S.C


Project Basics

INSURANCE
Description
Fixed Assets
Vehicles

13,626,115

Cost of
Insurance
204,392

1,700,000

68,000

Total cost

Total

272,392

REPAIR & MAINTAINACE


Description

Total cost

Cost of Rep &


maintain

Building and construction


Machinery & Equipment

5,940,000
7,427,115

118,800
371,356

Office furniture & fixtures


Vehicle

259,000
1,700,000

2,590
170,000

Total

662,746

SPAREPARTS
Description
Machinery & Equipment
Vehicle

Total cost
7,427,115
1,700,000

Total

Cost of
spareparts
742,712
85,000
827,712

DEPRECIATION & AMORTIZATION


Description

Total cost Cost of D & A

Building and Civil Work

5,940,000

297,000

Machineries and Equipment

7,427,115

742,712

Vehicles

1,700,000

340,000

Office Furniture and Equipment


Pre-production expence
Total

259,000

51,800

1,210,000

242,000

16,536,115

1,673,512

Habesha Construction Materials Development S.C

No. of
Employees

Salary
per month

General Manager

8,000

96,000

Secretary
Total

1
2

2,000

24,000
120,000

5,000

60,000

- operator

15

2,500

450,000

- Assistant operators

15

1,600

288,000

Junior Technician

- Laborers

20

500

120,000

8 th grade

- Machinist

10

2,500

300,000

Technician

- Electrician
Total

3
64

2,000

72,000
###

Technician

Job Title

Yearly salary

Profession
BA in mechanical
engineering
Diploma in secretarial
science

Experience
10 Year experience
2 Year experience

Production Department

Plant manager

BA in mechanical engineering
Senior Technician

5 Year experience
Certificate or
diploma
Certificate or
diploma
No experience
Certificate from
Comp. High School
Comp. High School
or Tech. School

Administration and personnel Department


2 supervisory
experience

Personnel head

3,500

42,000

Management B.A

Personnel clerk

1,000

12,000

Diploma

2 years experience

Filling Clerk

1,000

12,000

Diploma

2 years experience

Total

66,000

Marketing Study, promotion and Sales manager

Marketing officer

3,000

36,000

BA in Marketing or management3 year experience

Sales persons

2,500

60,000

BA in Marketing or management2 year experience

Total

96,000

Property Administration and procurement manager


No. of
Employees

Salary
per month

Purchaser

3,000

72,000

Diploma or BA in Purchasing

Delivery supervisor

3,000

36,000

Supplies Mgt. Diploma

7 Year experience

1
4

1,000

12,000
120,000

Supplies Mgt. Diploma

3 Year experience

Finance Manager

5,000

60,000

BA in accounting

15 Year experience

Accountants

2,500

60,000

BA in accounting

2 Year experience

Data entry clerks

1,000

24,000

Diploma in accounting

0 Year experience

Job Title

Spare parts and supplies

Yearly salary

Profession

Experience
2 years experience

Finance Department

144,000

Income Statement

Sales Revenue

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Year 8

Year 9

Year 10

###

###

###

###

###

###

###

###

###

###

Plant capacity

65%

75%

85%

95%

100%

100%

100%

100%

100%

100%

Direct Labour

###

###

###

###

###

###

###

###

###

###

###

Raw Material cost


local raw material
imported raw material
Labor and staf
Labor and staf benefit
Plant Overhead Costs
Repair & maintainace
Spare parts
Utilities
Plant Cost
Administration & Selling Expenses
administration expenses
Royality Payment
Professional Expense
Stationary & P.T.T
Land lease expenses
Insurance
Salary
Benfit
selling expenses
Promotional Expense
Traveling Expense
Salary
Benfit
Miscellaneous Expense
Operating Costs
Depreciation
Total Production Cost
EBIT
Interest
EBT

###

###

###

###

6,614,238
4,444,808
1,290,000
38,700

###

7,135,627
5,128,625
1,935,000
58,050

###

8,087,044
5,812,442
2,225,250
66,758

9,038,461
6,496,259
2,559,038
76,771

9,514,169
6,838,167
2,942,893
88,287

9,989,878
7,180,075
3,090,038
92,701

###
7,539,079
3,244,540
97,336

###
7,916,033
3,406,767
102,203

###
8,311,835
3,577,105
107,313

###
8,727,426
3,755,960
112,679

3,038,729

4,736,046

4,972,848

5,221,490

5,482,565

5,756,693

6,044,528

6,346,754

6,664,092

6,997,296

###

###

662,746

729,020

765,471

803,745

843,932

886,129

930,435

976,957

1,025,805

1,077,095

827,712
1,548,271

910,483
3,096,543

956,007
3,251,370

1,003,807
3,413,938

1,053,998
3,584,635

1,106,697
3,763,867

1,162,032
3,952,060

1,220,134
4,149,663

1,281,141
4,357,146

1,345,198
4,575,004

###

###

###

###

###

###

###

###

###

###

###
856,392

###
###

###
###

###
###

###
###

###
###

###
###

###
###

###
###

###
###

20,000
40,000
20,000
272,392
450,000
54,000
358,485
250,965
96,000
11,520
100,000
###
1,673,512

21,000
42,000
20,000
272,392
675,000
81,000
479,813
318,533
144,000
17,280
100,000
###
1,673,512

22,050
44,100
20,000
272,392
776,250
93,150
582,576
397,104
165,600
19,872
100,000
###
1,673,512

23,153
46,305
20,000
272,392
892,688
107,123
701,497
488,204
190,440
22,853
100,000
###
1,673,512

24,310
48,620
272,392
1,026,591
123,191
810,576
565,289
219,006
26,281
100,000
###
1,673,512

25,526
51,051
272,392
1,077,920
129,350
851,105
593,553
229,956
27,595
100,000
###
1,431,512

