Item No

Description

No

L/R
m

B/r
m

H
m

Earthwork in Excavation depth


upto 2.65 m below G.L

10.3

10.3

2.95

4.9

0.5

0.15

1
1
1

4.9
4.9
2.55

0.5
3.05
0.5

0.15
0.35
0.35

56
56
1

4.5
2.75
424.4794

0.016
0.016
0.01

0.45

42
632

0.012
1.26292

0.008

19.16372

0.5

12
144

19.16372
2.1

0.016
0.01

19.16372

0.45

16
2
4
144

19.16372
19.16372
19.16372
2.1

0.016
0.01
0.008
0.01

24

2.8

0.25

Foundation
PCC Mat
Concrete
Rectangular portion
Triangle 1
Triangle 2
Steel
Radial A
Radial B
Circumferencial
Sand filling
Column
Concrete
Steel
Longitudunal steel
Stirrups

4
4a.

Ring beam
Foundation
Concrete
Steel
Longitudinal steel
Stirrups

4b.

Over Columns
Concrete
Steel
Longitudinal steel
Side face reinforcement

4c.
5

Stirrups
Braces
Concrete
Steel
longitudinal steel

20.35

21.1

0.7

0.75

0.6

1st
2nd
3rd
4th
Stirrups
6

Bottom Dome
Concrete
Steel
Bottom mesh
Top radial
Top circumferencial
Top Dome
Concrete
Steel
Bottom mesh
Top radial
Top circumferencial
Side walls
Concrete
Steel
Hoops
0 to 0.34
0.34 to 0.7
0.7 to 1.12
1.12 to 1.46
1.46 to 1.82
1.82 to 2.24
2.24 to 2.6
2.6 to 3.04
3.04 to 3.85
3.85 to 4.2
Vertical rods
Edge beam stirrups
Cone wall
Concrete
Steel
Radial
Hoop

36
24
24
12
24
24
336

2.8
2.8
2.8
2.8
2.8
2.8
0.75

6.15

57
234
5

6.15
0.75
5.775

9.13

85
348
5

9.13
0.85
8.705

0.008
0.008
0.008

27.17478

0.15

4
4
4
4
4
4
4
4
6
6
259
91

27.17478
27.17478
27.17478
27.17478
27.17478
27.17478
27.17478
27.17478
27.17478
27.17478
4.2
0.5

0.012
0.012
0.012
0.01
0.01
0.01
0.008
0.008
0.008
0.008
0.008
0.008

22.14823

0.2

246.09142 1.767767
34.00
22.14823

0.012
0.016
0.016
0.01
0.016
0.01
0.08

0.15
0.01
0.008
0.008

0.125

0.008
0.012

4.2

1.767767

10

10a.

10b.

11

13

Staircase
Concrete
Concrete slab
Concrete stairs
Steel
Main bars
Distribution
Top-main
Top-distribution

8.5
85

2.86
0.45

0.45
0.17

51
81
102
45

2.86
0.45
0.8
0.45

0.01
0.008
0.01
0.008

0.11
0.235

Landing
Concrete
Steel
Steel bottom main
Steel bottom distribution
Steel top main
Steel top distribution

0.9

0.45

54
27
54
45

0.9
0.45
0.9
0.45

0.01
0.008
0.01
0.012

Railing
25 dia GI pipe along staircase
25 dia GI pipe along landing
L Iron post

17
18
18

2.86
0.9
0.05

0.025
0.025
0.006

2
15

3.84
0.6

0.11
0.25

0.25
0.05

8
19.2

3.84
0.26

0.016
0.008

45
60

0.6
0.2

0.008
0.008

3.84

0.025

5.3

4.4

169
169

0.9
0.9

0.008
0.008

30.47345

0.012

RCC ladder
Concrete
Concrete - braces
Concrete - steps
Steel
Steel - braces
Longitudinal
Stirrups
Steel - Steps
Longitudinal
Stirrups
Railing
25 dia GI pipe along staircase
Balcony slab
Concrete
Steel
Radial
Top
Bottom
Circumferencial
Top

0.11

0.15

Bottom

30.47345

0.012

Quantity
cum

total steel in (cum)

