Você está na página 1de 176

THE EMBED PLATE CONNECTION

CALCULATIONS WERE THE ONLY ITEMS


REVIEWED. PLEASE REFER TO THOSE
CALCUALTIONS FOR COMMENTS.

THORNTON TOMASETTI, INC. (TT)


NO EXCEPTIONS
EXCEPTIONS NOTED
REJECTED

MJ

THIS SUBMITTAL CONCERNS ITEMS NOT DESIGNED BY TT.


REVIEW IS LIMITED TO ASSESSING, WHERE REQUIRED BY
THE CONTRACT DOCUMENTS, THE STRUCTURAL EFFECT OF
THE LOADS IMPOSED BY THE REVIEWED ITEM ON THE
STRUCTURAL
SYSTEM
DESIGNED BY TT,
AND/OR
CONFIRMING, BASED SOLELY ON THE REPRESENTATIONS
BY THE CONTRACTOR, ITS SUBCONTRACTORS OR
VENDORS OR THEIR ENGINEER ("CONTRACTOR"), THAT THE
ITEM REVIEWED CONFORMS WITH ANY APPLICABLE
PERFORMANCE CRITERIA ESTABLISHED BY TT IN THE
CONTRACT DOCUMENTS AND/OR ANY APPLICABLE
PARAMETERS ESTABLISHED BY TT IN THE CONTRACT
DOCUMENTS. SUCH REVIEW DOES NOT CONSTITUTE AN
INDEPENDENT CONFIRMATION BY TT THAT SUCH
REPRESENTATIONS BY THE CONTRACTOR ARE ACCURATE.
THE CONTRACTOR REMAINS SOLELY RESPONSIBLE FOR
COMPLIANCE WITH THE REQUIREMENTS OF THE CONTRACT
DOCUMENTS INCLUDING ANY PERFORMANCE CRITERIA
AND/OR PARAMETERS.
By

MJ

Date:

11 OCT 2012

11 OCT 2012

The Design Teams concern is that these members will


arrive on site with excessive installed cambers greater
than what is calculated. This was a construction issue at
Basra Sports City. This issue may not be mitigated unless
E-Construct and the precaster modify their design and/or
manufacturing process. This is a functional and
serviceability issue, not a strength issue. So if the
excessive cambers do not create code compliance issues
related to egress, and if Anwar Soura is willing to accept
the added expense and field issues created by over
cambered precast, we cannot force E-Construct to modify
their design or the precasters manufacturing practices.
However, we strongly recommend that E-construct
evaluate a modified strand layout that controls the
camber, such as adding prestressed strands in the
compression zone. The precaster should also evaluate
their strand release and storage practices to reduce the
camber.

Camber Check

e.Construct

Project :

Tel. +9714-391-1015
Fax +9714-391-6860
Dubai Internet Cityy

Calculated by :

IKM

Date

Checked by :

M.G.

Date

Ref.

Al Meena Sports Complex

Part of Structure

Bleachers - Sec 1

Proj. No.

J-1.1005

15-Aug-12

Sheet

Off

15-Aug-12

Rev.

Calculations

Output

4- Deflection Check :
4.1- Short term deflections according to FE model Results at transfer after rotating :
OW
SIL
LL
PS

PCI 4.8.5

=
=
=
=

5.6
0
0.00
-11.68

mm
mm
mm
mm

4.2- Net Camber @ Erection :


-Net Camber @ Erection are obtained by multiplying the deflection values with the factors
mentioned in the reference

Case /
Value
OW
PS

ACI 318-05
9.5(b)

Short term
value
5.600
-11.680

4.6- Net Cumber @ Erection =

Units and sign convention:


Deflection : mm

Factor
1.85
1.80

5.6x1.85 -11.68x1.8=

-ve
ve Upward +ve Downward

-10.66 mm

Bleacher type 1 (Method-1)

Slab Capacity Table

MIDAS/Set
Company

e -C O NSTR U C T

Project Name

Designer

M .M

File Name

AL MEENA STADI U M -( B C -TY PE1)

1. Design Conditions
Design Code : ACI318M-02
Material Data :
:

fc ' =

40 MPa

fy = 420 MPa

Concrete Clear Cover : 40 mm

2. Slab Thk : 100 mm


Short Direction Moment

(Unit : kN-m/m)

@ 100

@ 150

@ 200

@ 250

@ 300

@ 355

@ 406

@ 457

T8

10.0

6.8

5.2

4.2

3.5

2.9

2.6

2.3

T8+T10

12.5

8.6

6.5

5.2

4.4

3.7

3.3

2.9

T10

14.9

10.2

7.8

6.3

5.3

4.5

3.9

3.5

T10+T12

17.6

12.2

9.3

7.6

6.3

5.4

4.7

4.2

T12

20.1

14.1

10.8

8.8

7.4

6.3

5.5

4.9

@ 100

@ 150

@ 200

@ 250

@ 300

@ 355

@ 406

@ 457

Long Direction Moment


T8

8.3

5.7

4.3

3.5

2.9

2.5

2.2

1.9

T8+T10

10.2

7.0

5.4

4.3

3.6

3.1

2.7

2.4

T10

11.9

8.3

6.3

5.1

4.3

3.6

3.2

2.9

T10+T12

13.8

9.7

7.4

6.0

5.1

4.3

3.8

3.4

T12

15.4

10.9

8.4

6.9

5.8

4.9

4.3

3.9

Vc

MIDAS/Set V 3.3.2
Date : 08/07/2012

43.5 kN/m

http://www.MidasUser.com

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
26.71
-4.30
-6.16
-8.01
-9.87
-11.72
-13.58
-15.43
-17.29
-19.14
-21.00
-21.00

CB: 1.2OW+1.6LL+~
MAX :
MIN :
FILE:
UNIT:
DATE:

46890
44491
Menna Stad~
kN*m/m
08/12/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
26.71
-11.90
-12.91
-13.92
-14.93
-15.94
-16.95
-17.97
-18.98
-19.99
-21.00
-21.00

CB: 1.2OW+1.6LL+~
MAX :
MIN :
FILE:
UNIT:
DATE:

46890
44491
Menna Stad~
kN*m/m
08/12/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

Bleacher type 1 (Method-2)

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
23.05
20.09
17.13
14.17
11.21
8.25
5.29
2.32
0.00
-3.60
-6.56
-9.52

CB: 1.2DL+1.6LL+~
MAX : 53387
MIN : 53368
FILE: Menna Stad~
UNIT: kN*m/m
DATE: 08/10/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
23.05
-4.30
-4.82
-5.34
-5.87
-6.39
-6.91
-7.43
-7.95
-8.47
-9.00
-9.52

CB: 1.2DL+1.6LL+~
MAX : 53387
MIN : 53368
FILE: Menna Stad~
UNIT: kN*m/m
DATE: 08/10/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

Camber Check

e.Construct

Project :

Tel. +9714-391-1015
Fax +9714-391-6860
Dubai Internet Cityy

Calculated by :

IKM

Date

Checked by :

M.G.

Date

Ref.

Al Meena Sports Complex

Part of Structure

Bleachers - Sec 2

Proj. No.

J-1.1005

15-Aug-12

Sheet

Off

15-Aug-12

Rev.

Calculations

Output

4- Deflection Check :
4.1- Short term deflections according to FE model Results at transfer after rotating :
OW
SIL
LL
PS

PCI 4.8.5

=
=
=
=

0.25
0
0.00
-0.49

mm
mm
mm
mm

4.2- Net Camber @ Erection :


-Net Camber @ Erection are obtained by multiplying the deflection values with the factors
mentioned in the reference

Case /
Value
OW
PS

ACI 318-05
9.5(b)

Short term
value
0.250
-0.490

Net Cumber @ Erection =

Units and sign convention:


Deflection : mm

Factor
1.85
1.80

0.25x1.85 - 0.49x1.8=

-vee Up
Upward
ard ++vee Do
Downward
n ard

-0.42 mm

Bleacher type 2 (Method-1)

Slab Capacity Table

MIDAS/Set
Company

e -C O NSTR U C T

Project Name

Designer

M .M

File Name

AL MEENA STADI U M -( B C -TY PE1)

1. Design Conditions
Design Code : ACI318M-02
Material Data :
:

fc ' =

40 MPa

fy = 420 MPa

Concrete Clear Cover : 40 mm

2. Slab Thk : 100 mm


Short Direction Moment

(Unit : kN-m/m)

@ 100

@ 150

@ 200

@ 250

@ 300

@ 355

@ 406

@ 457

T8

10.0

6.8

5.2

4.2

3.5

2.9

2.6

2.3

T8+T10

12.5

8.6

6.5

5.2

4.4

3.7

3.3

2.9

T10

14.9

10.2

7.8

6.3

5.3

4.5

3.9

3.5

T10+T12

17.6

12.2

9.3

7.6

6.3

5.4

4.7

4.2

T12

20.1

14.1

10.8

8.8

7.4

6.3

5.5

4.9

@ 100

@ 150

@ 200

@ 250

@ 300

@ 355

@ 406

@ 457

Long Direction Moment


T8

8.3

5.7

4.3

3.5

2.9

2.5

2.2

1.9

T8+T10

10.2

7.0

5.4

4.3

3.6

3.1

2.7

2.4

T10

11.9

8.3

6.3

5.1

4.3

3.6

3.2

2.9

T10+T12

13.8

9.7

7.4

6.0

5.1

4.3

3.8

3.4

T12

15.4

10.9

8.4

6.9

5.8

4.9

4.3

3.9

Vc

MIDAS/Set V 3.3.2
Date : 08/07/2012

43.5 kN/m

http://www.MidasUser.com

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
26.71
22.38
18.04
13.70
9.36
5.03
0.00
-3.65
-7.99
-12.32
-16.66
-21.00

CB: 1.2OW+1.6LL+~
MAX :
MIN :
FILE:
UNIT:
DATE:

46890
44491
Menna Stad~
kN*m/m
08/12/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
26.71
-4.30
-6.16
-8.01
-9.87
-11.72
-13.58
-15.43
-17.29
-19.14
-21.00
-21.00

CB: 1.2OW+1.6LL+~
MAX :
MIN :
FILE:
UNIT:
DATE:

46890
44491
Menna Stad~
kN*m/m
08/12/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
26.71
-11.90
-12.91
-13.92
-14.93
-15.94
-16.95
-17.97
-18.98
-19.99
-21.00
-21.00

CB: 1.2OW+1.6LL+~
MAX :
MIN :
FILE:
UNIT:
DATE:

46890
44491
Menna Stad~
kN*m/m
08/12/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

Bleacher type 2 (Method-2)

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
1.36
1.17
0.98
0.79
0.60
0.41
0.22
0.00
-0.16
-0.35
-0.54
-0.73

ST: Live Load


MAX :
MIN :
FILE:
UNIT:
DATE:

44698
44633
SEC-2-2507~
kN*m/m
08/12/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
1.36
-0.70
-0.70
-0.71
-0.71
-0.71
-0.72
-0.72
-0.72
-0.73
-0.73
-0.73

ST: Live Load


MAX :
MIN :
FILE:
UNIT:
DATE:

44698
44633
SEC-2-2507~
kN*m/m
08/12/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

Camber Check

e.Construct

Project :

Tel. +9714-391-1015
Fax +9714-391-6860
Dubai Internet Cityy

Calculated by :

IKM

Date

Checked by :

M.G.

Date

Ref.

Al Meena Sports Complex

Part of Structure

Bleachers - Sec 3

Proj. No.

J-1.1005

15-Aug-12

Sheet

Off

15-Aug-12

Rev.

