Republic of the Philippines

OFFICE OF THE CITY ENGINEER


Zamboanga City

PROGRAM OF WORKS

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COM


Project Name & Location

ITEM NO.

DESCRIPTION

MATERIALS

LABOR

EQUIPMENT

JOB ORDER

SUB-TOTAL

A. EXISTING BLEACHERS
A1. BLEACHER I (MAIN BLEACHER): AREA = 3,094.45 SQUARE METERS
I

MASONRY WORKS

II

ROOFING WORKS

86,652.50

101,450.00

188,102.50

2,688,776.00

101,450.00

2,790,226.00

III

DOORS

683,960.00

683,960.00

IV

WINDOWS

945,093.00

945,093.00

WINDOW GRILLES

6,092.00

6,092.00

VI

SEPTIC VAULT

VII

TILE WORKS

VIII

PLUMBING WORKS

IX

ELECTRICAL WORKS

PAINTING WORKS

94,165.50

117,520.00

2,600.00

214,285.50

1,015,079.00

218,320.00

8,000.00

1,241,399.00

576,037.00

31,896.00

607,933.00

1,876,734.50

117,520.00

1,994,254.50

703,341.50

285,000.00

988,341.50

2,631.53

560.00

3,191.53

8,493.25

2,994.00

General Repaintings
SUB-TOTAL =
A2. OFFICE AREA
I

REINFORCED CONCRETE WORKS


Includes: Lavatory Counter

II

FABRICATION OF CABINET

400.00

11,887.25

(Note: Use well-seasoned lumber)


Includes: Fabrication & installation of wooden hanging cabinet
III

DOOR

2,644.00

2,644.00

Doors (Job Order)


IV

PLUMBING WORKS

8,218.50

2,994.00

11,212.50

9,608.50

2,994.00

226,488.00

117,520.00

344,008.00

3,954.25

1,120.00

5,074.25

Includes: Repiping of Sanitary System & Water Supply System;


Supply & Installation of Plumbing Fixtures and Accessories
V

TILEWORKS

400.00

13,002.50

Includes: Supply & Installation of Tiles


VI

ELECTRICAL WORKS
Pleb Office (Ground Floor) and Sports Office (Second & Third Floor)

VII

PAINTING WORKS
Includes: Repainting

Page 1

Republic of the Philippines

OFFICE OF THE CITY ENGINEER


Zamboanga City

PROGRAM OF WORKS

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COM


Project Name & Location

ITEM NO.

DESCRIPTION

MATERIALS

LABOR

EQUIPMENT

JOB ORDER

SUB-TOTAL

SUB-TOTAL =
A3. COMFORT ROOM NO.1
CR #1 TOTAL FLOOR AREA = 130,977 SQ.M.
I

REMOVAL OF STRUCTURE AND OBSTRUCTION

15,948.00

1,900.00

17,848.00

Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.
II

LAYOUT AND EXCAVATION

1,680.00

1,680.00

Includes: Wall footing


III

REINFORCING STEEL

21,010.00

4,491.00

1,550.00

27,051.00

61,752.50

12,588.00

2,600.00

76,940.50

12,135.75

2,994.00

15,129.75

Includes: Stiffener Column, Lintel Beam, Wall footing,


Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete Partitions
IV

STRUCTURAL CONCRETE
(Includes 14 days curing period)
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete Partitions, Repair of Wall Cracks

MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)

VI

PLUMBING WORKS

114,344.50

31,896.00

146,240.50

VII

ELECTRICAL WORKS

36,170.75

7,485.00

43,655.75

VIII

TILE WORKS

80,264.50

17,770.00

1,200.00

99,234.50

CARPENTRY WORKS

36,239.75

8,885.00

800.00

45,924.75

IX

Includes: Installation of new Ceiling Board, Ceiling Joist,


Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs

Page 2

Republic of the Philippines

OFFICE OF THE CITY ENGINEER


Zamboanga City

PROGRAM OF WORKS

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COM


Project Name & Location

ITEM NO.
X

DESCRIPTION

MATERIALS

LABOR

EQUIPMENT

DOORS

JOB ORDER

SUB-TOTAL

25,800.00

25,800.00

Includes: Painting
XI

WINDOWS

2,094.00

2,094.00

XII

WINDOW GRILLES

6,092.00

6,092.00

33,000.00

33,000.00

86,512.00

86,512.00

16,760.00

16,760.00

Includes: Painting
XIII

ROLL-UP DOOR SHUTTER


Includes: Painting

XIV

STEEL RAILING
Supply, Fabrication & Installation of Stair Rail, and Wall
Mounted Rail

XV

SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign
SUB-TOTAL =

A4. COMFORT ROOM NO. 2


CR #2 TOTAL AREA = 107.813 SQ.M.
I

REMOVAL OF STRUCTURE AND OBSTRUCTION

17,628.00

1,900.00

19,528.00

Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.
II

LAYOUT AND EXCAVATION

560.00

560.00

1,120.00

8,104.50

Includes: Wall Footing


III

REINFORCING STEEL

6,984.50

Includes: Stiffener Column, Lintel Beam, Wall footing,


Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions

Page 3

Republic of the Philippines

OFFICE OF THE CITY ENGINEER


Zamboanga City

PROGRAM OF WORKS

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COM


Project Name & Location

ITEM NO.

IV

DESCRIPTION

MATERIALS

STRUCTURAL CONCRETE

LABOR

EQUIPMENT

JOB ORDER

5,200.00

SUB-TOTAL

54,839.00

14,268.00

74,307.00

30,890.00

10,285.00

41,175.00

151,202.75

35,670.00

186,872.75

(Includes 28 days curing period)


Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions
V

MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)

VI

PLUMBING WORKS

VII

ELECTRICAL WORKS

VIII

TILE WORKS

IX

CARPENTRY WORKS

35,546.75

5,988.00

143,042.50

33,292.00

1,200.00

177,534.50

41,534.75

41,254.50

11,890.00

800.00

53,944.50

Includes: Installation of new Ceiling Board, Ceiling Joist,


Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs
X

DOORS

29,400.00

29,400.00

WINDOWS

1,435.00

1,435.00

WINDOW GRILLES

4,028.40

4,028.40

33,000.00

33,000.00

29,580.00

29,580.00

16,760.00

16,760.00

Includes: Painting
XI
XII

Includes: Painting
XIII

ROLL-UP DOOR SHUTTER


Includes: Painting

XIV

STEEL RAILING
Supply, Fabrication & Installation of Mid Rail, and Wall
Mounted Rail

XV

SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign
SUB-TOTAL =

Page 4

Republic of the Philippines

OFFICE OF THE CITY ENGINEER


Zamboanga City

PROGRAM OF WORKS

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COM


Project Name & Location

ITEM NO.