26,802
53,604
272,392
1,131,816
135,818
893,660
623,231
241,454
28,974
100,000
###
1,431,512

28,142
56,284
272,392
1,188,407
142,609
938,343
654,393
253,527
30,423
100,000
###
1,431,512

29,549
59,098
272,392
1,247,827
149,739
985,260
687,112
266,203
31,944
100,000
###
1,431,512

31,027
62,053
272,392
1,310,219
157,226
###
721,468
279,513
33,542
100,000
###
1,431,512

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###

###
703,806
###

###
571,080
###

Income tax (30%)


EAT

###

###
426,622
###
4,360,618

###

###

###

###
269,395
###
6,396,700
###

98,271
###
8,245,608
###

0
###
8,792,132
###

9,258,797
###

9,748,795
###

44

44

Cash Flow Statement


Year 0

Year 1

Year 2

Year 3

Year 4

CASH INFLOWS
Owner's Equity

8,957,775

Bank Loan

8,957,775

Net Profit

5,977,830

8,924,107

Depreciation & amortization

1,673,512
###
###

1,673,512
###
###

Total Cash Inflows

17,915,549

7,651,342

10,597,618

10,174,775
1,673,512
###
###
11,848,287

14,925,633
1,673,512
16,599,145

Cash Outflows
Inv'ment on Fix. Assets

(15,326,115)

Working Capital

(1,379,434)

Pre-production Cost
& interest

(1,210,000)

(294,680)

(164,082)

(175,573)

(1,634,310)

(1,778,768)

(1,935,995)

(5,380,047)

(8,031,696)

(9,157,298)

(1,501,583)

(7,309,037)

(9,974,545)

Replacement
Loan Repayment

(1,501,583)

Dividend (30%)
Total Cash Outflows

(17,915,549)

###

Net Cash Flow

6,149,759

3,288,581

1,873,741

5,330,279

Cum. Cash Balance

6,149,759

9,438,340

11,312,081

16,642,360

Retained Earnings

597,783

892,411

1,017,478

1,492,563

Cumm. Ret.Earnings

597,783

1,490,194

2,507,671

4,000,235

45

Projected Balance Sheet


Inv't

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Year 8

Year 9

Year 10

6,149,759
2,430,044

9,438,340
2,954,180

11,312,081
3,267,433

16,642,360
3,592,824

19,914,090
3,817,526

24,468,278
3,977,119

28,938,649
4,165,867

33,567,277
4,364,051

38,362,074
4,572,145

###
4,790,644

8,579,802

12,392,520

14,579,514

20,235,184

23,731,617

28,445,397

33,104,516

37,931,328

42,934,219

###

5,643,000
6,684,404
1,360,000
207,200

5,346,000
5,941,692
1,020,000
155,400

5,049,000
5,198,981
680,000
103,600

4,752,000
4,456,269
340,000
51,800

4,455,000
3,713,558
1,700,000
259,000

4,158,000
2,970,846
1,360,000
207,200

3,861,000
2,228,135
1,020,000
155,400

3,564,000
1,485,423
680,000
103,600

3,267,000
742,712
340,000
51,800

ASSETS
CURRENT ASSETS
Cash Balance
Current assets
Total Current Assets

2,430,044
###

FIXED ASSETS
Building and construction
Machineries and Equipment
Vehicles
Office Furniture and
Equipment
Total Fixed Assets
Pre-Production Cost &
Interest
Total Assets

5,940,000
7,427,115
1,700,000
259,000
###
##
##
1,210,000
###

13,894,604## 12,463,092
##
## 11,031,581
##
##

9,600,069##
## 10,127,558####

8,696,046##
##

7,264,535####

5,833,023##
##

4,401,512##
##

2,970,000
###

968,000

726,000

484,000

242,000

23,442,406

25,581,612

26,095,095

30,077,253

33,859,174

37,141,443

40,369,050

43,764,351

47,335,731

###

1,050,610
5,380,047

1,280,066
8,031,696

1,429,238
9,157,298

1,579,055
13,433,070

1,661,414
17,315,776

1,744,485
18,463,477

1,831,709
19,443,473

1,923,295
20,472,470

2,019,459
21,552,916

2,120,432
###

LIABILITIES & Capital


LIABILITIES:
Current liablities
Dividend Payable
Long term loan
Bank Loan
Sub Total

1,050,610

8,957,775
###

7,456,191

5,821,882

4,043,114

2,107,119

13,886,848

15,133,644

14,629,649

17,119,244

18,977,190

20,207,962

21,275,183

22,395,765

23,572,376

###

8,957,775
597,783

8,957,775
1,490,194

8,957,775
2,507,671

8,957,775
4,000,235

8,957,775
5,924,210

8,957,775
7,975,707

8,957,775
10,136,093

8,957,775
12,410,812

8,957,775
14,805,580

8,957,775
###

CAPITAL:
Owner's Equity
Retained Earnings

8,957,775

Sub total

###

9,555,558

10,447,968

11,465,446

12,958,009

14,881,984

16,933,482

19,093,868

21,368,586

23,763,355

###

Total Liabil.& Capital

###

23,442,406

25,581,612

26,095,095

30,077,253

33,859,174

37,141,443

40,369,050

43,764,351

47,335,731

###

80.81%

6.38%

46

Financial Ratios
For the year ended

Year 1

Year 2

10:45:5011/12/2015

Year 3

Year 4

Year 5

Current Ratio

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!

Quick Ratio

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!

Net Working Capital Ratio


Current Liabilities to Inventory
Ratio

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!

4.30
###

5.32
###

5.37
###

6.83
###

#REF!

Cash Ratio

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!

Asset Ratios

Year 1

Year 2

Year 3

Year 4

Year 5

Inventory Turnover Ratio

16.80
###

18.21
###

20.13
###

22.21
###

24.35
###
###

Fixed Assets Turnover Ratio

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!