Calculations

Output

4- Deflection Check :
4.1- Short term deflections according to FE model Results at transfer after rotating :
OW
SIL
LL
PS

PCI 4.8.5

=
=
=
=

2.8
0
0.00
-6.16

mm
mm
mm
mm

4.2- Net Camber @ Erection :


-Net Camber @ Erection are obtained by multiplying the deflection values with the factors
mentioned in the reference

Case /
Value
OW
PS

ACI 318-05
9.5(b)

Short term
value
2.800
-6.160

Net Cumber @ Erection =

Units and sign convention:


Deflection : mm

Factor
1.85
1.80

2.8x1.85 - 6.16x1.8=

-ve Upward +ve Downward

-5.91 mm

Bleacher type 3 (Method-1)

Slab Capacity Table

MIDAS/Set
Company

e -C O NSTR U C T

Project Name

Designer

M .M

File Name

AL MEENA STADI U M -( B C -TY PE1)

1. Design Conditions
Design Code : ACI318M-02
Material Data :
:

fc ' =

40 MPa

fy = 420 MPa

Concrete Clear Cover : 40 mm

2. Slab Thk : 100 mm


Short Direction Moment

(Unit : kN-m/m)

@ 100

@ 150

@ 200

@ 250

@ 300

@ 355

@ 406

@ 457

T8

10.0

6.8

5.2

4.2

3.5

2.9

2.6

2.3

T8+T10

12.5

8.6

6.5

5.2

4.4

3.7

3.3

2.9

T10

14.9

10.2

7.8

6.3

5.3

4.5

3.9

3.5

T10+T12

17.6

12.2

9.3

7.6

6.3

5.4

4.7

4.2

T12

20.1

14.1

10.8

8.8

7.4

6.3

5.5

4.9

@ 100

@ 150

@ 200

@ 250

@ 300

@ 355

@ 406

@ 457

Long Direction Moment


T8

8.3

5.7

4.3

3.5

2.9

2.5

2.2

1.9

T8+T10

10.2

7.0

5.4

4.3

3.6

3.1

2.7

2.4

T10

11.9

8.3

6.3

5.1

4.3

3.6

3.2

2.9

T10+T12

13.8

9.7

7.4

6.0

5.1

4.3

3.8

3.4

T12

15.4

10.9

8.4

6.9

5.8

4.9

4.3

3.9

Vc

MIDAS/Set V 3.3.2
Date : 08/07/2012

43.5 kN/m

http://www.MidasUser.com

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
26.71
22.38
18.04
13.70
9.36
5.03
0.00
-3.65
-7.99
-12.32
-16.66
-21.00

CB: 1.2OW+1.6LL+~
MAX :
MIN :
FILE:
UNIT:
DATE:

46890
44491
Menna Stad~
kN*m/m
08/12/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
26.71
-11.90
-12.91
-13.92
-14.93
-15.94
-16.95
-17.97
-18.98
-19.99
-21.00
-21.00

CB: 1.2OW+1.6LL+~
MAX :
MIN :
FILE:
UNIT:
DATE:

46890
44491
Menna Stad~
kN*m/m
08/12/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

Bleacher type 3 (Method-2)

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
31.45
25.67
19.88
14.10
8.32
0.00
-3.24
-9.02
-14.80
-20.59
-26.37
-32.15

CB: 1.2(O.w+sdl)~
MAX :
MIN :
FILE:
UNIT:
DATE:

47958
47334
SEC-3 (25 ~
kN*m/m
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
31.45
-11.90
-13.92
-15.95
-17.97
-20.00
-22.02
-24.05
-26.07
-28.10
-30.12
-32.15

CB: 1.2(O.w+sdl)~
MAX :
MIN :
FILE:
UNIT:
DATE:

47958
47334
SEC-3 (25 ~
kN*m/m
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

Camber Check

e.Construct

Project :

Tel. +9714-391-1015
Fax +9714-391-6860
Dubai Internet Cityy

Calculated by :

IKM

Date

Checked by :

M.G.

Date

Ref.

Al Meena Sports Complex

Part of Structure

Bleachers - Sec 4

Proj. No.

J-1.1005

15-Aug-12

Sheet

Off

15-Aug-12

Rev.

Calculations

Output

4- Deflection Check :
4.1- Short term deflections according to FE model Results at transfer after rotating :
OW
SIL
LL
PS

PCI 4.8.5

=
=
=
=

0.12
0
0.00
-0.39

mm
mm
mm
mm

4.2- Net Camber @ Erection :


-Net Camber @ Erection are obtained by multiplying the deflection values with the factors
mentioned in the reference

Case /
Value
OW
PS

ACI 318-05
9.5(b)

Short term
value
0.120
-0.390

Net Cumber @ Erection =

Units and sign convention:


Deflection : mm

Factor
1.85
1.80

0.12x1.85 - 0.39x1.8=

-ve Upward +ve Downward

-0.48 mm

Bleacher type 4 (Method-1)

Slab Capacity Table

MIDAS/Set
Company

e -C O NSTR U C T

Project Name

Designer

M .M

File Name

AL MEENA STADI U M -( B C -TY PE1)

1. Design Conditions
Design Code : ACI318M-02
Material Data :
:

fc ' =

40 MPa

fy = 420 MPa

Concrete Clear Cover : 40 mm

2. Slab Thk : 100 mm


Short Direction Moment

(Unit : kN-m/m)

@ 100

@ 150

@ 200

@ 250

@ 300

@ 355

@ 406

@ 457

T8

10.0

6.8

5.2

4.2

3.5

2.9

2.6

2.3

T8+T10

12.5

8.6

6.5

5.2

4.4

3.7

3.3

2.9

T10

14.9

10.2

7.8

6.3

5.3

4.5

3.9

3.5

T10+T12

17.6

12.2

9.3

7.6

6.3

5.4

4.7

4.2

T12

20.1

14.1

10.8

8.8

7.4

6.3

5.5

4.9

@ 100

@ 150

@ 200

@ 250

@ 300

@ 355

@ 406

@ 457

Long Direction Moment


T8

8.3

5.7

4.3

3.5

2.9

2.5

2.2

1.9

T8+T10

10.2

7.0

5.4

4.3

3.6

3.1

2.7

2.4

T10

11.9

8.3

6.3

5.1

4.3

3.6

3.2

2.9

T10+T12

13.8

9.7

7.4

6.0

5.1

4.3

3.8

3.4

T12

15.4

10.9

8.4

6.9

5.8

4.9

4.3

3.9

Vc

MIDAS/Set V 3.3.2
Date : 08/07/2012

43.5 kN/m

http://www.MidasUser.com

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
26.71
22.38
18.04
13.70
9.36
5.03
0.00
-3.65
-7.99
-12.32
-16.66
-21.00

CB: 1.2OW+1.6LL+~
MAX :
MIN :
FILE:
UNIT:
DATE:

46890
44491
Menna Stad~
kN*m/m
08/12/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
26.71
-4.30
-6.16
-8.01
-9.87
-11.72
-13.58
-15.43
-17.29
-19.14
-21.00
-21.00

CB: 1.2OW+1.6LL+~
MAX :
MIN :
FILE:
UNIT:
DATE:

46890
44491
Menna Stad~
kN*m/m
08/12/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
26.71
-11.90
-12.91
-13.92
-14.93
-15.94
-16.95
-17.97
-18.98
-19.99
-21.00
-21.00

CB: 1.2OW+1.6LL+~
MAX :
MIN :
FILE:
UNIT:
DATE:

46890
44491
Menna Stad~
kN*m/m
08/12/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

Bleacher type 4 (Method-2)

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
12.18
9.89
7.61
5.32
3.04
0.00
-1.53
-3.82
-6.10
-8.39
-10.67
-12.96

CB: 1.2 D.L.+1.6~


MAX :
MIN :
FILE:
UNIT:
DATE:

43136
43136
SEC-4 Rev0~
kN*mm/mm
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
12.18
-4.30
-5.26
-6.22
-7.19
-8.15
-9.11
-10.07
-11.03
-12.00
-12.96
-12.96

CB: 1.2 D.L.+1.6~


MAX :
MIN :
FILE:
UNIT:
DATE:

43136
43136
SEC-4 Rev0~
kN*mm/mm
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
12.18
-11.90
-12.02
-12.14
-12.25
-12.37
-12.49
-12.61
-12.72
-12.84
-12.96
-12.96

CB: 1.2 D.L.+1.6~


MAX :
MIN :
FILE:
UNIT:
DATE:

43136
43136
SEC-4 Rev0~
kN*mm/mm
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

Camber Check

e.Construct

Project :

Tel. +9714-391-1015
Fax +9714-391-6860
Dubai Internet City

Calculated by :

IKM

Date

Checked by :

M.G.

Date

Ref.

Al Meena Sports Complex

Bleachers - Sec 5

Part of Structure

Proj. No.

J-1.1005

15-Aug-12

Sheet

Off

15-Aug-12

Rev.

Calculations

Output

4- Deflection Check :
4.1- Short term deflections according to FE model Results at transfer after rotating :
OW
SIL
LL
PS

PCI 4.8.5

=
=
=
=

2.82
0
0.00
-10.14

mm
mm
mm
mm

4.2- Net Camber @ Erection :


-Net Camber @ Erection are obtained by multiplying the deflection values with the factors
mentioned in the reference

Case /
Value
OW
PS

ACI 318-05
9.5(b)

Short
term
2.820
-10.140

Net Cumber @ Erection =

Units and sign convention:


Deflection : mm

Factor
1.85
1.80

2.82x1.85 - 10.14x1.8=

-ve Upward +ve Downward

-13.04 mm

Bleacher type 5 (Method-1)

Slab Capacity Table

MIDAS/Set
Company

e -C O NSTR U C T

Project Name

Designer

M .M

File Name

AL MEENA STADI U M -( B C -TY PE1)

1. Design Conditions
Design Code : ACI318M-02
Material Data :
:

fc ' =

40 MPa

fy = 420 MPa

Concrete Clear Cover : 40 mm

2. Slab Thk : 100 mm


Short Direction Moment

(Unit : kN-m/m)

@ 100

@ 150

@ 200

@ 250

@ 300

@ 355

@ 406

@ 457

T8

10.0

6.8

5.2

4.2

3.5

2.9

2.6

2.3

T8+T10

12.5

8.6

6.5

5.2

4.4

3.7

3.3

2.9

T10

14.9

10.2

7.8

6.3

5.3

4.5

3.9

3.5

T10+T12

17.6

12.2

9.3

7.6

6.3

5.4

4.7

4.2

T12

20.1

14.1

10.8

8.8

7.4

6.3

5.5

4.9

@ 100

@ 150

@ 200

@ 250

@ 300

@ 355

@ 406

@ 457

Long Direction Moment


T8

8.3

5.7

4.3

3.5

2.9

2.5

2.2

1.9

T8+T10

10.2

7.0

5.4

4.3

3.6

3.1

2.7

2.4

T10

11.9

8.3

6.3

5.1

4.3

3.6

3.2

2.9

T10+T12

13.8

9.7

7.4

6.0

5.1

4.3

3.8

3.4

T12

15.4

10.9

8.4

6.9

5.8

4.9

4.3

3.9

Vc

MIDAS/Set V 3.3.2
Date : 08/07/2012

43.5 kN/m

http://www.MidasUser.com

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
17.08
14.06
11.05
8.03
5.02
2.01
0.00
-4.02
-7.04
-10.05
-13.06
-16.08

CB: 1.2DL+1.6LL+~
MAX :
MIN :
FILE:
UNIT:
DATE:

43408
42655
Menna Stad~
kN*m/m
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
17.08
-4.30
-5.48
-6.66
-7.83
-9.01
-10.19
-11.37
-12.54
-13.72
-14.90
-16.08

CB: 1.2DL+1.6LL+~
MAX :
MIN :
FILE:
UNIT:
DATE:

43408
42655
Menna Stad~
kN*m/m
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
17.08
-11.90
-12.32
-12.74
-13.15
-13.57
-13.99
-14.41
-14.82
-15.24
-15.66
-16.08

CB: 1.2DL+1.6LL+~
MAX :
MIN :
FILE:
UNIT:
DATE:

43408
42655
Menna Stad~
kN*m/m
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

Bleacher type 5 (Method-2)

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
14.28
11.20
8.11
5.03
1.95
0.00
-4.21
-7.29
-10.37
-13.45
-16.54
-19.62

CB: OW+SIL+LL+PS
MAX :
MIN :
FILE:
UNIT:
DATE:

46680
48118
Menna Stad~
kN*mm/mm
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
14.28
-4.30
-5.83
-7.36
-8.89
-10.43
-11.96
-13.49
-15.02
-16.55
-18.08
-19.62

CB: OW+SIL+LL+PS
MAX :
MIN :
FILE:
UNIT:
DATE:

46680
48118
Menna Stad~
kN*mm/mm
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
14.28
-11.90
-12.67
-13.44
-14.21
-14.99
-15.76
-16.53
-17.30
-18.07
-18.84
-19.62

CB: OW+SIL+LL+PS
MAX :
MIN :
FILE:
UNIT:
DATE:

46680
48118
Menna Stad~
kN*mm/mm
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

Camber Check

e.Construct

Project :

Tel. +9714-391-1015
Fax +9714-391-6860
Dubai Internet Cityy

Calculated by :

IKM

Date

Checked by :

M.G.

Date

Ref.

Al Meena Sports Complex

Part of Structure

Bleachers - Sec 6

Proj. No.

J-1.1005

15-Aug-12

Sheet

Off

15-Aug-12

Rev.

