Você está na página 1de 8

B SCHOOL FOR PRESIDENCY UNIVERSITY

PROJECT : PROPOSED PRESIDENCY UNIVERSITY B.SCHOOL

Legend

SUBJECT : COMPARATIVE STATEMENT - TENDER FOR EXTERNAL HT ELECTRIAL

Sl#

A
A.1

A.2

Description

Qty

Units

95% less than Consultant's Estimate


Between 95% & 105% to Consultant's Estimate
105% greater than Consultant's Estimate

Consultant's Estimate
SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

ANPCPMC Estimate
SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Grid Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Flutech Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Veeresh Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Megatron
SUPPLY
Rate
Amount

INSTALLATION
Rate
Amount

External Electrical Works


SINGLE POLE STRUCTURE:
Supply, installation, interconnection (between EB line,
GOSs,DOLO fuse, ), testing and commissioning of 1 No. 11
Mtrs RCC Spun pole with following components mounted : a)
1 set of 11KV, 500Amps,GOS b) 1 set of 11KV, DOLO fuse
unit c) 1 set of 9KV, 5KA, lightning arrester. Rate shall
include all necessary accessories like mounting bracket for
GOS, DOLO , Interconnection of components using suitable
size of aluminium conductor thro alkathilene tube, excavation
, refilling ,foundation for the RCC pole, etc etc complete .
3 Each

95,000

285,000

12,000

36,000

72,000

216,000

14,500

43,500

58,000

174,000

8,770

26,310

70,000

210,000

22,000

66,000

70,000

210,000

13,000

39,000

90,000.00

270,000.00

32,000.00

96,000.00

1 Each

175,000

175,000

3,500

3,500

180,000

180,000

8,000

8,000

190,000

190,000

6,200

6,200

180,000

180,000

10,000

10,000

191,500

191,500

7,500

7,500

194,238.00

194,238.00

20,000.00

20,000.00

1 Each

450,000

450,000

6,000

6,000

415,000

415,000

10,500

10,500

396,000

396,000

6,200

6,200

495,000

495,000

12,000

12,000

474,600

474,600

9,000

9,000

468,526.00

468,526.00

20,000.00

20,000.00

1 Each

1,520,000

1,520,000

8,000

8,000

1,215,000

1,215,000

18,500

18,500

1,148,500

1,148,500

11,840

11,840

1,185,000

1,185,000

10,000

10,000

1,235,500

1,235,500

9,000

9,000

894,672.00

894,672.00

22,000.00

22,000.00

65000

65,000

3,500

3,500

75850

75,850

6,000

6,000

73,570

73,570

3,250

3,250

75,750

75,750

8,500

8,500

79,000

79,000

3,800

3,800

71,888.00

71,888.00

6,000.00

6,000.00

11KV metering cubicle


Supply, installation, testing and commissioning of outdoor
11KV metering cubicle made up of 14SWG CRCA sheet with
powder coating consisting of following:
- 3nos Current Transformer, resincast, 2.75VA, Class:0.2. - Potential tansformer, resincast, 25VA, class :0.2,
-11KV/110V. - Electronic trivector meter,class:0.2,
Parameters : KWh,KAVRh, MDI in KVA with all necessary
parameters as per EB. Rate shall include all necessary hard
ware complete.
Make: MEI/Star switch gear/Banavathy
(Rate shall exclude civil works for foundation)

A.3

11KV VCB PANEL (For Transformer-500KVA):


Supply, installation, testing and commissioning of Outdoor
type 11KV Vaccum circuit breaker for 1000KVA Transformer
Protection Unit made up of 16SWG CRCA sheet for body
and 14 SWG CRCA sheet for door, floor mounting, powder
coated, with necessary hard ware, interconnection wiring &
accessories complete.Comprising of following:
-1 no's of 11KV 400A 350MVA 26.3KA 3P VCB Horizontal
drawout
- Transformer protection relay( Minimum OC,SC, EL,
W.Temp)
- "RYB", " TRIP CIRCUIT HEALTH LED" , "ALL Faults" LED
type indicator
- Expandable
Rate shall include all necessary hardwares for installation
complete & shall be as per BESCOM requirement
Make: ABB/ Scheinder
(Rate shall exclude civil works for foundation)