Total Assets Ratio

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!

Asset to Equity Ratio

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!

Solvency ratios
Year 1
Total Debt Ratio

Year 2

Year 3

Year 4

Year 5

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!#

9.49
###

16.63
###

35.07
###

80.15
###

#REF!

Solvency ratios

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!

Debt/Equity Ratio

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!

Interest Coverage Ratio

Profitability Ratios
Year 1

Year 2

Year 3

Year 4

Year 5

Earnings per Share


(EPS) Ratio

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!
###
###

Basic Earnings Power Ratio

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!

Price to Earnings Ratio(15X)

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!

Price to Cash Flow Ratio

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!

Payout Ratio

0.90
###

0.90
###

0.90
###

0.90
###

#REF!

Gross Profit margin

0.39
###

0.40
###

0.47
###

0.52
###

24%#

28%#

26%#

31%#

#REF!

ROI
Return on Investment

#REF!#

#REF!#

#REF!#

#REF!#

#REF!

ROA

#REF!

#REF!#

#REF!#

#REF!#

#REF!

ROCE
Return on Capital Employed

#REF!#

#REF!#

#REF!#

#REF!
###

#REF!

Return on Assets Ratio

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!

Return on Equity Ratio

#REF!
###

#REF!
###

#REF!
###

#REF!
###

#REF!

Net profit margin

Prepared by: Access Capital Services S.C

0.56
###
#

For internal use only. For discussion only.

Graphs
Operating and net profit
1
2
3
9,670,024.9 12,859,902.2 18,546,043.7
5,977,830.5 8,924,106.5 10,174,775.0

Operating Profit
Net Profit

25,000,000.0

20,000,000.0

15,000,000.0

Operating
Profit
Net Profit

10,000,000.0

5,000,000.0

0.0
1

Profitability Ratios

Operating margin
Net profit margin
Return on Investment (ROI)
Return on Capital Employed (R
Return on Asset (ROA)
Return on Equity Ratio (RER)

60%

50%

40%

1
39%
24%
#REF!
#REF!
#REF!
#REF!

2
40%
28%
#REF!
#REF!
#REF!
#REF!

3
47%
26%
#REF!
#REF!
#REF!
#REF!

60%

50%

40%

30%

20%

10%

0%
1

Earnings per Share (EPS) Ratio


Basic Earnings Power Ratio
Price to Earnings Ratio(15X)
Price to Cash Flow Ratio
Payout Ratio

1
#REF!
#REF!
#REF!
#REF!
0.90

2
#REF!
#REF!
#REF!
#REF!
0.90

3
#REF!
#REF!
#REF!
#REF!
0.90

0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
2008

2009

2010

2011

2012

0.20
0.10
2008

2009

2010

2011

2012

Break-Even Point
Figure - Breakeven Point

Profit (Loss)

3,000,000

2,000,000

1,000,000
10
-

2,000,000

4,000,000

6,000,000

8,000,000

10,000,000 12,000,000 14,000,000

(1,000,000)

(2,000,000)

(3,000,000)

Revenue

Calculation of break even point


Calculation of Fixed Costs
1
General Expenses
703,357
Admin & sales Payroll
Admin & sales personnel benefi
spare parts & maint.
Professional Expense
20,000
Stationary & P.T.T
40,000
Land lease expenses
20,000
Insurance
272,392
Traveling Expense
Fuel and Energy
28,347
Depreciation
1,673,512
Total Fixed Costs
2,757,607

2
773,924
21,000
42,000
20,000
272,392
28,347
1,673,512
2,831,175

3
855,646
22,050
44,100
20,000
272,392
28,347
1,673,512
2,916,046

Total Costs
Total Variable Costs

Gross Margin Calculation


Revenue
Cost of Sales
Gross Margin

18414863.3 22358063.6 24748370.4


15657255.9 19526888.7 21832324.1

1
25,096,500
15,426,475
38.5%

2
31,853,250
18,993,348
40.4%

3
39,710,385
21,164,341
46.7%

BreakEven Point based on Median, birr of Sales a Yea 6,401,235


BreakEven Point based on Maximum, birr Sales a Year 6,381,779
BreakEven Point based on Average, birr of Sales a Ye 6,550,527
Gross Sales
Revenue
Profit (Loss)

Gross Sales
Revenue
Fixed Costs
Variable Costs
Total Costs

Revenue per pcs of bottled wat


Variable Costs per Unit

Fixed Costs
Revenue per Unit
Variable Costs per Unit
Gross Sales Percentage
Sales in pcs
Revenue
Fixed Costs
Variable Costs
Total Costs
Difference
Break-Even Sales
Margin of Safety,pcs
Median Margin of Safety, tons

10%
640,124
(2,534,213)

20%
1,280,247
(2,252,634)

30%
1,920,371
(1,971,055)

640,124
640,124
2,815,792
358,544
3,174,337
(2,534,213)

1,280,247
1,280,247
2,815,792
717,089
3,532,881
(2,252,634)

1,920,371
1,920,371
2,815,792
1,075,633
3,891,425
(1,971,055)

1
#REF!
#REF!

2
#REF!
#REF!

3
#REF!
#REF!

2815792.2
#REF!
#REF!
10%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

20%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

30%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

#REF!

#REF!

2009

2010

2011

Break-Even Sales
Real Sales

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

4
23,392,018.4
14,925,633.5

5
24,866,081.0
#REF!

Operating
Profit
Net Profit

4
48%
31%
#REF!
#REF!
#REF!
#REF!

5
44%
#REF!
#REF!
#REF!
#REF!
#REF!

11

Operating margin
Net profit margin
Return on Inves tment (ROI)
Return on Capital Employed
(RoCE)
Return on As set (ROA)
Return on Equity Ratio (RER)

4
#REF!
#REF!
#REF!
#REF!
0.90

5
#REF!
#REF!
#REF!
#REF!
#REF!