Calculations

Output

4- Deflection Check :
4.1- Short term deflections according to FE model Results at transfer after rotating :
OW
SIL
LL
PS

PCI 4.8.5

=
=
=
=

0.28
0
0.00
-0.69

mm
mm
mm
mm

4.2- Net Camber @ Erection :


-Net Camber @ Erection are obtained by multiplying the deflection values with the factors
mentioned in the reference

Case /
Value
OW
PS

ACI 318-05
9.5(b)

Short term
value
0.280
-0.690

Net Cumber @ Erection =

Units and sign convention:


Deflection : mm

Factor
1.85
1.80

0.28x1.85 - 0.69x1.8=

-ve Upward +ve Downward

-0.72 mm

Bleacher type 6 (Method-1)

Slab Capacity Table

MIDAS/Set
Company

e -C O NSTR U C T

Project Name

Designer

M .M

File Name

AL MEENA STADI U M -( B C -TY PE1)

1. Design Conditions
Design Code : ACI318M-02
Material Data :
:

fc ' =

40 MPa

fy = 420 MPa

Concrete Clear Cover : 40 mm

2. Slab Thk : 100 mm


Short Direction Moment

(Unit : kN-m/m)

@ 100

@ 150

@ 200

@ 250

@ 300

@ 355

@ 406

@ 457

T8

10.0

6.8

5.2

4.2

3.5

2.9

2.6

2.3

T8+T10

12.5

8.6

6.5

5.2

4.4

3.7

3.3

2.9

T10

14.9

10.2

7.8

6.3

5.3

4.5

3.9

3.5

T10+T12

17.6

12.2

9.3

7.6

6.3

5.4

4.7

4.2

T12

20.1

14.1

10.8

8.8

7.4

6.3

5.5

4.9

@ 100

@ 150

@ 200

@ 250

@ 300

@ 355

@ 406

@ 457

Long Direction Moment


T8

8.3

5.7

4.3

3.5

2.9

2.5

2.2

1.9

T8+T10

10.2

7.0

5.4

4.3

3.6

3.1

2.7

2.4

T10

11.9

8.3

6.3

5.1

4.3

3.6

3.2

2.9

T10+T12

13.8

9.7

7.4

6.0

5.1

4.3

3.8

3.4

T12

15.4

10.9

8.4

6.9

5.8

4.9

4.3

3.9

Vc

MIDAS/Set V 3.3.2
Date : 08/07/2012

43.5 kN/m

http://www.MidasUser.com

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
14.86
12.42
9.98
7.54
5.10
2.66
0.00
-2.22
-4.66
-7.10
-9.54
-11.99

CB: 1.2(d.l.+SIL~
MAX :
MIN :
FILE:
UNIT:
DATE:

41964
41269
SEC-6 (25-~
kN*m/m
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
17.08
-4.30
-5.48
-6.66
-7.83
-9.01
-10.19
-11.37
-12.54
-13.72
-14.90
-16.08

CB: 1.2DL+1.6LL+~
MAX :
MIN :
FILE:
UNIT:
DATE:

43408
42655
Menna Stad~
kN*m/m
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
14.86
-11.90
-11.91
-11.92
-11.93
-11.93
-11.94
-11.95
-11.96
-11.97
-11.98
-11.99

CB: 1.2(d.l.+SIL~
MAX :
MIN :
FILE:
UNIT:
DATE:

41964
41269
SEC-6 (25-~
kN*m/m
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

Bleacher type 6 (Method-2)

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
4.75
3.89
3.03
2.16
1.30
0.43
0.00
-1.29
-2.16
-3.02
-3.88
-4.75

CB: OW+SIL+LL+PS
MAX :
MIN :
FILE:
UNIT:
DATE:

48281
48273
SEC-6 (25-~
kN*m/m
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
4.75
-4.30
-4.35
-4.40
-4.45
-4.50
-4.55
-4.60
-4.65
-4.70
-4.75
-4.75

CB: OW+SIL+LL+PS
MAX :
MIN :
FILE:
UNIT:
DATE:

48281
48273
SEC-6 (25-~
kN*m/m
08/13/2012
VIEW-DIRECTION
X:-0.483
Y:-0.837
Z: 0.259

Camber Check

e.Construct

Project :

Tel. +9714-391-1015
Fax +9714-391-6860
Dubai Internet Cityy

Calculated by :

IKM

Date

Checked by :

M.G.

Date

Ref.

Al Meena Sports Complex

Part of Structure

Bleachers - Sec 7

Proj. No.

J-1.1005

15-Aug-12

Sheet

Off

15-Aug-12

Rev.

Calculations

Output

4- Deflection Check :
4.1- Short term deflections according to FE model Results at transfer after rotating :
OW
SIL
LL
PS

PCI 4.8.5

=
=
=
=

13.4
0
0.00
-17.6

mm
mm
mm
mm

4.2- Net Camber @ Erection :


-Net Camber @ Erection are obtained by multiplying the deflection values with the factors
mentioned in the reference

Case /
Value
OW
PS

ACI 318-05
9.5(b)

Short term
value
13.400
-17.600

4.6- Net Cumber @ Erection =

Units and sign convention:


Deflection : mm

Factor
1.85
1.80

13.4x1.85 - 17.6x1.8=

-ve Upward +ve Downward

-6.89 mm

Bleacher type 7 (Method-1)

Slab Capacity Table

MIDAS/Set
Company

e -C O NSTR U C T

Project Name

Designer

M .M

File Name

AL MEENA STADI U M -( B C -TY PE1)

1. Design Conditions
Design Code : ACI318M-02
Material Data :
:

fc ' =

40 MPa

fy = 420 MPa

Concrete Clear Cover : 40 mm

2. Slab Thk : 100 mm


Short Direction Moment

(Unit : kN-m/m)

@ 100

@ 150

@ 200

@ 250

@ 300

@ 355

@ 406

@ 457

T8

10.0

6.8

5.2

4.2

3.5

2.9

2.6

2.3

T8+T10

12.5

8.6

6.5

5.2

4.4

3.7

3.3

2.9

T10

14.9

10.2

7.8

6.3

5.3

4.5

3.9

3.5

T10+T12

17.6

12.2

9.3

7.6

6.3

5.4

4.7

4.2

T12

20.1

14.1

10.8

8.8

7.4

6.3

5.5

4.9

@ 100

@ 150

@ 200

@ 250

@ 300

@ 355

@ 406

@ 457

Long Direction Moment


T8

8.3

5.7

4.3

3.5

2.9

2.5

2.2

1.9

T8+T10

10.2

7.0

5.4

4.3

3.6

3.1

2.7

2.4

T10

11.9

8.3

6.3

5.1

4.3

3.6

3.2

2.9

T10+T12

13.8

9.7

7.4

6.0

5.1

4.3

3.8

3.4

T12

15.4

10.9

8.4

6.9

5.8

4.9

4.3

3.9

Vc

MIDAS/Set V 3.3.2
Date : 08/07/2012

43.5 kN/m

http://www.MidasUser.com

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
2.04
1.47
0.90
0.33
0.00
-0.81
-1.39
-1.96
-2.53
-3.10
-3.67
-4.24

CB: 1.2DL+1.6LL
MAX : 1045
MIN : 320
FILE: Menna Stad~
UNIT: kN*m/m
DATE: 08/14/2012
VIEW-DIRECTION
X:-0.208
Y:-0.900
Z: 0.383

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
2.04
-4.22
-4.22
-4.22
-4.22
-4.23
-4.23
-4.23
-4.23
-4.23
-4.23
-4.24

CB: 1.2DL+1.6LL
MAX : 1045
MIN : 320
FILE: Menna Stad~
UNIT: kN*m/m
DATE: 08/14/2012
VIEW-DIRECTION
X:-0.208
Y:-0.900
Z: 0.383

Bleacher type 7 (Method-2)

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
10.94
9.15
7.36
5.57
3.79
2.00
0.00
-1.58
-3.37
-5.16
-6.94
-8.73
SCALE FACTOR=
5.4839E-005

CB: 1.2OW+1.6LL+~
MAX : 48423
MIN : 48415
FILE: Menna Stad~
UNIT: kN*m/m
DATE: 08/14/2012
VIEW-DIRECTION
X:-0.269
Y:-0.880
Z: 0.391

midas Gen
POST-PROCESSOR
PLATE FORCE
MOMENT-Mxx
10.94
-4.30
-4.79
-5.28
-5.78
-6.27
-6.76
-7.25
-7.75
-8.24
-8.73
-8.73
SCALE FACTOR=
5.4839E-005

CB: 1.2OW+1.6LL+~
MAX : 48423
MIN : 48415
FILE: Menna Stad~
UNIT: kN*m/m
DATE: 08/14/2012
VIEW-DIRECTION
X:-0.269
Y:-0.880
Z: 0.391

Table of Contents:
1. Design Criteria
2. Sap Model
3. Section design
4. Deflection Check
5. Typical Shop Drawings

1. Design Criteria

e.Construct
Tel. +9714-391-1015
Fax +9714-391-6860
Dubai Internet City
P.O.Box 500288

AL MENAA SPORTS COMPLEX

Project

Part of Structure

A.S

Calculated by

MK

Checked by

Ref.

STAIR
3-Jun-12

Sheet

Of

Date

3-Jun-12

Rev.

Output

1-DESGIN CRITERIA AND CODES :


the American concrete institute (ACI 318-2005)

2
32 N/mm

The cylinder compressive strength after 28 days shall be=

2
420 N/mm

reinforcement steel grade for longitudinal bar

2
420 N/mm

reinforcement steel grade stirrups


concrete cover

16 mm

2-SLAB SECTION
1.0m

Slab depth=

0.25m

3-LOADS
- own weight stair

=(25*width*depth)+(tooth weight)=
=(25*width*depth)+(25*area*width/projection)
=(25*1.0*0.25)+(25*0.0245*1.0/0.28) =

6.25+2.1875

- Superimposed dead load

0.5

KN/m2

- live load

48
4.8

KN/m2

4-calculation
- Additional weight of steps= 2.1875kN/m
- Super imposed = 0.5 *1.0= 0.50 kN/m
- Live load = 4.8 *1.0= 4.80 kN/m

5-STRAINING ACTIONS
( revise to "SAP" )
moment =

96 kN.m

PR-677

Date

Calculations

Slab width =

Proj. No.

taken 8.44 KN/m

2. Sap Model

SAP2000

SAP2000 v14.2.2 - File:STAIR_V11_V12 - Frame Span Loads (STEPS-WEIGHT) (As Defined) - KN, m, C Units

6/3/12 15:05:15

SAP2000

SAP2000 v14.2.2 - File:STAIR_V11_V12 - Frame Span Loads (SUPER-IMPOSED) (As Defined) - KN, m, C Units

6/3/12 15:05:46

SAP2000

SAP2000 v14.2.2 - File:STAIR_V11_V12 - Frame Span Loads (LIVE-LOAD) (As Defined) - KN, m, C Units

6/3/12 15:13:36

SAP2000

SAP2000 v14.2.2 - File:STAIR_V11_V12 - Moment 3-3 Diagram (ULT(1.2D+1.6L)) - KN, m, C Units

6/3/12 15:21:38

SAP2000

SAP2000 v14.2.2 - File:STAIR_V11_V12 - Moment 3-3 Diagram (WORKING) - KN, m, C Units

6/3/12 15:21:56

3. Section Design

MIDAS/Set

Slab Capacity Table

Company

e.construct

Project Name

AL MENAA SPORTS COMPLEX

Designer

A.M

File Name

\\1...\03-06-2012\midas\stair.B08

1. Design Conditions
Design Code : ACI318M-02
Material Data :
:

fc' =

32 MPa

fy = 420 MPa

Concrete Clear Cover : 16 mm

2. Slab Thk : 250 mm


Short Direction Moment

(Unit : kN-m/m)

@ 100

@ 125

@ 150

@ 200

@ 300

T10

66.2

53.2

44.5

33.5

22.5

T10+T12

80.1

64.5

54.0

40.7

27.3

T12

93.7

75.6

63.3

47.8

32.1

T12+T16

127.6

103.2

86.6

65.6

44.1

T16

159.9

129.8

109.2

82.9

55.9

Long Direction Moment


@ 100

@ 125

@ 150

@ 200

@ 300

T10

62.9

50.6

42.3

31.9

21.4

T10+T12

75.9

61.2

51.2

38.6

25.9

T12

88.6

71.5

59.9

45.2

30.4

T12+T16

119.8

97.0

81.5

61.7

41.6

T16

149.3

121.3

102.2

77.6

52.4

Vc

MIDAS/Set V 3.3.2
Date : 06/03/2012

161.2 kN/m

http://www.MidasUser.com

4. Deflection Check

SAP2000

7/5/12 10:56:12

Deflection =8.20 mm

SAP2000 v14.2.4 - File:STAIR_V11_V12 - Deformed Shape (PERMENANT-DL) - KN, m, C Units

SAP2000

7/5/12 10:57:31

Deflection =3.90 mm

SAP2000 v14.2.4 - File:STAIR_V11_V12 - Deformed Shape (LIVE-LOAD) - KN, m, C Units

e.Construct

Project

Tel. +9714-391-1015
Fax 9714-391-6860
Dubai Internet City
P.O.Box 500288

Calculated by

AL MENAA SPORTS COMPLEX


AS

Checked by

MK

Part of Structure

Ieff / Igross Ratio

Date

25-Jul-12

Sheet

Date

25-Jul-12

Rev.

Calculations

Ref.