DESCRIPTION

MATERIALS

LABOR

EQUIPMENT

JOB ORDER

SUB-TOTAL

A5. COMFORT ROOM NO. 3


CR # 3 TOTAL FLOOR AREA = 249.984 SQ.M.
I

REMOVAL OF STRUCTURE AND OBSTRUCTION

23,504.00

3,800.00

27,304.00

Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.
II

LAYOUT AND EXCAVATION

2,520.00

2,520.00

Includes: Wall Footing


III

REINFORCING STEEL

47,041.00

12,588.00

400.00

60,029.00

141,377.50

35,256.00

7,800.00

184,433.50

48,387.00

11,890.00

60,277.00

181,801.00

35,670.00

217,471.00

42,500.50

10,662.00

53,162.50

Includes: Stiffener Column, Lintel Beam, Wall footing,


Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions
IV

STRUCTURAL CONCRETE
(Includes 28 days curing period)
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions, Repair of Wall Cracks

MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)

VI

PLUMBING WORKS

VII

ELECTRICAL WORKS

VIII

TILE WORKS

220,618.00

42,528.00

1,200.00

264,346.00

CARPENTRY WORKS

124,308.50

28,536.00

1,200.00

154,044.50

IX

Includes: Installation of new Ceiling Board, Ceiling Joist,


Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs,

Page 5

Republic of the Philippines

OFFICE OF THE CITY ENGINEER


Zamboanga City

PROGRAM OF WORKS

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COM


Project Name & Location

ITEM NO.

DESCRIPTION

MATERIALS

LABOR

EQUIPMENT

JOB ORDER

SUB-TOTAL

Lockers and Pre-fab stool


X

DOORS

73,200.00

73,200.00

Includes: Painting
XI

WINDOWS

3,170.00

3,170.00

XII

WINDOW GRILLES

7,092.80

7,092.80

33,000.00

33,000.00

88,902.00

88,902.00

17,320.00

17,320.00

Includes: Painting
XIII

ROLL-UP DOOR SHUTTER


Includes: Painting

XIV

STEEL RAILING
Supply, Fabrication & Installation of Stair Rail, and Wall
Mounted Rail

XV

SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign
SUB-TOTAL =

A6. COMFORT ROOM NO. 4


CR #4 TOTAL FLOOR AREA = 175.184 SQ.M.
I

REMOVAL OF STRUCTURE AND OBSTRUCTION

20,566.00

3,800.00

24,366.00

Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.
II

LAYOUT AND EXCAVATION

560.00

560.00

4,491.00

20,856.00

Includes: Wall Footing


III

REINFORCING STEEL

16,365.00

Includes: Stiffener Column, Lintel Beam, Wall Footing,

Page 6

Republic of the Philippines

OFFICE OF THE CITY ENGINEER


Zamboanga City

PROGRAM OF WORKS

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COM


Project Name & Location

ITEM NO.

DESCRIPTION

MATERIALS

LABOR

EQUIPMENT

JOB ORDER

SUB-TOTAL

Concrete Slab, Ramp, Steps, Floor Lintel Beam,


Suspended concrete partitions
IV

STRUCTURAL CONCRETE

35,076.25

9,512.00

44,588.25

4,767.50

1,120.00

5,887.50

139,923.25

30,855.00

170,778.25

(Includes 28 days curing period)


Includes: Stiffener Column, Lintel Beam, Wall Footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended concrete partitions
V

MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)

VI

PLUMBING WORKS

VII

ELECTRICAL WORKS

VIII

TILE WORKS

IX

CARPENTRY WORKS

40,967.25

10,662.00

156,473.00

29,380.00

2,000.00

187,853.00

51,629.25

64,303.50

16,784.00

800.00

81,887.50

Includes: Installation of new Ceiling Board, Ceiling Joist,


Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs,
Lockers and Pre-fab stool
X

DOORS

35,700.00

35,700.00

Includes: Painting
XI

WINDOWS

1,704.00

1,704.00

XII

WINDOW GRILLES

4,894.00

4,894.00

33,000.00

33,000.00

88,902.00

88,902.00

17,040.00

17,040.00

Includes: Painting
XIII

ROLL-UP DOOR SHUTTER


Includes: Painting

XIV

STEEL RAILING
Supply, Fabrication & Installation of Stair Rail, and Wall
Mounted Rail

XV

SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign
SUB-TOTAL =

Page 7

Republic of the Philippines

OFFICE OF THE CITY ENGINEER


Zamboanga City

PROGRAM OF WORKS

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COM


Project Name & Location

ITEM NO.

DESCRIPTION

MATERIALS

LABOR

EQUIPMENT

JOB ORDER

SUB-TOTAL

A7. BLEACHER II: AREA = 578.28 SQUARE METERS


I

ROOFING WORKS

1,348,394.00

41,132.00

1,389,526.00

II
III

ELECTRICAL WORKS

347,178.75

58,760.00

405,938.75

PAINTING WORKS

261,116.00

78,822.00

339,938.00

SUB-TOTAL =
A8. BLEACHER III: AREA = 358.76 SQUARE METERS
I

ROOFING WORKS

1,229,725.50

58,760.00

II

TILE WORKS

480,997.00

81,160.00

1,288,485.50

III

PLUMBING WORKS

183,173.00

35,670.00

218,843.00

IV

ELECTRICAL WORKS

275,641.50

58,760.00

334,401.50

PAINTING WORKS

204,035.00

57,924.00

VI

GRILLES

27,440.00

27,440.00

VII

DOORS AND WINDOWS

43,588.00

43,588.00

34,948.00

6,000.00

568,157.00

261,959.00

SUB-TOTAL =
B. REHABILITATION / IMPROVEMENT OF SWIMMING POOL AREA
AREA = 2,055 SQUARE METERS
Includes:
1. SWIMMING POOL SHED
2. ELECTRICAL
3. GATES
4. PAINTING WORKS OF BLEACHERS

B1. SWIMMING POOL SHED


103
SPL-1
104

LAYOUT AND EXCAVATION WORKS

14,948.00

20,000.00

BACKFILLING WORKS

22,400.00

4,800.00

27,200.00

127,280.00

20,936.00

18,750.00

166,966.00

318,606.00

73,044.00

17,200.00

408,850.00

EMBANKMENT
Note: Provide 200mm Thick Embankment

405

STRUCTURAL CONCRETE
(Includes 14 days curing period)

Page 8

Republic of the Philippines

OFFICE OF THE CITY ENGINEER


Zamboanga City

PROGRAM OF WORKS

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COM


Project Name & Location

ITEM NO.