Earnings per Share


(EPS) Ratio
Bas ic Earnings Power
Ratio
Price to Earnings
Ratio(15X)
Price to Cas h Flow Ratio

2012

2012

Sales and C osts, Birr

11

14,000,000
12,000,000
10,000,000
8,000,000
10

000 12,000,000 14,000,000


6,000,000
4,000,000
2,000,000
-

4
950,053
23,153
46,305
20,000
272,392
28,347
1,673,512
3,013,762

5
1,010,611
24,310
48,620
272,392
28,347
1,673,512
3,057,792

6
1,010,611
24,310
48,620
272,392
28,347
1,431,512
2,815,792

5,000,000
Sales, ths roubles
10,000,000

7
1,010,611
24,310
48,620
272,392
28,347
1,431,512
2,815,792

8
1,010,611
24,310
48,620
272,392
28,347
1,431,512
2,815,792

15,000,

27228686.1
24214924.6

28945271.9 28703271.9 28703271.9 28703271.9


25887479.7 25887479.7 25887479.7 25887479.7

4
48,820,415
25,428,396
47.9%

5
56,528,901
31,662,820
44.0%

6
56,528,901
31,662,820
44.0%

7
56,528,901
31,662,820
44.0%

8
56,528,901
31,662,820
44.0%

40%
2,560,494
(1,689,475)

50%
3,200,618
(1,407,896)

60%
3,840,741
(1,126,317)

70%
4,480,865
(844,738)

80%
5,120,988
(563,158)

2,560,494
2,560,494
2,815,792
1,434,177
4,249,969
(1,689,475)

3,200,618
3,200,618
2,815,792
1,792,722
4,608,514
(1,407,896)

3,840,741
3,840,741
2,815,792
2,151,266
4,967,058
(1,126,317)

4,480,865
4,480,865
2,815,792
2,509,810
5,325,602
(844,738)

5,120,988
5,120,988
2,815,792
2,868,355
5,684,147
(563,158)

4
#REF!
#REF!

5
#REF!
#REF!

6
#REF!
#REF!

7
#REF!
#REF!

8
#REF!
#REF!

40%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

50%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

60%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

70%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

80%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

2012

2013

2014

2015

2016

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

Revenue
Fixed
Cos ts
Variable
Cos ts

s, ths roubles
10,000,000

9
1,010,611
24,310
48,620
272,392
28,347
1,431,512
2,815,792

15,000,000

10 minimum
maximum
mean
1,010,611
703,357
1,010,611
934,665
24,310
20,000
24,310
23,206
48,620
40,000
48,620
46,413
20,000
8,000
272,392
272,392
272,392
272,392
28,347
28,347
28,347
28,347
1,431,512
1,431,512
1,673,512
1,552,512
2,815,792
2,757,607
3,057,792
2,865,534

28703271.9
25887479.7

9
56,528,901
31,662,820
44.0%

28703271.9
25887479.7

10 minimum
maximum
mean
56,528,901
25,096,500
56,528,901 48,465,396
31,662,820
15,426,475
31,662,820 27,098,948
44.0%
38.5%
47.9%
43.7%

90%
5,761,112
(281,579)

100%
6,401,235
-

110%
7,041,359
281,579

120%
7,681,482
563,158

130%
8,321,606
844,738

5,761,112
5,761,112
2,815,792
3,226,899
6,042,691
(281,579)

6,401,235
6,401,235
2,815,792
3,585,443
6,401,235
-

7,041,359
7,041,359
2,815,792
3,943,988
6,759,780
281,579

7,681,482
7,681,482
2,815,792
4,302,532
7,118,324
563,158

8,321,606
8,321,606
2,815,792
4,661,076
7,476,868
844,738

110%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

120%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

130%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

9
#REF!
#REF!

10
#REF!
#REF!

90%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

100%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

#REF!

#REF!

2017

2018

#REF!
#REF!

#REF!
#REF!

median
1,010,611
24,310
48,620
272,392
28,347
1,552,512
###

median
###
###
44.0%

140%
8,961,730
1,126,317

150%
9,601,853
1,407,896

160%
10,241,977
1,689,475

170%
10,882,100
1,971,055

180%
11,522,224
2,252,634

190%
12,162,347
2,534,213

8,961,730
8,961,730
2,815,792
5,019,620
7,835,413
1,126,317

9,601,853
9,601,853
2,815,792
5,378,165
8,193,957
1,407,896

10,241,977
10,241,977
2,815,792
5,736,709
8,552,501
1,689,475

10,882,100
10,882,100
2,815,792
6,095,253
8,911,046
1,971,055

11,522,224
11,522,224
2,815,792
6,453,798
9,269,590
2,252,634

12,162,347
12,162,347
2,815,792
6,812,342
9,628,134
2,534,213

140%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

150%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

160%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

170%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

180%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

190%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

200%
12,802,471
2,815,792

12,802,471
12,802,471
2,815,792
7,170,886
9,986,679
2,815,792

200%
#REF!
#REF!
2,815,792
#REF!
#REF!
#REF!

