Você está na página 1de 5

RESUME OF KEY PERSONNEL

Name: Muhammad Shahid


0590127468

Proposed Position:

QC Engineer (E & I)

Mobile #

Minimum Qualification and Experience:


Working Limit: 5 Years
Discipline: Electrical Engineering:
English Speaking Capabilities:

Education:
School

written and spoken English

Dates in Attendance

Govt. College of Technology Bahawalpur.

2006- 2009

Degrees/Certification
Diploma of Associate

Engineer(Electrical)
The university of Lahore

2010-2014

Bachelor of science

in Electrical Technology
Punjab Pakistan.
CAREER OBJECTIVE:

Challenging careers in Electrical Engineering field where I can utilize and hone my skills, learn upcoming
advanced technologies and evolve along with the firm I work for.
Educational qualification:
Bachelor of Science Engineering &technology from the University of Lahore Pakistan- Diploma of
associate engineer from Government College of technology Bahawalpur, Pakistan.
Software Proficiency: Efficient awareness of Computers, Software installation, well at computer Operation,
Sufficient knowledge of internet concepts, etc.
Operating systems: Windows 8.1&10, MS Office.
Experiences in Saudia.
1) Electrical QC
Company

Duration: from 01/3/2015 to 2/10/2015


CCCC (China Communications Construction Company)

Experiences in Pakistan:
1) Electrical Engineer

Company:
Project:
Area of Interest:

Duration: from 01/02/2013 to 2/1/2014


Kot Addu Power Company Limited (Pakistan)
Electrical maintenance

Control and Maintenance of Electrical installations, switchgear, Machines & plant maintenance.

Experiences:
Expediting & inspection on vendor works, Pending issues from vendor and sub vendor,
engineering & drawing issues, follow up the status of in house and sub orders materials & followup fabrication schedule
Collect shipping information and delivery point information.
Inspect the items dimensionally and visually as per data sheet.
Monitor and inspection of equipments which are installed (distribution system) to ensure the
continuous power supply.
Planning and monitoring field survey of 33/11kv distribution sub station, and its distribution lines
for execution of works.
Prepare monthly reports, work schedule reports, area reports and safety topic briefings. Conduct
safety audits for all the sites where the works are undertaken.
Conduct installation resistance tests for cables of power control and instrumentation.
Monitor and attend operation review and maintenance planning meetings. Emergency plan and
planned activities based on operational priorities, arrange/procure material, and coordinate for
smooth execution of the jobs, supervise the technicians at the field personnels to resolve technical
issues.
Supervision and monitor transformers installation in the power plants and protection of it in power
systems.
Monitor the Underground installations (such as Duct Bank and plant earthing) and inspection of
the required burial depth and spacing requirements to adjacent installations and inspection, prior
to backfilling. Erection and commissioning of MV, LV switch gear
Inspection and monitor stepping-up the voltage for transmission at generating stations and for
stepping down voltage for further distribution at main step-down transformer substation.
Monitor Transformers damaged or burst out with external faults inrush, and over excitation
conditions.
Survey at field and the activities, resolve the technical construction and quality issues, whenever
occurs.
To ensure work complies with project standards and specifications which involves inspection and
checks for installations of conduits, cable trays, cable pulling and testing of power/ control
instruments cable and all relative electrical works.
Performed Inspections, testing and proper documentation to ensure correct and proper installation
of electrical systems which includes wiring termination, meggering functional checking of switch
gears, bus bars, motors, transformers, battery/ups, fire alarm panel, control systems.
Responsible for Selecting and mobilizing batches for commissioning of work at the site of
distribution system. Pre-commissioning of Motor Control Circuits (MCC) & preparation of
Quality Assurance and Quality control Plan as per Field Quality Control Plan, Issued construction
drawings and Specification.
Responsible for the over-all implementation of Quality Control related electrical works
accordance with project specifications and Engineering Standards. Verify the equipment and
devices used in the project meets the required specifications per project requirements, Standard
and tested in accordance with the procedures.