DESCRIPTION

MATERIALS

LABOR

EQUIPMENT

JOB ORDER

SUB-TOTAL

Note: Includes Footing & Column

409

BUILT-UP STEEL FRAMES

1,495,876.00

272,900.00

45,200.00

1,813,976.00

979,821.78

183,000.00

16,800.00

1,179,621.78

(Note: Includes Fabrication and Painting of Steel Frame,


Sway Brace, Base Plate)
1013

ROOFING WORKS
(Note: Use Pre-painted Rib Motiff Roofing)
(Includes: Installation of Pre-prepainted Rib Motiff Longspan
Roofing Sheets, Pre-painted EF & Pre-painted Ridge Roll,

Fascia Holder, Fascia Board, Sag Rod, Tension Rod, Turn Buckle & Purlins)
SPL-2

ELECTRICAL WORKS

161,942.50

29,380.00

191,322.50

1032

PAINTING WORKS

117,888.50

24,684.00

142,572.50

2,994.00

301,994.00

(Includes: Double Coating Paint)


(Includes: Structural Steel, Fascia Board, Movable Goal, Roof Marking & Line Marking)
SUB-TOTAL =
B2.

ELECTRICAL WORKS

299,000.00
SUB-TOTAL =

B3.

GATES

18,000.00

18,000.00

SUB-TOTAL =
B4.

PAINTING WORKS (BLEACHER)

139,947.00

31,896.00

171,843.00

SUB-TOTAL =

C. SCUPPER DRAIN AND CONCRETING OF WALKWAY


I

DEMOLITION AND EXCAVATION WORKS

II

REINFORCING STEEL BARS

19,308.00

10,000.00

29,308.00

58,406.00

12,342.00

9,300.00

80,048.00

32,441.00

6,171.00

38,612.00

3,850.00

2,240.00

6,090.00

(Includes Steel Grating)


III

CONCRETE WORKS
(Includes 14 days curing period)

IV

AGGREGATE SUB-BASE COURSE

Page 9

Republic of the Philippines

OFFICE OF THE CITY ENGINEER


Zamboanga City

PROGRAM OF WORKS

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COM


Project Name & Location

ITEM NO.

DESCRIPTION

MATERIALS

LABOR

EQUIPMENT

JOB ORDER

SUB-TOTAL

(Loose Volume)
V

PORTLAND CEMENT CONCRETE PAVEMENT

22,100.00

5,876.00

2,600.00

30,576.00

2,135.00

Vol. of Concrete = 5.31 cu.m.


SUB-TOTAL =
D. CONCRETE PAVEMENT
I

SUB-GRADE PREPARATION

II

AGGREGATE SUB-BASE COURSE

III

PORTLAND CEMENT CONCRETE PAVEMENT

560.00

1,575.00

4,400.00

2,240.00

3,150.00

9,790.00

30,703.00

10,468.00

3,550.00

44,721.00

(Includes 28 days curing period)


Thickness (Pavement): 0.15 m.
Area of Pavement: 42.18 sq.m.
Volume of Concrete: 6.33 cu.m.
SUB-TOTAL =
E. PERIMETER LIGHTS AT PLAYING FIELD AND STREETLIGHTS
E.1. PERIMETER LIGHTS AT PLAYING FIELD
I

PEDESTAL FOOTING

72,364.75

17,628.00

II

CONCRETE POST (1 UNIT)

11,627.50

4,114.00

15,741.50

III

UNDERGROUND ENCASEMENT

177,900.00

44,070.00

221,970.00

5,141,168.50

735,672.00

IV

ELECTRICAL WORKS

89,992.75

38,400.00

8,500.00

5,923,740.50

Includes 3 units 7,000W, LED Field Lights


E.2. TENNIS COURT AT BLEACHER #2
I

PEDESTAL FOOTING

18,222.50

5,331.00

23,553.50

II

UNDERGROUND ENCASEMENT

132,140.00

29,380.00

161,520.00

III

ELECTRICAL WORKS

688,938.75

92,360.00

38,400.00

8,500.00

828,198.75

E.3. TENNIS COURT AT BLEACHER #3


I

PEDESTAL FOOTING

II

UNDERGROUND ENCASEMENT

III

ELECTRICAL WORKS

E.4

FLOOD LIGHTS

18,222.50

5,331.00

23,553.50

132,140.00

29,380.00

161,520.00

346,162.75

60,870.00

38,400.00

8,500.00

453,932.75

1,872,934.50

382,060.00

38,400.00

100,000.00

2,393,394.50

SUB-TOTAL =
F. RUBBERIZED PLAYING FIELD

Page 10

Republic of the Philippines

OFFICE OF THE CITY ENGINEER


Zamboanga City

PROGRAM OF WORKS

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COM


Project Name & Location

ITEM NO.
I

DESCRIPTION

MATERIALS

LABOR

EQUIPMENT

RUBBERIZED PLAYING FIELD

JOB ORDER
75,509,031.00

SUB-TOTAL
75,509,031.00

SUB-TOTAL =

G. SITE DEVELOPMENT
104

EMBANKMENT

105

SUB-GRADE PREPARATION

1,677,150.00

200

AGGREGATE SUB-BASE COURSE PREPARATION

311

PORTLAND CEMENT CONCRETE PAVEMENT

10,285.00

326,500.00

28,798.00

262,500.00

291,298.00

3,375,559.00

28,798.00

373,500.00

3,777,857.00

8,356,233.00

653,590.00

1,700,900.00

10,710,723.00

48,270.00

10,000.00

2,013,935.00

SUB-TOTAL =
H. DRAINAGE SYSTEM
I

EXCAVATION

II

REINFORCING STEEL BAR

1,719,443.50

48,270.00

III

CONCRETE WORKS

3,522,712.20

773,490.00

IV

DISPOSAL OF EXCAVATED MATERIALS

58,270.00
1,767,713.50

241,800.00

4,538,002.20

587,600.00

587,600.00

SUB-TOTAL =
I. FENCE: L=465.32 m.
I

REMOVAL OF STRUCTURE AND OBSTRUCTIONS

274,320.00

II

LAYOUT AND EXCAVATION

109,160.00

III

REINFORCING STEEL BAR

IV

STRUCTURAL CONCRETE

MASONRY WORKS

VI

GATE

VII

PAINTING WORKS

982,630.00

48,270.00

789,258.85
1,909,892.25

274,320.00
109,160.00
9,600.00

1,040,500.00

172,865.00

59,800.00

1,021,923.85

375,000.00

110,000.00

2,394,892.25
125,750.00

279,082.00

44,070.00

125,750.00
323,152.00

SUB-TOTAL =
J. FENCE FRONTING WMSU
LENGTH = 60.61 M.
POST = 17 POST
I

LAYOUT AND EXCAVATION

II

REINFORCING STEEL BAR

III

STRUCTURAL CONCRETE

17,628.00

17,628.00

70,865.00

22,627.00

1,600.00

95,092.00

109,120.00

35,055.00

5,200.00

149,375.00

Page 11

Republic of the Philippines

OFFICE OF THE CITY ENGINEER


Zamboanga City

PROGRAM OF WORKS

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COM


Project Name & Location

ITEM NO.

