Lars Babendererde
BABENDERERDE
ENGINEERS
www.babeng.com
www.babeng.com
Rock
cohesion
Face
Cu
Support
KN/m
-
Lining
Install.
Jointing
RQD
Grain size
Water Ingress
Face
Support
Shield
100
90 %
>2m
Lining
Install.
Volume
per 30 m
Consequences
on
unlimited
pump capacity
behind
TBM
90
75 %
2.0
0.6 m
behind
TBM
unlimited
pump capacity
100
50
behind
TBM
75
50 %
0.6
0.2 m
possible
behind
TBM
> 20 l/s
pump capacity
50
25
recom.
behind
TBM
50
25 %
0.2
0.06 m
possibly
mech.
recom.
in
TBM
area
> 10 l/s
face support
25
5
recom.
mech.
required
under
shield
> 5 l/s
face support
mech.,
possibly required
EPB/Slurry
under
shield
> 2 l/s
methodology
vary
mech.,
possibly required
EPB/Slurry
under
shield
> 2 l/s
methodology
> 30 %
mech.,
possibly required
EPB/Slurry
under
shield
> 2 l/s
methodology
> 2 l/s
methodology
> 2 l/s
methodology
> 2 l/s
methodology
<1
www.babeng.com
Rock Structure
250
100
5
1
Soil
Shield
under
shield
required
under
shield
30
10
recom. required
under
shield
10
5
5
1
required required
required required
recom. required
> 30
under
shield
grout.
under
shield
immed.
grout.
under
shield
immed.
grout.
> 20 %
< 50 %
EPB /
Slurry
> 10 %
< 30 %
EPB /
Slurry
> 10 %
< 20 %
EPB /
Slurry
under
shield
required immed.
grout.
under
shield
required immed.
grout.
under
shield
required immed.
grout.
www.babeng.com
No face support
Mechanical support
Compressed air
Active, by support medium:
EPB or Slurry
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
Schluff
fein
Sand
mittel
grob
fein
Kies
mittel
grob
fein
Steine
mittel
Blcke
[%]
grob
100
90
80
70
60
50
40
30
Slurry-TBM drives
1. Lyon
2. Hamburg
3. Grauholztunnel
4. Wesertunnel
5. Zrich, Hermetschloo-Werdhlzli
6. Zrich, Thalwil
7. Portland, Gravel Alluvium
8. Wittenberg (polymer suspension)
20
10
0
0,002
0,006
0,02
0,06
0,2
0,63
6,3
20
63
100
200
1000
100
90
80
70
60
50
40
10
11
30
20
10
0
0,002
0,006
0,02
0,06
0,2
0,63
Grain-size [mm]
www.babeng.com
6,3
20
63
100
200
1000
EPB-TBM drives
9. Essen, U-Bahn Los 32/33
10. Milano, Passante Ferroviario
11. Metro Porto
Slurry limitation
High content of fines < 0,06 mm requires expensive separation process
EPB limitation
High permeability k > 10- m/s requires intensive conditioning
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
120.000
14.000
100.000
12.000
10.000
80.000
8.000
60.000
6.000
40.000
4.000
20.000
2.000
0
Open TBM Shielded TBM EPB-TBM
www.babeng.com
Slurry-TBM
Torque [kNm]
Thrust [kN]
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
Herrentunnel
under river Trave
11,7m
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com
www.babeng.com