Cyanidation plant project " THE TRIUMPH OF MOLLEPIA "

SECTION

SECTION 1
RECEPTION

SECTION 2
SAMPLING

SECTION 3
CRUSHING

CODE

1001 Truck Scale 50 t (2 used)


1002 Entrance gate
1003 Guard house
1004 Office
1005 Dining room
1006 Parking areas (trucks, office & camp)
1007 Mobile Equipment T450
2001 Ball Mill (Lab Equip.)
2002 Sample Dryer
2003 Electronic Scale
2004 Jones Cuarteador
3001 30t Corse Ore Bin
3002 Vibrating Feeder
3003 Conveyor #1
3004 Protection System
3005 Discharge Chute
3006 Jaw Crusher
3007 Vibr Screen
3008 Discharge Chute
3009 Conveyor #2
3010 Protection System
3011 Discharge Chute
3012 Magnet Eriez
3013 Cone Crusher
3014 Discharge Chute
3015 Conveyor #3
3016 Protection System
3017 Discharge Chute
3018 Conveyor #4
3019 Protection System
3020 Crusher Control Panel
3021 350 t Fine Ore Bin

Code

SECTION 4
GRINDING

EQUIPMENT

Item
4001 Conveyor #5 - 3 ply
4002 Scale for Conveyor #5
4003 Protection System
4004 Ball Mill
4005 Ball Mill Base
4006 U/F Pump Box
4007 Gravimetric Concentrator for Au
4008 Horizontal Pump #1
4009 Horizontal Pump #2
4010 A-C Vibrating screen

DRAFT
Size

POWER
kW

Item
Cost $

Shipping
Installation
Cost $

18 x 6 m

57,000

6 x 2.5m
20 x 15m
20 x 15m

4,050 Included
18,625 Included
16,188 Included

68 hp

5,080

Revised TOTAL COST


17-Sep-15
$

6,000

68,080

Included
Included
Included

4,050
18,625
16,188

50,100
7,515 N/A
100,000 Lump sum

57,615
100,000

1.2 x 0.8m
2 kg, 2 digit
((3 x 3 x 1) + 1/2(3x3x2)) m
4x9 ft
5.6
24" x 5/8"x 11 metros
7.45
for #1 conv.
for #1 conv.
10"x 24"
30
5x10 ft
8.94
for Screen
20" x 5/8"x 5.5 metros
5.6
for #2 conv.
for #2 conv.
SE-7336
1 ft 8"
30.00
for cone crus
20" x 5/8"x 4 metros
3.7
for #3 conv.
for #3 conv.
24" x 5/8"x 8 metros
5.6
for #4 conv.
for Section 3
10 starters
5.2 x 6 metros
Size
24" x 5/8"x 10 metros
for #5 conv.
7' x 12'
Steel
2x3x3 ft
4" x 3"
4" x 3"
5 x 10 ft

kW
5.6

200

3.7
6.7
6.7
12

10,400 Included
Included
5,366
1,270
9,600 Included
Included

800

550 Included
Included
29,000
2,980
9,600
7,500
3,430
3,200
550 Included
Included
8,000 Included
Included
550 Included

Included

99,700
2,980
9,600
550 Included
Included
16,000 Included
Included
550 Included
16,000 Included

Included
Included

42,522
5,750
33,475 Included
Included
Item
Shipping
Cost $
Cost $
Installation
4,000 Included
Included
6,076
1,270
800
349,000
10,160
73,600
218,360 Included
Included
6,538 Included
Included
80,000
3,980
3,200
10,825
1,270
800
10,825
1,270
800
10,500
1,270
800

17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15

10,400
49,700
9,600
In conveyor

550
83,844
56,394
550
8,000
In conveyor

550
154,544
550
16,000
In conveyor

550
16,000
In conveyor

90,536
33,475
Total
4,000
50,410
In conveyor

475,024
218,360
6,538
129,444
55,159
55,159
54,834

GRINDING

SECTION 5
CONTROLS

4011 D 6 Cyclone #1
4012 D 6 Cyclone #2
4013 Cylinder Pack Support
4014 Grinding Control Panel for Section 4
5001 Variable speed drive
5002 Variable speed drive
5003 Level Control Pump #1
5004 Level Control Pump #2
5005 Mass Flowmeter Cl TK
5006 Mass Flowmeter Cl TK
5007 Variable speed drive
5008 pH meter on line to TK #1 PHCH 371 PH
5009 Control room
5010 MCC room
Code
Equipment
6001 Mix Tank #1
6002 Agitator for TK #1
6003 Mix Tank #2
6004 Agitator for TK #2
6005 Mix Tank #3 to #9
6006 Agitator for TK #3 to #9
6007 Submersible pump
Code

