Você está na página 1de 41

LAMAQUE DEEP

THE NEXT FRONTIER

TSXV: ICG
1

FORWARD LOOKING STATEMENT


No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained on this presentation.
This presentation contains "forward-looking information" concerning Integra Gold Corp.s (Integra or the Company) future financial or operating
performance and other statements that express management's expectations or estimates of future developments, circumstances or results.
Generally, forward-looking information can be identified by the use of forward-looking terminology such as seeks, "believes", "anticipates", "plans",
continues, "budget", "scheduled", "estimates", "expects", "forecasts", "intends", projects, predicts, proposes, "potential", targets and
variations of such words and phrases, or by statements that certain actions, events or results "may", "will", "could", "would", should or "might" "be
taken", "occur" or "be achieved". Forward-looking statements included in this presentation include statements regarding potential mineralization and
mineral resources, the proposed mining scenario for the Lamaque Gold Project, including information with respect to the supporting infrastructure,
the potential life of mine, rates of employment and the effects of steps taken to mitigate local impacts and the expected completion dates of
exploration and drilling, exploration results, estimated and future exploration and administration expenditures, the completion of scoping studies,
preliminary economic assessment, pre-feasibility or feasibility studies, and future plans and objectives of Integra. While all forward-looking statements
involve various risks and uncertainties, these statements are based on certain assumptions that management of Integra believes are reasonable,
including that it will be able to obtain financing and on reasonable terms, that its current exploration and other objectives can be achieved, that its
exploration and other activities will proceed as expected, that its community and environmental impact procedures will work as anticipated, that
general business and economic conditions will not change in a material adverse manner, that Integra will not experience any material accident, labour
dispute or failure or shortage of equipment, and that all necessary government approvals for its planned exploration and potential development
activities will be obtained in a timely manner and on acceptable terms. There can be no assurance that the forward-looking statements will prove to
be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause
actual results to differ materially from the Integras expectations include, among others, the actual results of current exploration activities being
different than those anticipated by Integra, changes in project parameters as plans continue to be refined, changes in estimated mineral resources,
future prices of metals, increased costs of labor, equipment or materials, availability of equipment, failure of equipment to operate as anticipated,
accidents, effects of weather and other natural phenomena, risks related to community relations and activities of stakeholders, and delays in
obtaining governmental approvals or financing. Although Integra has attempted to identify important factors that could cause actual results to differ
materially, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such
statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly,
readers should not place undue reliance on forward-looking statements. Integra does not intend, and expressly disclaims any intention or obligation
to, update or revise any forward-looking information or statements whether as a result of new information, future events or otherwise, except as
required by law.
Herv Thiboutot, Eng., Senior Vice President, and Francois Chabot, Eng., Operation Manager, are the qualified person for the Company under National
Instrument 43-101, and have reviewed and approved all of the scientific and technical information contained in this presentation. The Company has
prepared NI 43-101-compliant technical reports for the Lamaque Property, respectively released on January 13 and February 10, 2015, which are
available on its website or at www.sedar.com. These technical reports include relevant information regarding the effective date and the assumptions,
parameters and methods of the mineral resource estimates on the Lamaque Property contained in this presentation and provide details on the
Preliminary Economic Evaluation. The mineral resource estimates stated in the presentation were prepared by independent consultants in accordance
with NI 43-101. A Qualified Person has not done sufficient work to classify the historical resources estimates contained in this presentation as current
mineral resources and the Company is not treating such historical estimates as current mineral resources. The historical mineral resources mentioned
in this presentation may not be conform to the NI 43-101 and should not be unduly accepted.
2

INTRODUCTION & HIGHLIGHTS


6 TERABYTES of digital mining and exploration data, comprising 75 years of mining history at
the Sigma and Lamaque Mines, was acquired in October 2014 by way of the Sigma/Lamaque
Mines and Mill Acquisition.

5 YEARS & $5M spent by the previous owners on the compilation of this data, including over
30,000 drill holes, hundreds of thousands of gold assays, hundreds of kilometers of underground
workings, mining statistics, geological sections, level plans, and photos. This data has never been
fully analyzed or used for exploration targeting until now.

PROOF-OF-CONCEPT data-points and intercepts have been uncovered by Integra,


highlighting numerous new areas and extensions of mineralization at Sigma and Lamaque that
remain untested.

