TRANSMISSIONSCHEMEFORDISPERSALOFPOWERFORM
2X660MWCOALFIREDPOWERPLANTSATTHAR
InsulationCoordination
2015B09PK500DO003
NEPC II CONSORTIUM
2015-B09-PK-500-DO-003
Insulation Coordination
Page 1 of 6
Insulation Coordination
(1) Basic insulation level
The system insulation level is as follows:
NEPC II CONSORTIUM
2015-B09-PK-500-DO-003
Insulation Coordination
Page 2 of 6
where:
U90%_ff is the fast front overvoltage being withstood with 90% probability (kV):
U90%_ff = U50%_ff kz_ff;
kz_ff is the deviation factor of the fast front withstand voltage: kz_ff = 0,961;
kz_sf is the deviation factor of the slow front withstand voltage. For switching
impulses: kz_sf = 0,922;
ka is the altitude factor
kcs is the statistical coordination factor taken as 1,05.
The gap factor kg (1.45 for conductor-structure) depends on the type of gap
In EN 50341-1 [8], Annex E, formulae for the calculation of the clearances Dpe_pf
between live and earth parts is as follows:
where:
kz_pf is the deviation factor being 0,910 for power frequency voltages;
kg_pf is the power frequency factor.
NEPC II CONSORTIUM
2015-B09-PK-500-DO-003
Insulation Coordination
Page 3 of 6
kV
550
kV
1550
kV
1175
3.1
phase to earth:KCS*U2%_sf
kV
1234
3.2
phase to phase:1.40*KCS*U2%_sf
kV
1727
4
4.1
4.2
0.978
0.946
phase to phase Ka
0.959
5.1
0.961
5.2
0.922
5.3
0.910
Conductor-window configuration(Kg_sf=1.25)
for fast front overvoltages Del
gap factor Kg_sf
6.1
6.2
1.45
2.79
the clearance distance between the extremities of the insulator string dis
2.63
3.03
1.22
m
0.92
Conductor-conductor configuration(Kg_sf=1.60)
gap factor Kg_sf
1.60
1.16
7.1
3.23
7.2
4.41
NEPC II CONSORTIUM
1.26
m
1.57
2015-B09-PK-500-DO-003
Insulation Coordination
Page 4 of 6
Based on bid document, the suspension and tension insulator sets is 29*170mm in Zone B.
According to the test procedures of IEC 60383-2
The suspension and tension insulator sets (29*170mm):
Dry Lighting Impulse Withstand Voltage: 2100kV
Wet Switching Impulse Withstand Voltage:1300kV
Insulation Coordination Calculation(EN 50341-1:2001)
1
kV
550
kV
2100
kV
1300
3.1
phase to earth:KCS*U2%_sf
kV
1365
3.2
phase to phase:1.40*KCS*U2%_sf
kV
1911
4
4.1
4.2
0.978
0.946
phase to phase Ka
0.959
5.1
0.961
5.2
0.922
5.3
0.910
Conductor-window configuration(Kg_sf=1.25)
for fast front overvoltages Del
gap factor Kg_sf
6.1
6.2
1.45
3.77
the clearance distance between the extremities of the insulator string dis
3.57
3.54
1.22
m
0.92
Conductor-conductor configuration(Kg_sf=1.60)
gap factor Kg_sf
1.60
1.16
7.1
4.38
7.2
5.24
1.26
m
1.57
2015-B09-PK-500-DO-003
Insulation Coordination
Page 5 of 6
From the table above, the live working clearance is about 3.095m when p.u. is 2.20.
p.u. is usually about 2.00 in 500kV transmission line.
From the table above, the clearance of 500kV live work is 3.20m, and an additional 0.5m space
allowing movement of human body shall be available where operators need to stay for work.
So, total live work clearance is 3.20+0.5=3.70m.
NEPC II CONSORTIUM
2015-B09-PK-500-DO-003
Insulation Coordination
Page 6 of 6
(7) Conclusion
The clearances of different standards
EPRI
IEC 60071
EN 50341
IEC 61467
for live work
GB 50545
for live work
(m)
2.78
(m)
3.1
(m)
3.03 3.77
(m)
3.095
(m)
3.7
From calculating above, the clearance 3.77m is enough for system insulation level.
Based on the bid document 500 kV TL CPP 01 Bidding Docs Volume II section 2.2.3,
The minimum clearance is 4.5m > 3.77m. Therefore, we will use clearance 4.5m for
insulation design.