Marfel Aluminium PLC


Projected Income Statement
For the year ended

294556365.xls

Revenue

Year 1

Year 2

11/12/2015 10:45:51

Year 3

Year 4

Year 5

Sales

25,096,500 ###

31,853,250 ###

39,710,385 100%

48,820,415 ###

56,528,901 ###

Total Revenue

25,096,500 ###

31,853,250 ###

39,710,385 100%

48,820,415 ###

56,528,901 ###

11,059,046

44%

12,264,252

39%

13,899,486

35%

15,534,720

32%

16,352,336

29%

4,367,429

17%

6,729,096

21%

7,264,855

18%

7,857,299

16%

8,513,745

15%

15,426,475

61%

18,993,348

60%

21,164,341

53%

23,392,018

48%

24,866,081

44%

9,670,025

39%

12,859,902

40%

18,546,044

47%

25,428,396

52%

31,662,820

56%

Selling and distribution

358,485

1%

479,813

2%

582,576

1%

701,497

1%

810,576

1%

General and Admin

856,392

3%

1,111,392

3%

1,227,942

3%

1,361,659

3%

1,495,104

3%

Miscellaneous Expense

100,000

0%

100,000

0%

100,000

0%

100,000

0%

100,000

0%

1,314,877

5%

1,691,204

5%

1,910,518

5%

2,163,156

4%

2,405,679

4%

8,355,148

33%

11,168,698

35%

16,635,526

42%

23,265,240

48%

29,257,141

52%

Amortization

242,000

1%

242,000

1%

242,000

1%

242,000

0%

242,000

0%

Depreciation

1,431,512

6%

1,431,512

4%

1,431,512

4%

1,431,512

3%

#REF! ###

6,681,637

27%

9,495,186

30%

14,962,015

38%

21,591,728

44%

#REF! ###

703,806

3%

571,080

2%

426,622

1%

269,395

1%

5,977,830

24%

8,924,107

28%

14,535,393

37%

21,322,334

44%

#REF! ###

0%

4,360,618

11%

6,396,700

13%

#REF! ###

28%

10,174,775

26%

14,925,633

31%

#REF! ###

COGS
Direct material
DL & MOH
Total COGS
Operating profit
Expenses

Total Expenses
EBITDA

EBIT

Interest expense

EBT
Income tax (30%)
EAT

5,977,830

0%
24%

8,924,107

98,271

0%

Yearly growth %:

Revenue
Gross profit
EAT

Prepared by: Access Capital Services S.C

25%

23%

16%

33%

44%

37%

25%

49%

14%

47%

#REF!

27%

For internal use only. For discussion purpose only.

Marfel Aluminium PLC


Projected Balance sheet
For the year ended

294556365.xls

Year 1

Year 2

11/12/2015 10:45:51

Year 3

Year 4

Year 5

ASSETS
Fixed Assets

###

Office Equipment and furniture

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Plant, machinery & equipment

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Vehicles

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Computers with accessories

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Buildings

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Land & Building Improvements


Accum. Depreciationfurniture and Equipment
Accum. Depreciationplant, machinery and Equipment

###

###

###

###

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Accum. Depreciation-Vehicles
Accum. Depreciationcomputers and accessories

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Accum. Depreciation-Buildings

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Accum. Depreciation-Land improvemen


Total Fixed Assets

###

###

###

###

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Deposits

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Organizational cost
Accumulated Amortization-Org. cost
Good will
Accumulated Amortization-good will

#REF!
#REF!
-

###

###

###

#REF!
#REF!
-

###

###

#REF!
#REF!
-

###

###

#REF!
#REF!
-

###

###

#REF!
#REF!
-

Total Other Assets

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Other Assets

###
###

###
###

###
###

###
###

###
###
###

Current Assets
Inventory

1,494,260

###

1,749,491

###

1,973,105

###

2,198,470

###

2,321,452

###

Prepaid Expenses

440,733

###

619,328

###

657,240

###

699,226

###

743,795

###

Net Accounts Receivable

219,146

###

281,867

###

318,420

###

360,526

###

400,947

###

Spare parts

275,904

###

303,494

###

318,669

###

334,602

###

351,333

###

Savings Account

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Cash on Hand

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Petty Cash

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Total Current Assets

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

Total Assets

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

#REF!

###

###

#REF!

###

###

#REF!

###

LIABILITIES AND CAPITAL


Capital
Paid-in Capital
Retained Earnings
Total Capital

597,783
#REF!

###
###

1,490,194
#REF!

###
###

2,507,671
#REF!

###
###

4,000,235
#REF!

Long-Term Liabilities
STL-1
STL-2
Total Long-Term Liabilities

7,456,191
-

###
###

5,821,882
-

###
###

4,043,114
-

###
###

2,107,119
-

###
###

0
-

###
###

7,456,191

###

5,821,882

###

4,043,114

###

2,107,119

###

###

Accrued Expenses

1,050,610

###

1,280,066

###

1,429,238

###

1,579,055

###

1,661,414

###

Income Taxes Payable (Provision)


Dividend Payable
Access Capital Services
XXX company

###
5,380,047 ###
###

Current Liabilities

Total Current Liabilities


Total Liabilities

Total Liabilities & Capital

6,430,657

###
9,157,298 ###
###

###
13,433,070 ###
###

#REF!

###
###

###

###

###

###

###

###

###

###

###

###

###

9,311,762

###

###

###

15,012,125

###

#REF!

###

17,119,244

###

#REF!

###

###

#REF!

###

###

###

###

###

###

###

#REF!

###

#REF!

###

#REF!

###

#REF!

Prepared by: Access Capital Services S.C

###
8,031,696 ###
###

#REF!

#REF!

#REF!
#REF!

#REF!

For internal use only. For discussion purpose only.

Cash Flow Projections


For the year ended

294556365.xls

11/12/2015 10:45:51

PROJECTED
Inv't

CASH FLOW FROM OPERATING ACTIVITIES


Net increase decrease) in stock holders equity resulting
from
operation
Adjustment
to reconcile net increase decrease) in
stockholder' equity resulting form operations to net cash
provided by (used in) operating activities

- ##

Year 1

Year 2

Year 3

Year 4

Year 5

5,977,830

8,924,107

14,535,393

21,322,334

###

Realized gain on investment

###

Deprecation and amortization

(Gain) loss on disposal of fixed assets


Change in assets-Increasing or (decreasing ) cash flows
from operating activities
Accounts Receivables
Prepaid expenses
Inventories
spare parts
Change in liabilities-Increasing or (decreasing ) cash
flows from operating activities
Accounts payable
Profit tax paid

Organizational cost

NET CASH PROVIDED BY (USED BY) INVESTING ACTIVITIE

1,673,512
-

###
#REF!
###

(62,721)

(36,552)

(42,106)

(440,733)

(178,594)
##

(37,913)

(41,985)

(44,569)

(1,494,260)

(255,230)

(223,614)

(225,365)

(122,983)

(275,904)

(27,590)

(15,175)

(15,933)

(16,730)

229,456

149,817

82,359

1,050,610

7,651,342

10,302,938

149,172

(40,421)

(4,360,618)

(6,396,700)

#REF!