SECTION 6
CYANIDATION
TANK/CARBON
CIP

Equipment

6008 Cyanide Tank


6009 Soda Tank
6010 Carbon Wash TK
6011 Carbon classifier screen
6012 Eductor to improve active carbon
6013 Vertical pump #1
6014 Vertical pump #2
6015 Centrifugal pump
6016 Control Panel Cl/Carbon CIP
6017 Carbon adsorption TK#1
Agitator
6018 Carbon adsorption TK#2
Agitator
6019 Carbon adsorption TK#3
Agitator
6020 Carbon adsorption TK#4
Agitator
6021 Carbon adsorption TK#5
Agitator
6022 Carbon adsorption TK#6
Agitator
6023 Carbon feed bin
6024 Compressor 5+10 m /min
6025 6 carbon transfer pumps
3

10 hp pump 1
10 hp pump 2
4" x 3" pump
4" x 3" pump
27.29 m3/h feed
32 m3/h exit
Agitator
2.5 x 12 m
2.5 x 12 m
Size
24 x 18 ft
24 x 18 ft
24 x 18 ft
4" x 2"
Size
4000 gallon
1000 gallon
3x5 ft
3x6 ft
2.5" x 3"
2.5" x 3"
1" x 1"

6 starters
7.5
7.5
0
0

3.7
3.7
1.5

5.6
8.16 x 20 ft
5.6
8.16 x 20 ft
5.6
8.16 x 20 ft
5.6
8.16 x 20 ft
5.6
8.16 x 20 ft
5.6
2.2

50 Nm3/h x 20
3 x 3" diaphragm

800

9,196
1,270
800
Not required
15
28,150
1,270
3,200
2,495
150
150
8,100 Included
Included
8,100 Included
Included
kW
Cost $
Cost $
Installation
36,767 Included
Included
15
28,150
1,270
3,200
36,767 Included
Included
15
28,150
1,270
3,200
257,369 Included
Included
105
197,050
8,890
22,400
10
0
Item
Shipping
kW
Cost $
Cost $
Installation
6,644
600
1,600
0
0
9,220 Included
Included
2.2
7,500
1,270
800

8.16 x 20 ft

3x4 ft

40,250
1,270
Included above
9,060 Included
Included
42,042
5,460

8,100
1,270
8,100
1,270
3,170
635
84,400
10,970
11,250 Included
Included
21,000
1,270
11,250 Included
Included
21,000
1,270
11,250 Included
Included
21,000
1,270
11,250 Included
Included
21,000
1,270
11,250 Included
Included
21,000
1,270
11,250 Included
Included
21,000
1,270
6,150 Included
Included

800
800
800

3,200
3,200
3,200
3,200
3,200
3,200

0
Air operated

16,992

7,620

4,800

17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15

84,584
0
9,060
89,766

53,530
0
74,884
45,059
8,100
8,100
Total
36,767
74,884
36,767
74,884
257,369
270,604

Total
51,108
0
9,220
51,834
52,434
52,434
46,869
137,634
53,514
67,734
53,514
67,734
53,514
67,734
53,514
67,734
53,514
67,734
53,514
67,734
48,414
42,264
71,676

SECTION 7
RECOVERY OF
RICH CARBON

7001 Submersible pump


7002 Active carbon screen
7003 Carbon fine screen
7004 Active carbon pulp screen
7005 Carbon Elution TK
7006 Hydrochloric acid tank
7007 Carbon fines tank
Code

SECTION 8
REABSORPTION

SECTION 9
CARBON
REACT.
SECTION 10
THERMAL REACT

SECTION 11
TAILINGS

SECTION 12
PLANT
ROOF
SECTION 13
RECOVERED
SOLUTION

8001 Stainless steel reactor


8002 Solution cauldron
8003 Step box
8004 Burner for cauldron D2
8005 SS cell #1 electroplating anodes/cathodes
8006 SS cell #2 electroplating anodes/cathodes
8007 SS pump #1 for solution
8008 SS pump #2 for solution
8009 Current Rectifier
8010 Flowmeter #1 eluent solution
8011 Flowmeter #2 eluent solution
9001 Regenerated carbon TK
10001 Feed hopper to reactivation
10002 Carbon feeder
10003 Thermal reactivation kiln
10004 Carbon feeder
10005 Carbon receiving box
11001 SRL Pump #1 DENVER
11002 SRL Pump #2 DENVER
11003 Pump box
11004 VORTEX FINDER D6 cyclone #1
11005 VORTEX FINDER D6 cyclone #2
11006 Centrifugal pump
11007 Eimco thickener
11008 Cyanide destruction TK
12001 Centrifugal drain pump
12002 Tailings pond
12003 Hydro-cyclone