DESCRIPTION

IV

MASONRY WORKS

GRILLE'S FENCE

VI

GATE AND GUARD HOUSE

VII

PAINTING WORKS

MATERIALS

LABOR

90,114.50

26,442.00

205,445.00

58,760.00

21,316.50

7,485.00

EQUIPMENT

JOB ORDER

7,200.00
6,550.00

SUB-TOTAL
123,756.50

160,000.00

160,000.00

308,000.00

578,755.00
28,801.50

SUB-TOTAL =
K. FENCE ALONG WEST NATIONAL HIGH SCHOOL (EXTENSION)
LENGTH = 264.46 LN.M. (89 POST)
I

REINFORCING STEEL BAR

232,100.00

41,976.00

3,200.00

277,276.00

II

STRUCTURAL CONCRETE

189,799.25

52,470.00

15,600.00

257,869.25

III

MASONRY WORKS

544,470.50

52,470.00

22,000.00

618,940.50

IV

PAINTING WORKS

121,763.00

23,780.00

145,543.00

8,885.00

8,885.00

SUB-TOTAL =
L. WATER SYSTEM
1. CONCRETE WATER TANK: AREA = 16 SQUARE METERS
I

LAYOUT AND EXCAVATION

Includes:
Layout and excavation works for footing and tie beam
II

REINFORCING STEEL BAR

241,227.00

61,142.00

4,000.00

306,369.00

198,035.00

44,070.00

10,400.00

252,505.00

(Note; Use Grade 40 Reinforcing Steel Bars)


Includes: Fabrication and Installation of Reinforcing Steel
Bars and tiewire for: columns, footings, tie beams and
beams, concrete elevated tank, steel ladder base
III

STRUCTURAL CONCRETE
(Includes 14 days curing period)
Includes: Concrete Works and Formworks, Scaffolding
for Columns, Tie Beam and Beams, Concrete Elevated
Tank, Steel Ladder Base

IV

WATER PROOFING

29,336.00

29,336.00

Includes: Supply and Application of Approved type superior


quality watertite waterproofing or approved equal with instant
plug, crystalline waterproofing
V

TILE WORKS

33,997.00

11,976.00

Page 12

800.00

46,773.00

Republic of the Philippines

OFFICE OF THE CITY ENGINEER


Zamboanga City

PROGRAM OF WORKS

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COM


Project Name & Location

ITEM NO.
VI

DESCRIPTION

MATERIALS

STEEL WORKS

LABOR

EQUIPMENT

164,578.83

35,670.00

9,664.25

2,240.00

100,043.24

23,780.00

6,300.00

215,510.24

52,470.00

4,500.00

JOB ORDER

9,600.00

SUB-TOTAL
209,848.83

Includes: Fabrication and Installation of Steel ladder


and Stainless ladder, Manhole Cover
VII

PAINTING WORKS

11,904.25

(Apply two (2) coatings)


Includes: Concrete Structure and Steel Member
SUB-TOTAL =
2. CISTERN TANK: AREA = 9 SQUARE METERS
I

CISTERN TANK

13,611.60

143,734.84

Includes:
Layout and excavation works for footing and tie beam,
Reinforcing Steel, Concrete Works,
Fabrication and Installation of
Stainless ladder, Manhole Cover, Water Proofing,
Tile Works, Paintings
SUB-TOTAL =
3. DISTRIBUTION LINE
I

DISTRIBUTION LINE

272,480.24

Includes: Layout and Excavation, Backfilling, Chipping Works,


Restoration Works
SUB-TOTAL =
M. EQUIPMENT, MACHINERIES AND SUPPLIES
I

Supply and Installation of Equipment, Machineries and Supplies

23,000,000.00

23,000,000.00

SUB-TOTAL =
SPL-1

Project Billboard/Signage

SPL-2

Safety & Health

SPL-3

Temporary Facility

1,854.72

1,854.72

38,050.00

117,165.00

155,215.00

9,711.25

1,818.00

11,529.25

51,331,882.67

7,588,526.00

SUB-TOTAL =
TOTAL

Page 13

4,212,253.00

101,617,258.52

164,749,920.19

Republic of the Philippines

OFFICE OF THE CITY ENGINEER


Zamboanga City

PROGRAM OF WORKS

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COM


Project Name & Location

ITEM NO.

DESCRIPTION

MATERIALS

LABOR

EQUIPMENT

JOB ORDER

SUB-TOTAL

164,749,920.19
Prepared by:

Prepared by:

MICHILLE M. ASAIN
Engineer I

Checked by:

GERALDINE T. RABAGO
Engineering Assistant

OIC-Chief, Pl

Page 14

RTS COMPLEX AT BALIWASAN

7.000000000%

8%

12%

OCM

CP

VAT

TOTAL

13,167.18

15,048.20

25,958.15

242,276.02

195,315.82

223,218.08

385,051.19

3,593,811.09

47,877.20

54,716.80

94,386.48

880,940.48

66,156.51

75,607.44

130,422.83

1,217,279.78

426.44

487.36

840.70

7,846.50

14,999.99

17,142.84

29,571.40

275,999.72

86,897.93

99,311.92

171,313.06

1,598,921.91

42,555.31

48,634.64

83,894.75

783,017.70

139,597.82

159,540.36

275,207.12

2,568,599.80

69,183.91

79,067.32

136,391.13

1,272,983.85
12,441,676.86

223.41

255.32

440.43

4,110.69

832.11

950.98

1,640.44

15,310.78

185.08

211.52

364.87

3,405.47

784.88

897.00

1,547.33

14,441.70

910.18

1,040.20

1,794.35

16,747.22

24,080.56

27,520.64

47,473.10

443,082.30

355.20

405.94

700.25

6,535.63

Page 15

RTS COMPLEX AT BALIWASAN

7.000000000%

8%

12%

OCM

CP

VAT

TOTAL
503,633.80

1,249.36

1,427.84

2,463.02

22,988.22

117.60

134.40

231.84

2,163.84

1,893.57

2,164.08

3,733.04

34,841.69

5,385.84

6,155.24

10,617.79

99,099.36

1,059.08

1,210.38

2,087.91

19,487.12

10,236.84

11,699.24

20,181.19

188,357.76

3,055.90

3,492.46

6,024.49

56,228.61

6,946.42

7,938.76

13,694.36

127,814.04

3,214.73

3,673.98

6,337.62

59,151.08

Page 16

RTS COMPLEX AT BALIWASAN

7.000000000%

8%

12%

OCM

CP

VAT

TOTAL

1,806.00

2,064.00

3,560.40

33,230.40

146.58

167.52

288.97

2,697.07

426.44

487.36

840.70

7,846.50

2,310.00

2,640.00

4,554.00

42,504.00

6,055.84

6,920.96

11,938.66

111,427.46

1,173.20

1,340.80

2,312.88

21,586.88

829,424.02

1,366.96

1,562.24

2,694.86

25,152.06

39.20

44.80

77.28

721.28

567.32

648.36

1,118.42

10,438.60

Page 17

RTS COMPLEX AT BALIWASAN

7.000000000%

8%

12%

OCM

CP

VAT

TOTAL

5,201.49

5,944.56

10,254.37

95,707.42

2,882.25

3,294.00

5,682.15

53,033.40

13,081.09

14,949.82

25,788.44

240,692.10

2,907.43

3,322.78

5,731.80

53,496.76

12,427.42

14,202.76

24,499.76

228,664.44

3,776.12

4,315.56

7,444.34

69,480.52

2,058.00

2,352.00

4,057.20

37,867.20

100.45

114.80

198.03

1,848.28

281.99

322.27

555.92

5,188.58

2,310.00

2,640.00

4,554.00

42,504.00

2,070.60

2,366.40

4,082.04

38,099.04

1,173.20

1,340.80

2,312.88

21,586.88

924,480.55

Page 18

RTS COMPLEX AT BALIWASAN

7.000000000%

8%

12%

OCM

CP

VAT

TOTAL

1,911.28

2,184.32

3,767.95

35,167.55

176.40

201.60

347.76

3,245.76

4,202.03

4,802.32

8,284.00

77,317.35

12,910.35

14,754.68

25,451.82

237,550.35

4,219.39

4,822.16

8,318.23

77,636.78

15,222.97

17,397.68

30,011.00

280,102.65

3,721.38

4,253.00

7,336.43

68,473.30

18,504.22

21,147.68

36,479.75

340,477.65

10,783.12

12,323.56

21,258.14

198,409.32

Page 19

RTS COMPLEX AT BALIWASAN

7.000000000%

8%

12%

OCM

CP

VAT

TOTAL

5,124.00

5,856.00

10,101.60

94,281.60

221.90

253.60

437.46

4,082.96

496.50

567.42

978.81

9,135.53

2,310.00

2,640.00

4,554.00

42,504.00

6,223.14

7,112.16

12,268.48

114,505.78

1,212.40

1,385.60

2,390.16

22,308.16

1,605,198.72

1,705.62

1,949.28

3,362.51

31,383.41

39.20

44.80

77.28

721.28

1,459.92

1,668.48

2,878.13

26,862.53

Page 20

RTS COMPLEX AT BALIWASAN

7.000000000%

8%

12%

OCM

CP

VAT

TOTAL

3,121.18

3,567.06

6,153.18

57,429.67

412.13

471.00

812.48

7,583.10

11,954.48

13,662.26

23,567.40

219,962.39

3,614.05

4,130.34

7,124.84

66,498.47

13,149.71

15,028.24

25,923.71

241,954.66

5,732.13

6,551.00

11,300.48

105,471.10

2,499.00

2,856.00

4,926.60

45,981.60

119.28

136.32

235.15

2,194.75

342.58

391.52

675.37

6,303.47

2,310.00

2,640.00

4,554.00

42,504.00

6,223.14

7,112.16

12,268.48

114,505.78

1,192.80

1,363.20

2,351.52

21,947.52

991,303.73

Page 21

RTS COMPLEX AT BALIWASAN

7.000000000%

8%

12%

OCM

CP

VAT

TOTAL

97,266.82

111,162.08

191,754.59

1,789,709.49

28,415.71

32,475.10

56,019.55

522,849.11

23,795.66

27,195.04

46,911.44

437,840.14
2,750,398.74

90,193.99

103,078.84

177,811.00

1,659,569.32

39,770.99

45,452.56

78,405.67

731,786.22

15,319.01

17,507.44

30,200.33

281,869.78

23,408.11

26,752.12

46,147.41

430,709.13

18,337.13

20,956.72

36,150.34

337,403.19

1,920.80

2,195.20

3,786.72

35,342.72

3,051.16

3,487.04

6,015.14

56,141.34
3,532,821.71

2,446.36

2,795.84

4,822.82

1,904.00

2,176.00

3,753.60

45,013.02
35,033.60

11,687.62

13,357.28

23,041.31

215,052.21

28,619.50

32,708.00

56,421.30

526,598.80

Page 22

RTS COMPLEX AT BALIWASAN

7.000000000%

8%

12%

OCM

CP

VAT

TOTAL

126,978.32

145,118.08

250,328.69

2,336,401.09

82,573.52

94,369.74

162,787.81

1,519,352.85

13,392.58

15,305.80

26,402.51

246,423.38

9,980.08

11,405.80

19,675.01

183,633.38

5,107,508.33
21,139.58

24,159.52

41,675.17

388,968.27
388,968.27

1,260.00

1,440.00

2,484.00

23,184.00
23,184.00

12,029.01

13,747.44

23,714.33

221,333.78
221,333.78

2,051.56

2,344.64

4,044.50

37,748.70

5,603.36

6,403.84

11,046.62

103,101.82

2,702.84

3,088.96

5,328.46

49,732.26

426.30

487.20

840.42

7,843.92

Page 23

RTS COMPLEX AT BALIWASAN

7.000000000%

8%

12%

OCM

CP

VAT

2,140.32

2,446.08

TOTAL

4,219.49

39,381.89
237,808.59

149.45

170.80

294.63

2,749.88

685.30

783.20

1,351.02

12,609.52

3,130.47

3,577.68

6,171.50

57,600.65

72,960.05

6,299.49

7,199.42

12,419.00

1,101.91

1,259.32

2,172.33

115,910.66
20,275.05

15,537.90

17,757.60

30,631.86

285,897.36

414,661.84

473,899.24

817,476.19

7,629,777.76

1,648.75

1,884.28

3,250.38

30,336.91

11,306.40

12,921.60

22,289.76

208,037.76

57,973.91

66,255.90

114,291.43

1,066,719.99

1,648.75

1,884.28

3,250.38

30,336.91

11,306.40

