ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: 1:1:8
Unidad
Costo
cantidad
Importe
Unidad: M3
TON
$1,678.00
0.190000
$318.82
53.80%
CALHIDRA
TON
$1,100.00
0.120000
$132.00
22.27%
ARENA
M3
$115.00
1.180000
$135.70
22.90%
AGUA ( MANEJO)
M3
$18.00
0.340000
$6.12
1.03%
Subtotal: MATERIALES
$592.64
100.00%
Costo directo
$592.64
Anlisis: 1:4
Unidad: M3
M3
$115.00
1.200000
$138.00
16.94%
CEMENTO GRIS
TON
AGUA ( MANEJO)
M3
$1,678.00
0.400000
$671.20
82.40%
$18.00
0.300000
$5.40
0.66%
Subtotal: MATERIALES
$814.60
100.00%
Costo directo
$814.60
Anlisis: 1:5
Unidad: M3
M3
CEMENTO GRIS
TON
$115.00
1.220000
$140.30
18.71%
$1,678.00
0.360000
$604.08
AGUA ( MANEJO)
M3
80.57%
$18.00
0.300000
$5.40
0.72%
Subtotal: MATERIALES
$749.78
100.00%
Costo directo
$749.78
Anlisis: 1A
Unidad: JOR
JOR
$229.99
1.000000
$229.99
JOR
$498.05
0.100000
$49.81
17.80%
$279.80
100.00%
Costo directo
$279.80
CABO DE OFICIOS
82.20%
Pgina 2
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: 1A1A
Unidad
Costo
cantidad
Importe
Unidad: JOR
JOR
$229.99
1.000000
$229.99
33.83%
OFICIAL AZULEJERO
JOR
$400.00
1.000000
$400.00
58.84%
CABO DE OFICIOS
JOR
$498.05
0.100000
$49.81
7.33%
$679.80
100.00%
Costo directo
$679.80
Anlisis: 1A1E
Unidad: JOR
JOR
$240.00
1.000000
$240.00
26.97%
OFICIAL ALUMINIERO
JOR
$600.01
1.000000
$600.01
67.43%
CABO DE OFICIOS
JOR
$498.05
0.100000
$49.81
5.60%
$889.82
100.00%
Costo directo
$889.82
Anlisis: 1A1P
Unidad: JOR
JOR
$215.00
1.000000
$215.00
34.97%
OFICIAL ALBAIL
JOR
$350.00
1.000000
$350.00
56.93%
CABO DE OFICIOS
JOR
$498.05
0.100000
$49.81
8.10%
$614.81
100.00%
Costo directo
$614.81
Anlisis: 1A5P
Unidad: JOR
JOR
$215.00
5.000000
$1,075.00
67.64%
OFICIAL ALBAIL
JOR
$350.00
1.000000
$350.00
22.02%
CABO DE OFICIOS
JOR
$498.05
0.330000
$164.36
10.34%
$1,589.36
100.00%
Costo directo
$1,589.36
Pgina 3
ANALISIS DE BASICOS
Cdigo
Concepto
Unidad
Costo
cantidad
Importe
Anlisis: 1B1A
Unidad: JOR
JOR
$229.99
1.000000
$229.99
31.51%
OFICIAL BARNIZADOR
JOR
$450.00
1.000000
$450.00
61.66%
CABO DE OFICIOS
JOR
$498.05
0.100000
$49.81
6.83%
$729.80
100.00%
Costo directo
$729.80
Anlisis: 1C1A
Unidad: JOR
JOR
$229.99
1.000000
$229.99
30.07%
JOR
$485.00
1.000000
$485.00
63.42%
CABO DE OFICIOS
JOR
$498.05
0.100000
$49.81
6.51%
$764.80
100.00%
Costo directo
$764.80
Anlisis: 1C1E
Unidad: JOR
JOR
$240.00
1.000000
$240.00
28.58%
JOR
$550.00
1.000000
$550.00
65.49%
CABO DE OFICIOS
JOR
$498.05
0.100000
$49.81
5.93%
$839.81
100.00%
Costo directo
$839.81
Anlisis: 1CO1A
Unidad: JOR
JOR
$229.99
1.000000
$229.99
31.51%
OFICIAL COLOCADOR
JOR
$450.00
1.000000
$450.00
61.66%
CABO DE OFICIOS
JOR
$498.05
0.100000
$49.81
6.83%
$729.80
100.00%
Costo directo
$729.80
Pgina 4
ANALISIS DE BASICOS
Cdigo
Concepto
Unidad
Costo
cantidad
Importe
Anlisis: 1F1A
Unidad: JOR
JOR
$229.99
1.000000
$229.99
28.40%
OFICIAL FIERRERO
JOR
$530.00
1.000000
$530.00
65.45%
CABO DE OFICIOS
JOR
$498.05
0.100000
$49.81
6.15%
$809.80
100.00%
Costo directo
$809.80
Anlisis: 1H1A
Unidad: JOR
JOR
$499.99
1.000000
$499.99
64.12%
AYUDANTE GENERAL
JOR
$229.99
1.000000
$229.99
29.49%
CABO DE OFICIOS
JOR
$498.05
0.100000
$49.81
6.39%
$779.79
100.00%
Costo directo
$779.79
Anlisis: 1P
Unidad: JOR
CUADRILLA No 1 (1 PEON)
MANO DE OBRA
PEON
JOR
$215.00
1.000000
$215.00
81.19%
JOR
$498.05
0.100000
$49.81
18.81%
$264.81
100.00%
Costo directo
$264.81
CABO DE OFICIOS
Anlisis: 1P1A
Unidad: JOR
JOR
$350.00
1.000000
$350.00
55.57%
AYUDANTE GENERAL
JOR
$229.99
1.000000
$229.99
36.52%
CABO DE OFICIOS
JOR
$498.05
0.100000
$49.81
7.91%
$629.80
100.00%
Costo directo
$629.80
Pgina 5
ANALISIS DE BASICOS
Cdigo
Concepto
Unidad
Costo
cantidad
Importe
Anlisis: 1P1E
Unidad: JOR
JOR
$240.00
1.000000
$240.00
26.97%
OFICIAL PLOMERO
JOR
$599.99
1.000000
$599.99
67.42%
SOBRESTANTE
JOR
$500.01
0.100000
$50.00
5.62%
$889.99
100.00%
Costo directo
$889.99
Anlisis: 1S1E
Unidad: JOR
JOR
$240.00
1.000000
$240.00
34.78%
OFICIAL SOLDADOR
JOR
$400.00
1.000000
$400.00
57.97%
SOBRESTANTE
JOR
$500.01
0.100000
$50.00
7.25%
$690.00
100.00%
Costo directo
$690.00
Anlisis: 1S2E
Unidad: JOR
JOR
$240.00
2.000000
$480.00
51.61%
OFICIAL SOLDADOR
JOR
$400.00
1.000000
$400.00
43.01%
SOBRESTANTE
JOR
$500.01
0.100000
$50.00
5.38%
$930.00
100.00%
Costo directo
$930.00
Anlisis: 1V1A
Unidad: JOR
JOR
$229.99
1.000000
$229.99
31.51%
OFICIAL VIDRIERO
JOR
$450.00
1.000000
$450.00
61.66%
CABO DE OFICIOS
JOR
$498.05
0.100000
$49.81
6.83%
$729.80
100.00%
Costo directo
$729.80
Pgina 6
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: 200.