Off

Output

Calculation of Ieff / Igross Ratio

Input Only Blue Cells

SECTION DATA :
SECTION HEIGHT, H

300

mm

SECTION WIDTH,, B

200

mm

SLAB THICKNESS

mm

SECTION COVER, C ( dist to c.g of main rft. From bottom )

42

mm

SECTION COVER, Ct ( dist to c.g of top rft.from top )

42

mm

SECTION DEPTH, D

258

mm

BEAM SPAN, L

CONCRETE STRENGTH, Fcu

40

N/mm2

STEEL STRENGTH, Fy

420

N/mm2

8.5.1

Ec, 28 days= 4700X(Fc')^0.5=

26587 21
26587.21

N/
N/mm2
2

8.5.2

ES

200000

N/mm2

n = Es / Ec28

7.52

APPLIED MOMENT, Ma (WORKING)

24.00

kn.m

MATERIAL PROPERTIES :

ACI

Robot

Proj. No.

PROVIDED BOTTOM RFT., As

16

804.25

mm2

PROVIDED TOP RFT., As'

12

226.19

mm2

e.Construct

Project

Tel. +9714-391-1015
Fax 9714-391-6860
Dubai Internet City
P.O.Box 500288

Calculated by

AL MENAA SPORTS COMPLEX


AS

Checked by

MK

Part of Structure

Ieff / Igross Ratio

Date

25-Jul-12

Sheet

Date

25-Jul-12

Rev.

Calculations

Ref.

300

LOCATION OF C.G:
=

150.00

mm

GROSS SECTION INTERIA , Ig = 200x300^3 /12

4.500E+08

mm4

Yt

150

mm

Fr

4.43

N/mm2

Mcr = fr * Ig / yt

13.28

kn.m

factor , A

factor, B

77.51

factor, C

-16323.3

DIST , Z ( dist from top of sec to netural axis )

94.75

mm

Icr

2.23E+08

mm4

2.61E+08

mm4

HEIGHT OF C.G FROM BOTTOM FIBER


ACI 318

CALCULATIONS OF Mcr :

9.5.2.3

CALCULATIONS OF Icr :

CALCULATIONS OF Ie :
Ie = ( Mcr / Ma ) ^3 * Ig + [ 1- ( Mcr/ Ma ) ^3 ] * Icr

Ie / Ig

0.58

Off

Output

200
300

Proj. No.

e.Construct

Project

Tel. +9714-391-1015
Fax 9714-391-6860
Dubai Internet City
P.O.Box 500288

Calculated by

Ref.

AL MENAA SPORTS COMPLEX

Deflection Calculations

Date

AS

Checked by

Part of Structure

25-Jul-12

Date

M.K

25-Jul-12

Calculations

Effect of cracking (refer to Ieff-Igross sheet)

Ie

0.59

I gross

Calculated Deflections:
D.L

(Due to Permenant Dead loads)

8.20

mm

L.L

(Due to live loads only)

3.90

mm

10%

8.59

Sustained loads as a percentage of live load %


sus (Due to Dead Load + % of live load specified as sustained )
Creep + Shrinkage

mm

( sus)

Where:

= / ( 1 + 50' )
' = As' / b x d

2.00

226.19

mm2

276.00

mm

200.00

mm

Span Under Consideration

7000

mm

' = 226.194671058465 / 200 x 276

0.00410

= 2 / ( 1 + 50 x 0.0041 )

1.660

14.26

As'

12

Creep + Shrinkage

Check Short term Deflection :


=

mm

Live Load

3.90

Floors not supporting and not attached to nonstructural elements likely to be damaged by large deflections

short term(max allawable)

short term

L/360

<

19.44

short term(max allawable)

mm

OK

Check Long term Deflection:

Long term

Sheet

of

Rev.

Output
Input Only Blue Cells

Servicability Limits

short term

Proj. No.

Live Load +

Creep + Shrinkage

18.16

Roof or floor construction supporting or attached to nonstructural elements NOT LIKELY to be damaged by large deflections

Long term(max allawable)


Long term
No Need to use Camber

L/240

<

29.17

mm

Long term(max allawable)

OK

mm

0.00

5. Typical Shop Drawings

Design of beam

e.Construct
Tel. +9714-391-1015
Fax +9714-391-6860
Dubai Internet City
P.O.Box 500288

AL MENAA SPORTS COMPLEX

Project

Part of Structure

A.S

Calculated by

MK

Checked by

Ref.

Sheet

Of

Date

4-Jun-12

Rev.

Output

the American concrete institute (ACI 318-2005)

2
32 N/mm

The cylinder compressive strength after 28 days shall be=

2
420 N/mm

reinforcement steel grade for longitudinal bar

2
420 N/mm

reinforcement steel grade stirrups


concrete cover

40 mm

2-Beam SECTION
0.20m
0.30m

3-LOADS
- own weight Beam

=(25*width*depth)
=(25*0.20*0.30) x1.20

1.8 Kn/m'

- REACTON FROM STAIR

65

KN/m'

TOTAL LOADS

66 8
66.8

KN/m'
KN/m

5-STRAINING ACTIONS
moment= 66.8X(2)^2/8+((.3X.2X2^2X25/8)x1.2)= 34.3 kN.m
shear = (66.8 x2 /2 )+ ((2X.2X.3X25/2)x1.2)= 68.6Kn

PR-677

4-Jun-12

1-DESGIN CRITERIA AND CODES :

beam depth=

Proj. No.

Date

Calculations

beam width =

STAIR

e.Construct

Project

Tel. +9714-391-1015
Fax 9714-391-6860
Dubai Internet City
P.O.Box 500288

Calculated by

AL MENAA SPORTS COMPLEX


AS

Checked by

MK

Part of Structure

Ieff / Igross Ratio

Date

25-Jul-12

Sheet

Date

25-Jul-12

Rev.

Calculations

Ref.

Off

Output

Calculation of Ieff / Igross Ratio

Input Only Blue Cells

SECTION DATA :
SECTION HEIGHT, H

300

mm

SECTION WIDTH,, B

200

mm

SLAB THICKNESS

mm

SECTION COVER, C ( dist to c.g of main rft. From bottom )

42

mm

SECTION COVER, Ct ( dist to c.g of top rft.from top )

42

mm

SECTION DEPTH, D

258

mm

BEAM SPAN, L

CONCRETE STRENGTH, Fcu

40

N/mm2

STEEL STRENGTH, Fy

420

N/mm2

8.5.1

Ec, 28 days= 4700X(Fc')^0.5=

26587 21
26587.21

N/
N/mm2
2

8.5.2

ES

200000

N/mm2

n = Es / Ec28

7.52

APPLIED MOMENT, Ma (WORKING)

24.00

kn.m

MATERIAL PROPERTIES :

ACI

Robot

Proj. No.

PROVIDED BOTTOM RFT., As

16

804.25

mm2

PROVIDED TOP RFT., As'

12

226.19

mm2

e.Construct

Project

Tel. +9714-391-1015
Fax 9714-391-6860
Dubai Internet City
P.O.Box 500288

Calculated by

AL MENAA SPORTS COMPLEX


AS

Checked by

MK

Part of Structure

Ieff / Igross Ratio

Date

25-Jul-12

Sheet

Date

25-Jul-12

Rev.

Calculations

Ref.

300

LOCATION OF C.G:
=

150.00

mm

GROSS SECTION INTERIA , Ig = 200x300^3 /12

4.500E+08

mm4

Yt

150

mm

Fr

4.43

N/mm2

Mcr = fr * Ig / yt

13.28

kn.m

factor , A

factor, B

77.51

factor, C

-16323.3

DIST , Z ( dist from top of sec to netural axis )

94.75

mm

Icr

2.23E+08

mm4

2.61E+08

mm4

HEIGHT OF C.G FROM BOTTOM FIBER


ACI 318

CALCULATIONS OF Mcr :

9.5.2.3

CALCULATIONS OF Icr :

CALCULATIONS OF Ie :
Ie = ( Mcr / Ma ) ^3 * Ig + [ 1- ( Mcr/ Ma ) ^3 ] * Icr

Ie / Ig

0.58

Off

Output

200
300

Proj. No.

e.Construct

Project

Tel. +9714-391-1015
Fax 9714-391-6860
Dubai Internet City
P.O.Box 500288

Calculated by

Ref.

AL MENAA SPORTS COMPLEX

Deflection Calculations

Date

AS

Checked by

Part of Structure

25-Jul-12

Date

M.K

25-Jul-12

Calculations

Effect of cracking (refer to Ieff-Igross sheet)

Ie

0.59

I gross

Calculated Deflections:
D.L

(Due to Permenant Dead loads)

8.20

mm

L.L

(Due to live loads only)

3.90

mm

10%

8.59

Sustained loads as a percentage of live load %


sus (Due to Dead Load + % of live load specified as sustained )
Creep + Shrinkage

mm

( sus)

Where:

= / ( 1 + 50' )
' = As' / b x d

2.00

226.19

mm2

276.00

mm

200.00

mm

Span Under Consideration

7000

mm

' = 226.194671058465 / 200 x 276

0.00410

= 2 / ( 1 + 50 x 0.0041 )

1.660

14.26

As'

12

Creep + Shrinkage

Check Short term Deflection :


=

mm

Live Load

3.90

Floors not supporting and not attached to nonstructural elements likely to be damaged by large deflections

short term(max allawable)

short term

L/360

<

19.44

short term(max allawable)

mm

OK

Check Long term Deflection:

Long term

Sheet

of

Rev.

Output
Input Only Blue Cells

Servicability Limits

short term

Proj. No.

Live Load +

Creep + Shrinkage

18.16

Roof or floor construction supporting or attached to nonstructural elements NOT LIKELY to be damaged by large deflections

Long term(max allawable)


Long term
No Need to use Camber

L/240

<

29.17

mm

Long term(max allawable)

OK

mm

0.00

Beam Design [stair beam (200x300)]

MIDAS/Set
Company

e -C ONSTR U C T

Project Name

AL M e e n a STAD I U M -( B C -TY PE 3 )

Designer

M .M

File Name

\\1 ...\m i d a s\b e a m .B 0 6

1. Geometry and Materials


30

Design Code : ACI318M-02


Material Data : fc ' = 32 MPa

(1 = 0.836)

fy = 420, fys = 420 MPa


:

2 - T12

(dT = 30 mm)

Bot. Layer 1

2 - T16

(dB = 30 mm)

Bot. Layer 2

2 - T16

(dB = 60 mm)

Total Steel Area Ast = 1030 mm2

30

Top Layer 1

300

Section Dim. : 300 * 200 mm

(st = 0.0172)

200

2. Member Force and Moment


Mu

34.30 kN-m

Tu

0.00 kN-m

Vu

68.60 kN

3. Check Reinforcement Ratio and Crack Control


Minimum Tension Reinf.

As,min =

172

804 mm2 ....... O.K.

<

smax = MIN[95000/fs-2.5C c , 300(252/fs)] =

300 mm

>

s=

140 mm ...... O.K.

4. Check Torsional Moment Capacity


Strength Reduction Factor = 0.750
Tneg

fc ' Acp2
Pcp
12

( )

1.3 kN-m

>

Tu

(Torsional Reinf. Negligible)

5. Check Bending Moment Capacity


Strength Reduction Factor = 0.900

Provided Reinforcement
Tension Reinf. =

804, Comp. Reinf. =

Neutral Axis Depth

Max. Tensile strain

226, Skin Reinf. =

0 mm2

61 mm
0.0104

Design Moment Strength Mn =

>

0.004 .... O.K.

69.6 kN-m

Strength Ratio : Applied/Design = 0.493

< 1.000 ....... O.K.

6. Check Shear Capacity


Strength Reduction Factor = 0.750
Vc + Vs = 36.1 + 32.5

= 68.6 kN

Stirrup Spacing : 2 - T8 @ 120 mm

MIDAS/Set V 3.3.2
Date : 08/15/2012

http://www.MidasUser.com

Beam Design [stair beam (200x300)]

MIDAS/Set
Company

e -C O NSTR U C T

Project Name

AL M e e n a STAD I U M -( B C -TY PE 3 )

Designer

M .M

File Name

\\1 ...\m i d a s\b e a m .B 0 6

1. Geometry and Materials


30

Design Code : ACI318M-02


Material Data : fc ' = 32 MPa

(1 = 0.836)

fy = 420, fys = 420 MPa


:

2 - T12

(dT = 30 mm)

Bot. Layer 1

2 - T16

(dB = 30 mm)

Bot. Layer 2

2 - T16

(dB = 60 mm)

Total Steel Area Ast = 1030 mm2

30

Top Layer 1

300

Section Dim. : 300 * 150 mm

(st = 0.0229)

150

2. Member Force and Moment


Mu

34.30 kN-m

Tu

0.00 kN-m

Vu

68.60 kN

3. Check Reinforcement Ratio and Crack Control


Minimum Tension Reinf.

As,min =

129

804 mm2 ....... O.K.

<

smax = MIN[95000/fs-2.5C c , 300(252/fs)] =

300 mm

>

s=

90 mm ...... O.K.