A.3

500kVA LOW LOSS TRANSFORMER WITH OLTC


Supply of 11KV/433V 5000KVA transformer, copper wound,
Delta/star grounded, 3 phase,50hz, Dyn11, + 5%or - 15%
ON circuit tap changeover in 17 steps (1.25%/step), suitable
for floor mounting, Impedence as per IS, HT side cable box ,
LT side cable box. Rate shall include factory routine tests as
per IS.
Important: 50%Load loss - 1600Watts , Full load loss 5500watts
Following accessories shall be provided as minimum:
1. Bokholz relay
2. Oil temperature guage/relay.
3. Oil level guage.
4. Winding temp. relay
Make:
OLTC: OLG/CRT
RTCC Relay:Precission Measurements/Peacon
(Rate shall exclude civil works for foundation)

A.4

Out door LT box


Supply, installation, testing and commissioning of " L.T
KIOSK" ,outdoor type, IP56, pole mounting, powder coated,
make out of 14 SWG CRCA sheet steel for body and 14
SWG for doors with1 No. of 800Amps 36KA TPN MCCB ,

1 Set

outgoing cabel box , necessary mounting hard ware &


accessories complete.
(Rate shall exclude civil works for foundation)

A N Prakash Construction Project Management Consultants Pvt. Ltd

Page : 1

B SCHOOL FOR PRESIDENCY UNIVERSITY


Sl#
A.5

Description

Qty

Units

Consultant's Estimate
SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

ANPCPMC Estimate
SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Grid Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Flutech Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Veeresh Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Megatron
SUPPLY
Rate
Amount

INSTALLATION
Rate
Amount

YARD FENCING as per STANDARD ELECTRICAL


PRACTICE
Supply & installation of Chain linked fencing for transformer
yard as per below specification:
Frame Size 2.5m x 1.5m
MS Angle 50 x 6mm
Chain Link 8swg GI
Supporting ISMB 75 x 40mm
Paint - 2 coats Red oxide and 2 Coats Enamel.

A.6
A.6.1

50 Mtrs

1,600

80,000

250

12,500

2,750

137,500

250

12,500

2,450

122,500

480

24,000

3,100

155,000

500

25,000

1,875

93,750

150

7,500

2,600.00

130,000.00

240.00

12,000.00

brackets etc etc complete. Make: Raychem


Indoor

3 Each

6,800

20,400

500

1,500

7,250

21,750

1,875

5,625

6,500

19,500

1,750

5,250

4,600

13,800

1,500

4,500

5,250

15,750

1,650

4,950

6,449.00

19,347.00

3,200.00

9,600.00

Outdoor

3 Each

5,000

15,000

400

1,200

7,250

21,750

1,750

5,250

6,500

19,500

2,250

6,750

5,800

17,400

1,780

5,340

9,320.00

27,960.00

3,300.00

9,900.00

2 Each

6,800

13,600

500

1,000

6,250

12,500

1,650

3,300

4,810

9,620

1,350

2,700

4,500

9,000

1,500

3,000

4,780

9,560

1,450

2,900

5,388.00

10,776.00

3,000.00

6,000.00

1 Each

750,000

750,000

8,000

8,000

750,000

750,000

15,000

15,000

722,950

722,950

7,020

7,020

757,350

757,350

16,500

16,500

774,600

774,600

10,000

10,000

720,446.00

720,446.00

20,000.00

20,000.00

15 Mtrs

1300

19,500

120

1,800

1175

950
9,500
1,100 1,540,000

90
90

900
126,000

HT CABLE TERMINATION
Supply and installation of 3Cx185Sqmm 11KV cable heat
shrinkable type end termination . Rate shall included all
necessary acessories like glands, copper lugs, mounting

A.6.2

Supply and installation of 3Cx95Sqmm 11KV cable heat


shrinkable type end termination . Rate shall included all
necessary acessories like glands, copper lugs, mounting
brackets etc etc complete. Make: Raychem
Indoor