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$115.00
0.530000
$60.95
6.67%
GRAVA
M3
$150.00
0.640000
$96.00
10.51%
AGUA ( MANEJO)
M3
$18.00
0.235000
$4.23
0.46%
CEMENTO GRIS
TON
$1,678.00
0.350000
$587.30
64.31%
$748.48
81.96%
$131.92
14.44%
$131.92
14.44%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 22 (1 ALBAIL + 5 PEONES)
JOR
$1,589.36
0.083000
$131.92
0.030000
$3.96
0.43%
$57.81
0.500000
$28.91
3.17%
$32.87
3.60%
$913.27
Anlisis: 250.
Unidad: M3
M3
$115.00
0.530000
$60.95
6.23%
GRAVA
M3
$150.00
0.630000
$94.50
9.65%
AGUA ( MANEJO)
M3
$18.00
0.230000
$4.14
0.42%
CEMENTO GRIS
TON
$1,678.00
0.390000
$654.42
66.86%
$814.01
83.16%
$131.92
13.48%
$131.92
13.48%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 22 (1 ALBAIL + 5 PEONES)
JOR
$1,589.36
0.083000
$131.92
0.030000
$3.96
0.40%
$57.81
0.500000
$28.91
2.95%
$32.87
3.36%
$978.80
Pgina 7
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: ACERC10
Unidad
Costo
cantidad
Importe
Unidad: TON
Acero de refuerzo en cimentacion del No. 10, de Fy=4200 kg/cm2, incluye: materiales,
acarreos, cortes, desperdicios, habilitado, amarres, mano de obra, equipo y herramienta.
MATERIALES
ALAMBRE RECOCIDO
KG
$12.50
30.000000
$375.00
2.54%
VARILLA DE 1 1/4"
KG
$9.95
1,070.000000
$10,646.50
72.06%
$11,021.50
74.60%
$3,644.10
24.66%
$3,644.10
24.66%
$109.32
0.74%
$109.32
0.74%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)
JOR
$809.80
4.500000
$3,644.10
0.030000
$14,774.92
Anlisis: ACERC3
Unidad: TON
KG
$12.50
50.000000
$625.00
4.16%
VARILLA DE 3/8"
KG
$9.95
1,070.000000
$10,646.50
70.86%
$11,271.50
75.02%
$3,644.10
24.25%
$3,644.10
24.25%
$109.32
0.73%
$109.32
0.73%
9.5 MM
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)
JOR
$809.80
4.500000
$3,644.10
0.030000
$15,024.92
Pgina 8
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: ACERC4
Unidad
Costo
cantidad
Importe
Unidad: TON
KG
$12.50
40.000000
$500.00
3.36%
KG
$9.95
1,070.000000
$10,646.50
71.45%
$11,146.50
74.81%
$3,644.10
24.46%
$3,644.10
24.46%
$109.32
0.73%
$109.32
0.73%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)
JOR
$809.80
4.500000
$3,644.10
0.030000
$14,899.92
Anlisis: ACERC5
Unidad: TON
KG
$12.50
35.000000
$437.50
2.95%
KG
$9.95
1,070.000000
$10,646.50
71.75%
$11,084.00
74.70%
$3,644.10
24.56%
$3,644.10
24.56%
$109.32
0.74%
$109.32
0.74%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)
JOR
$809.80
4.500000
$3,644.10
0.030000
$14,837.42
Anlisis: ACERC6
Unidad: TON
KG
$12.50
30.000000
$375.00
2.54%
KG
$9.95
1,070.000000
$10,646.50
72.06%
$11,021.50
74.60%
$3,644.10
24.66%
$3,644.10
24.66%
$109.32
0.74%
$109.32
0.74%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)
JOR
$809.80
4.500000
$3,644.10
0.030000
Pgina 9
ANALISIS DE BASICOS
Cdigo
Concepto
Unidad
Costo
Costo directo
cantidad
Importe
$14,774.92
Pgina 10
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: ACERC8
Unidad
Costo
cantidad
Importe
Unidad: TON
KG
$12.50
30.000000
$375.00
2.54%
VARILLA DE 1"
KG
$9.95
1,070.000000
$10,646.50
72.06%
$11,021.50
74.60%
$3,644.10
24.66%
$3,644.10
24.66%
$109.32
0.74%
$109.32
0.74%
25.4 MM
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)
JOR
$809.80
4.500000
$3,644.10
0.030000
$14,774.92
Anlisis: ACERE2
Unidad: TON
KG
$12.50
70.000000
$875.00
3.75%
ALAMBRON
KG
$15.00
1,070.000000
$16,050.00
68.74%
$16,925.00
72.49%
$6,235.46
26.71%
$6,235.46
26.71%
$187.06
0.80%
$187.06
0.80%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)
JOR
$809.80
7.700000
$6,235.46
0.030000
$23,347.52
Anlisis: ACERE3
Unidad: TON
KG
$12.50
50.000000
$625.00
3.57%
VARILLA DE 3/8"
KG
$9.95
1,070.000000
$10,646.50
60.74%
$11,271.50
64.31%
$6,073.50
34.65%
$6,073.50
34.65%
$182.21
1.04%
$182.21
1.04%
9.5 MM
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)
JOR
$809.80
7.500000
$6,073.50
0.030000
Pgina 11
ANALISIS DE BASICOS
Cdigo
Concepto
Unidad
Costo
Costo directo
cantidad
Importe
$17,527.21
Pgina 12
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: ACERE4
Unidad
Costo
cantidad
Importe
Unidad: TON
KG
$12.50
40.000000
$500.00
2.87%
KG
$9.95
1,070.000000
$10,646.50
61.18%
$11,146.50
64.05%
$6,073.50
34.90%
$6,073.50
34.90%
$182.21
1.05%
$182.21
1.05%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)
JOR
$809.80
7.500000
$6,073.50
0.030000
$17,402.21
Anlisis: ANGFPL
Unidad: M
KG
$39.44
0.040000
$1.58
1.14%
$41.85
0.100000
$4.19
3.02%
$12.00
0.100000
$1.20
0.87%
$10,224.50
0.008000
$81.80
59.03%
$88.77
64.06%
$46.50
33.56%
$46.50
33.56%
PRIMARIO
ANTICORROSIVO
No.2,
89-97 LT
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
THINNER STANDARD
LT
TON
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.)
JOR
$930.00 /
20.000000
HOR
HOR
HERRAMIENTA MENOR
$377.68
0.002000
$0.76
0.55%
$6.81
0.100000
$0.68
0.49%
$46.50
0.040000
$1.86
1.34%
$3.30
2.38%
$138.57
Anlisis: BARANDAL
Unidad: ml
$1,850.00
100.00%
Subtotal: SUBCONTRATOS
ml
$1,850.00
$1,850.00
100.00%
Costo directo
$1,850.00
1.000000
Pgina 13
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: CARP/BLANCA
Unidad
Costo
cantidad
Importe
Unidad: M2
PZA
$320.00
1.000000
$320.00
18.83%
MADERA DE PINO DE 1a
PT
$65.00
2.250000
$146.25
8.61%
CHAPA DE MADERA
M2
$125.00
1.000000
$125.00
7.36%
TRIPLAY DE PINO DE 16 MM
PZA
$345.00
1.000000
$345.00
20.30%
RESISTOL 850 DE 1 LT
LT
$75.00
0.400000
$30.00
1.77%
AGUARRAS
LT
$16.16
0.250000
$4.04
0.24%
BARNIZ
LT
$56.00
0.750000
$42.00
2.47%
PIJA
PZA
$0.56
6.000000
$3.36
0.20%
TAQUETE
PZA
$0.38
6.000000
$2.28
0.13%
KG
$31.30
0.250000
$7.83
0.46%
LIJA
PZA
$3.60
0.250000
$0.90
0.05%
PZA
$30.62
2.000000
$61.24
3.60%
PIJA
PZA
$0.56
10.000000
$5.60
0.33%
LT
$68.85
0.500000
$34.43
2.03%
$1,127.93
66.37%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 15 (1 CARP. O. B.+AY. ESP.)