4. Check Torsional Moment Capacity


Strength Reduction Factor = 0.750
Tneg

fc ' Acp2
Pcp
12

( )

0.8 kN-m

>

Tu

(Torsional Reinf. Negligible)

5. Check Bending Moment Capacity


Strength Reduction Factor = 0.900

Provided Reinforcement
Tension Reinf. =

804, Comp. Reinf. =

Neutral Axis Depth

Max. Tensile strain

226, Skin Reinf. =

0 mm2

77 mm
0.0076

Design Moment Strength Mn =

>

0.004 .... O.K.

67.9 kN-m

Strength Ratio : Applied/Design = 0.505

< 1.000 ....... O.K.

6. Check Shear Capacity


Strength Reduction Factor = 0.750
Vc + Vs = 27.0 + 41.6

= 68.6 kN

Stirrup Spacing : 2 - T8 @ 120 mm

MIDAS/Set V 3.3.2
Date : 08/15/2012

http://www.MidasUser.com

SAP2000

SAP2000 v14.2.2 - File:STAIR_V11_V12 - Joint Reactions (ULT(1.2D+1.6L)) - KN, mm, C Units

5/30/12 9:19:51

SAP2000

5/30/12 9:44:26

Deflection =0.62 mm

SAP2000 v14.2.2 - File:beam_V11_V12 - Deformed Shape (PERMENANT-DL) - KN, m, C Units

SAP2000

5/30/12 9:45:04

Deflection =0.33 mm

SAP2000 v14.2.2 - File:beam_V11_V12 - Deformed Shape (LIVE-LOAD) - KN, m, C Units

e.Construct

Project

Tel. +9714-391-1015
Fax 9714-391-6860
Dubai Internet City
P.O.Box 500288

Calculated by

AL MENAA SPORTS COMPLEX

Ieff / Igross Ratio

Date

AS

Checked by

Part of Structure

5-Jul-12

Date

MK

Sheet

Output

Calculation of Ieff / Igross Ratio

Input Only Blue Cells

SECTION DATA :
SECTION HEIGHT, H

250

mm

SECTION WIDTH,, B

1000

mm

SLAB THICKNESS

mm

SECTION COVER, C ( dist to c.g of main rft. From bottom )

24

mm

SECTION COVER, Ct ( dist to c.g of top rft.from top )

22

mm

SECTION DEPTH, D

226

mm

BEAM SPAN, L

CONCRETE STRENGTH, Fcu

40

N/mm2

STEEL STRENGTH, Fy

420

N/mm2

8.5.1

Ec, 28 days= 4700X(Fc')^0.5=

26587 21
26587.21

N/
N/mm2
2

8.5.2

ES

200000

N/mm2

n = Es / Ec28

7.52

APPLIED MOMENT, Ma (WORKING)

72.10

kn.m

MATERIAL PROPERTIES :

ACI

Robot

Off

Rev.

5-Jul-12

Calculations

Ref.

Proj. No.

PROVIDED BOTTOM RFT., As

16

1608.50

mm2

PROVIDED TOP RFT., As'

12

904.78

mm2

e.Construct

Project

Tel. +9714-391-1015
Fax 9714-391-6860
Dubai Internet City
P.O.Box 500288

Calculated by

AL MENAA SPORTS COMPLEX


AS

Checked by

MK

Part of Structure

Ieff / Igross Ratio

Date

5-Jul-12

Date

Sheet

Output

1000
250

250

LOCATION OF C.G:
=

125.00

mm

GROSS SECTION INTERIA , Ig = 1000x250^3 /12

1.302E+09

mm4

Yt

125

mm

Fr

4.43

N/mm2

Mcr = fr * Ig / yt

46.12

kn.m

factor , A

factor, B

37.81

factor, C

-5768.6

DIST , Z ( dist from top of sec to netural axis )

59.36

mm

Icr

4.15E+08

mm4

6.47E+08

mm4

HEIGHT OF C.G FROM BOTTOM FIBER


ACI 318

CALCULATIONS OF Mcr :

9.5.2.3

CALCULATIONS OF Icr :

CALCULATIONS OF Ie :
Ie = ( Mcr / Ma ) ^3 * Ig + [ 1- ( Mcr/ Ma ) ^3 ] * Icr

Ie / Ig

0.50

Off

Rev.

5-Jul-12

Calculations

Ref.

Proj. No.

e.Construct

Project

Tel. +9714-391-1015
Fax 9714-391-6860
Dubai Internet City
P.O.Box 500288

Calculated by

Ref.

AL MENAA SPORTS COMPLEX

Deflection Calculations

Date

AS

Checked by

Part of Structure

5-Jul-12

Date

M.K

Sheet

5-Jul-12

Output
Input Only Blue Cells

Servicability Limits
Effect of cracking (refer to Ieff-Igross sheet)

Ie

0.50

I gross

Calculated Deflections:
D.L

(Due to Permenant Dead loads)

8.20

mm

L.L

(Due to live loads only)

3.90

mm

10%

8.59

Sustained loads as a percentage of live load %


sus (Due to Dead Load + % of live load specified as sustained )
Creep + Shrinkage

mm

( sus)

Where:

= / ( 1 + 50' )
' = As' / b x d

As'

12

2.00

904.78

mm2
mm

226.00

1000.00

mm

Span Under Consideration

7000

mm

' = 904.77868423386 / 1000 x 226

0.00400

= 2 / ( 1 + 50 x 0.004 )

1.666

14.31

Creep + Shrinkage

Check Short term Deflection :


=

mm

Live Load

3.90

Floors not supporting and not attached to nonstructural elements likely to be damaged by large deflections

short term(max allawable)

short term

L/360

<

19.44

short term(max allawable)

mm

OK

Check Long term Deflection:

Long term

of

Rev.

Calculations

short term

Proj. No.

Live Load +

Creep + Shrinkage

18.21

Roof or floor construction supporting or attached to nonstructural elements NOT LIKELY to be damaged by large deflections

Long term(max allawable)


Long term
No Need to use Camber

L/240

<

29.17

mm

Long term(max allawable)

OK

mm

0.00

Corbel Design

Corbel Design [vomitory wall corbel]

MIDAS/Set
Company

e -C O NSTR U C T

Project Name

Designer

M .M

File Name

AL M e e n a STAD I U M -( B C -TY PE 3 )

1. Design Conditions
Design Code : ACI318M-02
fc ' =

40 MPa

fy =

460 MPa
Ah

Corbel Depth :

200 mm

Effective Dep. :

150 mm

Corbel Width

bw =

200 mm

100 mm

Distance to Vu :

d (150)

Friction Coeff. : = 1.4

N uc

h (200)

Material Data :

Vu
a

As

Framing bar

2. Applied Loads
:

Vu =

68.6 kN

Horiz. Tensile :

Shear

Nuc =

14.0 kN

Vu

68.6 kN

>

>

Nuc =

0.2Vu =

14.0 kN

--->

13.7 kN
O.K.

3. Check Bearing Plate Size and Corbel Effective Depth


Vu

Pnb = (0.85fc 'A1 )

Bearing Plate Size A1 =

Vu
=
0.85fc 'A1

Vn_max1 = 0.2fc 'bwd

240.0 kN

>

Vn =

91.5 kN

--->

O.K.

Vn_max2 = 5.6bwd

168.0 kN

>

Vn =

91.5 kN

--->

O.K.

<

d =

Req'd =
a/d

Vu
*0.2*fc 'bw
0.67

=
<

2882 mm2

57 mm
1.00

--->

150 mm

--->

O.K.

O.K.

4. Determine Shear-Friction Reinf.


Avf

Vu
*f y*

142 mm2

5. Determine Direct Tension Reinf.


Af

Vu a+Nuc (h-d)
*fy*(0.9d)

An

Nuc
*f y

162 mm2
41 mm2

6. Determine Primary Tension Reinf.


As1

= 2Avf /3 + An

135 mm2

As2

= Af + An

203 mm2

104 mm2

As,min = 0.04*
As

fc '
*bw*d
fy

= Max[As1 , As2 , As,min ] =

203 mm2

(5 - T8)

7. Determine Shear Reinf. (Closed Stirrups)


Ah 0.5 (As - A n )
Spaci.=

MIDAS/Set V 3.3.2
Date : 08/15/2012

2/3d
2

81 mm2

50 mm

(2 - T6)

http://www.MidasUser.com

Design of wall

e.Construct
Tel. +9714-391-1015
Fax +9714-391-6860
Dubai Internet City
P.O.Box 500288

AL MENAA SPORTS COMPLEX

Project

Part of Structure

A.S

Calculated by

MK

Checked by

Sheet

Of

Date

4-Jun-12

Rev.

Output

the American concrete institute (ACI 318-2005)

2
32 N/mm

The cylinder compressive strength after 28 days shall be=

2
460 N/mm

reinforcement steel grade for longitudinal bar

2
420 N/mm

reinforcement steel grade stirrups


concrete cover

30 mm

2-Wall SECTION
=

Wall depth=

0.150 m
3.0 m

3-LOADS
- own weight Wall

=(25*width*depth)
=(25*0.15*3.00) x1.20

- REACTON FROM STAIR

TOTAL LOADS

5-STRAINING ACTIONS
N.F =143.5 Kn

T10-200 AT BOTH SIDES

PR-677

4-Jun-12

1-DESGIN CRITERIA AND CODES :

Wall width

Proj. No.

Date

Calculations

Ref.

STAIR

13.50 Kn/m'

2x65

KN/m'

130+13 5=143 5 KN/m


130+13.5=143.5
KN/m'

MIDAS/Set

Wall Design [stair wall]

Company

e.construct

Project Name

AL MENAA SPORTS COMPLEX

Designer

A.M

File Name

\\1...\03-06-2012\midas\wall.B04

1. Geometry and Materials

30

150

Design Code : ACI318M-02


Material Data : fc' = 32 MPa

30

Stress Profile : Equivalent Stress Block


(1 = 0.836)

200

fy = 460, fys = 420 MPa

200

Effect. Height : KLu = 3000 mm


Wall Dim. (Length*Thk) : 2000 * 150 mm
Vertical Reinf. : T10 @200 (D) (=0.0052)
End Reinf.

: 0-T10 @200

Total Vertical Steel Area : Ast = 1728 mm2 (v = 0.0058)

2. Magnified Moment
KLu/rmaj = 3000/600 = 5.00 < 34-12(M1/M2) = 22.00
= 1.000

maj

3. Member Force and Moment


Pu

134.5 kN

Muy

0.0,

Mux =

0.0 kN-m

majMuy = maj*Muy

0.0 kN-m

4. Check Axial and Moment Capacity


Maximum Axial Load

Pn(max)

Depth to the Neutral Axis

Strength Reduction Factor

Check Major Axis

Design Axial Load Strength Pn


Design Moment Strength

Mn

Strength Ratio : Muy/Mny = 0.000

4632.1 kN
213 mm
0.9000

134.5 kN

772.0 kN-m

< 1.000 ....... O.K.

5. P-M Interaction Diagram

Pn(kN)

P(kN)
9000

Major Axis

8000

fs=0

7000
6000

fs=0.5fy

5000
4632
4000

b=615mm

3000

t=0.005

2000
1000

(135,0)

(135,772)

M(kN-m)

MIDAS/Set V 3.3.2
Date : 06/04/2012

2500

2250

2000

1750

1500

1250

1000

750

500

250

-1000

Mn(kN-m)

4632.1

888.0

4220.8

1119.5

3809.5

1294.6

3398.2

1416.9

2986.9

1493.9

2575.7

1527.8

2164.4

1421.2

1753.1

1272.9

1341.8

1134.3

930.5

977.6

519.3

904.3

108.0

726.6

-303.3

394.5

-714.6

0.8

http://www.MidasUser.com
-1/2-

MIDAS/Set

Wall Design [stair wall]

Company

e.construct

Project Name

AL MENAA SPORTS COMPLEX

Designer

A.M

File Name

\\1...\03-06-2012\midas\wall.B04

6. Check Shear Capacity


Strength Reduction Factor = 0.750
Design Force Vu =

0.0 kN (Pu = 134.5 kN)

Used Horz. Reinf. : T10 @ 200


Vc + Vs = 274.7 + 395.8 = 670.6 kN

>

0.0 kN

....... O.K.

h,min = 0.0020 (Vu < Vc/2) < h = 0.0052 .......