12,921.60

22,289.76

208,037.76

31,775.29

36,314.62

62,642.72

584,665.38

167,537.62

191,471.56

330,288.44

3,082,692.12
13,262,687.66

Page 24

RTS COMPLEX AT BALIWASAN

7.000000000%

8%

12%

OCM

CP

VAT

5,285,632.17

6,040,722.48

TOTAL

10,420,246.28

97,255,631.93
97,255,631.93

140,975.45

161,114.80

277,923.03

20,390.86

23,303.84

40,199.12

2,593,948.28
375,191.82

264,449.99

302,228.56

521,344.27

4,865,879.82

749,750.61

856,857.84

1,478,079.77

13,795,411.22
21,630,431.14

4,078.90

4,661.60

8,041.26

75,051.76

123,739.95

141,417.08

243,944.46

2,276,814.99

317,660.15

363,040.18

626,244.30

5,844,946.83

41,132.00

47,008.00

81,088.80

756,828.80
8,953,642.38

19,202.40

21,945.60

37,856.16

7,641.20

8,732.80

15,064.08

353,324.16
140,598.08

72,835.00

83,240.00

143,589.00

1,340,164.00

71,534.67

81,753.91

141,025.49

1,316,237.92

167,642.46

191,591.38

330,495.13

3,084,621.22

8,802.50

10,060.00

17,353.50

161,966.00

22,620.64

25,852.16

44,594.98

416,219.78
6,813,131.15

1,233.96

1,410.24

2,432.66

22,704.86

6,656.44

7,607.36

13,122.70

122,478.50

10,456.25

11,950.00

20,613.75

192,395.00

Page 25

RTS COMPLEX AT BALIWASAN

7.000000000%

8%

12%

OCM

CP

VAT

TOTAL

8,662.96

9,900.52

17,078.40

159,398.37

11,200.00

12,800.00

22,080.00

206,080.00

40,512.85

46,300.40

79,868.19

745,436.44

2,016.11

2,304.12

3,974.61

37,096.33
1,485,589.50

19,409.32

22,182.08

38,264.09

357,131.49

18,050.85

20,629.54

35,585.96

332,135.59

43,325.84

49,515.24

85,413.79

797,195.36

10,188.01

11,643.44

20,084.93

187,459.38
1,673,921.83

621.95

710.80

1,226.13

11,443.88

21,445.83

24,509.52

42,278.92

394,603.27

17,675.35

20,200.40

34,845.69

325,226.44

2,053.52

2,346.88

4,048.37

37,784.77

3,274.11

3,741.84

6,454.67

60,243.62

Page 26

RTS COMPLEX AT BALIWASAN

7.000000000%

8%

12%

OCM

CP

VAT

TOTAL

14,689.42

16,787.91

28,959.14

270,285.29

833.30

952.34

1,642.79

15,332.67

1,114,919.95

10,061.44

11,498.79

19,835.41

185,130.47

185,130.47

19,073.62

21,798.42

37,602.27

350,954.55

350,954.55

1,610,000.00

1,840,000.00

3,174,000.00

29,624,000.00
29,624,000.00

129.83

148.38

255.95

2,388.88

10,865.05

12,417.20

21,419.67

199,916.92

807.05

922.34

1,591.04

14,849.67
217,155.47

11,532,494.41

13,179,993.61

22,735,488.99

212,197,897.20

Page 27

RTS COMPLEX AT BALIWASAN

7.000000000%

8%

12%

OCM

CP

VAT

11532494.41

13,179,993.61

22735488.99

TOTAL

212197897.19828

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Programming Div.

Page 28

CONSTRUCTION SCHEDULE
NAME OF PROJECT

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT BALIWA

LOCATION

APPROPRIATION
DURATION

:
:

UNDERTAKEN

BALIWASAN, ZAMBOANGA CITY


Php 4,500,000.00
80 CALENDAR DAYS
BY CONTRACT

SCOPE OF WORK

N0. OF DAYS
10

20

A. EXISTING BLEACHERS
A1. BLEACHER I (MAIN BLEACHER): AREA = 3,094.45 SQUARE METERS
I
MASONRY WORKS
II
ROOFING WORKS
III
DOORS
IV
WINDOWS
V
WINDOW GRILLES
VI
SEPTIC VAULT
VII
TILE WORKS
VIII
PLUMBING WORKS
IX
ELECTRICAL WORKS
X
PAINTING WORKS
General Repaintings
A2. OFFICE AREA
I
REINFORCED CONCRETE WORKS
Includes: Lavatory Counter
II
FABRICATION OF CABINET
(Note: Use well-seasoned lumber)
Includes: Fabrication & installation of wooden hanging cabinet
III
DOOR
Doors (Job Order)
IV
PLUMBING WORKS
Includes: Repiping of Sanitary System & Water Supply System;
Supply & Installation of Plumbing Fixtures and Accessories
V
TILEWORKS
Includes: Supply & Installation of Tiles
VI
ELECTRICAL WORKS
Pleb Office (Ground Floor) and Sports Office (Second & Third Floor)
VII
PAINTING WORKS
Includes: Repainting
A3. COMFORT ROOM NO.1
CR #1 TOTAL FLOOR AREA = 130,977 SQ.M.

Page 29

30

40

50

60

70

80

90

CONSTRUCTION SCHEDULE
NAME OF PROJECT

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT BALIWA

LOCATION

APPROPRIATION
DURATION

:
:

UNDERTAKEN

BALIWASAN, ZAMBOANGA CITY


Php 4,500,000.00
80 CALENDAR DAYS
BY CONTRACT

SCOPE OF WORK

N0. OF DAYS
10

II
III

IV

V
VI
VII
VIII
IX

X
XI
XII
XIII

20

REMOVAL OF STRUCTURE AND OBSTRUCTION


Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.
LAYOUT AND EXCAVATION
Includes: Wall footing
REINFORCING STEEL
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete Partitions
STRUCTURAL CONCRETE
(Includes 14 days curing period)
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete Partitions, Repair of Wall Cracks
MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)
PLUMBING WORKS
ELECTRICAL WORKS
TILE WORKS
CARPENTRY WORKS
Includes: Installation of new Ceiling Board, Ceiling Joist,
Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs
DOORS
Includes: Painting
WINDOWS
WINDOW GRILLES
Includes: Painting
ROLL-UP DOOR SHUTTER
Includes: Painting

Page 30

30

40

50

60

70

80

90

CONSTRUCTION SCHEDULE
NAME OF PROJECT

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT BALIWA

LOCATION

APPROPRIATION
DURATION

:
:

UNDERTAKEN

BALIWASAN, ZAMBOANGA CITY


Php 4,500,000.00
80 CALENDAR DAYS
BY CONTRACT

SCOPE OF WORK

N0. OF DAYS
10

XIV

XV

20

STEEL RAILING
Supply, Fabrication & Installation of Stair Rail, and Wall
Mounted Rail
SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign

A4. COMFORT ROOM NO. 2


CR #2 TOTAL AREA = 107.813 SQ.M.
I
REMOVAL OF STRUCTURE AND OBSTRUCTION
Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.
II
LAYOUT AND EXCAVATION
Includes: Wall Footing
III
REINFORCING STEEL
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions
IV
STRUCTURAL CONCRETE
(Includes 28 days curing period)
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions
V
MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)
VI
PLUMBING WORKS
VII
ELECTRICAL WORKS
VIII
TILE WORKS
IX
CARPENTRY WORKS