A.7

MAIN L.T PANEL


Supply installation, testing and commissioning of following
L.T PANEL made up of 14SWG CRCA sheet for body and 14
SWG CRCA sheet for door, Outdoor type, floor mounting,
powder coated, with necessary hard ware, interconnection
wiring & accessories complete as per SLD drg#
S668-E-S-Ext-01

A.7.1 Main L.T Panel with PLC


A.8

H.T / L.T CABLES & CABLE TERMINATION


H.T / L.T CABLES
Supply,Laying and testing of 1.1/13KV, armoured, PVC
insulated, alumnimum cables. Cable shall be laid in
exisitng hume pipes/trench/cable tray.

A.8.1 3C x 185 Sqmm XLPE 11KV Al.Armoured Cable

17,625

50

750

930

13,950

80

1,200

1,125

16,875

85

1,275

980

14,700

85

1,275

957.00

14,355.00

175.00

2,625.00

819
8,190
960 1,344,000

40
72

400
100,800

635
775

6,350
1,085,000

60
95

600
133,000

675
845

6,750
1,183,000

75
85

750
119,000

650
870

6,500
1,218,000

78
110

780
154,000

638.00
842.00

6,380.00
1,178,800.00

120.00
175.00

1,200.00
245,000.00

48,000
30,000
4,000

166
125
137

199,200
187,500
27,400

30
25
20

36,000
37,500
4,000

135
105
130

162,000
157,500
26,000

20
15
12

24,000
22,500
2,400

145
110
125

174,000
165,000
25,000

30
25
15

36,000
37,500
3,000

164
115
150

196,800
172,500
30,000

30
28
24

36,000
42,000
4,800

145.00
110.00
120.00

174,000.00
165,000.00
24,000.00

35.00
32.00
25.00

42,000.00
48,000.00
5,000.00

350
70

4,900
560

1,833
311

25,662
2,488

238
50

3,332
400

1,400
150

19,600
1,200

500
50

7,000
400

2,500
225

35,000
1,800

550
150

7,700
1,200

1,100
200

15,400
1,600

650
150

9,100
1,200

1,823.00
155.00

25,522.00
1,240.00

700.00
90.00

9,800.00
720.00

60
35

720
700

230
140

2,760
2,800

45
35

540
700

130
75

1,560
1,500

30
25

360
500

190
150

2,280
3,000

140
125

1,680
2,500

150
100

1,800
2,000

100
75

1,200
1,500

140.00
60.00

1,680.00
1,200.00

80.00
30.00

960.00
600.00

A.8.2 3C x 95 Sqmm XLPE 11KV Al.Armoured Cable


A.8.3 3.5C 240 Sqmm XLPE 1.1KV Al. Armoured cable

10 Mtrs
1400 Mtrs

A.8.4 4C 25 Sqmm XLPE 1.1KV Al. Armoured cable


A.8.5 4C 16 Sqmm XLPE 1.1KV Al. Armoured cable
A.8.6 4C 2.5 Sqmm copper. Armoured cable

1200 Mtrs
1500 Mtrs
200 Mtrs

170
140
120

204,000
210,000
24,000

40
20
20

A.9.1 3.5C 240 Sqmm XLPE 1.1KV Al. Armoured cable


A.9.2 4C 25 Sqmm XLPE 1.1KV Al. Armoured cable

14 Each
8 Each

1,800
125

25,200
1,000

A.9.3 4C 16 Sqmm XLPE 1.1KV Al. Armoured cable


A.9.4 4C 2.5 Sqmm copper. Armoured cable

12 Each
20 Each

100
60

1,200
1,200

A.9

CABLE END TERMINATION


End terminations of the below listed cables including supply
of brass glands, solders long barrel type copper lugs etc
complete.