Size

5.6
2.2
1.5
2.2
3.7
Polyethylene

0
kW

Equipment

14001 Steel wool storage


14002 Storage for chemical attack
14003 Stove / kitchen
14004 Filter press

7,168
1,270
800
7,500
1,270
800
4,500
635
800
7,500
1,270
800
9,220 Included
Included
6,644
635
800
6,150 Included
Included
Item
Shipping
Cost $
Cost $
Installation

17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15
17-Sep-15

51,502
51,834
48,199
51,834
51,484
50,343
6,150
Total

525 lit/min
525 lit/min

0.75
1
1
5.6
5.6

2.5 x 2.5 m

6,150 Included

550 Included
Included
5,366
635

800

550
6,801

5,366

800

6,801

2 1/2" x 2"
2 1/2" x 2"
2.8x1.5x2.5m

1,270
1,270

6,538 Included

3.7
0
0
0.75

1x2-8

7.6 x 3m
3 x 4.3 m
1" X 1 1/2"

800
800

9,238
9,238

Included

635

6,150

5.6

Included

6,538

2,054
1,270
800
49,500
5,080
16,000
12,000 Included
Included
3,150
1,270
800
259,875 Included

34,650 m2
4x4m
1x2-8

Size
2.5m x 12m

7,168
7,168

0
0

346,500 m3

12004 Poly-liner
13001 Recovered solution TK
13002 Recovered solution pump
13003 Roof of the plant area
Code

SECTION 14
SMELTING

Equipment

6 x 4"
3x6 ft
3x6 ft
3x6 ft
4x5 ft
2.2 x 1.5 m
3 x 5 ft

Included

259,875

173,250 Included
Included
15,765 Included
Included
2,054
1,270

173,250
15,765
4,124

800

Item
Shipping
Cost $
Cost $
Installation
8,100 Included
Included

kW

2.2

4,124
70,580
12,000
5,220

Total
8,100

SECTION 14
SMELTING
14005 Tilting furnace
14006 Gas extraction system
14007 Gas washing
15001 Water storage pond
15002 Water storage pond pump

SECTION 15
WATER SYST.

SECTION 16
SHOPS/STORES

SECTION 17
ELECTRICAL

15003 Recycled water pond


15004 Recycled water pump
15005 Potable water day tank
15006 Potable water pump
15007 Water line to plant
15008 Pipes & fittings in plant
16001 Mechanical maintenance
16002 Electrical maintenance
16003 Laboratory Building
16004 Laboratory Equipment
16005 Washroom & lavatories
16005 Lighting general
16006 Office equipment general
16007 Fuel pump
16008 Fuel tank
16009 Warehouse
17001 22.9 kV power line to site
17002 Transformer 0.7 MVA
17003 Transformer
17004 Motor starters (73)
Control program & configuration ABB
17005 Power cables & trays
SUB TOTAL

CONTINGENCY (15%)
GRAND TOTAL

0.75
0.37
5 x 5m
1x2-8
85 m
1x2-7
2.5 x 2.5 m
1" x 1.5"
3 km 4" dia
2, 3 & 4"dia
18 x 6 m

3.5

5.6
0.75

5.2

10 x 15m
8.6
25 m

125 Included
Included
2,054
1,270

800

125
4,124

489 Included
Included
3,733
1,270
800
6,150 Included
Included
3,170
1,270
800
90,000 Included
Included
68,243 Included
44,000
8,610 Included
Included
Included in above
10,156 Included
Included
See item 2001

489
5,803
6,150
5,240
90,000
112,243
8,610
0
10,156
0

1,993 Included

Included

1,993

4,920 Included
7,656 Included
300,000 Included
By others

Included
Included
Included

4,920
7,656
300,000
0

10
5
0.75
2 x 2.5 m
10 x 15 m
5 ~ 7 km
22.9kV / 440V
440V to 220V

635.47

44,374
5,080
52,275
35,272 Included
3,492,777
121,920
628,700
21,946
523,917
18,288
4,645,394
162,154