11,684,205

16,423,572

#REF!

###
(1,210,000)

Good will
proceeds from disposals of property and equipment

1,673,512

NET CASH PROVIDED BY (USED BY) OPERATING ACTIVITIE (1,379,434)

Acquisition of property and equipment

###

1,673,512

###

(219,146)

CASH FLOWS FROM INVESTING ACTIVITIES

1,673,512

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###
###
#REF!

#REF!

#REF!

#REF!

###
###
#REF!

CASH FLOWS FROM FINANCING ACTIVITIES


New lines of credit
Long-term

XX Bank

8,957,775

Other

Short term

###

###

###

###

###

Repayment of lines of credit


Long term

XX Bank

(1,501,583)

Other

###

(1,634,310)
-

(1,778,768)
-

(1,935,995)

(2,107,119)

###

Short term
Paid up capital

8,957,775
##
##

Dividend paid

NET CASH PROVIDED BY(USED BY) FINANCING ACTIVITIES 17,915,549


NET INCREASE(DECREASE)IN CASH

CASH AT THE BEGINNING OF THE YEAR

CASH AT THE END OF THE YEAR

-##
##

Prepared by: Access Capital Services S.C

(5,380,047)

(8,031,696)

(9,157,298)

###

(1,501,583)

(7,014,357)

(9,810,464)

(11,093,292)

###

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
##
##

#REF!

#REF!

#REF!

#REF!
##
##

For internal use only. For discussion purpose only.

Cash Flow Projections


For the year ended

294556365.xls

11/12/2015 10:45:51

Descriptions
INV'T
Total Investment cost in Birr

Year 1

Year 2

Year 3

Year 4

Year 5

###

Total Revenue

###

###

###

###

###

Less: Operating cost

###

###

###

###

###

###

###

###

###

Gross Profit

8,355,148

Less: Interest Expense


Deprecation and Amortization
Profit Before Tax
Less :Corp. Income Tax @ 30%

Add: Deprecation and Amortization


Less: Capital expenditure
8,957,775

Add: Interest
Add or deduct: Working captial
Free cash flow-Equity
Free cash flow-Total investment
Free cash flow-Debt

571,080

426,622

269,395

98,271

1,673,512

1,673,512

1,673,512

1,673,512

1,673,512

5,977,830

8,924,107

Profit After Tax

Debt Finance In/out

703,806

-8,957,775

Average Inflation
Discount Rate
Interest rate Long term loan
Deposit
Loan Repayment period

###

###

###

###

8,924,107

1,453,539

2,132,233

2,748,536

1,673,512

1,673,512

1,673,512

1,673,512

1,673,512

###

###

###

###

###

682,692
##
##

553,947
##
##

413,823
##
##

261,313
##
##

-##
##

(294,680)
##
##

(164,082)
##
##

(175,573)
##
##

95,322
(142,343)

6,832,451
##
## 9,222,576
##
## 1,598,024
##
## 1,955,490
##
## 2,267,907

###

6,832,451

9,222,576

1,598,024

1,955,490

-8,957,775

6,832,451

9,222,576
15
2,390,125
##

1,598,024
38
1,860,523
##

1,955,490
2,267,907
37.61
39.04
262,498
##
##
###

3.11
###

###

8,957,775
8,957,775

50%

31

50%

22%
12%

13.97

###
###
###

###
###
###

15

-29

2,390,125
##
3.11

###
##
(53.30)

2,267,907

1.61

(8.96)

###

###

(17.36)

(8.36)

###
##
##
(53.36)

###
(56.36)

9%
0%
5 years
15

Total investment
16
NPV
IRR
Pay back period

###

5,977,830

Major Inputs
Investment Structure
Total Investment

###

7,339,198
24%

38

2,390,125
##
3.11
###
###
###

-29
###
##
(53.30)
###
###
###

(17.36)
###
##
##
(53.36)
###

(8.36)
###
(56.36)
###

Months

Debt Equity
NPV
IRR
Pay back period

###
64%

15

Months

Owner's Equity
NPV
IRR
Pay back period

Prepared by: Access Capital Services S.C

6,738,681
31%

15

Months

For internal use only. For discussion purpose only.

Access Edible oil Plant


Loan Amortization Schedule

294556365.xls

Monthly
Monthly Accm,
Month Principal Amt. Interest Interest
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

8,957,775
8,837,443
8,716,259
8,594,217
8,471,310
8,347,533
8,222,879
8,097,342
7,970,915
7,843,593
7,715,370
7,586,238
7,456,191
7,325,223
7,193,328
7,060,498
6,926,728
6,792,009
6,656,337
6,519,704
6,382,102
6,243,527
6,103,969
5,963,423
5,821,882
5,679,337
5,535,784
5,391,213
5,245,618
5,098,992
4,951,328
4,802,617
4,652,853
4,502,028
4,350,135
4,197,166
4,043,114
3,887,970
3,731,727
3,574,378
3,415,914
3,256,328
3,095,611
2,933,756
2,770,754
2,606,598
2,441,278
2,274,788
2,107,119
1,938,262
1,768,209
1,596,951
1,424,481
1,250,788
1,075,865
899,704
722,294
543,628