A.10

mounting 3x 120Sqmm 11KV Aerial Bunched cable ABC ,


sprial earthing, excavation , concreting etc etc complete
A.11

9Mtrs RCC
Supply & installation of 9Mtrs RCC pole, Rate shall include
all accessories like J-hook and suspension clamp for
22 Each

7,000

154,000

1,000

22,000

6,500

143,000

1,500

33,000

5,750

126,500

880

19,360

6,050

133,100

1,575

34,650

6,800

149,600

1,875

41,250

6,159.00

135,498.00

2,200.00

48,400.00

5 Each

4,000

20,000

750

3,750

5,975

29,875

1,250

6,250

5,800

29,000

880

4,400

5,750

28,750

1,075

5,375

6,037

30,185

1,650

8,250

5,886.00

29,430.00

2,000.00

10,000.00

5 Each

1,100

5,500

300

1,500

1,500

7,500

500

2,500

1,620

8,100

435

2,175

1,250

6,250

1,000

5,000

1,905

9,525

1,600

8,000

1,400.00

7,000.00

400.00

2,000.00

8Mtrs RCC Stud pole


Supply & installation of 8Mtrs RCC pole (Note: Rate shall
include sprial earthing, excavation , concreting etc etc
complete)

A.12

Guy set with No.15 strain insulator & Concreting materials

A.13

Over head Line(H.T)


Supply, installation, testing and commissioning of Standard
compacted circular Aluminum conductor, conductor
screened with extruded semi conducting compound followed
by copper tape,each core sheathed with PVC type ST-2
compound, 3C twisted around XLPE insulated Aluminum
A N Prakash Construction Project Management Consultants Pvt. Ltd

Page : 2

B SCHOOL FOR PRESIDENCY UNIVERSITY


Sl#

Description

Qty

Units

Consultant's Estimate
SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

ANPCPMC Estimate
SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Grid Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Flutech Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Veeresh Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Megatron
SUPPLY
Rate
Amount

INSTALLATION
Rate
Amount

alloy messenger wire to form 11kV grade Aerial Bunched


Cable (ABC) with specified to IS 7098/II/85 and confirming to
the GTP with wire rope.
(Note:-Rateshall exclude RCC pole,Insulators & Cross arm)
A.13.1 3Runs X 120 Sqmm

