METHOD OF PROCEDURE (MOP)

Re-engineering Replacement XDM1000 to BG30 at Palembang

Document No

: 030/MOP/IX/Eng.Trans/2015

Revision No

: 01

Issue Date

: 03 September 2015

Priority / Level

: High

Location

: Palembang

Page 1 of 8

PT. MORA TELEMATIKA INDONESIA


Grha 9 Building Jl. Penataran No.9
Proklamasi, Jakarta Pusat 10320
Phone : +6221 3199 8600 Fax : +6221 316 0897

Table of Contents
METHOD OF PROCEDURE .............................................................................................................. 1
1. PURPOSE ..................................................................................................................................... 3
2. WORK INFORMATION ................................................................................................................ 3
2.1 Work Schedule ...................................................................................................................... 3
2.2 Person In Charge (Internal and External) .......................................................................... 3
3. RISK ANALYSIS ............................................................................................................................... 3
4. OUTAGE / DOWN TIME ................................................................................................................ 4
5. PRE INSTALLATION & INTEGRATION ........................................................................................... 4
6. NETWORK TOPOLOGY .................................................................................................................. 4
7. TECHNICAL ACTION ...................................................................................................................... 5
8. ROLLBACK PLAN ............................................................................................................................ 6
9. POST MONITORING ...................................................................................................................... 7
10. CONDITION ................................................................................................................................. 7
11. COORDINATION PROCESS .......................................................................................................... 7

Page 2 of 8

PT. MORA TELEMATIKA INDONESIA


Grha 9 Building Jl. Penataran No.9
Proklamasi, Jakarta Pusat 10320
Phone : +6221 3199 8600 Fax : +6221 316 0897

1. PURPOSE
This document has been prepared to fulfill the need of Re-engineering Replacement
XDM1000 to BG30 at Palembang.
2. WORK INFORMATION
2.1 Work Schedule
Date

Kamis, 03 Desember 2015

Working Time

01.00 AM 04.00 AM

Impact

02.00 AM 03.30 AM (15 Menit/E1)

Work Description

Re-engineering Replacement XDM1000 to BG30 at Palembang

2.2 Person In Charge (Internal and External)

Internal
Name

Title

Phone

Email

David

ENG/Transmission 082111112816

david@moratelindo.co.id

NOC TX

NOC

(021) 31996800

transmission@noc.moratelindo.co.id

Himawan

FOC Palembang

081994500006

himawan.hadi@moratelindo.co.id

External
Name

Title

Phone

Email

3. RISK ANALYSIS

No
1

Possibility Issues
Traffic downtime

Precaution

PIC

Downtime Approval

CS & NOC

Page 3 of 8

PT. MORA TELEMATIKA INDONESIA


Grha 9 Building Jl. Penataran No.9
Proklamasi, Jakarta Pusat 10320
Phone : +6221 3199 8600 Fax : +6221 316 0897

4. OUTAGE / DOWN TIME


This work will be done in the live system. This kind of work will cause an outage / traffic
interruption for existing equipment for around 90 minutes.

5. PRE INSTALLATION / ACTIVITY


No
1

Description
Prepare material to support activity

Date

PIC

Status

28 Agustus2015

FOC and

Done

Inventory
2

Make sure XC reroute or protected

28 Agustus 2015

NOC

Done

6. NETWORK TOPOLOGY
Network Existing

Network Plan
Page 4 of 8

PT. MORA TELEMATIKA INDONESIA


Grha 9 Building Jl. Penataran No.9
Proklamasi, Jakarta Pusat 10320
Phone : +6221 3199 8600 Fax : +6221 316 0897