63,451
62,599
61,740
60,876
60,005
59,128
58,245
57,356
56,461
55,559
54,651
53,736
52,815
51,887
50,953
50,012
49,064
48,110
47,149
46,181
45,207
44,225
43,236
42,241
41,238
40,229
39,212
38,188
37,156
36,118
35,072
34,019
32,958
31,889
30,813
29,730
28,639
27,540
26,433
25,319
24,196
23,066
21,927
20,781
19,626
18,463
17,292
16,113
14,925
13,729
12,525
11,312
10,090
8,860
7,621
6,373
5,116
3,851

63,451
126,049
187,790
248,665
308,670
367,799
426,044
483,400
539,861
595,420
650,070
703,806
52,815
104,702
155,654
205,666
254,731
302,841
349,990
396,171
441,378
485,603
528,839
571,080
41,238
81,467
120,679
158,867
196,023
232,141
267,213
301,231
334,189
366,078
396,892
426,622
28,639
56,179
82,612
107,930
132,126
155,192
177,119
197,900
217,526
235,989
253,282
269,395
14,925
28,655
41,180
52,491
62,581
71,441
79,062
85,435
90,551
94,402

11/12/201510:45:51

Monthly

Outstanding
Month
Loan
Repayment end Bal
9,021,225
8,900,042
8,777,999
8,655,093
8,531,315
8,406,661
8,281,124
8,154,698
8,027,376
7,899,152
7,770,020
7,639,974
7,509,006
7,377,110
7,244,281
7,110,510
6,975,792
6,840,120
6,703,486
6,565,885
6,427,309
6,287,752
6,147,206
6,005,664
5,863,120
5,719,566
5,574,995
5,429,401
5,282,775
5,135,110
4,986,399
4,836,636
4,685,811
4,533,918
4,380,949
4,226,896
4,071,752
3,915,510
3,758,160
3,599,696
3,440,110
3,279,393
3,117,538
2,954,536
2,790,380
2,625,061
2,458,571
2,290,901
2,122,044
1,951,991
1,780,734
1,608,263
1,434,571
1,259,648
1,083,486
906,077
727,410
547,479

(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)
(183,782)

8,837,443
8,716,259
8,594,217
8,471,310
8,347,533
8,222,879
8,097,342
7,970,915
7,843,593
7,715,370
7,586,238
7,456,191
7,325,223
7,193,328
7,060,498
6,926,728
6,792,009
6,656,337
6,519,704
6,382,102
6,243,527
6,103,969
5,963,423
5,821,882
5,679,337
5,535,784
5,391,213
5,245,618
5,098,992
4,951,328
4,802,617
4,652,853
4,502,028
4,350,135
4,197,166
4,043,114
3,887,970
3,731,727
3,574,378
3,415,914
3,256,328
3,095,611
2,933,756
2,770,754
2,606,598
2,441,278
2,274,788
2,107,119
1,938,262
1,768,209
1,596,951
1,424,481
1,250,788
1,075,865
899,704
722,294
543,628
363,696

Access Edible oil Plant


Loan Amortization Schedule

294556365.xls

59
60

363,696
182,490

2,576
1,293

96,978
98,271

366,272
183,782

11/12/201510:45:51

(183,782)
(183,782)

182,490
0

Max. Allumnium Assembley


capacity(15 Persons @ 8 hrs)
m2

Month 1

Month 2

Month 3

Month 4

150

150

150

150

Total Production capacity

150

150

150

150

Production Capacity rate used

65%

65%

65%

65%

Production per day

98

98

98

98

No of days

26

26

26

26

2,535.0

2,535.0

2,535.0

2,535.0

185

185

185

185

Kick plate tap (Fascia)

#REF!

#REF!

#REF!

#REF!

Glazing Bed (Ferma)

#REF!

#REF!

#REF!

#REF!

Outer frame (L-profile)

#REF!

#REF!

#REF!

#REF!

Opening (Z-profile)

#REF!

#REF!

#REF!

#REF!

T-profile

#REF!

#REF!

#REF!

#REF!

Total Monthly Kg required

#REF!

#REF!

#REF!

#REF!

Connectors T

#REF!

#REF!

#REF!

#REF!

Connectors L

#REF!

#REF!

#REF!

#REF!

Screws

2,535

2,535

2,535

2,535

Glass seal rubber

#REF!

#REF!

#REF!

#REF!

Z rubber

#REF!

#REF!

#REF!

#REF!

Hinge

#REF!

#REF!

#REF!

#REF!

Key

#REF!

#REF!

#REF!

#REF!

Special spring

#REF!

#REF!

#REF!

#REF!

Arm

#REF!

#REF!

#REF!

#REF!

Monthly PCS required

#REF!

#REF!

#REF!

#REF!

No of Shifts per day

Total production
Raw material requiement
Kick plate (Zekolo)

Month 5

Month 6

Month 7

Month 8

Month 9

Month 10

Month 11

150

150

150

150

150

150

150

150

150

150

150

150

150

150

65%

65%

65%

65%

65%

65%

65%

98

98

98

98

98

98

98

26

26

26

26

26

26

26

2,535.0

2,535.0

2,535.0

2,535.0

2,535.0

2,535.0

2,535.0

185

185

185

185

185

185

185

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

2,535

2,535

2,535

2,535

2,535

2,535

2,535

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Month 12
150
1
150
65%
98
26
2,535.0

185
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2,535
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Max. Allumnium Assembley


capacity(15 Persons @ 8 hrs)
m2

Month 1

Month 2

Month 3

Month 4

150

150

150

150

Total Production capacity

150

150

150

150

Production Capacity rate used

65%

65%

65%

65%

Production per day

98

98

98

98

No of days

26

26

26

26

2,535.0

2,535.0

2,535.0

2,535.0

No of Shifts per day

Total production
Raw material requiement
Kick plate (Zekolo)

Kick plate tap (Fascia)

#REF!

#REF!

#REF!

#REF!

Glazing Bed (Ferma)

#REF!