LAMAQUE DEEP

the down-dip extension of the Lamaque Mine, below 1,100 meters vertical, is
the most obvious target. The Lamaque Mine was once Qubecs largest gold mining operation
between 1955 to 1985 and was host to one of the highest ounce-per-vertical-meter gold
deposits (4,000 oz Au / meter) in the Abitibi Greenstone Belt, one of the richest gold belts in the
world.
3

PRESENTATION OUTLINE

1. LOCATION
2. GEOLOGICAL SETTING, MODEL & CONCEPT
3. HISTORICAL PRODUCTION
4. HISTORICAL DATA GATHERING/INTERPRETATION
5. DATA INTEGRATION/3D MODELLING
6. LAMAQUE DEEP HISTORIC DRILLING
7. TARGET CONCEPT SUMMARY
8. RESOURCE POTENTIAL
9. ACKNOWLEDGEMENT
4

PROPERTY LOCATION

VAL-DOR

PROPERTY LOCATION

SIGMA

LAMAQUE

TRIANGLE
6

PRESENTATION OUTLINE

1. LOCATION
2. GEOLOGICAL SETTING, MODEL & CONCEPT
3. HISTORICAL PRODUCTION
4. HISTORICAL DATA GATHERING/INTERPRETATION
5. DATA INTEGRATION/3D MODELLING
6. LAMAQUE DEEP HISTORIC DRILLING
7. TARGET CONCEPT SUMMARY
8. RESOURCE POTENTIAL
9. ACKNOWLEDGEMENT
7

DISTRICT GEOLOGY

REGIONAL GEOLOGY

LOCAL GEOLOGY

10

COMPOSITE SECTIONAL VIEW LOOKING EAST

11

GEOLOGY & STRUCTURAL MODEL

Fractured dioritic to
tonalitic intrusions with
injections of auriferous
quartz-tourmalinepyrite veins
Ductile and brittle shear
veins, horizontal
tension veins

POTENTIAL OF REPETITION
AND EXTENSION OF VEINS
LATERALLY AND AT DEPTH
12

TYPICAL MINERALIZATION AT SIGMA AND LAMAQUE

Brittle & Tension Veins (Flats) in G Dyke

Horizontal Vein

Sub-Vertical Shear Hosted Vein

13

LAMAQUE DEEP TARGET & CONCEPT (LOOKING EAST)


Historical Boundary
Sigma #2

Lamaque #6-7 #3 #4

Lamaque Level 1 to 10

Sigma Level 1 to 10
Winze #1

C Porphyry
Diabase
Diorite
Sigma Level 11 to 20
G-Dyke
Granodiorite
Sigma-diorite
Vein
Tuff
Lava

Lamaque Level 11 to 23
Winze #2

Lamaque Level 24 to 36
Shaft Depth 1,100m

Sigma Level 21 to 30

Level 30th

Sigma Level 31 to 40
Shaft Depth 1,830m

Projection of the
Mineralized Zones

Deep Lamaque
Unexplored area
Minimum of 730m
vertical

14

PRESENTATION OUTLINE

1. LOCATION
2. GEOLOGICAL SETTING, MODEL & CONCEPT
3. HISTORICAL PRODUCTION
4. HISTORICAL DATA GATHERING
5. DATA INTEGRATION/3D MODELLING
6. LAMAQUE DEEP HISTORIC DRILLING
7. TARGET CONCEPT SUMMARY
8. RESOURCE POTENTIAL
9. ACKNOWLEDGEMENT
15

SIGMA-LAMAQUE HISTORICAL PRODUCTION


TOTAL PRODUCTION FIGURES FOR THE SIGMA AND
LAMAQUE MINES TO THE END OF APRIL, 2011

*
*majority open-pit mining

TOTAL PRODUCTION FIGURES FOR THE MAIN AREAS


OFforTHE
LAMAQUE
Total Production Figures
the Principal
MiningMINE
Areas of the Lamaque Mine
Mining Area
Main Plug
East Plug
West Plug
No. 2 Mine
No. 3 Mine
Total

Tonnes
18,166,848
2,721,397
1,491,952
1,482,775
318,560
24,151,963

Gold Grade (g/t) Ounces Produced


6.34
3,695,194
3.94
343,827
4.56
219,014
4.97
237,596
6.30
58,536
5.86
4,554,167

16
Micon, 2011

PRESENTATION OUTLINE

1. LOCATION
2. GEOLOGICAL SETTING, MODEL & CONCEPT
3. HISTORICAL PRODUCTION
4. HISTORICAL DATA GATHERING
5. DATA INTEGRATION/3D MODELLING
6. LAMAQUE DEEP HISTORIC DRILLING
7. TARGET CONCEPT SUMMARY
8. RESOURCE POTENTIAL
9. ACKNOWLEDGEMENT
17

