ELEMENT A - FRAME

ITEM

DESCRIPTIONS

UNIT

QTY

PREAMBLES FOR EXCAVATION


Excavation below ground water level has not been measured in
accordance to clause D.15 and D16 of the SMM of Building
Works Second Edition.
The excavation rate shall include for keeping all excavations free
from all water (including storm, percolating, spring, running water
and water below the Water Table Level and the Contractor is to
ascertain for himself the water levels as no claims will be
entertained on the grounds that these levels are not known) by
pumping, baling and other means including formation of
temporary drainage.
EXCAVATION AS SPECIFIED IRRESPECTIVE OF MACHINE
OR
HAND
EXCAVATION
COMMENCING
FROM
FORMATION LEVEL AND GET OUT, PART RETURN FILL IN
AND RAM AND DEPOSIT AND SPREAD IN MAKING UP
LEVELS WHERE DIRECTED WITHIN THE SITE AND
REMAINDER LOAD AND CART AWAY.
A

Excavate on Fish pond maximum depth not exceeding 3.00m

M3

71

Excavate to reduce level maximum depth not exceeding 1.00m

M3

522

Excavate pit for pile cap maximum depth not exceeding 2.00m
(Provisional)

M3

40

Ditto trench for ground beam maximum depth not exceeding


1.00m

M3

533

M2

533

M2

713

SOIL-ANTI TERMITE TREATMENT


D

`Rentokil' or other equal and approved pre construction anti


termiticide poisoning chemical as specified in 4 stage process
power sprayed to soil surfaces at application rate of 5 litre/metre
square including providing warranty for five years commencing
from Date of Practical Completion all as per specialists details
100MM THICK WELL COMPACTED HARDCORE

To receive ground slab and apron slab

RATE

ELEMENT A - FRAME
ITEM

DESCRIPTIONS

TO COLLECTION

UNIT

QTY

RATE

ELEMENT A - FRAME
ITEM

DESCRIPTIONS

UNIT

QTY

LEAN CONCRETE GRADE 15 (1:3:6 - 20 MM AGGREGATE);


UNIFORMED SURFACES CLASS U1 FINISH; as specified
A

Bed of blinding screed not exceeding 100mm thick laid on earth or


hardcore to receive pile cap

M3

Bed of blinding screed not exceeding 100mm thick laid on earth or


hardcore to receive pile cap

M3

Ditto to receive ground beam

M3

Ditto to receive ground slab and apron slab

M3

35

VIBRATED REINFORCED CONCRETE GRADE 25 (1 : 1 : 2 20 MM AGGREGATE); UNIFORMED SURFACES CLASS U1


FINISH; as specified :E

Pond fish

M3

20

Pile cap

M3

40

Column stump (Provisional)

M3

Ground beam

M3

55

Column

M3

Ground slab and apron slab exceeding 100mm and not exceeding
150mm thick

M3

720

Roof beam

M3

21

M2

25

1 LAYER OF BRC A6 STEEL FABRIC REINFORCEMENT


WELL LAPPED AT JOINTS (MEASURED NETT - NO
ALLOWANCE MADE FOR LAPS)
L

Apron slab

RATE

ELEMENT A - FRAME
ITEM

DESCRIPTIONS

TO COLLECTION

UNIT

QTY

RATE

ELEMENT A - FRAME
ITEM

DESCRIPTIONS

UNIT

QTY

Kg

8,346

HIGH TENSILE ROD REINFORCEMENT TO BS 4449 as


specified (Cont'd.):Ground Slab
A

10 mm Diameter as main bar

MILD STEEL ROD REINFORCEMENT TO BS 4449 as


specified :Pile Cap
B

10mm Diameter as main bar

Kg

159

12 mm Ditto

Kg

259

16 mm Ditto

Kg

1,124

Column Stump
E

12mm Diameter as main bar

Kg

12

16 mm Ditto

Kg

119

Column
G

10mm Diameter as main bar

Kg

393

12 mm Ditto

Kg

206

20 mm Ditto

Kg

77

25 mm Ditto

Kg

69

Roof Beam
L

10mm Diameter as main bar

Kg

455

12 mm Ditto

Kg

456

16 mm Ditto

Kg

747

20 mm Ditto

Kg

1,240

25 mm Ditto

Kg

1,079

RATE

ELEMENT A - FRAME
ITEM

DESCRIPTIONS

TO COLLECTION

UNIT

QTY

RATE

ELEMENT A - FRAME
ITEM

DESCRIPTIONS

UNIT

QTY

CLASS F1 FORMWORK as specified :A

Sides of fish pond

M2

120

Sides of pile cap

M2

60

Sides of column stump (Provisional)

M2

52

Sides of Column

M2

84

Sides of ground beam

M2

600

Sides of roof beam

M2

372

Edge of ground slab and apron not exceeding 100 mm high

150

Single layer of 0.25mm Thick polythene sheet damp proof


membrane as specified well lapped at joints and turned up against
for at least the full thickness of suspended ground floor slab on
concrete blinding and on backing screed of wall tiles (both
measured separately) (measured nett no allowance made for laps)
to ground slab including providing warranty for five years
commencing from Date of Practical Completion all as per
specialists detail

M2

720

TO COLLECTION

RATE

ELEMENT A - FRAME
ITEM

DESCRIPTIONS
COLLECTION

From Page No. C1 / 1..

From Page No. C1 / 2..

From Page No. C1 / 3..

From Page No. C1 / 4..

TOTAL CARRIED TO SUMMARY

UNIT

QTY

RATE

ELEMENT A - FRAME
ITEM

DESCRIPTIONS

UNIT

QTY

RATE

AMOUNT

AMOUNT

C1 / 1

AMOUNT

AMOUNT

C1 / 2

AMOUNT

AMOUNT

C1 / 3

AMOUNT

C1 / 4

AMOUNT

AMOUNT
C1 / 5