APPLICATIONS IN
THE OIL INDUSTRY
ENMAX CPRS
Metering
station
Transfer
Station
Natural Gas
Pipeline
Crude Oil
Pipeline
Joint Station
Waste Water
Plant
Waste Water
pipeline
Downhole Units
n
Flowing wells
Pumping wells
Gas-lifting wells
Surface Units
n Oil/Gas production facilities
n
INLINE STYLE
DISCS
CANISTER STYLE
CPRS
Downhole unit
Packer
Perforations
Pump
Perforations
ESP
ESP Sub
Packer
CPRS Downhole unit
Perforations
Gas Mandrel
CPRS
Downhole unit
Packer
CPRS
Downhole unit
Gas Mandrel
Packer
PRODUCTION WELL
CPRS
OIL/GAS SEPARATOR
OIL TANK
CPRS
OIL PIPELINE
WATER PIPELINE
WATER TANK
WATER
INJECTION
WELL
CPRS
WATER
INJECTION
PUMP
FLAMELESS CUTTING
0.8
0.8
0.7
0.6
Liquid, T/D
Location: Qiaokou
0.6
0.5
0.5
0.4
0.3
Oil, T/D
0.3
0.2
0.1
0
Before
After
Up, A
58
48
48
n
41
40
Down, A
30
20
10
0
Before
After
DN 50 PN 2.5MPa
Wellhead
Oil
Liquid
Water
No.
t/d
t/d
Flowline
Flowline
size
Length
mm
Max
Back
Hot Oil
Pressure
Cyle d
Return Oil
Temp.
MPa
63-72
2.23
25.51
91.27
60*3.5
90
3.8
30
34
69-782
0.69
22
96.86
60*3.5
950
3.5
30
32
150
100
50
30
60
30
0
Well 63-72
Well 69-782
Oil Pressure Comparison Before and After the installation @Well 69-782
Oil Pressure Comparison Before and After the installation @Well 63-72
Well#: Xinhe 16
Operator: No.6 Production
Company
Downhole issues: Scale &
Corrosion
Averaged at a pump repair every 45 days, three times of pump failures within six months
Liquid, tons
Crude, tons
0.5
0
Before
installation
After
installation
Production started on Dec. 14, 1997 with ESP. The oil production
was stabilized above 100 m3/d after acidizing in 1998.
Since mid April, 2005, EPS failed frequently due to scale buildup
A magnetic scale tool was run into the well, but it did not work,
failed in a short time, less than 3 months
Ba0.75Sr0.25SO4
%
Impurities
J10
400
350
300
250
200
150
100
50
0
2004-11-9 2005-2-17 2005-5-28 2005-9-5 2005-12- 2006-3-24 2006-7-2 2006-10- 2007-1-18 2007-4-28 2007-8-6 2007-11- 2008-2-22 2008-6-1
14
10
14
Location: GNPOC
NE-03 & NEE03
Trial Period: May 20th
to August 20th , 2014
CPRS Units: two sets
of 6x 10 surface
units, one for each
Report Date:
September 3rd 2014
Well Name
THP
FLP
NE-03
450
400
NEE-03
490
410
Before
points
installation
4# Heater
6 mm
Hard
6 mm
Hard
2 mm
Hard
1mm
88 days
165 days
w/o
w/o
chemicals
chemicals
Crispy
tubes
2# Heater
3mm
Crispy
-3
tubes
Water
Mixing
to
pump filter
knock
off
Easy to clean
Location: Weiqi-1&
Weiqi-11 Natural Gas
Gathering Station, 5
Natural Gas
Compressors & 3 Heat
exchangers
Operator: Zhongyuan
No.3 Production
Company
Main issue: high
hardness cooling
water, and serious
Scale problems and
the system can be
plugged off in one
year
Conclusion
After three month trial application,
CPRS did prevent scale buildup
successfully , which reached and
exceeded the oilfield expectation.
GNPOC