TYPICAL PLAN VIEW LAMAQUE (LEVEL 24 2400)

Vein #35
Vein #32

Vein #56
Vein #27N

Vein #27

Vein #39

300 m
18

TYPICAL PLAN VIEW SIGMA (LEVEL 30 4050)

17038
9.11 g/t Au
over 11.95 m
Vein 46N

Vein 46
100
m

19

HISTORIC STOPE 22 IN MAIN PLUG LOOKING WEST

4.13 Au g/t over 43.13m

70 m

20 m

20

PRESENTATION OUTLINE

1. LOCATION
2. GEOLOGICAL SETTING, MODEL & CONCEPT
3. HISTORICAL PRODUCTION
4. HISTORICAL DATA GATHERING
5. DATA INTEGRATION/3D MODELLING
6. LAMAQUE DEEP HISTORIC DRILLING
7. TARGET CONCEPT SUMMARY
8. RESOURCE POTENTIAL
9. ACKNOWLEDGEMENT
21

VEIN, PLUG & DRILL HOLE INTERPRETATION


17038
9.11 g/t Au
sur 11.95 m

Vein 46N

Vein 46

Plug interpretation using


DDH lithology information

Veins interpretation using Au assays


and shear zones/veins
observation in log; interpreted in
plan

Vein 44N
100m

Vein 44
22

PROOF-OF-CONCEPT
LAMAQUE & SIGMA UNDERGROUND OPENINGS
Lamaque

Sigma
N

Minimum
730m

Target:
Lamaque Deep
Unexplored area

Open at depthusing
below both mines
Plug interpretation
DDH lithology information
100 m

23

LAMAQUE PLUGS:
FAVORABLE INTRUSIVE HOST ROCKS
Lamaque

Sigma
N

West Plug

Main Plug

Plug interpretation using


DDH lithology information

100 m

24

KNOWN MINERALIZED SHEAR ZONES


Lamaque

Sigma
N

Plug interpretation using


DDH lithology information

100 m

25

EXISTING DRILL HOLES IN DEEP LAMAQUE EXTENSION


Lamaque

Sigma
N

LIMITED DRILLING

McWatters (1997-2003)
Incomplete target compilation
Limited holes in intrusive
Plughost
interpretation

using
DDH lithology information

100 m

26

MAIN LAMAQUE PLUG PROJECTION


Lamaque

Sigma
N

West Plug
Main Plug

Plug interpretation using


DDH lithology information

100 m

27

SIGMA MINERALIZED SHEAR ZONES PROJECTION


Lamaque

Sigma
N

Vein 44

Plug interpretation using


DDH lithology information
Zone M

Vein 46

100 m

28

PRESENTATION OUTLINE

1. LOCATION
2. GEOLOGICAL SETTING, MODEL & CONCEPT
3. HISTORICAL PRODUCTION
4. HISTORICAL DATA GATHERING
5. DATA INTEGRATION/3D MODELLING
6. LAMAQUE DEEP HISTORIC DRILLING
7. TARGET CONCEPT SUMMARY
8. RESOURCE POTENTIAL
9. ACKNOWLEDGEMENT
29

SELECTED DRILL HOLES DEEP LAMAQUE


Sigma

Lamaque

Open at depth below


both mines
Plug interpretation
using
DDH lithology information
100 m

30

SELECTED DRILL HOLES DEEP LAMAQUE


4.51 g/t Au
over 0.91m

4.18 g/t Au
over 3.08m

Plug interpretation using


DDH lithology information

100 m

31

SELECTED DRILL HOLE INTERCEPTS DEEP LAMAQUE

DDH
17112*
including

17383*
including
including

17384
17431*
including
which includes

17911
17912

From (m)
491.3
494.9
113.9
113.9
136.0
21.6
131.7
134.3
137.8
6.2
35.5

To (m)
503.5
499.2
141.0
121.9
138.7
29.6
224.4
152.4
147.9
7.2
38.6

Au (g/t)
Length (m)
6.94
12.1
16.44
4.3
2.72
27.1
4.96
8.0
6.66
2.7
1.15
7.9
1.36
92.6
2.74
18.1
3.66
10.1
4.51
0.9
4.18
3.1
* in red, shown in next slides