CUADRILLA No 13 (1 BARNIZADOR + AYUD.)
JOR
$839.81
0.400000
$335.92
19.77%
JOR
$729.80
0.300000
$218.94
12.88%
$554.86
32.65%
$16.65
0.98%
$16.65
0.98%
$554.86
0.030000
$1,699.44
Pgina 14
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: CCA200
Unidad
Costo
cantidad
Importe
Unidad: M3
KG/CM2,
M3
$1,050.00
1.020000
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 22 (1 ALBAIL + 5 PEONES)
JOR
$1,589.36 /
5.000000
HOR
HERRAMIENTA MENOR
$1,071.00
75.22%
$1,071.00
75.22%
$317.87
22.32%
$317.87
22.32%
$50.83
0.500000
$25.42
1.79%
$317.87
0.030000
$9.54
0.67%
$34.96
2.46%
$1,423.83
Anlisis: CCE250
Unidad: M3
PREM.
C-1,
F'c=250
KG/CM2, M3
$1,250.00
1.000000
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 22 (1 ALBAIL + 5 PEONES)
JOR
$1,589.36 /
8.000000
HOR
HERRAMIENTA MENOR
$1,250.00
84.46%
$1,250.00
84.46%
$198.67
13.42%
$198.67
13.42%
$50.83
0.500000
$25.42
1.72%
$198.67
0.030000
$5.96
0.40%
$31.38
2.12%
$1,480.05
Pgina 15
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: CEEB250
Unidad
Costo
cantidad
Importe
Unidad: M3
PREM.
C-1,
F'c=250
KG/CM2, M3
$1,250.00
1.020000
$1,275.00
74.63%
AGUA ( MANEJO)
M3
$18.00
0.040000
$0.72
0.04%
MUESTREO DE CONCRETO
PZA
$252.21 /
6.000000
$42.04
2.46%
$112.19
1.020000
$114.43
6.70%
$112.19
1.020000
$114.43
6.70%
$1,546.62
90.53%
$132.45
7.75%
$132.45
7.75%
0.030000
$3.97
0.23%
2.000000
$25.42
1.49%
$29.39
1.72%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 22 (1 ALBAIL + 5 PEONES)
JOR
$1,589.36 /
12.000000
HOR
$132.45
$50.83 /
$1,708.46
Anlisis: CEH200
Unidad: M3
JOR
$1,589.36 /
4.000000
HOR
HERRAMIENTA MENOR
$397.34
29.08%
$397.34
29.08%
$50.83
0.500000
$25.42
1.86%
$397.34
0.030000
$11.92
0.87%
$37.34
2.73%
$931.54
68.18%
$931.54
68.18%
$913.27
Subtotal: BASICOS
Costo directo
1.020000
$1,366.22
Pgina 16
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: CEH250
Unidad
Costo
cantidad
Importe
Unidad: M3
JOR
$1,589.36 /
6.000000
HOR
HERRAMIENTA MENOR
$264.89
20.43%
$264.89
20.43%
$50.83
0.500000
$25.42
1.96%
$264.89
0.030000
$7.95
0.61%
$33.37
2.57%
$998.38
77.00%
$998.38
77.00%
$978.80
1.020000
Subtotal: BASICOS
Costo directo
$1,296.64
Anlisis: cel-louver
Unidad: M2
M2
$850.00
1.000000
$850.00
67.48%
PERFIL DE ALUMINIO
KG
$38.50
3.500000
$134.75
10.70%
$984.75
78.17%
$266.95
21.19%
$266.95
21.19%
$8.01
0.64%
$8.01
0.64%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 16 (1 ALUMINIERO + AY.ESP.)
JOR
$889.82
0.300000
$266.95
0.030000
$1,259.71
Pgina 17
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: celosia x m2
Unidad
Costo
cantidad
Importe
Unidad: M2
PZA
$43.96
10.000000
$439.60
28.43%
Pieza
$79.54
1.360000
$108.17
7.00%
$547.77
35.42%
$444.91
28.77%
$444.91
28.77%
$13.35
0.86%
$13.35
0.86%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 16 (1 ALUMINIERO + AY.ESP.)
JOR
$889.82
0.500000
$444.91
0.030000
$5.03
15.000000
$75.45
4.88%
$30.99
15.000000
$464.85
30.06%
$540.30
34.94%
Subtotal: BASICOS
Costo directo
$1,546.33
Anlisis: CFID02
Unidad: M2
PZA
$746.39
0.330000
$246.31
17.45%
PZA
$254.21
0.330000
$83.89
5.94%
PZA
$803.44
0.020000
$16.07
1.14%
PZA
$14.31
0.800000
$11.45
0.81%
PIJA
PZA
$0.56
3.200000
$1.79
0.13%
SILICON
CAR
$49.94
1.000000
$49.94
3.54%
M2
$238.06
1.100000
$261.87
18.56%
PELICULA ESMERILADO
M2
$125.00
0.400000
$50.00
3.54%
$721.32
51.12%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 16 (1 ALUMINIERO + AY.ESP.)
CUADRILLA No 14 (1 VIDRIERO + AYUDANTE)
JOR
$889.82 /
2.250000
$395.48
28.02%
JOR
$729.80 /
3.000000
$243.27
17.24%
$638.75
45.26%
Pgina 18
ANALISIS DE BASICOS
Cdigo
Concepto
HERRAMIENTA MENOR
Unidad
%
ANDAMIOS
Costo
$638.75
cantidad
0.030000
Importe
$19.16
%
1.36%
$638.75
0.050000
$31.94
2.26%
$51.10
3.62%
$1,411.17
Pgina 19
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: CFID03
Unidad
Costo
cantidad
Importe
Unidad: M2
PZA
$746.39
0.330000
$246.31
15.31%
PZA
$254.21
0.330000
$83.89
5.22%
PZA
$803.44
0.020000
$16.07
1.00%
PZA
$14.31
0.800000
$11.45
0.71%
PIJA
PZA
$0.56
3.200000
$1.79
0.11%
SILICON
CAR
$49.94
1.000000
$49.94
3.10%
M2
$238.06
1.100000
$261.87
16.28%
PELICULA ESMERILADO
M2
$125.00
0.500000
$62.50
3.89%
$733.82
45.62%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 16 (1 ALUMINIERO + AY.ESP.)