950 Mtrs

700

665,000

100

95,000

805

764,750

75

71,250

885

840,750

45

42,750

810

769,500

205

194,750

805

764,750

60

57,000

683.00

648,850.00

120.00

114,000.00

8 Each

700

5,600

350

2,800

575

4,600

250

2,000

235

1,880

40

320

1,250

10,000

1,000

8,000

675

5,400

175

1,400

850.00

6,800.00

400.00

3,200.00

10 Each

3,500

35,000

1,250

12,500

4,800

48,000

1,500

15,000

4,800

48,000

1,315

13,150

3,500

35,000

2,500

25,000

4,600

46,000

1,750

17,500

5,700.00

57,000.00

1,800.00

18,000.00

2 Each

13,500

27,000

2,000

4,000

13,500

27,000

1,500

3,000

12,500

25,000

1,750

3,500

11,500

23,000

4,000

8,000

13,800

27,600

2,250

4,500

12,000.00

24,000.00

1,800.00

3,600.00

2 Each

12,000

24,000

2,000

4,000

12,250

24,500

2,000

4,000

22,000

44,000

1,750

3,500

15,500

31,000

4,500

9,000

11,000

22,000

2,000

4,000

13,000.00

26,000.00

1,800.00

3,600.00

A.15.1 40x6mm Hotdipped 80micron GI Strip

110 Mtrs

228

25,080

55

6,050

170

18,700

30

3,300

180

19,800

35

3,850

165

18,150

75

8,250

340

37,400

40

4,400

177.00

19,470.00
-

55.00

6,050.00
-

A.15.2 25x6mm Hotdipped 80micron GI Strip

100 Mtrs

175

17,500

44

4,400

130

13,000

16

1,600

110

11,000

28

2,800

95

9,500

40

4,000

182

18,200

32

3,200

118.00

11,800.00
-

40.00

4,000.00
-

A.15.3 25x3mm GI Strip

250 Mtrs

90

22,500

34

8,500

50

12,500

12

3,000

75

18,750

22

5,500

65

16,250

35

8,750

108

27,000

28

7,000

48.00

12,000.00

38.00

9,500.00

A.15.4 25x6 copper Flat

20 Mtrs

950

19,000

60

1,200

945

18,900

20

400

950

19,000

28

560

795

15,900

40

800

875

17,500

32

640

979.00

19,580.00

45.00

900.00

2 Each

25,000

50,000

2,000

4,000

22,250

44,500

2,500

5,000

21,170

42,340

2,455

4,910

27,500

55,000

2,500

5,000

22,000

44,000

1,250

2,500

20,143.00

40,286.00

2,400.00

4,800.00

A.16.1 Supply and laying of 150mm Dia 6KG PVC pipe. Rate
shall included excavation and refilling(for incoming Cable)

75 Mtrs

560

42,000

175

13,125

465

34,875

175

13,125

520

39,000

40

3,000

350

26,250

45

3,375

480

36,000

40

3,000

350.00

26,250.00

225.00

16,875.00

A.16.2 Supply and laying of 75mm Dia 6KG PVC pipe. Rate
shall included excavation and refilling(for incoming Cable)

R/O Mtrs

200

A.14

Supply & installation of one set of dead end clamp and


bracket sutiable for 3x 120Sqmm 11KV Aerial Bunched
cable ABC on existing 11Mtrs pole with accessories like
brackets , hardware etc. complete

A.14a EARTHING
A.14a.1 G.I PIPE EARTHING
Supply, installation, testing and commissioning of G.I
pipe electrode type earth station as per IS 3043
complete with 38mm dia class 'B' pipe, funnel, test
link, brick masonry chamber with heavy duty cover,
etc etc complete.
A.14a.2 COPPER PLATE EARTHING
Supply, installation, testing and commissioning of
Copper plate 600x600x3mm electrode earth station as
per IS 3043 complete with 38mm dia class 'B' pipe,
funnel, test link, brick masonry chamber with heavy
duty cover, etc etc complete.
A.14a.3 MIANTENANCE FREE EARTH STATION
Supply , Installation , testing and commissioning of 1
number of 3mtr length 5/8" dia JK steel rod moleculerly
bonded with 250 microns copper with SS U clamps & nuts
for interconnecting along with alternative layers of soil and
grounding enchancing matrerial (GEM) which consists of 1
set of 5 Kgs Part 1 (mixture of calcium carbonate,
tetrasodium hexacynoferrate & sodium sulphate) + Part 2 +
1 set of 5Kgs Part 2 (copper sulphate). Rate shall include
excavation, refilling, with heavy duty weather proof
polyplastic earth pit chamber & cover(model#PPC02) etc
complete.
Contact # 09886008218(Mr. Shanth Kumar)
A.15

EARTHING STRIP
Supply , laying & termination of following earth strip. Rate
shall include all necessary accessories including clamping
to the walls, cables, cable trays etc complete.

A.15a STREET LIGHTING PANEL (out Door)


Supply, installtion, testing and commissioning of STREET
LIGHT PANEL made up of 16SWG CRCA sheet for body
and 14 SWG CRCA sheet for door, outdoor type, floor
mounting, powder coated,Degree of projection IP56, with
necessary hard ware, interconnection wiring & accessories
complete comprising of the following
Incomming : 40A 4P 10KA MCB
+ 2 nos. 32A 3P AC1 contactor
+ 2 nos. 24hrs Timer
Outgoings : 8 Nos 20A 10KA SP MCB
A.16

MISCELLANEOUS ITEMS

120

250

165

365

35

225

35

210

30

250.00

180.00

A.16.3 Supply and laying of 50mm Dia 6KG PVC pipe. Rate shall
A N Prakash Construction Project Management Consultants Pvt. Ltd

Page : 3

B SCHOOL FOR PRESIDENCY UNIVERSITY


Sl#

Description

Qty

included excavation and refilling(for incoming TV & Tel Cable)

Units

R/O Mtrs

Consultant's Estimate
SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount
85
90

ANPCPMC Estimate
SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount
165
150