Plug interpretation using


DDH lithology information

100 m

32

DRILL HOLE 17112 - EAST OF MAIN PLUG

6.94 g/t Au over


12.1 m

Including
16.44 g/t Au over 4.3 m

Plug interpretation using


DDH lithology information

100 m

33

DRILL HOLE 17383 - WEST OF MAIN PLUG

2.72 g/t Au
over 27.1 m

Including
4.96 g/t Au over 8.0 m

Including
6.66 g/t Au over 2.7 m

Plug interpretation using


DDH lithology information

100 m

34

DRILL HOLE 17383 - IN MAIN PLUG

Including
2.74 g/t Au over 18.1 m

1.36 g/t Au over


92.6 m

Which includes
3.66 g/t Au over 10.1 m

Plug interpretation using


DDH lithology information

100 m

35

PRESENTATION OUTLINE

1. LOCATION
2. GEOLOGICAL SETTING, MODEL & CONCEPT
3. HISTORICAL PRODUCTION
4. HISTORICAL DATA GATHERING
5. DATA INTEGRATION/3D MODELLING
6. LAMAQUE DEEP HISTORIC DRILLING

7. TARGET CONCEPT SUMMARY


8. RESOURCE POTENTIAL
9. ACKNOWLEDGEMENT
36

LAMAQUE DEEP TARGET CONCEPT SUMMARY


SIGMA-LAMAQUE

World Class deposits

LAMAQUE DEEP

Target area contains all the gold bearing structures and favorable host rocks from both mines:
Plugs as a favorable intrusive host rock, dipping northeast towards the Sigma mine
Similar quartz-tourmaline-pyrite veining and related shear zones
The projection of mineralized shear zones from Sigma are dipping southward towards the
Lamaque intrusive plugs

CONCLUSION

Highlights an unexplored target area below 1,100 meters vertical at Lamaque Mine
Area subjected to extremely limited past drilling within a largely unexplored volume of rock
Target is a minimum of 730m vertical by 600m North-South by 700m East-West
Lamaque and Sigma mines unexplored below 1,100m and 1,830m vertical, respectively
Significant gold grades reported in historic drill holes which were not drilled at optimal
orientations
Recovered gold bearing intercepts give strong evidence of continuity at depth
Sigma and Lamaque gold bearing structures likely to extend beyond 1,830m vertical, at depth
and laterally

Plug interpretation using


DDH lithology information

100 m

37

PRESENTATION OUTLINE

1. LOCATION
2. GEOLOGICAL SETTING, MODEL & CONCEPT
3. HISTORICAL PRODUCTION
4. HISTORICAL DATA GATHERING
5. DATA INTEGRATION/3D MODELLING
6. LAMAQUE DEEP HISTORIC DRILLING
7. TARGET CONCEPT SUMMARY

8. RESOURCE POTENTIAL
9. ACKNOWLEDGEMENT
38

LAMAQUE DEEP RESOURCE POTENTIAL

DEEP TARGET PARAMETERS

2,100 oz per vertical meter mined at Sigma


4,100 oz per vertical meter mined at Lamaque
3,400 oz per vertical meter mined in Lamaque
Main Plug

LAMAQUE DEEP BLUE SKY TARGET POTENTIAL

730m to +1,000 m extension


Val-dOr mines over 3,000m currently operating
(eg. Laronde Mine)
No geological evidence of system having depth
limitations

100 m

39

THE PLAN
PHASE 1 Initial Data Compilation (completed)
Commenced October 2014
Results announced June 2015

PHASE 2 Detailed Database Construction (Q3 2015)

Contracted to InnovExplo Inc, Val-dOr


Integration and validation of historic data
Coordinate-grid standardization and georeferencing
Data entry of missing information
Digitization of data into global database
Construction of 3D solids from historic 2D data
Integration of regional information (geophysic, geology, etc)
Production statistics (tonnage and grade by stope)

PHASE 3 Targeting (Q4 2015)


PHASE 4 Exploration (2016+)

100 m

40

ACKNOWLEDGEMENT

INNOVEXPLO FROM VAL-DOR

Database compilation and validation


goCad 3-D modelling
Presentation support

GEOLOGICA Inc. FROM VAL-DOR


Presentation support
Lamaque South compilation

TECK, DOME MINES, PLACER DOME AND OTHERS


Over 75 years of mining and data-gathering

LAMAQUE DEEP
41

Você também pode gostar