7. TECHNICAL ACTION
Activity
No

Description

Date/Time

PIC

Status

Make sure the condition of normal


traffics before an expandable

03 Desember 2015 /
01.00 AM

FOC Palembang &


NOC

NSA

[At NMS] Make sure all traffic at still


normal

NOC

NSA

[At Palembang] Instalasi BG30

03 Desember 2015 /
01.00 AM
03 Desember 2015 /
01.00AM-01.30AM

FOC Palembang

NSA

NOC

NSA

FOC Palembang

NSA

FOC Palembang

NSA

[At NMS] Create New Tunneling


from NIX Palembang XDM2000.15
Slot i7 Port 3,5 to XL Palembang
BG30 Slot TS1 Port 1,2 (Interface
STM-1)
[At Palembang] Jumper from
XDM2000.15 Slot i7 Port 3,5 to OTB
(NIX Palembang <> XL Palembang)
[At Palembang] Jumper from BG30
Slot TS1 Port 1,2 to OTB (XL
Palembang <> SF Palembang)

03 Desember 2015 /
01.30AM-02.00AM

Page 5 of 8

PT. MORA TELEMATIKA INDONESIA


Grha 9 Building Jl. Penataran No.9
Proklamasi, Jakarta Pusat 10320
Phone : +6221 3199 8600 Fax : +6221 316 0897

No
7

9
10
11
12
13

Description

Date/Time

PIC

Status

[At NMS] Re-route all traffic /


tunneling passing XDM 1000
[At Palembang] Change of physical
from XDM1000 to direct OTB (SF
Palembang <> NIX Palembang)
[At NMS] Make all traffic MSP 1+1
Inner Palembang
[At NMS] Create New XC from BG30
to XL
[At Palembang] Laying cabel E1
from BG30 to DDF XL
[In NMS] Makesure TX & RX level
both site
[In NMS] Makesure link back to
normal

03 Desember 2015 /
02.00AM-02.30AM

NOC

SA

FOC Palembang

SA

NOC

SA

NOC

SA

FOC Palembang

SA

NOC

NSA

FOC Palembang

NSA

03 Desember 2015 /
02.30AM-03.00AM

03 Desember 2015 /
03.00AM-03.30AM

03 Desember 2015 /
03.30AM-04.00AM

8. ROLLBACK PLAN
When this work fail, all configuration and physical connection will be back to default
(30minutes).
9. POST MONITORING
After activity done and successfully,all component must be monitoring 1x24 hours. And if
during monitoring detect anomaly, all configuration and physical connection will be back to
default.
10. CONDITION
This activity will be conduct and authorized by Moratel team. Upon the completion of the
work, NOC and FOCteam shall inform to Eng.Trans that this activity has been completed.
11. COORDINATION PROCESS
For proposing implementation schedule, working permit by Moratel transport team will
accompany NOC and FOC Team, coordination shall be made to Moratel in order to get approval.

***End of Document***
LIST IMPACT CUSTOMER
Page 6 of 8

PT. MORA TELEMATIKA INDONESIA


Grha 9 Building Jl. Penataran No.9
Proklamasi, Jakarta Pusat 10320
Phone : +6221 3199 8600 Fax : +6221 316 0897

CID / LINK
[CID: 1006DC00004959] sMART PLG-Kuala Tungkal_Via XL
[CID: 1006DC00001772] SMART PLG-Kuala Tungkal_Via XL
[CID: 1214DC00001379] SMART PLG-Muaro Bungo
[CID: 1214DC00001382] SMART PLG-Muaro Bungo
[CID: 1006IT00004825] POI_SMART-XL_PLG_E1#2
[CID: 1006DC00004299] SMART PLG-Muaro Bungo

Page 7 of 8

PT. MORA TELEMATIKA INDONESIA


Grha 9 Building Jl. Penataran No.9
Proklamasi, Jakarta Pusat 10320
Phone : +6221 3199 8600 Fax : +6221 316 0897

Page 8 of 8

PT. MORA TELEMATIKA INDONESIA


Grha 9 Building Jl. Penataran No.9
Proklamasi, Jakarta Pusat 10320
Phone : +6221 3199 8600 Fax : +6221 316 0897

Você também pode gostar