When warming up the V-3/4 &V-18, line up feed gas and establish
3.5-5 knm3/h flow to flare from V-018. Keep V-49-003 inlet
temperature set at 385C.
When the H2S is <0.2 ppm and HCL/Chloride <0.1 ppm, start for
warm up LTSC & prepare and cut in feed to reformer catalyst
tubes
Note:
LTSC warm up can be done from other running HP unit V-018
outlet gas
When CO2 Absorber outlet gas result CO + CO2 content less than
1.3 % , start warming up methanator, flare the gas through PCV023B,
Precautions
While increasing Reformer / system temperature and pressure, to
check for any leak from all the system
Arch
temperatur
e oC
275
300
350
400
500
600
700
Total steam
flow FIC-019
Tons/hr
20
20
20
20
28
36
38
Reformer
back pressure
kg/cm2
0
2
4
5
7
9
11
Steam generation
system pressure
kg/cm2
7
10
15
20
25
29
30
11.
Once all burners are inline, set the reformer heater
minimum firing at 0.058 kg/cm2 LP fuel gas pressure and car
seal the HCV-062/063,
12.
Start Benfield circulation by H2 pressure from other
running HP unit,
13.
Benfield system is ready to receive feed from HTSC and
start warming up of HTSC as per procedure,
14.
When the feed gas from V-018 outlet sample results:
H2S is <0.2 ppm and HCL/Chloride <0.1 ppm, prepare and
cut in feed to reformer catalyst tubes as per procedure,
15.
Increase feed gas to reformer to 1.2 tons/hr per each
cell (total 2.4 tons/hr) and maintain reformer back pressure
at 17.0 kg/cm2 ,
16.
Start venting u/s of CO2 Absorber and maintain
reformer back pressure and reboiler level,
17.
Pressurize the CO2 absorber and start venting u/s of
methanator through PCV-022 ( make sure V-007 inlet B/V,
XV-903 and its bypass B/V close),
18.
19.
After ONE hour, send CO2 absorber outlet sample to lab
to check for CO and CO2,
20.
Increase feed gas to reformer to 2.3 tons/hr per each
cell (total 4.6 tons/hr),
21.
When CO2 Absorber outlet gas result CO + CO2 content
less than 1.3 % , start warming up methanator, flare the gas
through PCV-023B,
22.
Send H2 product sample to lab to check H2,CH4,and CO
/ CO2,if result CO / CO2 is <20 ppm and H2 is >96%,route
product H2 to H2 header and line up recycle H2.
23.
Check V-010 / 011 process condensate sample and
route V-10 / 11 condensate to V013.
24.