Design calculation sheet

Project no:
Subject:

Date:
S08001-1
Stairwell Pressurisation

31/5/2009

Sheet no.:

of

Computed by:
Checked by:

M.Seyam
A.Khattab

Approved by:

This sheet calculates the staircase pressurization required to maintain a +ve pressure in the stairewell in case of fire emergency.
The calculations in this sheet follow the ASHRAE Standard.
Condition 1 : Analysis with Closed Doors

Design Conditions
Outside Design Temprature
Building Design Temprature

46
24

C
C

No. of Story
Height Per Story

22
3.5

Temprature Factor

-0.80

Pa/M

Area Between Building & outside Per Story

460

M2

Area Between Stairwell & Building Per Story

58

M2

Area of the Gap Around each Stairwell Door

Area Ratio For Exterior Walls

Area Ratio For Stair Well Walls

Leakage Area Between Building & outside Per Story

(Abo)

0.023

M2

Leakage Area Between Stairwell & Building Per Story

(Asb)

0.024812

M2

Minimum pressure diffrence at the top of the stair

(dPsbt)

13

Pa

Maximum pressure diffrence at the bottom of the stair

(dPsbb)

42

Pa

Q(Total Volume Flow Rate)

2362

L/S

Volume Flow Rate Per Floor

107

L/S

Condition 2 : Analysis with Opened Doors


NO. of Doors
NO. of Closed Doors
NO. of Opened Doors

22
21
1

Pressure Diffrence Between Stair & Outside at the top

(dPsot)

28

Pa

Pressure Diffrence Between Stair & Outside at the Middle

(dPsom)

59

Pa

Pressure Diffrence Between Stair & Outside at the Bottom

(dPsob)

90

Pa

M2

0.023

M2

166

L/S

Door Area

Effective Flow Area

Q(Volume Flow Rate)

Condition 3 : Analysis with Exterior Door Opened

(Abo)

Condition 3 : Analysis with Exterior Door Opened


Q(Volume Flow Rate)

Note:

7959

L/s

Total Flow Required for Stairwell

10380

L/s

Total Flow Required for Stairwell+10% SAFETY

11418

L/s

Input Data
Output Data

Design calculation sheet


Project no:
Subject:

Date:
S08001-1
Stairwell Pressurisation

31/5/2009

Sheet no.:

of

This sheet calculates the staircase pressurization required to maintain a +ve pressure in the stairewell in case of fire emerg
The calculations in this sheet follow the ASHRAE Standard.
Condition 1 : Analysis with Closed Doors

Design Conditions
Outside Design Temprature
Building Design Temprature

46
24

C
C

No. of Story
Height Per Story

22
3.5

Temprature Factor

-0.80

Pa/M

Area Between Building & outside Per Story

460

M2

Area Between Stairwell & Building Per Story

72.1

M2

Area of the Gap Around each Stairwell Door

Area Ratio For Exterior Walls

Area Ratio For Stair Well Walls

Leakage Area Between Building & outside Per Story

(Abo)

0.023

M2

Leakage Area Between Stairwell & Building Per Story

(Asb)

0.025009

M2

Minimum pressure diffrence at the top of the stair

(dPsbt)

13

Pa

Maximum pressure diffrence at the bottom of the stair

(dPsbb)

41

Pa

Q(Total Volume Flow Rate)

2376

L/S

Volume Flow Rate Per Floor

108

L/S

Condition 2 : Analysis with Opened Doors


NO. of Doors

22

NO. of Closed Doors


NO. of Opened Doors

21
1

Pressure Diffrence Between Stair & Outside at the top

(dPsot)

28

Pa

Pressure Diffrence Between Stair & Outside at the Middle

(dPsom)

59

Pa

Pressure Diffrence Between Stair & Outside at the Bottom

(dPsob)

90

Pa

M2

0.023

M2

166

L/S

7970

L/s

Total Flow Required for Stairwell

10404

L/s

Total Flow Required for Stairwell+10% SAFETY

11445

L/s

Door Area

Effective Flow Area

Q(Volume Flow Rate)

(Abo)

Condition 3 : Analysis with Exterior Door Opened


Q(Volume Flow Rate)

Input Data
Output Data

Computed by:
Checked by:

M.Seyam
A.Khattab

Approved by:

airewell in case of fire emergency.

