Escolar Documentos
Profissional Documentos
Cultura Documentos
LABORELEC IN A NUTSHELL
The Research Center of ENGIE for the Electricity Value Chain
as member of the DRT family
Expert
servic
es
Sustainable
Use
00/00/2015
OUR PEOPLE
250 experts
with unique skills
in multiple domains
OUR WORLDWIDE
COVERAGE
Missions in more
than 60 countries
OUR EXPERIENCE
> 50 years
of experience
in the power business
OUR RESOURCES
State of the art laboratories,
measurement systems
and software
00/00/2015
Sustainable use
Chemistry
Processes
Materials
Electricity
Applications
Water chemistry
& Biology
Process perform.
& automation
Materials
technology
Electrical
power systems
Energy
efficiency
Nuclear chemistry
Combustion
& emissions
Electrical equipm.
& machines
Lighting
technology
CO2 capture
& valorisation
Vibrations
& mechanics
Oil analyses
Grid automation
Remote monitoring
& diagnosis
Energy storage
Cyber security
Renewable
00/00/2015
Sustainable use
USE OF
ENERGY
Use of Energy
Technical Consulting
Sustainable use of
energy coaching
Flexibility review for
demand side
management
Lighting audits & testing
00/00/2015
Objective:
Volvo wanted to realise the first CO2-free automotive plant in the world.
followed
by Tve (Sweden)
Site Characteristics
Site Characteristics
Energy
needs (2004)
Available
area:
-14.400
tCO2
Bio Oil
- 1.200 tCO2
AlpEnergie
-3.450 tCO2
Wood Boiler
-2.800 tCO2
Windturbines
- 3.450 tCO2
Laborelec offers
Back-up slides
Customers
Operate
Value
Invest / build
/ retrofit
Explore
new technol.
Services
Integrate in the context and environment
Competences
00/00/2015
13
OPERATE
Performance
Fleet management
Environment
Reliability
Availability
Troubleshooting
Cost reduction
00/00/2015
Emissions monitoring
Control loop optimization
Combustion optimization
Cycle optimization
Plant efficiency
Cooling tower efficiency
Gasturbine performance
Plant flexibility
Circ.fludized bed boilers
Biomass
Environmental footprint
Lifetime assessment
SCR & deNox
O&M optimization
Overhaul postponing
Rational water use
Chemical cost opt.
14
INVEST
BUILD
RETROFIT
Prefeasibility
Contracting
Construction
Review of specifications
Design review
Technical comparison
Review measurement
provisions
Factory audits
00/00/2015
Factory &
site acceptance testing
Zero references
Review inspection
Witnessing&
performance testing
Boiler cleaning
Review of preoperational proc.
Root cause analyses
15
BUILD
OPERATE
Investment analysis
Contracting
Reliability - Availability
Troubleshooting
Build
00/00/2015
Specifications review
Design review
Technical comparisons
Factory audits
Compliance
Review inspection
Witnessing
Protection and selectivity studies
Review pre-operational procedures
Root cause analyses
16
ENGIE
DRT (Research & Technologies Division)
LABORELEC - Research and Innovation Center in Electrical Power Technology
Rodestraat 125
1630 Linkebeek
Tl : +32 (0)2 382 02 11
info@laborelec.com
00/00/2015
17