MIDAS/Set V 3.3.2
Date : 06/04/2012

O.K.

http://www.MidasUser.com
-2/2-

Check Lifting

SAP2000

SAP2000 v14.2.2 - File:STAIR lifting_V11_V12 - Moment 3-3 Diagram (ULT(1.2D+1.6L)) - KN, m, C Units

6/4/12 10:21:54

SAP2000

SAP2000 v14.2.2 - File:STAIR lifting_V11_V12 - Shear Force 2-2 Diagram (ULT(1.2D+1.6L)) - KN, m, C Units

6/4/12 10:22:47

MIDAS/Set

Beam Design [CHECK LIFTING]

Company

e.construct

Project Name

AL MENAA SPORTS COMPLEX

Designer

A.M

File Name

\\1...\03-06-2012\midas\beam.B06

1. Geometry and Materials


(1 = 0.836)

32

Material Data : fc' = 32 MPa

250

30

Design Code : ACI318M-02


fy = 420, fys = 420 MPa

1000

Section Dim. : 250 * 1000 mm


Top Layer 1

8 - T12

(dT = 30 mm)

Bot. Layer 1

8 - T16

(dB = 32 mm)

Total Steel Area Ast = 2513 mm2 (st = 0.0101)

2. Member Force and Moment


Mu

20.00 kN-m

Tu

0.00 kN-m

Vu

22.65 kN

3. Check Reinforcement Ratio and Crack Control


Minimum Tension Reinf.

As,min =

734

1608 mm2 ....... O.K.

<

smax = MIN[95000/fs-2.5Cc, 300(252/fs)] =

300 mm > s = 134 mm ...... O.K.

4. Check Torsional Moment Capacity


Strength Reduction Factor = 0.750
Tneg

fc' Acp2
12
Pcp

8.8 kN-m

>

Tu

(Torsional Reinf. Negligible)

5. Check Bending Moment Capacity


Strength Reduction Factor = 0.900

Provided Reinforcement

Tension Reinf. = 1608, Comp. Reinf. =


Neutral Axis Depth

Max. Tensile strain

t =

905, Skin Reinf. =

0 mm2

30 mm
0.0189

Design Moment Strength Mn =

> 0.004 .... O.K.

125.0 kN-m

Strength Ratio : Applied/Design = 0.160

< 1.000 ....... O.K.

6. Check Shear Capacity


Strength Reduction Factor = 0.750
Vc + Vs = 154.1 + 0.0

MIDAS/Set V 3.3.2
Date : 06/04/2012

= 154.1 kN

http://www.MidasUser.com

MIDAS/Set

Beam Design [CHECK LIFTING]

Company

e.construct

Project Name

AL MENAA SPORTS COMPLEX

Designer

A.M

File Name

\\1...\03-06-2012\midas\beam.B06

1. Geometry and Materials


(1 = 0.836)

32

Material Data : fc' = 32 MPa

250

30

Design Code : ACI318M-02


fy = 420, fys = 420 MPa

1000

Section Dim. : 250 * 1000 mm


Top Layer 1

8 - T12

(dT = 30 mm)

Bot. Layer 1

8 - T16

(dB = 32 mm)

Total Steel Area Ast = 2513 mm2 (st = 0.0101)

2. Member Force and Moment


Mu

-9.50 kN-m

Tu

0.00 kN-m

Vu

22.65 kN

3. Check Reinforcement Ratio and Crack Control


Minimum Tension Reinf.

As,min =

741

905 mm2 ....... O.K.

<

smax = MIN[95000/fs-2.5Cc, 300(252/fs)] =

300 mm > s = 134 mm ...... O.K.

4. Check Torsional Moment Capacity


Strength Reduction Factor = 0.750
Tneg

fc' Acp2
12
Pcp

8.8 kN-m

>

Tu

(Torsional Reinf. Negligible)

5. Check Bending Moment Capacity


Strength Reduction Factor = 0.900

Provided Reinforcement
Tension Reinf. =

905, Comp. Reinf. = 1608, Skin Reinf. =

Neutral Axis Depth

Max. Tensile strain

t =

0 mm2

26 mm
0.0222

Design Moment Strength Mn =

> 0.004 .... O.K.

-75.6 kN-m

Strength Ratio : Applied/Design = 0.126

< 1.000 ....... O.K.

6. Check Shear Capacity


Strength Reduction Factor = 0.750
Vc + Vs = 155.6 + 0.0

MIDAS/Set V 3.3.2
Date : 06/04/2012

= 155.6 kN

http://www.MidasUser.com

Table of Contents:
1. Design Criteria
2. Straining Actions
3. Section Design

1. Design criteria

Project

Job ref
AL MENAA SPORTS CITY

e.construct
www.econstruct.ae

Part of structure

Calc sheet no

VOMITORY WALL (type 3)


Drawing ref

Calculated by
MM

Ref.

of

Date
09/07/2010

Checked by
KA

rev
0
Date
09/07/2010

Calculations

Output

VOMITORY WALL
DIMENSION "refer to EC-BL-101 drawing"
Wall length = 2.25 m, average height = 2.815+3.615/2=3.21 m , thickness = 0.2 m
CALCULATION
1. Own weight of wall= 25*average wall height*wall thickness
=25*3.21*0.2= 16.05 kN/m
2. Reaction of seat on the wall: (seat span = 6.5 m)
a. dead load from seat
Wd= (ow of seat /width of seat )+super imposed on seats
= (25*0.19/0.95)+0.5
= 5.5 KN/m
Rd= 5.5*6.5/2= 17.87 KN
- weight of concrete tread (Type1) = (25* area* length )
= (25*0.20*.4*0.915*2/1.4) = 2.61 KN/m

(concrete tread dimension)


- weight of concrete tread (Type2) = (25* area* width* number /length of wall )
= (25*0.20*.80*0.915*1/1.4) = 2.61 KN/m
Rd=17.87+(2.61*2.25/2) = 20.81 KN

Page | 1

Project

e.consstructt
www.econstruct.ae

Job ref
AL MENAA SP
PORTS CITY

Part of struucture

Calc sheet no

VOMITORY WALL
W
(type 3)
Drawing reef

R
Ref.

Calculated by
b
MM

of

Date
09/07/2010

Checcked by
KA

rev
0
Date
09/077/2010

C
Calculations

Outtput

3. live
e load from
m seat
WL = 4.8
RL = 4.8*6.5/ 2= 15.6 K
KN

Page | 2

W=2.275 KN

Project

Job ref
AL MENAA SPORTS CITY

e.construct
www.econstruct.ae

Part of structure

Calc sheet no

VOMITORY WALL (type 3)


Drawing ref

Ref.

Calculated by
MM

of

Date
09/07/2010

Checked by
KA

rev
0
Date
09/07/2010

Calculations

Output

a. Lifting stage

(Refer to PCI , figure 5.3.1.1)


W= OW *static load multiplier for stripping and dynamic load (refer to PCI 5.3.31)
= 25*0.2*1.3 =6.5 kN/m2
Mx =1.2*6.5*2.52 /8 = 6.09 kN.m/m
My = 1.2*0.0107 * 6.5 *2.5* 2.252 =1.05 kN.m

Check for cracking (Fcr =0.6f`c= 0.632= 3.93 N/mm2 =3394 kN/m2
- Mx*y/I =16.5*0.1*12/(2.25*0.23 ) = 1100 kN/m2 < 3394 kN/m2
- My*x/I =1.05*.1/( width/2 *depth3/12)
= 1.05*0.1*12/ ( 2.5/2 * 0.23) = 126 kN/m2 < 3394 kN/m2

Page | 5

2. Straining Actions

SAP2000

7/10/12 18:18:29

SAP2000 v14.2.4 - File:2 VW -103 (4-6-2012) - Frame Span Loads (DEAD) (As Defined) - KN, m, C Units

SAP2000

SAP2000 v14.2.4 - File:2 VW -103 (4-6-2012) - Joint Loads (RL) (As Defined) - KN, m, C Units

7/25/12 11:33:39

SAP2000

SAP2000 v14.2.4 - File:2 VW -103 (4-6-2012) - Joint Loads (Rd) (As Defined) - KN, m, C Units

7/25/12 11:34:28

SAP2000

SAP2000 v14.2.4 - File:2 VW -103 (4-6-2012) - Moment 3-3 Diagram (ULT) - KN, m, C Units

7/25/12 11:35:27

3. Section Design

Wall Design [walls (case 1)]

MIDAS/Set
Company

e -C O NSTR U C T

Project Name

AL M e e n a STAD I U M -(VWALL -TY PE3 )

Designer

M .M

File Name

\\1 ...\TY PE -3 \M I D AS\W AL L .B 0 4

1. Geometry and Materials

30

200

Design Code : ACI318M-02


Material Data : fc ' = 32 MPa

30

Stress Profile : Equivalent Stress Block


(1 = 0.836)

100

fy = 420, fys = 420 MPa

150

150

150

150

150

Effect. Height : KLu = 1800 mm


Wall Dim. (Length*Thk) : 2250 * 200 mm
Vertical Reinf. : T10 @150 (D) (=0.0052)
End Reinf.

: 4-T10 @100

Total Vertical Steel Area : Ast = 2670 mm2

(v = 0.0059)

2. Member Force and Moment


Pu

0.0 kN

0.0,

Mux =

38.6 kN-m

Muy = maj*Muy

0.0 kN-m

min Mux = min *MAX[Mux, Pu emin ] =

38.6 kN-m

Muy
maj

3. Check Axial and Moment Capacity


Maximum Axial Load

Check Major Axis

P n(max) =

Depth to the Neutral Axis

Strength Reduction Factor

6910.2 kN
189 mm
0.9000

Design Axial Load Strength P n

0.0 kN

Design Moment Strength

1048.3 kN-m

Mn

Strength Ratio : Muy/Mny = 0.000

< 1.000 ....... O.K.

Check Minor Axis


Applied Axial Force of Minor Axis (P u ) =
Depth to the Neutral Axis

Strength Reduction Factor

0.0 kN
22 mm
0.9000

Design Axial Load Strength P n

-0.0 kN

Design Moment Strength

90.8 kN-m

Mn

Strength Ratio : Mux/Mnx = 0.425

< 1.000 ....... O.K.

Combined Ratio
(Mux/Mnx)1.00 + (M uy/Mny)1.00 = 0.425

MIDAS/Set V 3.3.2
Date : 07/25/2012

< 1.000 ....... O.K.

http://www.MidasUser.com
- 1 /2 -

Wall Design [walls (case 1)]

MIDAS/Set
Company

e -C O NSTR U C T

Project Name

AL M e e n a STAD I U M -(VWALL -TY PE 3 )

Designer

M .M

File Name

\\1 ...\TY PE -3 \M I D AS\W AL L .B 0 4

4. P-M Interaction Diagram


P(kN)

P(kN)

15000

15000

Major Axis

13250

Minor Axis

13250

11500

11500

f s=0
9750

9750

8000

8000

f s=0.5f y
6910

6250

6910

6250

b=659mm

4500

4500

t=0.005

2750

2750

1000

1000

(0,0)

-750

M(kN-m)

(0,1048)

(0,39)

-750

350

315

280

245

210

175

140

105

70

35

4000

3600

3200

2800

2400

2000

1600

1200

800

-2500
400

-2500

M(kN-m)

(-0,91)

5. Check Shear Capacity


Strength Reduction Factor = 0.750
Design Force Vu =

0.0 kN (Pu = 0.0 kN)

Used Horz. Reinf. : #3 @ 305


Vc + Vs = 381.8 + 264.0 = 645.9 kN

h,min

= 0.0020 (Vu < Vc /2) <

MIDAS/Set V 3.3.2
Date : 07/25/2012

>

0.0 kN

....... O.K.

h = 0.0023 .......

O.K.

http://www.MidasUser.com
- 2 /2 -

CHECKAS DEEP BEAM

Beam Design [Right Riser]

MIDAS/Set
Company

e -C O NSTR U C T

Project Name

AL M e e n a STAD I U M -( B C -TY PE 3 )

Designer

M .M

File Name

\\1 ...\M I D AS\D E E P B E AM .B 0 6

1. Geometry and Materials


50

Design Code : ACI318M-02


Material Data : fc ' = 40 MPa

(1 = 0.779)

fy = 460, fys = 420 MPa


Top Layer 1

2 - T10

(dT = 50 mm)

Top Layer 2

2 - T10

(dT = 210 mm)

Top Layer 3

2 - T10

(dT = 360 mm)

Top Layer 4

2 - T10

(dT = 510 mm)

Bot. Layer 1

2 - T12

(dB = 50 mm)

Bot. Layer 2

2 - T12

(dB = 210 mm)

Bot. Layer 3

2 - T12

(dB = 360 mm)

Bot. Layer 4

2 - T10

(dB = 510 mm)

Left Skin Reinf. :

1 - T10

Right Skin Reinf. :

1 - T10

Total Steel Area Ast = 1621 mm2

50

1400

Section Dim. : 1400 * 200 mm

200

(st = 0.0058)

2. Member Force and Moment


Mu

38.50 kN-m

Tu

0.00 kN-m

Vu

0.00 kN

3. Check Reinforcement Ratio and Crack Control


Minimum Tension Reinf.

As,min =

781

836 mm2 ....... O.K.

<

smax = MIN[95000/fs-2.5C c , 300(252/fs)] =

234 mm

>

s=

100 mm ...... O.K.