Page 31

30

40

50

60

70

80

90

CONSTRUCTION SCHEDULE
NAME OF PROJECT

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT BALIWA

LOCATION

APPROPRIATION
DURATION

:
:

UNDERTAKEN

BALIWASAN, ZAMBOANGA CITY


Php 4,500,000.00
80 CALENDAR DAYS
BY CONTRACT

SCOPE OF WORK

N0. OF DAYS
10

20

Includes: Installation of new Ceiling Board, Ceiling Joist,


Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs
X
DOORS
Includes: Painting
XI
WINDOWS
XII
WINDOW GRILLES
Includes: Painting
XIII
ROLL-UP DOOR SHUTTER
Includes: Painting
XIV
STEEL RAILING
Supply, Fabrication & Installation of Mid Rail, and Wall
Mounted Rail
XV
SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign
A5. COMFORT ROOM NO. 3
CR # 3 TOTAL FLOOR AREA = 249.984 SQ.M.
I
REMOVAL OF STRUCTURE AND OBSTRUCTION
Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.
II
LAYOUT AND EXCAVATION
Includes: Wall Footing
III
REINFORCING STEEL
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions
IV
STRUCTURAL CONCRETE
(Includes 28 days curing period)
Includes: Stiffener Column, Lintel Beam, Wall footing,

Page 32

30

40

50

60

70

80

90

CONSTRUCTION SCHEDULE
NAME OF PROJECT

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT BALIWA

LOCATION

APPROPRIATION
DURATION

:
:

UNDERTAKEN

BALIWASAN, ZAMBOANGA CITY


Php 4,500,000.00
80 CALENDAR DAYS
BY CONTRACT

SCOPE OF WORK

N0. OF DAYS
10

20

Concrete Slab, Ramp, Steps, Floor Lintel Beam,


Suspended Concrete partitions, Repair of Wall Cracks
V
MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)
VI
PLUMBING WORKS
VII
ELECTRICAL WORKS
VIII
TILE WORKS
IX
CARPENTRY WORKS
Includes: Installation of new Ceiling Board, Ceiling Joist,
Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs,
Lockers and Pre-fab stool
X
DOORS
Includes: Painting
XI
WINDOWS
XII
WINDOW GRILLES
Includes: Painting
XIII
ROLL-UP DOOR SHUTTER
Includes: Painting
XIV
STEEL RAILING
Supply, Fabrication & Installation of Stair Rail, and Wall
Mounted Rail
XV
SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign
A6. COMFORT ROOM NO. 4
CR #4 TOTAL FLOOR AREA = 175.184 SQ.M.
I
REMOVAL OF STRUCTURE AND OBSTRUCTION
Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.

Page 33

30

40

50

60

70

80

90

CONSTRUCTION SCHEDULE
NAME OF PROJECT

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT BALIWA

LOCATION

APPROPRIATION
DURATION

:
:

UNDERTAKEN

BALIWASAN, ZAMBOANGA CITY


Php 4,500,000.00
80 CALENDAR DAYS
BY CONTRACT

SCOPE OF WORK

N0. OF DAYS
10

II
III

IV

V
VI
VII
VIII
IX

X
XI
XII
XIII
XIV

XV

20

LAYOUT AND EXCAVATION


Includes: Wall Footing
REINFORCING STEEL
Includes: Stiffener Column, Lintel Beam, Wall Footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended concrete partitions
STRUCTURAL CONCRETE
(Includes 28 days curing period)
Includes: Stiffener Column, Lintel Beam, Wall Footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended concrete partitions
MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)
PLUMBING WORKS
ELECTRICAL WORKS
TILE WORKS
CARPENTRY WORKS
Includes: Installation of new Ceiling Board, Ceiling Joist,
Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs,
Lockers and Pre-fab stool
DOORS
Includes: Painting
WINDOWS
WINDOW GRILLES
Includes: Painting
ROLL-UP DOOR SHUTTER
Includes: Painting
STEEL RAILING
Supply, Fabrication & Installation of Stair Rail, and Wall
Mounted Rail
SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign

A7. BLEACHER II: AREA = 578.28 SQUARE METERS

Page 34

30

40

50

60

70

80

90

CONSTRUCTION SCHEDULE
NAME OF PROJECT

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT BALIWA

LOCATION

APPROPRIATION
DURATION

:
:

UNDERTAKEN

BALIWASAN, ZAMBOANGA CITY


Php 4,500,000.00
80 CALENDAR DAYS
BY CONTRACT

SCOPE OF WORK

N0. OF DAYS
10

I
II
III

20

ROOFING WORKS
ELECTRICAL WORKS
PAINTING WORKS

A8. BLEACHER III: AREA = 358.76 SQUARE METERS


I
ROOFING WORKS
II
TILE WORKS
III
PLUMBING WORKS
IV
ELECTRICAL WORKS
V
PAINTING WORKS
VI
GRILLES
VII
DOORS AND WINDOWS

B. REHABILITATION / IMPROVEMENT OF SWIMMING POOL AREA


AREA = 2,055 SQUARE METERS
Includes:
1. SWIMMING POOL SHED
2. ELECTRICAL
3. GATES
4. PAINTING WORKS OF BLEACHERS
B1. SWIMMING POOL SHED
103
LAYOUT AND EXCAVATION WORKS
SPL-1 BACKFILLING WORKS
104
EMBANKMENT
Note: Provide 200mm Thick Embankment
405
STRUCTURAL CONCRETE
(Includes 14 days curing period)
Note: Includes Footing & Column
409
BUILT-UP STEEL FRAMES
(Note: Includes Fabrication and Painting of Steel Frame,
Sway Brace, Base Plate)
1013
ROOFING WORKS
(Note: Use Pre-painted Rib Motiff Roofing)

Page 35

30

40

50

60

70

80

90

CONSTRUCTION SCHEDULE
NAME OF PROJECT

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT BALIWA

LOCATION

APPROPRIATION
DURATION

:
:

UNDERTAKEN

BALIWASAN, ZAMBOANGA CITY


Php 4,500,000.00
80 CALENDAR DAYS
BY CONTRACT

SCOPE OF WORK

N0. OF DAYS
10

SPL-2
1032

B2.
B3.
B4.