CUADRILLA No 14 (1 VIDRIERO + AYUDANTE)
JOR
$889.82 /
2.000000
$444.91
27.66%
JOR
$729.80 /
2.000000
$364.90
22.69%
$809.81
50.35%
$809.81
0.030000
$24.29
1.51%
$809.81
0.050000
$40.49
2.52%
$64.78
4.03%
$1,608.41
Anlisis: CIMCC
Unidad: M2
PZA
$24.00
1.000000
$24.00
17.77%
PZA
$30.45
0.400000
$12.18
9.02%
PZA
$55.00
0.200000
$11.00
8.15%
ALAMBRE RECOCIDO
KG
$12.50
0.200000
$2.50
1.85%
DIESEL
LTO
$7.95
0.300000
$2.39
1.77%
CLAVOS DE 2 A 4 "
KG
$21.00
0.200000
$4.20
3.11%
$56.27
41.67%
$76.48
56.64%
$76.48
56.64%
$2.29
1.70%
$2.29
1.70%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 7 (1 CARP. O.N. + AYUDANTE)
JOR
$764.80 /
10.000000
$76.48
0.030000
$135.04
Pgina 20
ANALISIS DE BASICOS
Cdigo
Concepto
Unidad
Costo
cantidad
Importe
Pgina 21
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: CIMCD
Unidad
Costo
cantidad
Importe
Unidad: M2
PZA
$24.00
1.000000
$24.00
16.69%
PZA
$30.45
0.400000
$12.18
8.47%
PZA
$55.00
0.200000
$11.00
7.65%
ALAMBRE RECOCIDO
KG
$12.50
0.200000
$2.50
1.74%
DIESEL
LTO
$7.95
0.300000
$2.39
1.66%
CLAVOS DE 2 A 4 "
KG
$21.00
0.200000
$4.20
2.92%
$56.27
39.13%
$84.98
59.10%
$84.98
59.10%
$2.55
1.77%
$2.55
1.77%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 7 (1 CARP. O.N. + AYUDANTE)
JOR
$764.80 /
9.000000
$84.98
0.030000
$143.80
Anlisis: CIMCF
Unidad: M2
PZA
$24.00
1.000000
$24.00
18.94%
PZA
$30.45
0.200000
$6.09
4.81%
ALAMBRE RECOCIDO
KG
$12.50
0.200000
$2.50
1.97%
DIESEL
LTO
$7.95
0.300000
$2.39
1.89%
CLAVOS DE 2 A 4 "
KG
$21.00
0.200000
$4.20
3.31%
$39.18
30.92%
$84.98
67.07%
$84.98
67.07%
$2.55
2.01%
$2.55
2.01%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 7 (1 CARP. O.N. + AYUDANTE)
JOR
$764.80 /
9.000000
$84.98
0.030000
$126.71
Pgina 22
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: CIMCL
Unidad
Costo
cantidad
Importe
Unidad: M2
PZA
$24.00
1.000000
$24.00
17.77%
PZA
$30.45
0.400000
$12.18
9.02%
PZA
$55.00
0.200000
$11.00
8.15%
ALAMBRE RECOCIDO
KG
$12.50
0.200000
$2.50
1.85%
DIESEL
LTO
$7.95
0.300000
$2.39
1.77%
CLAVOS DE 2 A 4 "
KG
$21.00
0.200000
$4.20
3.11%
$56.27
41.67%
$76.48
56.64%
$76.48
56.64%
$2.29
1.70%
$2.29
1.70%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 7 (1 CARP. O.N. + AYUDANTE)
JOR
$764.80 /
10.000000
$76.48
0.030000
$135.04
Anlisis: CIMCM
Unidad: M2
PZA
$24.00
1.000000
$24.00
18.43%
PZA
$30.45
PZA
$55.00
0.200000
$6.09
4.68%
0.200000
$11.00
ALAMBRE RECOCIDO
KG
8.45%
$12.50
0.300000
$3.75
DIESEL
2.88%
LTO
$7.95
0.300000
$2.39
CLAVOS DE 2 A 4 "
1.84%
KG
$21.00
0.200000
$4.20
3.23%
$51.43
39.50%
$76.48
58.74%
$76.48
58.74%
$2.29
1.76%
$2.29
1.76%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 7 (1 CARP. O.N. + AYUDANTE)
JOR
$764.80 /
10.000000
$76.48
0.030000
$130.20
Pgina 23
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: CIMCYC
Unidad
Costo
cantidad
Importe
Unidad: M2
PZA
$24.00
1.000000
$24.00
18.15%
PZA
$30.45
0.200000
$6.09
4.61%
PZA
$55.00
0.100000
$5.50
4.16%
ALAMBRE RECOCIDO
KG
$12.50
0.200000
$2.50
1.89%
DIESEL
LTO
$7.95
0.300000
$2.39
1.81%
CLAVOS DE 2 A 4 "
KG
$21.00
0.200000
$4.20
3.18%
$44.68
33.79%
$84.98
64.28%
$84.98
64.28%
$2.55
1.93%
$2.55
1.93%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 7 (1 CARP. O.N. + AYUDANTE)
JOR
$764.80 /
9.000000
$84.98
0.030000
$132.21
Anlisis: CIMCZ
Unidad: M2
PZA
$24.00
1.000000
$24.00
18.15%
PZA
$30.45
0.200000
$6.09
4.61%
PZA
$55.00
0.100000
$5.50
4.16%
ALAMBRE RECOCIDO
KG
$12.50
0.200000
$2.50
1.89%
DIESEL
LTO
$7.95
0.300000
$2.39
1.81%
CLAVOS DE 2 A 4 "
KG
$21.00
0.200000
$4.20
3.18%
$44.68
33.79%
$84.98
64.28%
$84.98
64.28%
$2.55
1.93%
$2.55
1.93%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 7 (1 CARP. O.N. + AYUDANTE)
JOR
$764.80 /
9.000000
$84.98
0.030000
$132.21
Pgina 24
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: CIMEF
Unidad
Costo
cantidad
Importe
Unidad: M2
Cimbra acabado comn en fronteras, a base de madera de pino de 3a., incluye: materiales,
acarreos, cortes, desperdicios, habilitado, cimbrado, descimbra, mano de obra, equipo y
herramienta.
MATERIALES
DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25''
PZA
$24.00
1.100000
$26.40
19.70%
ALAMBRE RECOCIDO
KG
$12.50
0.100000
$1.25
0.93%
DIESEL
LTO
$7.95
0.200000
$1.59
1.19%
CLAVOS DE 2 A 4 "
KG
$21.00
0.300000
$6.30
4.70%
$35.54
26.52%
$95.60
71.34%
$95.60
71.34%
$2.87
2.14%
$2.87
2.14%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 7 (1 CARP. O.N. + AYUDANTE)
JOR
$764.80 /
8.000000
$95.60
0.030000
$134.01
Anlisis: CIMEL
Unidad: M2
Cimbra acabado comn en losas, a base de madera de pino de 3a., incluye: materiales,
acarreos, cortes, desperdicios, habilitado, cimbrado, descimbra, mano de obra, equipo y
herramienta.