M/s Grid Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount
148
30

A.16.4 Supply & Installing Danger name plates of approved shape


and size

4 Each

325

1,300

50

200

250

1,000

25

100

100

400

A.16.6 Supply & installing Shock chart as approved by the


electrical inspectorate

2 Each

298

596

50

100

250

500

25

50

480

960

12

144,000

102,000

A.16.7 Excavation and refilling upto a depth of 750mm for Cables

12000

Cft

A.16.8 Sand for cable laying

1200

Cft

100

120,000

10

12,000

60

72,000

10

12,000

45

A.16.9 Burnt bricks for cable laying

2100

Cft

60

126,000

15

31,500

15

31,500

10

21,000

30 Nos

450

13,500

50

1,500

250

7,500

100

3,000

300,000

300,000

300,000

300,000

A.16.10 Cast iron cable route marker


A.17

M/s Flutech Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount
175
35

M/s Veeresh Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount
175
28

M/s Megatron
SUPPLY
Rate
Amount
191.00

INSTALLATION
Rate
Amount
150.00

20

500

2,000

150

600

450

1,800

75

300

750.00

3,000.00

50.00

200.00
-

750

1,500

100

200

980

1,960

100

200

800.00

1,600.00

50.00

100.00

25

300,000

12

144,000

22.00

264,000.00

70

84,000

15

180,000

54,000

10

12,000

75

90,000

20

24,000

25

52,500

10,500

55

115,500

15

31,500

60

126,000

195

5,850

35

1,050

250

7,500

50

1,500

275

8,250

140,000

140,000

320,000

320,000

75

2,250

275,000

275,000

70.00

84,000.00

25.00

30,000.00

70.00

147,000.00

25.00

52,500.00

650.00

19,500.00

70.00

2,100.00

375,000.00

375,000.00

PROFESSIONAL AND LAISONING CHARGES


(With EB and INSPECTORATE)
Liasion with EB/ Electrical inspectorate, preparation &
getting approval of drawings by Electriciity Board(EB),
obtaining clearence from CEIG for the installation, filing
application and follow-up at different levels with EB,
co-ordinating with MRT dept etc etc complete upto servicing
of power. (Note : Including Deposits)

TOTAL PART
VAT 14.5% and 5.5%
Service Tax 14.0%

GRAND TOTAL

6,783,176

970,905

6,145,425

Included

N/A

730,537

908,922

N/A

Included

127,249

7,754,081

7,912,133

5,739,880

743,325

6,107,255

1,370,605

6,134,130

1,019,235

5,719,094

1,546,230

609,794

N/A

650,389

N/A

889,449

N/A

829,269

N/A

N/A

104,066

N/A

191,885

N/A

142,693

N/A

216,472

7,197,065
L1

A N Prakash Construction Project Management Consultants Pvt. Ltd

8,320,134
L4

8,185,507
L2

8,311,065
L3

Page : 4

COMPARATIVE STATEMENT TECHNO COMMERCIAL


PROJECT : PRESIDENCY UNIVERSITY ' B' SCHOOL @ DIBBUR , BANGALORE.
PROJECT : PROPOSED PRESIDENCY UNIVERSITY B.SCHOOL
SUBJECT : TECHNO COMMERCIAL STATEMENT FOR EXTERNAL HT ELECTRICAL WORKS - R1
Sl. #
Sub Heads
As per TENDER
M/s.Grid Electricals
COMMERCIAL
1
Type of Tender
Item Rate
Item Rate

M/s.Flutech Electricals

M/s.Veeresh Electricals

Item Rate

Item Rate

M/s.Megatron
Item Rate
30 days from the date of
submission.

Validity of tender

60 days from the date of submission

Accepted

Accepted

Accepted

Period of completion

2 calender months from the date of


commencement of work

Accepted

Accepted

Accepted

Accepted

5% of the value of work done from each interim


Retention money from bill will be retained by client in cash. The Amount
interim bills (interest free) so retained shall not bear any interest for
duration retained.

Accepted

Accepted

Accepted

Accepted

Release of Retention

50% with the final bill. Balance 50% on expiry of


defects liability period of 1 year subject to
deduction of amount paid for rectification of any
defects by the client.