4. Check Torsional Moment Capacity


Strength Reduction Factor = 0.750
Tneg

fc ' Acp2
Pcp
12

( )

9.7 kN-m

>

Tu

(Torsional Reinf. Negligible)

5. Check Bending Moment Capacity


Strength Reduction Factor = 0.900

Provided Reinforcement
Tension Reinf. =

836, Comp. Reinf. =

Neutral Axis Depth

Max. Tensile strain

628, Skin Reinf. =

157 mm2

118 mm
0.0313

Design Moment Strength Mn =

>

0.004 .... O.K.

480.9 kN-m

Strength Ratio : Applied/Design = 0.080

< 1.000 ....... O.K.

6. Check Shear Capacity


Strength Reduction Factor = 0.750
Vc + Vs = 179.7 + 0.0

MIDAS/Set V 3.3.2
Date : 07/25/2012

= 179.7 kN

http://www.MidasUser.com

a. 9m span Bleacher

4.7

47.8

57.4

3.6

41.3

61.4

4.0

39.6

3.7

61.9

4.8

49.8

38.9

56.8

1.8

37.7

44.2

60.5

1.9

42.7

60.8

3.2

40.7

36.8

midas Gen

MAX. REACTION

1.7919E+000

6.1935E+001

Z: 0.259

Y:-0.837

FILE: 9m
UNIT: kN
DATE: 09/27/2012
VIEW-DIRECTION
X:-0.483

MAX : 108185
MIN : 106310

CB: 1.2DL+1.6LL

FZ:

NODE= 108185

FZ:

NODE= 106310

MIN. REACTION

FORCE-Z

POST-PROCESSOR
REACTION FORCE

Project
Calculated by

www.econstruct.ae

Part of Structure

AL-MENAA SPORT COMPLEX

Date

M.M

Checked by

STUD PLATE for BC 9m

27-Sep-12

Date

H.Nasr

27-Sep-12

Sheet

Off

Rev.

Output

Calculations

Ref.

Proj. No.

Properties for Different Elements

Properties

Elements
ANGLES
PLATES
HEADED STUDS

Fy (Mpa) Fult (Mpa)

Description
ASTM A36M
ASTM A36M, MINIMUM YIELD STRENGTH 250 Mpa
ASTM A108, GRADE 1010 THROUGH 1020 HEADED STUD TYPE,

250
250

400
400

350

450

ACI 318
(D.5.1)

1- Check steel strength of Stud in Tension :


Ns = n x Ase x Fut

Eq ( D.3 )

Ns = 3 x 3.14 / 4 ( 16 )^2 x450 / 1000

KN

2.0E+05

mm2

2.6E+05

mm2

KN

2- Check Concrete Breakout strength of each row of Studs in Tension :


Ncb = AN / ANo x 1 x 2 x 3 x Nb
Ano=

Eq ( D.4 )

9 x Hef^2 ==9 x (150)^2

1.5 He

(SED)
150

810
200

250

200
150

AN = (ca1+s1+1.5He)(2x1.5He) , ca1=(225+150+1.5*150)*(200+1.5*150)=
3795

(BED)

(D.5.2)

271.296

To calculate AN
Nb = K x (fc')^0.50 x Hef^1.50 = 10 x (40)^0.50 x (150)^1.50

Eq ( D.7 )

116.19

1 = 1 / ( 1 + 2e'N/3hef) = 1 / .333 = .75

Eq ( D.9 )

0.75

2 = 0.70 + 0.30 x Cmin/1.50 Hef = 0.70 + 0.30 x 100/3*150 =

Eq ( D.10 )

0.77

3(Castinanchors)=

1.25

1.5

105.153

Ncb=0.75*0.77*1.25*255000/202500*116.19
(D.5.3)

KN

3- Check Pullout strength of Stud in Tension :


Npn = 4 x Np

Eq ( D.12 )

Np = Abrg x 8 fc'
Stud
Abrg = 3.14/4 x (30^2 - 16^2)

505.54

mm2

1.00

4
Stud Head
Npn = 3 x 505.54 x 8 x 40 / 1000

(D.5.4)

KN

184.863

KN

542.592

KN

4- Check Concrete side face blowout strength of Stud in Tension :


Nsb = 13.0 x C x (Abrg)^0.50 x (fc')^0.50

Eq ( D.15 )

Nsb = 13.0 x 100 x (505.54)^0.50 x (40)^0.50 / 1000

(D.6.1)

485.318

5- Check steel strength of Stud in shear :


Vs = n x Ase x Fut
Vs =

Eq ( D.17 )
6 x 3.14/4 (16)^2 x 450 / 1000

Project
Calculated by

www.econstruct.ae

Part of Structure

AL-MENAA SPORT COMPLEX

Date

M.M

Checked by

STUD PLATE for BC 9m

27-Sep-12

Date

H.Nasr

27-Sep-12

6- Check Concrete Breakout strength of Stud in shear :

Sheet

Off

Rev.

Output

Calculations

Ref.

Proj. No.

3> SED/BED=((150+810)/(150+3795))=

0.24

>0.2

corner

Pci Design Handbook

Vcb = Vco3 (Cvcr)(Cev3)(Ch3)(Cc3)


Vco3 =

4086.6

KN

206.1

KN

210.306

KN

62.00

KN

0.45

KN

13.743

KN

41.826

KN

Vu ( Shear ) = 1.33 *62

82.460

KN

Nu ( Tension ) =

41.826

KN

16.5(f'c)0.5(BED)1.33=

Cev3 = 1/(1+0.67*(e'v/BED) =

(D.6.3)

Eq (6.5.5.9)
918.7 kip

16.5(1)(4600)^0.5((3795+150)/25.4)^1.33/1000=
1/(1+0.678(0/(3795+150)=

Ch3 =

0.75*(h/BED)^0.5=

Cc3 =

0.7*(SED/BED)^1/3= 0.7*((810+150)/(3795+3795))^(1/3)=

,Cvcr =

0.85

Vcb=

918.71*1*0.17*0.35*0.85=

0.75*(200/(3795+150))^0.5=

Eq (6.5.5.2)

Eq (6.5.5.6)

0.17

Eq (6.5.5.5)

0.35

Eq (6.5.5.10)

assume as a cracked section with edge RFT T12

46.3 kip

7- Check pryout strength of Stud in shear :


Vcp = Kcp x Ncp
For Hef > 65 mm , Kcp = 2.00
Vcp =

2.00 x105.15=

8- Calculations of Forces on One Stud :


Vu ( Total Shear Reaction from Bleacher ) =
Nu ( Total horizontal Reaction from Bleacher )
Vu per one Stud =1.33*62 / 6

=1.6*0.35*0.8=

1.6x0.35x(9.5/2) = 2.52 KN

, ( 6 studs per one angle)

Vu=62
Steel Angle

Mu = ((62*0.075)=

4.65 KN.m

Nu=0.448

Tension per Top row = 1.33*(4.65 /(150/1000)+0.448)

150

mm

Shear Studs

For check the adequacy of the stud section , please refer to MIDAS SET check
For straining actions on the angle please refer to bleacher calculation-section 8

ACI 318

9- Check Combined stresses :

(D.7)

Vn ( Shear Capacity ) = 0.75 x206.11

( From items 5, 6 & 7 )

154.585

KN

Nn ( Tension Capacity ) = 0.75 x105.15

( From items 1, 2 , 3 & 4 )

78.865

KN

Vu / Vn+Nu/Nn<=1.20
82.46 / 154.59 + 41.83 / 78.86 = 0.53 + 0.53

1.064
< 1.20 , Safe

Project

ALMENAASPORTSCOMPLEX

Calculatedby

PartofStructure
ANGLECONNECTION(9m)

Proj.No.

Date

Sheet

M.M
Checkedby

I.T

27Sep12
Date

Rev.

27Sep12

Calculations

Ref.

Output

Checkofconnectioncapacity:
ADJUST DESIGN FOR AXIAL
LOAD.

Vu=61.5
2.52 kN

Vu(MAXULTIMATEVERTICALFORCECARRIEDBYCONNECTION)

82.5

KN

Vw(MAXWORKINGVERTICALFORCECARRIEDBYCONNECTION)=Tu/1.5

55.0

KN

150

mm

150

mm

250

mm

10

mm

AngleSectionProperties:

Lv

90

mm

Lh

mm

Fy

248

MPa

ts

12

mm

Fy

248

Mpa

Stiffenerproperties:

Checkforsteelangle:
CheckofSectionY:
slotwidth=
NumberofStiffners
a(stiffenerwidthatsecY)=

0 mm
3
75 mm

y"=

12.791 mm

Iy=

2754845 mm^4

Zy=Iy/(ay")=

44283 mm^3

Mu=Vu*Lv

7.42

KN.M

Mn=Fy*Z

10.98

KN.M

AISCLRFD

0.9

1999

Mn

9.884

KN.M

(D11,D12)

Ag(Areagross)

5200

mm2

AISCLRFD

Pn=0.75FyAg

967

KN

(F11)

1999
Tu/Pn+Mu/Mn

0.84

<1

[safe]

10

10

a. 10.5m span Bleacher

6.2

58.1

65.8

4.7

47.7

5.2

72.4

44.1

73.7

6.3

4.7

43.3

59.1

45.2

66.5

2.0

50.5

72.5

2.1

47.5

73.3

3.6

45.5

44.1

midas Gen

MAX. REACTION

2.0025E+000

7.3651E+001

Z: 0.259

Y:-0.837

FILE: 10
UNIT: kN
DATE: 09/27/2012
VIEW-DIRECTION
X:-0.483

MAX : 108185
MIN : 106310

CB: 1.2DL+1.6LL

FZ:

NODE= 108185

FZ:

NODE= 106310

MIN. REACTION

FORCE-Z

POST-PROCESSOR
REACTION FORCE

Project
Calculated by

www.econstruct.ae

Part of Structure

AL-MENAA SPORT COMPLEX

Date

M.M

Checked by

STUD PLATE for BC 10.5m

27-Sep-12

Date

H.Nasr

27-Sep-12

Calculations

Ref.

Proj. No.

Sheet

Off

Rev.

Output

Properties for Different Elements

Properties

Elements
ANGLES
PLATES
HEADED STUDS

Fy (Mpa) Fult (Mpa)

Description
ASTM A36M
ASTM A36M, MINIMUM YIELD STRENGTH 250 Mpa
ASTM A108, GRADE 1010 THROUGH 1020 HEADED STUD TYPE,

250
250

400
400

350

450

ACI 318
(D.5.1)

1- Check steel strength of Stud in Tension :


Ns = n x Ase x Fut

Eq ( D.3 )

Ns = 3 x 3.14 / 4 ( 16 )^2 x450 / 1000

KN

2.0E+05

mm2

2.8E+05

mm2

KN

2- Check Concrete Breakout strength of each row of Studs in Tension :


Ncb = AN / ANo x 1 x 2 x 3 x Nb
Ano=

Eq ( D.4 )

9 x Hef^2 ==9 x (150)^2

1.5 He

(SED)
200

810
200

250

200
150

AN = (ca1+s1+1.5He)(2x1.5He) , ca1=(225+200+1.5*150)*(200+1.5*150)=
3795

(BED)

(D.5.2)

271.296

To calculate AN
Nb = K x (fc')^0.50 x Hef^1.50 = 10 x (40)^0.50 x (150)^1.50

Eq ( D.7 )

116.19

1 = 1 / ( 1 + 2e'N/3hef) = 1 / .333 = .75

Eq ( D.9 )

0.75

2 = 0.70 + 0.30 x Cmin/1.50 Hef = 0.70 + 0.30 x 100/3*150 =

Eq ( D.10 )

0.77
1.25

3(Castinanchors)=

1.5
113.916

Ncb=0.75*0.77*1.25*276250/202500*116.19
(D.5.3)

KN

3- Check Pullout strength of Stud in Tension :


Npn = 4 x Np

Eq ( D.12 )

Np = Abrg x 8 fc'
Stud
Abrg = 3.14/4 x (30^2 - 16^2)

505.54

mm2

1.00

4
Stud Head
Npn = 3 x 505.54 x 8 x 40 / 1000

(D.5.4)

KN

184.863

KN

542.592

KN

4- Check Concrete side face blowout strength of Stud in Tension :


Nsb = 13.0 x C x (Abrg)^0.50 x (fc')^0.50

Eq ( D.15 )

Nsb = 13.0 x 100 x (505.54)^0.50 x (40)^0.50 / 1000

(D.6.1)

485.318

5- Check steel strength of Stud in shear :


Vs = n x Ase x Fut
Vs =

Eq ( D.17 )
6 x 3.14/4 (16)^2 x 450 / 1000

Project
Calculated by

www.econstruct.ae

Part of Structure

AL-MENAA SPORT COMPLEX

Date

M.M

Checked by

STUD PLATE for BC 10.5m

27-Sep-12

Date

H.Nasr

27-Sep-12

Calculations

Ref.
6- Check Concrete Breakout strength of Stud in shear :

Proj. No.

Sheet

Off

Rev.