MATERIALES
DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25''
PZA
$24.00
1.250000
$30.00
PZA
$30.45
0.500000
$15.23
9.77%
PZA
$55.00
0.400000
$22.00
14.11%
ALAMBRE RECOCIDO
KG
$12.50
0.100000
$1.25
0.80%
DIESEL
LTO
$7.95
0.300000
$2.39
1.53%
CLAVOS DE 2 A 4 "
KG
$21.00
0.300000
$6.30
4.04%
$77.17
49.49%
$76.48
49.04%
$76.48
49.04%
$2.29
1.47%
$2.29
1.47%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 7 (1 CARP. O.N. + AYUDANTE)
JOR
$764.80 /
10.000000
$76.48
0.030000
$155.94
19.24%
Pgina 25
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: descanso
Unidad
Costo
cantidad
Importe
Unidad: PZA
Descanso a base de bastidor de angulo de 2 1/2"x 1/4" de 3.60x1.80 mts, armado con 1
parrilla del No. 3 a cada 15 cm con concreto f'c=250 kg/cm2 en 5 cm de espesor con placa
antiderrapante, incluye: cimbrado, armado, colado, descimbrado, montaje, cortes,
soldaduras, material, mano de obra y herramienta.
MATERIALES
ANGULO DE FIER. (3/16" Y 1/4") x 2 1/2"
TON
KG
PRIMARIO
ANTICORROSIVO
No.2,
89-97 LT
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
THINNER STANDARD
LT
TON
$13,500.00
0.065880
$889.38
13.09%
$39.44
1.024800
$40.42
0.59%
$41.85
1.024800
$42.89
0.63%
$12.00
0.512400
$6.15
0.09%
$21,409.28
0.096000
$2,055.29
30.24%
$3,034.13
44.64%
$930.00
13.68%
$930.00
13.68%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.)
JOR
$930.00 /
1.000000
HOR
HERRAMIENTA MENOR
$6.81
1.500000
$10.22
0.15%
$930.00
0.030000
$27.90
0.41%
$38.12
0.56%
$17,527.21
0.050440
$884.07
13.01%
$1,296.64
0.340200
$441.12
6.49%
$155.94
6.804000
$1,061.02
15.61%
$3.49
65.880000
$229.92
3.38%
$2.71
65.880000
$178.53
2.63%
Subtotal: BASICOS
$2,794.66
41.12%
Costo directo
$6,796.91
Pgina 26
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: ESA32020
Unidad
Costo
cantidad
Importe
Unidad: PZA
Placa base de 3/8" de 20x20 cm. con 4 anclas de redondo de 1/2" con un desarrollo de 60
cm con rosca en un extremo, incluye: tuercas y rondanas, trazo, materiales, cortes,
soldadura, fijacin, mano de obra, equipo y herramienta.
MATERIALES
PLACA A-36 DE 3 Y 4'' DE 3/16" A 1/2"
TON
KG
$13,500.00
0.003300
$44.55
16.84%
$39.44
0.050000
$1.97
0.74%
PRIMARIO
ANTICORROSIVO
No.2,
89-97 LT
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
$41.85
0.080000
$3.35
1.27%
THINNER STANDARD
LT
$12.00
0.040000
$0.48
0.18%
PZA
$37.70
4.000000
$150.80
57.01%
$201.15
76.05%
$46.50
17.58%
$46.50
17.58%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.)
JOR
$930.00 /
20.000000
HOR
$377.68
0.040000
$15.11
5.71%
HOR
$6.81
0.050000
$0.34
0.13%
HERRAMIENTA MENOR
$46.50
0.030000
$1.40
0.53%
$16.85
6.37%
$264.50
Anlisis: escalon
Unidad: PZA
Escalon a base de bastidor de angulo de 2 1/2"x 1/4" de 0.30x1.80 mts, armado con 1
parrilla del No. 3 a cada 15 cm con concreto f'c=250 kg/cm2 en 5 cm de espesor con placa
antiderrapante, incluye: cimbrado, armado, colado, descimbrado, montaje, cortes,
soldaduras, material, mano de obra y herramienta.
MATERIALES
ANGULO DE FIER. (3/16" Y 1/4") x 2 1/2"
TON
KG
PRIMARIO
ANTICORROSIVO
No.2,
89-97 LT
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
THINNER STANDARD
LT
TON
$13,500.00
0.025620
$345.87
34.15%
$39.44
0.512400
$20.21
2.00%
$41.85
0.512400
$21.44
2.12%
$12.00
0.256200
$3.07
0.30%
$21,409.28
0.008000
$171.27
16.91%
$561.86
55.48%
$93.00
9.18%
$93.00
9.18%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.)
JOR
$930.00 /
10.000000
HOR
HERRAMIENTA MENOR
$6.81
0.256200
$1.74
0.17%
$93.00
0.030000
$2.79
0.28%
$4.53
0.45%
$73.61
7.27%
$17,527.21
0.004200
Pgina 27
ANALISIS DE BASICOS
Cdigo
Concepto
Unidad
Concreto en estructura, hecho en obra de F'c=250 M3
kg/cm2, incluye: acarreos, colado, vibrado, mano de
obra, equipo y herramienta.
Costo
$1,296.64
cantidad
0.028350
Importe
$36.76
%
3.63%
$155.94
0.540000
$84.21
8.31%
$3.49
25.620000
$89.41
8.83%
$2.71
25.620000
$69.43
6.86%
$353.42
34.89%
Subtotal: BASICOS
Costo directo
$1,012.81
Pgina 28
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: ESCM1
Unidad
Costo
cantidad
Importe
Unidad: PZA
Escaln para escalera marina con desarrollo de 0.70 m, a base de redondo de 3/4" de
dimetro, soldado a placa de acero de 3/8" de 0.10x0.10m, ahogada en concreto, incluye:
anclaje, soldadura, pintura anticorrosiva, mano de obra, equipo y herramienta.
MATERIALES
SOLDADURA ELECTRODO 7018
KG
PRIMARIO
ANTICORROSIVO
No.2,
89-97 LT
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
$39.44
0.035000
$1.38
0.45%
$41.85
0.010000
$0.42
0.14%
THINNER STANDARD
LT
$12.00
0.010000
$0.12
0.04%
TON
$17,092.59
0.008000
$136.74
44.35%
TON
$16,065.00
0.003300
$53.01
17.19%
VARILLA DE 3/8"
KG
$9.95
0.100000
$1.00
0.32%
$192.67
62.49%
$93.00
30.16%
$93.00
30.16%
9.5 MM
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.)
JOR
$930.00 /
10.000000
HOR
$377.68
0.050000
$18.88
6.12%
HOR
$6.81
0.010000
$0.07
0.02%
HERRAMIENTA MENOR
$93.00
0.040000
$3.72
1.21%
$22.67
7.35%
$308.34
Anlisis: ESPEJO5
Unidad: M2
Espejo de 5 mm. de espesor, fijado con silicon, incluye: materiales, acarreos, cortes,
desperdicios, amnod e obra, equipo y herramienta.
MATERIALES
ESPEJO DE 5 MM AL CORTE
M2
SILICON
CAR
$369.84
1.100000
$406.82
73.50%
$49.94
0.200000
$9.99
1.80%
$416.81
75.31%
$132.69
23.97%
$132.69
23.97%
$3.98
0.72%
$3.98
0.72%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 14 (1 VIDRIERO + AYUDANTE)
JOR
$729.80 /
5.500000
$132.69
0.030000
$553.48
Pgina 29
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: ESTARML
Unidad
Costo
cantidad
Importe
Unidad: KG
KG
PRIMARIO
ANTICORROSIVO
No.2,
89-97 LT
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
THINNER STANDARD
LT
TON
$39.44
0.030000
$1.18
4.33%
$41.85
0.015000
$0.63
2.31%
$12.00
0.010000
$0.12
0.44%
$17,091.90
0.001020
$17.43
63.89%
$19.36
70.97%
$6.20
22.73%
$6.20
22.73%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.)