Design calculation sheet


Project no:
Subject:

Date:

Sheet no.:

of

Elevator Pressurization

Computed by:
Checked by:
Approved by:

This sheet calculates the Elevator pressurization required to maintain a +ve pressure in the Elevator in case of fire emergency.
The calculations in this sheet follow the ASHRAE Standard.

Design Conditions
Outside Design Temprature
Building Design Temprature

46
24

C
C

No. of Story
Height Per Story

22
3.5

-0.80

Pa/M

Flow Area Between Building & outside

460

M2

Area Between Elevator & Building Per Story

38

M2

Area Ratio For Elevator Walls

Temprature Factor

Flow Areas on Ground Floor

Flow Area Between Elevator & Building Per Story

(Aeb)

0.00684

M2

Flow Areas on Other Floors


Area Between Building & outside Per Story

460

M2

Area Between Elevator & Building Per Story

38

M2

Area Ratio For Exterior Walls

Area Ratio For Elevator Walls

Flow Area Between Building & Outside Per Story

(Abo)

0.023

M2

Flow Area Between Elevator & Building Per Story

(Aeb)

0.03192

M2

Pressure Diffrence Through The Building


Pressure Diffrence Between Elevator & Building at the Top

(dPebt)

13

Pa

Pressure Diffrence Between Elevator & Outside at the Top

(dPeot)

38

Pa

Pressure Diffrence Between Elevator & Outside at the Floor Above Ground

(dPeot)

97

Pa

Pressure Diffrence Between Elevator & Outside at the Bottom

(dPeob)

100

Pa

0.00684

M2

57

L/s

Effective Area Between Elevator & Outside

0.0

M2

Average Pressure Diffrence for This Section

67.6

Pa

Q(Flow Rate Required For The Rest of the Building)

2702

L/s

Total Flow Required for Elevator

2760

L/s

Total Flow Required for Elevator+10% SAFETY

3036

L/s

At the Ground Floor


Effective Area Between Elevator & Outside
Q(Flow Rate Required For Ground Floor)

The Rest of The Building

Input Data
Output Data

M.Seyam
A.Khattab

essure in the Elevator in case of fire emergency.

Design calculation sheet


Project no:

Date:

Sheet no.:

of

Elevator Lobby Pressurisation

Subject:

Computed by:
Checked by:

M.Seyam
A.Khattab

Approved by:

This sheet calculates the Fire Lift lobby pressurization required to maintain a +ve pressure in the lobby in case of fire emergency.
The calculations in this sheet follow the ASHRAE Standard.
Condition 1 : Analysis with Closed Doors

Design Conditions
Outside Design Temprature
Building Design Temprature

46
24

C
C

No. of Story
Height Per Story

1
3.5

-0.80

Pa/M

Area Between Building & outside Per Story

460

M2

Area Between Lobby & Building Per Story

72.8

M2

Area of the Gap Around each Lobby Door

Area Ratio For Exterior Walls

Area Ratio For Stair Well Walls

Temprature Factor

Leakage Area Between Building & outside Per Story

(Abo)

0.023

M2

Leakage Area Between Lobby & Building Per Story

(Asb)

0.04848

M2

Minimum pressure diffrence at the Lobby

(dPsbt)

13

Pa

Maximum pressure at the Lobby

(dPsbb)

14

Pa

148

L/S

Q(Total Volume Flow Rate)

Condition 2 : Analysis with Opened Doors


Pressure Diffrence Between Stair & Outside at the top

(dPsot)

71

Pa

Pressure Diffrence Between Lobby & Outside at the Middle

(dPsom)

72

Pa

Pressure Diffrence Between Lobby & Outside at the Bottom

(dPsob)

74

Pa

1.6

M2

0.023

M2

165

L/S

11404

L/s

Door Area
Effective Flow Area
Q(Volume Flow Rate)

(Abo)

Condition 3 : Analysis with Exterior Door Opened


Q(Volume Flow Rate)

Input Data
Output Data

Exterior Wall
1
Tight
2
Average
3
Loose
4
Very Loose

Stairwell Wall
1
Tight
2
Average
3
Loose

1
2

Doors
Single Leaf
Double Leaf

0.00005
0.00017
0.00035
0.0012

0.000014
0.00011
0.00035

0.024
0.048

Elevator Wall
1
Tight
2
Average
3
Loose

0.00018
0.00084
0.0018

Floors
Tight
Average
Loose

0.0000066
0.000052
0.00017

1
2
3