312.97

11.20
11.20
8.09
3.44
0.051
0.0310
0.03
279.05

0.1149696802

19.42

0.10
0.04

0.1403203085

6.71

0.05
0.02

0.0699875632

6.47

0.062
0.0030
0.00385
0.0238

10.08

0.0922632603

0.0114
0.0135
0.0135
0.0026
0.0135
0.00528
1.267

1.3265412679

4.4558583053
0.0276332298
0.035315239
0.0014514158

0.0643998846

8.1835445208
0.0389765097
0.0594176504
0.0021878051

0.1005819652

17.1201091657

0.0122935792
0.0122935792
0.0122935792
0.0085372078
0.0085372078
0.0085372078
0.005463813
0.005463813
0.0081957195
0.0081957195
0.05463813
0.0022765887

0.1467261448

7.8305811785
0.0218671078
0.0851667903

0.1070338981

1.203345
0.76404375
0.0114558176
0.0018329308
0.006408849
0.0010254158

0.0207230133

0.40095
0.0038170351
0.0006107256
0.0038170351
0.002290221

0.0105350168

0.0238662867
0.0079521564
0.0054

0.0372184431

0.2112
0.1125

0.0061766225
0.0002509253

0.0064275478

0.001357168
0.0006031858

0.0019603538

0.0037699112

0.0037699112

4.1139155799

4.1139155799

0.007658813
0.007658813

0.015317626

0.0206787951

0.0379111244

0.0172323293
6.4106025892

Explanatory notes
Assuming square pit for excavation with total clearance of 500mm
on either side; 300 mm sand filling at base

Outer radius - R, Inner radius - r. thickness - H


Including column width
Excluding column width
Excluding column width
L - With bend at both ends, r - radius of bar
L - With inclined bend at both ends, r - radius of bar
L - Running length of circumferencial steel, r - radius of bar

Summary
R - diameter of columns, H- Height of columns

R - diameter of roda, H- lenght of rods


L - Length of stirrups, r - diameter of rods

L - developed length, B - width of beam, H - Depth of beam

L - developed length, r - diameter of rods


Assume effective cover 25 mm, L- length of stirrups, r - diameter of rods

L - developed length, B - width of beam, H - Depth of beam

L - developed length, r - diameter of rods


Assume effective cover 25 mm, L- length of stirrups, r - diameter of rods

L - Length of beams, B - Width of beam, H - Depth of beam

L - Length of beams, r - diameter of rods

Assume effective cover 25 mm, L- length of stirrups, r - diameter of rods


Assuming the dome to be square
Developed radius - R, H - Thickness of slab
Developed radius - R, r - diameter of bars
No of rods = Circumference / spacing
R - Average radius
Assuming the dome to be square
Developed radius - R, r - diameter of bars
Developed radius - R, r - diameter of bars
No of rods = Circumference / spacing
R - Average radius, r - diameter of bars

L - Length of hoops, r - Diameter of rods

L - Length of rods, r - Diameter of rods


L - Length of stirrups, r - Diameter of rods

L - Average circumferencial length, B - Thickness of the wall, H - Height of wall


L - Length of rods, r - Diameter of rods
L - Average circumferencial length, r - Diameter of rods

L - Running length, B - Assumed width of staircase, H - Thickness of slab


L - Assumed Width of staircase, B - Riser, H - Riser

L - Running length, r - diameter of rods

L - length of landing, B - Assumed width of staircase, H - Thickness of slab

L - Running length, r - diameter of rods

L - Running length, Radius of rods - r


L - Running length, Radius of rods - r
L, B - Cross section dimensions, H - assumed height of Railing

L - length of landing, B, H - Cross-section of brace


L -Width of steps, B - Tread, H - Thickness of step

L - Running length, Radius of rods - r


L - Running length, Radius of rods - r
L - Running length, Radius of rods - r
L - Running length, Radius of rods - r
L - Running length, Radius of rods - r

R - outer radius, r - inner radius, H - slab thickness

L - Running length, Radius of rods - r


L - Running length, Radius of rods - r
L - Average running length of rods, r - radius of rods

L - Average running length of rods, r - radius of rods

Total Concrete in cum


105.68

Total Steel in tonnes


50.32

r
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Circumference
0.55
3.4557519189
0.713
4.479911124
0.876
5.5040703291
1.039
6.5282295342
1.202
7.5523887392
1.365
8.5765479443
1.528
9.6007071494
1.691 10.6248663544
1.854 11.6490255595
2.017 12.6731847646
2.18 13.6973439697
2.343 14.7215031747
2.506 15.7456623798
3.1 19.4778744523
3.259 20.4769009161
3.418 21.4759273799
3.577 22.4749538438
3.736 23.4739803076
3.895 24.4730067715
4.054 25.4720332353
4.213 26.4710596991
4.372
27.470086163
4.531 28.4691126268
4.69 29.4681390907
4.849 30.4671655545
424.4794329824