B: CH 4 - CH 10
1) In BILGE MENU, open the valve corresponding to CH in alarm
2) Start Bilge/Fire Pump No 1
3) After alarm goes off, leave it running for 5 minutes more, then stop pump and
close all valves.
B: WATER IN BY PUMP
1) Open sea chest valve BA 45 / BA 43(depends which side you need)
2) Following the way through nearest ballast pump, open throttle valves BA47/48/49/50 up to 90-100% to reduce pressure on line.
3) Open all valves on the main ballast line and valve for tanks you want to fill up
4) Start the ballast pump (only one for filling up!!!)
5) Check delivery pressure on pump, adjust from throttle valves(BA 47/48) to
be less than 2.5-3 bars
6) Close all valves
REMARK: ALWAYS FILL UP AT LEAST 2 TANKS IN ORDER TO HAVE A
SMALLER DELIVERY PRESSURE!!!