Witness the testing of all electrical devices grounding systems, cable Insulation test and make sure
it is acceptable to the proponent.
Monitor the Underground installations; check the required burial depth and spacing requirements
to adjacent installations, prior to backfilling.
Monitoring control panel wiring, Termination, cable routing & cable tray installation.
Review all necessary documents required for the turnover of the project package. Involved in
installation and pre-commissioning of the transformers, switchgears, motors, ups, fire alarm
systems, cable trays, and conduits works..
Coordinate with client representatives regarding the Implementation and quality of works.
Supervision of the actual installation of Electrical terms such as Raceways installation,
Grounding, Cable pulling and Laying, Duct Bank of HV and LV cables.
Provide drawing, site instruction, modification to the subcontractor for any revision on installation
of electrical works other than documents issued for construction and keep updating their
accomplishment daily.
Witness with Substation Transformer and Switchgear installation tests & commissioning
activities.
Test and Commissioning of MOVs , Motors, Local control station and Lighting Fixture
Verify the equipment and devices in the Project meets the required specification and have been
tested in accordance with the standard procedures.
Perform and supervise the testing of all electrical devices, grounding systems, cable measuring
and make sure it is acceptable to the Proponent.
Supervise the installation of the LV/MV Panel board, Switchboard, Conduit and Fitting Boxes.
2) Position

Electrical Engineer
Company

Duration: Duration: from 01/02/2012 to 28/12/2012


Moiz textile mills limited Lahore Pakistan

Specific Duties and Responsibilities/Scope of Work:


Prepare all inspection documents & getting the material inspected.
Conduct regular meeting with area in-charge, E&I construction manager and consultants, and
problem solving for technical/quality aspect, materials, schedule and others related project
problems.
All documentation work required in construction work.
Follow the installation works as per clients standard and approved technical drawings and work
programs.
All testing, pre-commissioning works follow the standard procedures and getting the test
certificates till handing over.
Supervision, monitoring for underground cable pulling, main ladder tray installation, instrument
stanchion installation, secondary tray installation, secondary cable pulling, instrument
installation, loop checking.
Organizing the team for job. Output deliverable, Co-ordination with inter department.
Supervision of various Instrument as per loop diagram, wiring inter connection diagram. Cable
trench location lay out, cable schedule.
Checking of solenoid valves, temp Elements RTD & Thermocouple.
Continuity check, loop check and then system check.

3) Position: E& I Engineer

Duration: from 02/02/2009 to 01/01/2010

Company: MEPCO (Multan electric power company Multan)


Specific Duties and Responsibilities/Scope of Work:
Performed Inspections, testing and proper documentation to ensure correct and proper installation
of electrical systems which includes wiring termination, meggering functional checking of switch
gears, bus bars, motors, transformers, battery/ups, fire alarm panel, control systems.
Responsible for Selecting and mobilizing batches for commissioning of work at the site of
distribution system. Pre-commissioning of Motor Control Circuits (MCC) & preparation of
Quality Assurance and Quality control Plan as per Field Quality Control Plan, Issued construction
drawings and

Specification.

Responsible for the over-all implementation of Quality Control related electrical works accordance
with project specifications and Engineering Standards. Verify the equipment and devices used in
the project meets the required specifications per project requirements, Standard and tested in
accordance with

the procedures.

Experience in overhauling/ calibrating/ testing/ commissioning/ maintenance/ loop checking and


trouble shooting of industrial/process control.
Supervision of various instrument involved in the installation calibration of various field
instrument like transmitter (Pressure &Temperature transmitter).
Trouble shooting of field instrument, panel instrument.
Open loop, close loop checking.
Familiar in hand held communicator and level troll.
PERSONAL STRENGTH AND ATTRIBUTES:

Positive, responsible and highly motivated person with ability to establish goals and work
enthusiastically towards their achievement.
Strong ability and willingness to learn things quickly.
Ability to work effectively both independently in Quality and Construction and in a team
environment.
Keen to gain knowledge, develop skills, mature and confident.
Ability to prioritize and organize workloads and complete projects within specified time frames.
Result oriented, hardworking, quick learner and problem solver.
Possess consistency, patience, persistence, and effective Presentation, Excellent Verbal and Written
communication skills.

Strong analytical and reasoning skills.


Strong communication, interpersonal, learning and organizing skills matched with the ability to
manage stress and time efficiently.

PERSONAL PROFILE
Name
Date of Birth
Place of Birth
Gender
Nationality
Religion
Marital Status
Passport No.
Iqama No.
Languages known

:
:
:
:
:
:
:
:
:
:

Muhammad Shahid
1.04.1990
Bahawalpur, Pakistan
Male.
Pakistani
Islam
Unmarried
BW5154431
2391256308 (Transferable)
English, Urdu

Você também pode gostar