24,000
24,000
285,750
51,435
42,863
380,048

73,454
52,275
59,272
5,844,591
702,080
876,689
7,423,360

OBSERVATIONS
RD pedira cotizacion de nuevas
Geomin. ID Civil diseara y cotizara
RD en base a cotizac de prefabricados
RD en base a cotizac de prefabricados
RD en base a cotizac de prefabricados
Geomin. ID Civil diseara y cotizara
Cargador Frontal para alquilar
JP con Tremolada espec y cotizac.
JP con Tremolada espec y cotizac.
JP con Tremolada espec y cotizac.
JP con Tremolada espec y cotizac.
Geomin. Debe dar un esquema
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
RD va pedir cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Geominc debe ubicar y disear cablea
Geomin debe hacer esquema

Tenemos cotizacion
RD pedira cotizacion
Tenemos cotizacion
Definir tamao y buscar 2da mano
No sabemos que es preguntar Les
Especificaciones de Geominco
Cotizado por Les
Especificaciones de Geominco
Especificaciones de Geominco
Especificaciones de Geominco

Especificaciones
Especificaciones
Especificaciones
Especificaciones
Especificaciones
Especificaciones
Especificaciones
Especificaciones
Especificaciones
Especificaciones
Especificaciones
Especificaciones
Especificaciones
Especificaciones

de
de
de
de
de
de
de
de
de
de
de
de
de
de

Geominco
Geominco
Geominco
Geominco
Geominco
Geominco
Geominco
Geominco
Geominco
Geominco
Geominco
Geominco
Geominco
Geominco

Tenemos cotizacion

No sabemos que es, preguntar a Les

Geominco debe especificar


Geominco debe especificar
Geominco debe especificar
Geominco debe especificar
Geominco debe especificar
Geominco debe especificar
Geominco debe especificar
Geominco debe especificar
Geominco debe especificar
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Tenemos cotizacion
Geomin. Debe dar medidas
Geomin. Debe especificar
Geomin. Debe especificar

Geomin.
Geomin.
Geomin.
Geomin.
Geomin.
Geomin.
Geomin.

Geom
Geom
Geom
Geom
Geom
Geom
Geom
Geom
Geom
Geom
Geom

Debe
Debe
Debe
Debe
Debe
Debe
Debe

especificar
especificar
especificar
especificar
especificar
especificar
especificar

especificara
especificara
especificara
especificara
especificara
especificara
especificara
especificara
especificara
especificara
especificara

para
para
para
para
para
para
para
para
para
para
para

pedir
pedir
pedir
pedir
pedir
pedir
pedir
pedir
pedir
pedir
pedir

cotizac
cotizac
cotizac
cotizac
cotizac
cotizac
cotizac
cotizac
cotizac
cotizac
cotizac

Geom especificara para pedir cotizac


Geom
Geom
Geom
Geom
Geom
Geom
Geom
Geom
Geom
Geom
Geom
Geom
Geom
Geom

especificara
especificara
especificara
especificara
especificara
especificara
especificara
especificara
especificara
especificara
especificara
especificara
especificara
especificara

para
para
para
para
para
para
para
para
para
para
para
para
para
para

pedir
pedir
pedir
pedir
pedir
pedir
pedir
pedir
pedir
pedir
pedir
pedir
pedir
pedir

cotizac
cotizac
cotizac
cotizac
cotizac
cotizac
cotizac
cotizac
cotizac
cotizac
cotizac
cotizac
cotizac
cotizac

ID Civil Geomin debe cotizar


Geo chequeara area JP pide cotizac.
Geom especificara para pedir cotizac
Geom especificara para pedir cotizac
No sabemos, Les debe aclarar

Geom
Geom
Geom
Geom

especificara
especificara
especificara
especificara

para
para
para
para

pedir
pedir
pedir
pedir

cotizac
cotizac
cotizac
cotizac

Geom
Geom
Geom
Geom
Geom

especificara para pedir cotizac


especificara para pedir cotizac
especificara para pedir cotizac
espec. Concreto o metal y med
especificara para pedir cotizac

Geom especificara para pedir cotizac


Geom especificara para pedir cotizac
Geom especificara para pedir cotizac
Geom especificara para pedir cotizac
eom especif y cotizara
Geom hara un plano de distribucion

Esta cotizado
Esta cotizado
Geominco hara especificaciones
Jimy especificara y cotizara
Geomin especificara para cotizar
Geomin especificara para cotizar
Esta cotizado
Geominco especif y coti<ara
Geomin. Especificara para alquilar
Geomin. Especificara para alquilar
Vienen con cada equipo
Habria que ver condensadores
Geomin diseara distribucion

Você também pode gostar