Output

3> SED/BED=((200+810)/(150+3795))=

0.26

>0.2

corner

Pci Design Handbook

Vcb = Vco3 (Cvcr)(Cev3)(Ch3)(Cc3)


Vco3 =

4086.6

KN

256.7

KN

227.832

KN

73.70

KN

0.45

KN

16.337

KN

49.606

KN

Vu ( Shear ) = 1.33 *73.7

98.021

KN

Nu ( Tension ) =

49.606

KN

16.5(f'c)0.5(BED)1.33=

Cev3 = 1/(1+0.67*(e'v/BED) =

(D.6.3)

Eq (6.5.5.9)
16.5(1)(4600)^0.5((3795+150)/25.4)^1.33/1000=
1/(1+0.678(0/(3795+150)=

Ch3 =

0.75*(h/BED)^0.5=

Cc3 =

0.7*(SED/BED)^1/3= 0.7*((810+200)/(3795+3795))^(1/3)=

,Cvcr =

0.85

Vcb=

918.71*1*0.21*0.36*0.85=

0.75*(300/(3795+150))^0.5=

918.7 kip

Eq (6.5.5.2)

Eq (6.5.5.6)

0.21

Eq (6.5.5.5)

0.36

Eq (6.5.5.10)

assume as a cracked section with edge RFT T12

57.7 kip

7- Check pryout strength of Stud in shear :


Vcp = Kcp x Ncp
For Hef > 65 mm , Kcp = 2.00
Vcp =

2.00 x113.92=

8- Calculations of Forces on One Stud :


Vu ( Total Shear Reaction from Bleacher ) =
Nu ( Total horizontal Reaction from Bleacher )
Vu per one Stud =1.33*73.7 / 6

=1.6*0.35*0.8=

1.6x0.35x(10.5/2) = 2.94kN

, ( 6 studs per one angle)

Vu=73.7
Steel Angle

Mu = ((73.7*0.075)=

5.53 KN.m

Nu=0.448

Tension per Top row = 1.33*(5.53 /(150/1000)+0.448)

150

mm

Shear Studs

For check the adequacy of the stud section , please refer to MIDAS SET check
For straining actions on the angle please refer to bleacher calculation-section 8

ACI 318

9- Check Combined stresses :

(D.7)

Vn ( Shear Capacity ) = 0.75 x227.83

( From items 5, 6 & 7 )

170.874

KN

Nn ( Tension Capacity ) = 0.75 x113.92

( From items 1, 2 , 3 & 4 )

85.437

KN

Vu / Vn+Nu/Nn<=1.20
98.02 / 170.87 + 49.61 / 85.44 = 0.57 + 0.58

1.154
< 1.20 , Safe

Project

ALMENAASPORTSCOMPLEX

Calculatedby

PartofStructure
ANGLECONNECTION(10.5m)

Proj.No.

Date

Sheet

M.M
Checkedby

I.T

27Sep12
Date

Rev.

27Sep12

Calculations

Ref.

Output

Checkofconnectioncapacity:
ADJUST DESIGN FOR AXIAL
LOAD.

Vu=61.5
2.94 kN

Vu(MAXULTIMATEVERTICALFORCECARRIEDBYCONNECTION)

98.0

KN

Vw(MAXWORKINGVERTICALFORCECARRIEDBYCONNECTION)=Tu/1.5

65.3

KN

150

mm

150

mm

250

mm

10

mm

AngleSectionProperties:

Lv

90

mm

Lh

mm

Fy

248

MPa

ts

12

mm

Fy

248

Mpa

Stiffenerproperties:

Checkforsteelangle:
CheckofSectionY:
slotwidth=
NumberofStiffners
a(stiffenerwidthatsecY)=

0 mm
3
75 mm

y"=

12.791 mm

Iy=

2754845 mm^4

Zy=Iy/(ay")=

44283 mm^3

Mu=Vu*Lv

8.82

KN.M

Mn=Fy*Z

10.98

KN.M

AISCLRFD

0.9

1999

Mn

9.884

KN.M

(D11,D12)

Ag(Areagross)

5200

mm2

AISCLRFD

Pn=0.75FyAg

967

KN

(F11)

1999
Tu/Pn+Mu/Mn

0.99

<1

[safe]

e.construct

Project

Tel. +9714-391-1015
Fax 9714-391-6860
Dubai Internet City
P.O.Box 500288

Calculated by

Date

Checked by

Date

Almenaa Stadium

Part of Structure

Comparizon Between Steel Plate

3-Sep-12
3-Sep-12

Calculations

Ref.

Lose Plate

Sheet

Off

Rev.

Output

Comparizon Between Steel Size


Hard Ware
Tread embeded
Plate
Wall embeded
Plate

Proj. No.

Contract Connection

Proposed Connection

6x40x150 w/ (2) -13 Dia x 600 DBA

10x100x100 w/ (2) -12 Dia x 500 DBA w/ (2) -10


Dia x 50 mm LG.

6x150x150 w/ (4) -10 Dia x 100 LG. HAS

10x150x200 w/ (4) -16 Dia x 150 LG. HAS

13 Dia x 100 A36 Rod

L 100 x 100 x 8

3.7

40.0

46.7

3.0

36.6

48.7

3.1

2.9

36.0

41.1

48.8

3.9

46.6

1.7

35.2

38.2

29.9

48.3

1.9

37.7

48.3

3.0

35.8

29.6

midas Gen

MAX. REACTION

1.7492E+000

4.8787E+001

Z: 0.259

Y:-0.837

FILE: 7
UNIT: kN
DATE: 09/27/2012
VIEW-DIRECTION
X:-0.483

MAX : 114761
MIN : 106310

CB: 1.2DL+1.6LL

FZ:

NODE= 114761

FZ:

NODE= 106310

MIN. REACTION

FORCE-Z

POST-PROCESSOR
REACTION FORCE

Project
Calculated by

www.econstruct.ae

Part of Structure

AL-MENAA SPORT COMPLEX

Date

M.M

Checked by

STUD PLATE for BC 7.5m

27-Sep-12

Date

H.Nasr

27-Sep-12

Calculations

Ref.

Proj. No.

Sheet

Off

Rev.

Output

Properties for Different Elements

Properties

Elements
ANGLES
PLATES

Fy (Mpa) Fult (Mpa)

Description
ASTM A36M
ASTM A36M, MINIMUM YIELD STRENGTH 250 Mpa

250
250

400
400

ASTM A108, GRADE 1010 THROUGH 1020 HEADED STUD TYPE,

350

450

HEADED STUDS

ACI 318
(D.5.1)

1- Check steel strength of Stud in Tension :


Ns = n x Ase x Fut

Eq ( D.3 )

Ns = 4 x 3.14 / 4 ( 16 )^2 x450 / 1000

KN

3.6E+05

mm2

3.2E+05

mm2

KN

2- Check Concrete Breakout strength of each row of Studs in Tension :


Ncb = AN / ANo x 1 x 2 x 3 x Nb
Ano=

9 x Hef^2 =

Eq ( D.4 )
=9 x (200)^2

1.5 He

(SED)
300
3000
60

300

60
200

AN = (ca1+s1+1.5He)(2x1.5He) , ca1=(300+300+1.5*200)*(60+1.5*200)=
640

(BED)

(D.5.2)

361.728

To calculate AN
Nb = K x (fc')^0.50 x Hef^1.50 = 10 x (40)^0.50 x (150)^1.50

Eq ( D.7 )

178.89

1 = 1 / ( 1 + 2e'N/3hef) = 1 / .333 = .75

Eq ( D.9 )

0.75

2 = 0.70 + 0.30 x Cmin/1.50 Hef = 0.70 + 0.30 x 100/3*150 =

Eq ( D.10 )

0.77

1.5

3(Castinanchors)=

1.25
115.706

Ncb=0.75*0.77*1.25*324000/360000*178.89
(D.5.3)

KN

3- Check Pullout strength of Stud in Tension :


Npn = 4 x Np

Eq ( D.12 )

Np = Abrg x 8 fc'
Stud
Abrg = 3.14/4 x (30^2 - 16^2)

505.54

mm2

1.00

4
Stud Head
Npn = 4 x 505.54 x 8 x 40 / 1000

(D.5.4)

KN

184.863

KN

723.456

KN

4- Check Concrete side face blowout strength of Stud in Tension :


Nsb = 13.0 x C x (Abrg)^0.50 x (fc')^0.50

Eq ( D.15 )

Nsb = 13.0 x 100 x (505.54)^0.50 x (40)^0.50 / 1000

(D.6.1)

647.091

5- Check steel strength of Stud in shear :


Vs = n x Ase x Fut
Vs =

Eq ( D.17 )
8 x 3.14/4 (16)^2 x 450 / 1000

Project
Calculated by

www.econstruct.ae

Part of Structure

AL-MENAA SPORT COMPLEX

Date

M.M

Checked by

STUD PLATE for BC 7.5m

27-Sep-12

Date

H.Nasr

27-Sep-12

Calculations

Ref.
6- Check Concrete Breakout strength of Stud in shear :

-SED/BED=

Proj. No.

Sheet

Off

Rev.

Output
3.928571429

>3 not corner condition

Pci Design Handbook

Vcb = Vco3 (Cvcr)(Cev3)(Ch3)(Cx3)


Vco3 =

522.3

KN

294.5

KN

231.413

KN

49.00

KN

0.90

KN

8.146

KN

41.928

KN

Vu ( Shear ) = 1.33 *49

65.170

KN

Nu ( Tension ) =

41.928

KN

16.5(f'c)0.5(BED)1.33=

Cev3 = 1/(1+0.67*(e'v/BED) =

(D.6.3)

Eq (6.5.5.9)
16.5(1)(4600)^0.5((640+200)/25.4)^1.33/1000=
1/(1+0.678(0/(640+200)=

117.4 kip

Eq (6.5.5.2)

Eq (6.5.5.6)

Ch3 =

0.75*(h/BED)^0.5=

0.75*(700/(640+200))^0.5=

0.68

Eq (6.5.5.5)

Cx3 =

0.85+(X/3BED) =

=0.85+(300/(3*(640+200)))

0.97

Eq (6.5.5.4)

,Cvcr =

0.85

Vcb=

117.42*1*0.68*0.97*0.85=

assume as a cracked section with edge RFT T12

66.2 kip

7- Check pryout strength of Stud in shear :


Vcp = Kcp x Ncp
For Hef > 65 mm , Kcp = 2.00
Vcp =

2.00 x115.71=

8- Calculations of Forces on One Stud :


Vu ( Total Shear Reaction from Bleacher ) =
Nu ( Total horizontal Reaction from Bleacher ) =
Vu per one Stud =1.33*49 / 8

1.6*0.15*7.5/2 =

, ( 8 studs per one angle)

Vu=49
Steel Angle

Mu = ((49*0.125)=

6.13 KN.m

Nu=0.9

Tension per Top row = 1.33*(6.13 /(200/1000)+0.9)

200

mm

Shear Studs

For check the adequacy of the stud section , please refer to MIDAS SET check
For straining actions on the angle please refer to bleacher calculation-section 8

ACI 318

9- Check Combined stresses :

(D.7)

Vn ( Shear Capacity ) = 0.75 x231.41

( From items 5, 6 & 7 )

173.560

KN

Nn ( Tension Capacity ) = 0.75 x115.71

( From items 1, 2 , 3 & 4 )

86.780

KN

Vu / Vn+Nu/Nn<=1.20
65.17 / 173.56 + 41.93 / 86.78 = 0.38 + 0.48

0.859
< 1.20 , Safe

Project

ALMENAASPORTSCOMPLEX

Calculatedby

PartofStructure
ANGLECONNECTION(7.5m)

Proj.No.

Date

Sheet

M.M
Checkedby

I.T

27Sep12
Date

Rev.

27Sep12

Calculations

Ref.

Output

Checkofconnectioncapacity:
ADJUST DESIGN FOR AXIAL
LOAD.
Vu=61.5

0.9 kN

Vu(MAXULTIMATEVERTICALFORCECARRIEDBYCONNECTION)

65.2

KN

Vw(MAXWORKINGVERTICALFORCECARRIEDBYCONNECTION)=Tu/1.5

43.4

KN

200

mm

200

mm

250

mm

10

mm

Lv

125

mm

Lh

mm

Fy

248

MPa

AngleSectionProperties:

Stiffenerproperties:
ts

12

mm

Fy

248

Mpa

Checkforsteelangle:
CheckofSectionY:
slotwidth=

0 mm

NumberofStiffners

a(stiffenerwidthatsecY)=

75 mm

y"=

12.791 mm

Iy=

2754845 mm^4

Zy=Iy/(ay")=

44283 mm^3

Mu=Vu*Lv

8.15

KN.M

(F11)

Mn=Fy*Z

10.98

KN.M

AISCLRFD

0.9

1999

Mn

9.884

KN.M

(D11,D12) Ag(Areagross)

5200

mm

AISCLRFD

967

KN

Pn=0.75FyAg

1999
Tu/Pn+Mu/Mn

0.89

<1

[safe]

Você também pode gostar