JOR
$930.00 /
150.000000
HOR
$377.68
0.000681
$0.26
0.95%
HOR
$600.46
0.001997
$1.20
4.40%
HOR
$6.81
0.010000
$0.07
0.26%
HERRAMIENTA MENOR
$6.20
0.030000
$0.19
0.70%
$1.72
6.30%
$27.28
Anlisis: ESTCANAL
Unidad: KG
KG
PRIMARIO
ANTICORROSIVO
No.2,
89-97 LT
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
THINNER STANDARD
LT
MONTEN PINTADO
TON
$39.44
0.020000
$0.79
2.83%
$41.85
0.020000
$0.84
3.01%
$12.00
0.010000
$0.12
0.43%
$18,900.00
0.001020
$19.28
69.01%
$21.03
75.27%
$6.64
23.77%
$6.64
23.77%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.)
JOR
$930.00 /
140.000000
HOR
$6.81
0.010000
$0.07
0.25%
$6.64
0.030000
$0.20
0.72%
$0.27
0.97%
$27.94
Pgina 30
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: ESTPLAL
Unidad
Costo
cantidad
Importe
Unidad: KG
Estructura metlica (placa a-36 ligera) incluye: materiales, acarreos, cortes, trazo,
habilitado, soldadura, aplicacin de primer anticorrosivo, montaje, mano de obra, equipo
y herramienta.
MATERIALES
PLACA A-36 DE 3 Y 4'' DE 3/16" A 1/2"
TON
KG
$13,500.00
0.001020
$13.77
44.78%
$39.44
0.003000
$0.12
0.39%
PRIMARIO
ANTICORROSIVO
No.2,
89-97 LT
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
$41.85
0.010000
$0.42
1.37%
THINNER STANDARD
$12.00
0.010000
$0.12
0.39%
$14.43
46.93%
$8.45
27.48%
$8.45
27.48%
LT
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.)
JOR
$930.00 /
110.000000
HOR
$377.68
0.020000
$7.55
24.55%
HOR
$6.81
0.010000
$0.07
0.23%
HERRAMIENTA MENOR
$8.45
0.030000
$0.25
0.81%
$7.87
25.59%
$30.75
Anlisis: ESTPLAP
Unidad: KG
Estructura metlica (placa a-36 pesada) incluye: materiales, acarreos, cortes, trazo,
habilitado, soldadura, aplicacin de primer anticorrosivo, montaje, mano de obra, equipo
y herramienta.
MATERIALES
PLACA A-36 DE 5 Y 6'' DE 3/8" A 2"
TON
KG
$13,800.00
0.001050
$14.49
63.33%
$39.44
0.030000
$1.18
5.16%
PRIMARIO
ANTICORROSIVO
No.2,
89-97 LT
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
$41.85
0.007500
$0.31
1.35%
THINNER STANDARD
$12.00
0.005000
LT
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.)
JOR
$930.00 /
150.000000
$0.06
0.26%
$16.04
70.10%
$6.20
27.10%
$6.20
27.10%
HOR
$377.68
0.001000
$0.38
1.66%
HOR
$6.81
0.010000
$0.07
0.31%
HERRAMIENTA MENOR
$6.20
0.030000
$0.19
0.83%
$0.64
2.80%
$22.88
Pgina 31
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: ESTPTR
Unidad
Costo
cantidad
Importe
Unidad: KG
KG
PRIMARIO
ANTICORROSIVO
No.2,
89-97 LT
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
THINNER STANDARD
LT
PTR DE 4x4"
TON
$39.44
0.030000
$1.18
3.81%
$41.85
0.020000
$0.84
2.71%
$12.00
0.015000
$0.18
0.58%
$17,500.00
0.001050
$18.38
59.31%
$20.58
66.41%
$9.30
30.01%
$9.30
30.01%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.)
JOR
$930.00 /
100.000000
HOR
$377.68
0.002000
$0.76
2.45%
HOR
$6.81
0.010000
$0.07
0.23%
HERRAMIENTA MENOR
$9.30
0.030000
$0.28
0.90%
$1.11
3.58%
$30.99
Anlisis: ESTVIGAL
Unidad: KG
KG
PRIMARIO
ANTICORROSIVO
No.2,
89-97 LT
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
THINNER STANDARD
LT
$39.44
0.030000
$1.18
5.62%
$41.85
0.010000
$0.42
2.00%
$12.00
0.005000
$0.06
0.29%
$13,300.00
0.001020
$13.57
64.59%
$15.23
72.49%
$5.17
24.61%
$5.17
24.61%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.)
JOR
$930.00 /
180.000000
HOR
$377.68
0.001000
$0.38
1.81%
HOR
$6.81
0.010000
$0.07
0.33%
HERRAMIENTA MENOR
$5.17
0.030000
$0.16
0.76%
$0.61
2.90%
$21.01
Pgina 32
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: ESTVIGAP
Unidad
Costo
cantidad
Importe
Unidad: KG
KG
PRIMARIO
ANTICORROSIVO
No.2,
89-97 LT
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
THINNER STANDARD
LT
$39.44
0.025000
$0.99
4.61%
$41.85
0.010000
$0.42
1.96%
$12.00
0.005000
$0.06
0.28%
$13,300.00
0.001020
$13.57
63.18%
$15.04
70.02%
$4.65
21.65%
$4.65
21.65%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.)
JOR
$930.00 /
200.000000
HOR
$377.68
0.001000
$0.38
1.77%
HOR
$600.46
0.001997
$1.20
5.59%
HOR
$6.81
0.010000
$0.07
0.33%
HERRAMIENTA MENOR
$4.65
0.030000
$0.14
0.65%
$1.79
8.33%
$21.48
Anlisis: LAM/ANT
Unidad: M2
M2
$175.00
1.000000
$175.00
59.76%
TORNILLO HILTI
PZA
$12.50
3.000000
$37.50
12.81%
$212.50
72.57%
$77.98
26.63%
$77.98
26.63%
$2.34
0.80%
$2.34
0.80%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 9 (1 HERRERO + AYUDANTE)
JOR
$779.79
0.100000
$77.98
0.030000
$292.82
Pgina 33
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: MAT/PUERTA
Unidad
Costo
cantidad
Importe
Unidad: PZA
PZA
$442.93
0.170000
$75.30
5.24%
PZA
$317.92
0.170000
$54.05
3.76%
PZA
$256.91
1.000000
$256.91
17.86%
PZA
$80.99
2.670000
$216.24
15.04%
PZA
$293.49
0.170000
$49.89
3.47%
PZA
$162.10
0.870000
$141.03
9.81%
REMATE DURANODIC
PZA
$275.84
0.870000
$239.98
16.69%
JGO
$57.54
1.000000
$57.54
4.00%
PZA
$234.89
1.000000
$234.89
16.33%
PZA
$271.11
0.120000
$32.53
2.26%
TAQUETE
PZA
$0.38
8.000000
$3.04
0.21%
PIJA
PZA
$0.56
20.000000
$11.20
0.78%
SILICON
CAR
$49.94
0.500000
$24.97
1.74%
VINIL
$2.54
16.000000
Subtotal: MATERIALES
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR
$0.00
0.030000
Costo directo
$40.64
2.83%
$1,438.21
100.00%
$0.00
0.00%
$1,438.21
Anlisis: MEST
Unidad: KG
JOR
$690.00 /
600.000000
HOR
$1.15
42.44%
$1.15
42.44%
$600.46
0.002497
$1.50
55.35%
HERRAMIENTA MENOR
$1.15
0.030000
$0.03
1.11%
EQUIPO DE SEGURIDAD
$1.15
0.030000
$0.03
1.11%
$1.56
57.56%
Costo directo
$2.71
Pgina 34
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: PAD10VP
Unidad
Costo
cantidad
Importe
Unidad: PZA
Puerta de 1.10 x 2.10 m. a base de perfiles de aluminio anodizado duranodik linea 2.00",
con marco y batiente, con cristal claro de 6 mm. de espesor, pivote descentrado y
cerradura, incluye: materiales, acarreos, cortes, desperdicios, herrajes, mano de obra,
equipo y herramienta.
