SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)

SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


ULTRASONIC TESTING (UT)

SATIP-NDE-UT-01

PROJECT TITLE:

ITEM
NO.
1.0

PROJECT PHASE
& ACTIVITY CODE

APPROVED DATE

WBS/BI/JO/NO.

QUALITY
PROCEDURE

TASK / ACTIVITY

QUALITY
RECORD

DISCIPLINE:

MECHANICAL- NDE

25-May-05
CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR

PID

OID-NDU

REMARKS

DOCUMENT REVIEW

1.1

Ultrasonic Testing Procedure/Method


Statement

See Remarks

RH1

H1

RH1

1.2

UT personnel qualification

SAIC-UT-2002

RH1

H1

RH1

1.3

TKY Technique procedure & Mock-up


Design

SAIC-UT-2003

RH1

H1

RH1

For Off-Shore Installation

W2**

W2**- OID will set the schedule for random


verification.

2.0

Review and Approval byOID/NDE Unit

EQUIPMENT
Verification of UT Equipment and
Accessories
Physical properties and condition of UT
equipment and accessories

2.1

SAIC-UT-2004

SAIC-UT-2004

RH1

R1

SAIC-UT-2004

SAIC-UT-2004

W1

Mock-up of TKY-Joints (Test Pieces)

SAIC-UT-2005

SAIC-UT-2005

H1

H1

H1/RH1 For Off-Shore Installation

3.1

Performance qualification of UT
Personnel on TKY Joints

See Remarks

H1

H1

H1/RH1

3.2

Pre-Test Inspection

SAIC-UT-2007

SAIC-UT-2007
SATR-UT-2005

H1

W1

See Note 1 of the General Notes for S.Aramco's


responsibility.

3.3

In- Process verification

SAIC-UT-2008

SAIC-UT-2008
SATR-UT-2005

W1

W1

See Note 1 of the General Notes for S.Aramco's


responsibility.

3.4

Evaluation of Test Result

SAIC-UT-2009

SAIC-UT-2009
SATR-UT-2005

RH1

R1

2.2
2.3
3.0

APPLICATION
For Off-Shore Installation. OID/NDE Unit will
qualify the UT Personnel

GENERAL NOTES
1

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
adjust the levels of Saudi Aramco participation based upon the Contractors performance.

Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization

3
4
5
W1
W2
H1

Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
representative is not present.
Hold:
QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
attendance.
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
100% Witness Inspection/Test
Sample Witness Inspection/Test
100% Hold Point for QC Inspection or Test

H2
R1
R2

LEGEND
Sample Hold Point for QC Inspection or Test
100% Review of Documents
sample Review of Documents

Page 1 of 1

RH1 100% Review and Approval of Documents


RH2 Sample Review and Approval of Documents
S Surveillance