Accepted

Accepted

Accepted

Accepted

Performance guarantee

Contractor shall furnish performance guarantee


in the form of a bank guarantee of a value equal
to 10% of the contract value less the value of
materials supplied by the client.

Accepted

Accepted

Accepted

Accepted

Mobilization Advance

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

8
9
11

10% of contract value will be paid as mobilisation


advance on production of bank guarantee for the
same amount.
Recovery of Mobilization Mobilisation advance paid shall be recovered
Advance
from Ist RA bill on pro-rata basis.
12 (Twelve) months from the date of issue of
Defect Liability Period
virtual completion certificate from client.
0.5% of value of contract per week of delay,
Liquidated damages
subject to maximum of 5% of the value of
contract.
1% of the value of work pending in the milestone
event shall be withheld (interest free) from
running bills

12

Milestone Penalty

13

Site
offices
/
Vendor scope
Godowns/Labour campus

Power shall be provided by the Client at one


point on chargeable basis; respective vendor has
to do the required cabling & metering for tap the
power supply from one point. The contractor, if
need be, shall install a diesel generator set of
required capacity to augment or replace the
power obtained from electricity board for
construction and administrative purposes. The
cost of such installation and running (including
consumables operational cost) the DG set shall
be entirely borne by the contractor.
*Contractor should inform client peak load
requirement before the commencement of work.
Any delay in the progress of work due to nonavailability of power shall not be acceptable.

14

Power & water supply

15

On award of work, the day of commencement


Date of commencement of
date shall be mutually discussed between Client
works
& contractor.

A.N.Prakash CPMC Pvt. Ltd.

P: 5/8

Sl. #
16

17

Sub Heads

As per TENDER

Submission of RA bills

Interim bill: Advance payment certification of 50%


of RA bill value within 10 (Ten) days and full
certification within 21 (twenty one) working days
from the date of complete bill submission and as
per the approved format will be done by Engineer
incharge/site incharge
Final bill: Within 90 (Ninty) days from the
submission of complete bill.

Certification of bills

18

Payment terms

19

Final Bill

Final bill: Within 90 (Ninty) days from the date of


receipt of payment certificate from the Engineer
In Charge.
A. Supply
60%against delivery of materials at site.
30% against Erection.
10% against testing, commissioning & Handing
over
B. Installation.
* 90% against Installation
* 10% against testing,commissioing & handing
over

20

Payment terms

21

Tax shall be deducted at source in accordance


with the statutory requirements from all payments
Taxes deduction at source
made to the contractor, including that in respect
of the mobilisation advance, if paid.

22

Price Validity

23
24
25

Extra works
Safety
Insurances / Policies

The quoted price in the tender is to be held firm


throughout, till the project is completed.
As per Tender
Applicable
Contractor scope

26

Taxes

Applicable

28
29
30

Statutory Variations
taxes, levies, etc.
ESI / PF
Labour cess
Makes of equipment

M/s.Flutech Electricals

M/s.Veeresh Electricals

M/s.Megatron

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Contractor shall submit RA bills Once in a month.

Interim bill: Advance payment within 10 (Ten)


days from the receipt of certificate of EIC/Site
team and balance payment shall be paid with all
recoveries within 21 (Twenty One) days from the
date of receipt of payment certificate from the
EIC/site team and all statutory compliances (like
ESI,PF etc., details for specific period.

27

M/s.Grid Electricals

Taxes are shown seperately,


Any increase in the taxation will
be implemented accordingly.
Accepted

Accepted

Accepted

Accepted

Accepted
Accepted
Accepted

Accepted
Accepted
Accepted

Accepted
Accepted
Accepted

Accepted
Accepted
Accepted
Taxes are shown separately.
Any increase in the taxation will
be implemented accordingly.

like
Contractor scope
Applicable
As per Tender

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

Accepted

A.N.Prakash CPMC Pvt. Ltd.

P: 6/8

Sl. #

Sub Heads

As per TENDER

M/s.Grid Electricals

M/s.Flutech Electricals

M/s.Veeresh Electricals

M/s.Megatron

31

Test certificates.

Required test certificates from manufacturer to


be handed over to client.