MATERIALES
ZOCLO PESADO DURANODIC
PZA
$442.93
0.200000
$88.59
2.43%
PZA
$317.92
0.200000
$63.58
1.75%
PZA
$256.91
1.000000
$256.91
7.05%
PZA
$80.99
2.670000
$216.24
5.94%
PZA
$293.49
0.170000
$49.89
1.37%
PZA
$162.10
0.870000
$141.03
3.87%
REMATE DURANODIC
PZA
$275.84
0.870000
$239.98
6.59%
JGO
$57.54
1.000000
$57.54
1.58%
JGO
$15.18
2.000000
$30.36
0.83%
PZA
$234.89
1.000000
$234.89
6.45%
PZA
$271.11
0.120000
$32.53
0.89%
TAQUETE
PZA
$0.38
8.000000
$3.04
0.08%
PIJA
PZA
$0.56
20.000000
$11.20
0.31%
SILICON
CAR
$49.94
0.500000
$24.97
0.69%
M2
$238.06
2.310000
$549.92
15.10%
VINIL
$2.54
16.000000
$40.64
1.12%
$2,041.31
56.06%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 16 (1 ALUMINIERO + AY.ESP.)
CUADRILLA No 14 (1 VIDRIERO + AYUDANTE)
JOR
$889.82
1.500000
$1,334.73
36.65%
JOR
$729.80
0.300000
$218.94
6.01%
$1,553.67
42.66%
$46.61
1.28%
$46.61
1.28%
$1,553.67
0.030000
$3,641.59
Pgina 35
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: PAD120VP
Unidad
Costo
cantidad
Importe
Unidad: PZA
Puerta de 1.20 x 2.10 m. a base de perfiles de aluminio anodizado duranodik linea 2.00",
con marco y batiente, con cristal claro de 6 mm. de espesor, pivote descentrado y
cerradura, incluye: materiales, acarreos, cortes, desperdicios, herrajes, mano de obra,
equipo y herramienta.
MATERIALES
ZOCLO PESADO DURANODIC
PZA
$442.93
0.200000
$88.59
1.92%
PZA
$317.92
0.200000
$63.58
1.37%
PZA
$256.91
1.000000
$256.91
5.55%
PZA
$80.99
2.670000
$216.24
4.67%
PZA
$293.49
0.170000
$49.89
1.08%
PZA
$162.10
0.870000
$141.03
3.05%
REMATE DURANODIC
PZA
$275.84
0.870000
$239.98
5.19%
JGO
$57.54
1.000000
$57.54
1.24%
JGO
$15.18
2.000000
$30.36
0.66%
PZA
$234.89
1.000000
$234.89
5.08%
PZA
$271.11
0.120000
$32.53
0.70%
TAQUETE
PZA
$0.38
8.000000
$3.04
0.07%
PIJA
PZA
$0.56
20.000000
$11.20
0.24%
SILICON
CAR
$49.94
0.500000
$24.97
0.54%
M2
$238.06
2.310000
$549.92
11.89%
VINIL
$2.54
16.000000
$40.64
0.88%
$2,041.31
44.13%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 16 (1 ALUMINIERO + AY.ESP.)
CUADRILLA No 14 (1 VIDRIERO + AYUDANTE)
JOR
$889.82
2.000000
$1,779.64
38.47%
JOR
$729.80
1.000000
$729.80
15.78%
$2,509.44
54.25%
$75.28
1.63%
$75.28
1.63%
$2,509.44
0.030000
$4,626.03
Pgina 36
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: PAD125VP
Unidad
Costo
cantidad
Importe
Unidad: PZA
Puerta de 1.25 x 2.10 m. a base de perfiles de aluminio anodizado duranodik linea 3.00",
con marco y batiente, con cristal claro de 6 mm. de espesor, pivote descentrado y
cerradura, incluye: materiales, acarreos, cortes, desperdicios, herrajes, mano de obra,
equipo y herramienta.
MATERIALES
ZOCLO PESADO DURANODIC
PZA
$442.93
0.400000
$177.17
2.77%
PZA
$317.92
0.400000
$127.17
1.99%
PZA
$256.91
1.200000
$308.29
4.82%
PZA
$80.99
3.500000
$283.47
4.43%
VINIL
$2.54
16.000000
$40.64
0.63%
TAQUETE
PZA
$0.38
8.000000
$3.04
0.05%
PZA
$271.11
0.120000
$32.53
0.51%
PZA
$234.89
1.000000
$234.89
3.67%
JGO
$15.18
2.000000
$30.36
0.47%
JGO
$57.54
1.000000
$57.54
0.90%
PZA
$293.49
0.170000
$49.89
0.78%
PZA
$162.10
0.870000
$141.03
2.20%
REMATE DURANODIC
PZA
$275.84
0.870000
$239.98
3.75%
PIJA
PZA
$0.56
20.000000
$11.20
0.17%
SILICON
CAR
$49.94
0.500000
$24.97
0.39%
M2
$238.06
3.375000
$803.45
12.55%
BARRA DE ALUMINIO
PZA
$1,250.00
1.000000
$1,250.00
19.53%
$3,815.62
59.62%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 14 (1 VIDRIERO + AYUDANTE)
CUADRILLA No 16 (1 ALUMINIERO + AY.ESP.)
JOR
$729.80
1.000000
$729.80
11.40%
JOR
$889.82
2.000000
$1,779.64
27.81%
$2,509.44
39.21%
$75.28
1.18%
$75.28
1.18%
$2,509.44
0.030000
$6,400.34
Pgina 37
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: PAD16VP
Unidad
Costo
cantidad
Importe
Unidad: PZA
Puerta de 1.60 x 2.10 m a base de perfiles de aluminio anodizado duranodik linea 2.00",
con marco y batiente, con cristal claro de 6 mm. de espesor, pivote descentrado y
cerradura, incluye: materiales, acarreos, cortes, desperdicios, herrajes, mano de obra,
equipo y herramienta.