#REF!

#REF!

#REF!

Outer frame (L-profile)

#REF!

#REF!

#REF!

#REF!

Opening (Z-profile)

#REF!

#REF!

#REF!

#REF!

T-profile

#REF!

#REF!

#REF!

#REF!

Connectors T

#REF!

#REF!

#REF!

#REF!

Connectors L

#REF!

#REF!

#REF!

#REF!

Screws

Glass seal rubber

#REF!

#REF!

#REF!

#REF!

Z rubber

#REF!

#REF!

#REF!

#REF!

Hinge

#REF!

#REF!

#REF!

#REF!

Key

#REF!

#REF!

#REF!

#REF!

Special spring

#REF!

#REF!

#REF!

#REF!

Arm

#REF!

#REF!

#REF!

#REF!

Monthly raw material cost

#REF!

#REF!

#REF!

#REF!

Month 5

Month 6

Month 7

Month 8

Month 9

Month 10

Month 11

150

150

150

150

150

150

150

150

150

150

150

150

150

150

65%

65%

65%

65%

65%

65%

65%

98

98

98

98

98

98

98

26

26

26

26

26

26

26

2,535.0

2,535.0

2,535.0

2,535.0

2,535.0

2,535.0

2,535.0

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Month 12
150
1
150
65%
98
26
2,535.0

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Projects
Nyala Motors
CMC Meri Diplomat
Ayat East View
Boles worbek 1
Bole Medhanialem
Lebbu villas
Megenagna Sunrise
Bole Japan
Bole Mega
Boles worbek 2
17/17
Panorama Village
Bole Mini
Grand Royal
Total

Project delivery schedule (Units)


2013
2014
2015
2016

YEAR

Local Import
Produc
ed
tion
Furnit
ure

Axis Title

2003/04 169,654 89,438


2004/05 167,293 ###
2005/06 288,566 ###
2006/07 308,268 ###
2007/08 392,477 ###
2008/09 653,184 ###
2009/10 ###
###
2010/11 793,304 ###
AVERA ###
###
GE

2003/04
2004/05
2005/06
2006/07
1,600,000
2007/08
1,400,000
2008/09
f(x) = 167545.7254901
1,200,000
2009/10R = 0.9741620118
2010/11
1,000,000
800,000
600,000
400,000
200,000
0
0

4
5
6
Axis Title

EMBED

Total
Supply
(Apparen
t
Consump
259,092
270,147
403,230
502,239
621,436
###
###
###
733,319

259,092
270,147
403,230
502,239
621,436
###
f(x) = 167545.725490196x
###
R = 0.9741620118
###

00

00

00

00

Column J
Linear
(Column J)
Linear
(Column J)

00

00

00

00
0
0

4
5
6
Axis Title

BUILDING AND CIVIL WORK


Description
Factory Main Hall
Store for Un-finished Products
Store for Finished Product
Offices
Showroom in the Factory
Fencing
Other Civil works including land dev't
Installation of Electric Transformer
Sub-Total
Contingency (10%)
Total Cost of Building & CivilWork

Area in
M2
1,250
225
225
150
150
3,000

Price in M2
1,500
2,500
2,500
3,000
3,000
250

2,000

Total Price
1,875,000
562,500
562,500
450,000
450,000
750,000
500,000
250,000
5,400,000
540,000
5,940,000

MACHINERY AND EQUIPMENT


DESCRIPTION
Circular Saw Machine
Automatic Edge Banding Machine
CNC Router Machine
Membrane Press
Multi Boring Machine
Air Compressor
Dust Collector Machine
Surface Planner Machine
Thickness Planner Machine
Spindle Moulder Machine
Auto Beam Panel Saw Machnie
Automatic Door Lock and Hinges Drilling Ma
Calibrating & Sanding Machine
Painting Booth
Band Saw Machine
Hydrolic Hot Press
Miscellaneous Tools
Sub Total
Contingency (10%)

QTY
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Total Machinery and Eqpt Cost

UNIT PRICETOTAL PRICE


120,000
120,000
500,000
500,000
1,307,692
1,307,692
1,500,000
1,500,000
225,000
225,000
20,000
20,000
10,000
10,000
100,000
100,000
105,000
105,000
103,846
103,846
950,000
950,000
600,000
600,000
615,385
615,385
150,000
150,000
55,000
55,000
350,000
350,000
40,000
40,000
6,751,923 6,751,923
675,192
675,192

7,427,115

7,427,115

FURNITURE AND EQUIPMENT


DESCRIPTION

QTY

UNIT PRICETOTAL PRICE

Office Table and Chair Set for General Mana


Tables
Chairs for staff
Computers with UPS
Shelfs
Printers
Telephone Sets
Fax Machine
Fire Extinguishers

1
30
30
10
2
5
20
1
5

Total Furniture & Fixtures

15,000
1,500
500
12,000
4,500
5,000
500
10,000
2,000

15,000
45,000
15,000
120,000
9,000
25,000
10,000
10,000
10,000

259,000

Vehicle

DESCRIPTION
ISUZU NPR
Double Cabin Pickup
VAN

QTY
1
1
1

Total Cost of Vehicle

PRE OPERATING EXPENSE


Description
Feasiblity study
Licencing & registration
Designing
Land lease expense
other Pre -operating cost
Project management cost
TOTAL PRE OPERATING EXPENSE

UNIT PRICETOTAL PRICE


1,000,000
1,000,000
700,000
700,000
-

###

Birr
220,000
50,000
300,000
90,000
250,000
300,000
###

Description
Building and Civil Works
Machinery and equipment
Motor Vehicles
Office furniture & fixtures
Pre operating expense
Total Fixed investment req
working capital
Total investment required

Planned
investment in Birr
5,940,000
7,427,115
1,700,000
259,000
1,210,000
16,536,115
1,335,557
17,871,673