Required test certificates from


manufacturer to be handed
over to client.

Required test certificates from


manufacturer to be handed
over to client.

Required test certificates from


manufacturer to be handed over to
client.

All relevant test certificates and


test reports issued by
manufacturers/ vendors and in
house testing pertaining to
materials will be handed over to
you as a part of project
document. Additional intensive
testing from external agencies
like CPRI, Civil Aid etc. has not
been included in this quote and
will be at an additional cost

32

Exclusions

Civil works ( Foundation for equipments )

Civil works ( Foundation for


equipments )

Civil works ( Foundation for


equipments )

Civil works ( Foundation for


equipments )

All civil works are excluded from our


scope.

Considered single compression


glands with Al lugs for Al cables
and Cu lugs for Cu cables
33

Others

*Quoted rate does not include


deposits as we require to know
the sanctioned load.

A.N.Prakash CPMC Pvt. Ltd.

P: 7/8

PROJECT : PROPOSED PRESIDENCY UNIVERSITY B.SCHOOL


SUBJECT : LIST OF MAKES
S/L#

Material

As per Tender - Make

M/s Grid Electricals

M/s Flutech Electricals

M/s Veeresh Electricals

M/s Megatron

Transformer

: Kamath/Vijay/Universal

: Kamath/Vijay/Universal

: Kamath/Vijay

: Kamath

: Vijay

MCB & DB's

: LEGRAND/Schneider/ABB

: LEGRAND/Schneider/ABB

: LEGRAND/Schneider/ABB

: LEGRAND/Schneider/ABB

: LEGRAND/Schneider/ABB

MCCB

: LEGRAND/Schneider /ABB

: LEGRAND/Schneider /ABB

: LEGRAND/Schneider /ABB

: LEGRAND/Schneider /ABB

: LEGRAND/Schneider /ABB

LT/HT cable

: Unistar/ KEI/RPG/havells

: Unistar/ KEI/RPG/havells

: KEI

: Havells

: KEI

Wires

: Anchor / RR /havells/Walna

: Anchor / RR /havells/Walna

: Anchor / RR /havells/Walna

: Anchor / RR /havells/Walna

: Anchor / RR /havells/Walna

HT Metering Cubical

: Bhanavathy

: Bhanavathy

: Bhanavathy

: Bhanavathy

: Bhanavathy

Cable glands and lugs

: Dowells/Multi

: Dowells/Multi

: Dowells/Multi

: Dowells

: Dowells/Multi

Meters

: MECO/RISHAB

: MECO/RISHAB

: MECO/RISHAB

: MECO/RISHAB

: MECO/RISHAB

Indicating lamp

: Technic/Siemens

: Technic/Siemens

: Technic/Siemens

: Technic/Siemens

: Technic/Siemens

10

Selector switch

: Kaycee/Salzer

: Kaycee/Salzer

: Kaycee/Salzer

: Kaycee/Salzer

: Kaycee/Salzer

11

ELR

: Prok Device / Enercon

: Prok Device / Enercon

: Prok Device / Enercon

: Prok Device / Enercon

: Prok Device / Enercon

12

Capacitors

: Ducati / Epcos

: Ducati / Epcos

: Ducati / Epcos

: Ducati / Epcos

: Ducati / Epcos

13

C.T & P.T

: Kalpa / Paras.

: Kalpa / Paras.

: Kalpa / Paras.

: Kalpa / Paras.

: Kalpa / Paras.

14

L.T Panel

: SB Enterprise (9448477089)
JMJ Switch Gears (8884569411)

: SB Enterprise (9448477089)
JMJ Switch Gears (8884569411)

: SB Enterprise (9448477089)

: SB Enterprise (9448477089)

: SB Enterprise (9448477089)

15

HT Panel

: GE/ABB/Schneider

: GE/ABB/Schneider

: ABB

: ABB

: GE/ABB/Schneider

16

Insulators

: BHEL/Jayashree

: BHEL/Jayashree

: BHEL/Jayashree

: BHEL/Jayashree

: BHEL/Jayashree

A.N.Prakash CPMC Pvt. Ltd.