MATERIALES
ZOCLO PESADO DURANODIC
PZA
$442.93
0.400000
$177.17
3.16%
PZA
$317.92
0.400000
$127.17
2.27%
PZA
$256.91
1.000000
$256.91
4.59%
PZA
$80.99
3.250000
$263.22
4.70%
PZA
$293.49
0.350000
$102.72
1.83%
TAQUETE
PZA
$0.38
16.000000
$6.08
0.11%
PZA
$271.11
0.240000
$65.07
1.16%
PZA
$234.89
1.000000
$234.89
4.19%
JGO
$15.18
2.000000
$30.36
0.54%
JGO
$57.54
1.000000
$57.54
1.03%
REMATE DURANODIC
PZA
$275.84
1.700000
$468.93
8.37%
PZA
$162.10
1.700000
$275.57
4.92%
PIJA
PZA
$0.56
20.000000
$11.20
0.20%
VINIL
$2.54
20.000000
$50.80
0.91%
M2
$238.06
3.528000
$839.88
14.99%
SILICON
CAR
$49.94
1.000000
$49.94
0.89%
$3,017.45
53.86%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 16 (1 ALUMINIERO + AY.ESP.)
CUADRILLA No 14 (1 VIDRIERO + AYUDANTE)
JOR
$889.82
2.000000
$1,779.64
31.77%
JOR
$729.80
1.000000
$729.80
13.03%
$2,509.44
44.79%
$75.28
1.34%
$75.28
1.34%
$2,509.44
0.030000
$5,602.17
Pgina 38
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: PAD80VP
Unidad
Costo
cantidad
Importe
Unidad: PZA
Puerta de 0.80x 2.10 m. a base de perfiles de aluminio anodizado duranodik linea 3.00",
con marco y batiente, con cristal claro de 6 mm. de espesor, pivote descentrado y
cerradura, incluye: materiales, acarreos, cortes, desperdicios, herrajes, mano de obra,
equipo y herramienta.
MATERIALES
ZOCLO PESADO DURANODIC
PZA
$442.93
0.400000
$177.17
3.18%
PZA
$317.92
0.400000
$127.17
2.28%
PZA
$256.91
1.200000
$308.29
5.54%
PZA
$80.99
3.500000
$283.47
5.09%
VINIL
$2.54
16.000000
$40.64
0.73%
TAQUETE
PZA
$0.38
8.000000
$3.04
0.05%
PZA
$271.11
0.120000
$32.53
0.58%
PZA
$234.89
1.000000
$234.89
4.22%
JGO
$15.18
2.000000
$30.36
0.55%
JGO
$57.54
1.000000
$57.54
1.03%
PZA
$293.49
0.170000
$49.89
0.90%
PZA
$162.10
0.870000
$141.03
2.53%
REMATE DURANODIC
PZA
$275.84
0.870000
$239.98
4.31%
PIJA
PZA
$0.56
20.000000
$11.20
0.20%
SILICON
CAR
$49.94
0.500000
$24.97
0.45%
M2
$238.06
3.375000
$803.45
14.43%
BARRA DE ALUMINIO
PZA
$1,250.00
1.000000
$1,250.00
22.46%
$3,815.62
68.55%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 16 (1 ALUMINIERO + AY.ESP.)
CUADRILLA No 14 (1 VIDRIERO + AYUDANTE)
JOR
$889.82
1.500000
$1,334.73
23.98%
JOR
$729.80
0.500000
$364.90
6.56%
$1,699.63
30.53%
$50.99
0.92%
$50.99
0.92%
$1,699.63
0.030000
$5,566.24
Pgina 39
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: PEESTL
Unidad
Costo
cantidad
Importe
Unidad: KG
$69.30
0.015000
$1.04
29.80%
THINNER STANDARD
$12.00
0.015000
$0.18
5.16%
$1.22
34.96%
$2.10
60.17%
$2.10
60.17%
LT
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 8 (1 PINTOR + AYUDANTE)
JOR
$629.80 /
300.000000
$2.10
0.030000
$0.06
1.72%
$2.10
0.050000
$0.11
3.15%
$0.17
4.87%
Costo directo
$3.49
ANDAMIOS
Anlisis: PEESTP
Unidad: KG
$69.30
0.010000
$0.69
THINNER STANDARD
$12.00
0.010000
$0.12
4.78%
$0.81
32.27%
$1.57
62.55%
$1.57
62.55%
LT
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 8 (1 PINTOR + AYUDANTE)
JOR
$629.80 /
400.000000
27.49%
$1.57
0.030000
$0.05
1.99%
$1.57
0.050000
$0.08
3.19%
$0.13
5.18%
Costo directo
$2.51
ANDAMIOS
Pgina 40
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: PEPTR
Unidad
Costo
cantidad
Importe
Unidad: KG
Pintura de esmalte 100 de la marca Comex, en estructura a base de perfiles PTR. aplicada
con compresora, a dos manos, incluye: preparacin de la superficie, materiales, mano de
obra, equipo y herramienta.
MATERIALES
PINTURA DE ESMALTE COMEX 100 BCO. Y LT
COLS. REG.
$69.30
0.020000
$1.39
27.63%
THINNER STANDARD
$12.00
0.020000
$0.24
4.77%
$1.63
32.41%
$3.15
62.62%
$3.15
62.62%
LT
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 8 (1 PINTOR + AYUDANTE)
JOR
$629.80 /
200.000000
$3.15
0.030000
$0.09
1.79%
$3.15
0.050000
$0.16
3.18%
$0.25
4.97%
Costo directo
$5.03
ANDAMIOS
Anlisis: PINTL
Unidad: M2
TON
AGUA ( MANEJO)
M3
$1,678.00
0.002000
$3.36
17.43%
$18.00
0.005000
$0.09
0.47%
$3.45
17.89%
$15.37
79.72%
$15.37
79.72%
$0.46
2.39%
$0.46
2.39%
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 5 (1 ALBAIL+1 PEON)
JOR
$614.81 /
40.000000
$15.37
0.030000
$19.28
Pgina 41
ANALISIS DE BASICOS
Cdigo
Concepto
Anlisis: SOLERA/ESTRUC
Unidad
Costo
cantidad
Importe
Unidad: KG
TON
KG
$13,800.00
0.001000
$13.80
62.19%
$39.44
0.030000
$1.18
5.32%
PRIMARIO
ANTICORROSIVO
No.2,
89-97 LT
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
$41.85
0.007500
$0.31
1.40%
THINNER STANDARD
$12.00
0.005000
$0.06
0.27%
$15.35
69.18%
$6.20
27.94%
$6.20
27.94%
LT
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.)
JOR
$930.00 /
150.000000
HOR
$377.68
0.001000
$0.38
1.71%
HOR
$6.81
0.010000
$0.07
0.32%
HERRAMIENTA MENOR
$6.20
0.030000
$0.19
0.86%
$0.64
2.88%
$22.19
Anlisis: TUA4038
Unidad: ML
Tubo de acero soldable C-40 sin costura de 38 mm. de dimetro, incluye: materiales,
acarreos, cortes, soldadura, mano de obra, pruebas, equipo y herramienta.
MATERIALES
TUBO NEG SOLD C-40 S/C 38MM
ML
$189.46
1.050000
KG
$39.44
0.026000
Subtotal: MATERIALES
MANO DE OBRA
CUADRILLA No 17 (1 SOLDADOR+1 AY.ESP.)
JOR
$690.00 /
16.000000
HOR
HERRAMIENTA MENOR
$198.93
80.27%
$1.03
0.42%
$199.96
80.68%
$43.13
17.40%
$43.13
17.40%
$6.81
0.380000
$2.59
1.05%
$43.13
0.050000
$2.16
0.87%
$4.75
1.92%
$247.84