20

(Includes: Installation of Pre-prepainted Rib Motiff Longspan


Roofing Sheets, Pre-painted EF & Pre-painted Ridge Roll,
Fascia Holder, Fascia Board, Sag Rod, Tension Rod, Turn Buckle & Purlins)
ELECTRICAL WORKS
PAINTING WORKS
(Includes: Double Coating Paint)
(Includes: Structural Steel, Fascia Board, Movable Goal, Roof Marking & Line Marking)
ELECTRICAL WORKS
GATES
PAINTING WORKS (BLEACHER)

C. SCUPPER DRAIN AND CONCRETING OF WALKWAY


I
DEMOLITION AND EXCAVATION WORKS
II
REINFORCING STEEL BARS
(Includes Steel Grating)
III
CONCRETE WORKS
(Includes 14 days curing period)
IV
AGGREGATE SUB-BASE COURSE
(Loose Volume)
V
PORTLAND CEMENT CONCRETE PAVEMENT
Vol. of Concrete = 5.31 cu.m.
D. CONCRETE PAVEMENT
I
SUB-GRADE PREPARATION
II
AGGREGATE SUB-BASE COURSE
III
PORTLAND CEMENT CONCRETE PAVEMENT
(Includes 28 days curing period)
Thickness (Pavement): 0.15 m.
Area of Pavement: 42.18 sq.m.
Volume of Concrete: 6.33 cu.m.
E. PERIMETER LIGHTS AT PLAYING FIELD AND STREETLIGHTS
E.1. PERIMETER LIGHTS AT PLAYING FIELD

Page 36

30

40

50

60

70

80

90

CONSTRUCTION SCHEDULE
NAME OF PROJECT

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT BALIWA

LOCATION

APPROPRIATION
DURATION

:
:

UNDERTAKEN

BALIWASAN, ZAMBOANGA CITY


Php 4,500,000.00
80 CALENDAR DAYS
BY CONTRACT

SCOPE OF WORK

N0. OF DAYS
10

I
II
III
IV

I
II
III
I
II
III
E.4

20

PEDESTAL FOOTING
CONCRETE POST (1 UNIT)
UNDERGROUND ENCASEMENT
ELECTRICAL WORKS
Includes 3 units 7,000W, LED Field Lights
E.2. TENNIS COURT AT BLEACHER #2
PEDESTAL FOOTING
UNDERGROUND ENCASEMENT
ELECTRICAL WORKS
E.3. TENNIS COURT AT BLEACHER #3
PEDESTAL FOOTING
UNDERGROUND ENCASEMENT
ELECTRICAL WORKS
FLOOD LIGHTS

F. RUBBERIZED PLAYING FIELD


I
RUBBERIZED PLAYING FIELD
G. SITE DEVELOPMENT
104
EMBANKMENT
105
SUB-GRADE PREPARATION
200
AGGREGATE SUB-BASE COURSE PREPARATION
311
PORTLAND CEMENT CONCRETE PAVEMENT
H. DRAINAGE SYSTEM
I
EXCAVATION
II
REINFORCING STEEL BAR
III
CONCRETE WORKS
IV
DISPOSAL OF EXCAVATED MATERIALS
I. FENCE: L=465.32 m.
I
REMOVAL OF STRUCTURE AND OBSTRUCTIONS
II
LAYOUT AND EXCAVATION
III
REINFORCING STEEL BAR
IV
STRUCTURAL CONCRETE
V
MASONRY WORKS
VI
GATE

Page 37

30

40

50

60

70

80

90

CONSTRUCTION SCHEDULE
NAME OF PROJECT

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT BALIWA

LOCATION

APPROPRIATION
DURATION

:
:

UNDERTAKEN

BALIWASAN, ZAMBOANGA CITY


Php 4,500,000.00
80 CALENDAR DAYS
BY CONTRACT

SCOPE OF WORK

N0. OF DAYS
10

VII

20

PAINTING WORKS

J. FENCE FRONTING WMSU


LENGTH = 60.61 M.
POST = 17 POST
I
LAYOUT AND EXCAVATION
II
REINFORCING STEEL BAR
III
STRUCTURAL CONCRETE
IV
MASONRY WORKS
V
GRILLE'S FENCE
VI
GATE AND GUARD HOUSE
VII
PAINTING WORKS
K. FENCE ALONG WEST NATIONAL HIGH SCHOOL (EXTENSION)
LENGTH = 264.46 LN.M. (89 POST)
I
II
III
IV

REINFORCING STEEL BAR


STRUCTURAL CONCRETE
MASONRY WORKS
PAINTING WORKS

L. WATER SYSTEM
1. CONCRETE WATER TANK: AREA = 16 SQUARE METERS
I
LAYOUT AND EXCAVATION
Includes:
Layout and excavation works for footing and tie beam
II
REINFORCING STEEL BAR
(Note; Use Grade 40 Reinforcing Steel Bars)
Includes: Fabrication and Installation of Reinforcing Steel
Bars and tiewire for: columns, footings, tie beams and
beams, concrete elevated tank, steel ladder base
III
STRUCTURAL CONCRETE
(Includes 14 days curing period)
Includes: Concrete Works and Formworks, Scaffolding
for Columns, Tie Beam and Beams, Concrete Elevated

Page 38

30

40

50

60

70

80

90

CONSTRUCTION SCHEDULE
NAME OF PROJECT

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT BALIWA

LOCATION

APPROPRIATION
DURATION

:
:

UNDERTAKEN

BALIWASAN, ZAMBOANGA CITY


Php 4,500,000.00
80 CALENDAR DAYS
BY CONTRACT

SCOPE OF WORK

N0. OF DAYS
10

20

30

40

50

60

70

80

90

Tank, Steel Ladder Base


IV
WATER PROOFING
Includes: Supply and Application of Approved type superior
quality watertite waterproofing or approved equal with instant
plug, crystalline waterproofing
V
TILE WORKS
VI
STEEL WORKS
Includes: Fabrication and Installation of Steel ladder
and Stainless ladder, Manhole Cover
VII
PAINTING WORKS
(Apply two (2) coatings)
Includes: Concrete Structure and Steel Member
2. CISTERN TANK: AREA = 9 SQUARE METERS
I
CISTERN TANK
Includes:
Layout and excavation works for footing and tie beam,
Reinforcing Steel, Concrete Works,
Fabrication and Installation of
Stainless ladder, Manhole Cover, Water Proofing,
Tile Works, Paintings
3. DISTRIBUTION LINE
I
DISTRIBUTION LINE
Includes: Layout and Excavation, Backfilling, Chipping Works,
Restoration Works
M. EQUIPMENT, MACHINERIES AND SUPPLIES
I
Supply and Installation of Equipment, Machineries and Supplies
SPL-1
SPL-2
SPL-3

Project Billboard/Signage
Safety & Health
Temporary Facility

PREPARED BY:

PREPARED BY:

MICHILLE M. ASAIN
Engineer I

GERALDINE T. RABAGO
Engineering Assistant

CHECKED BY:

Page 39

DONALD F. RECINTO
Engineer III

APPROVAL RECOMMENDED:

RODRIGO C. REBOLLOS, SR
Assistant City Engineer

CONSTRUCTION SCHEDULE
NAME OF PROJECT

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT BALIWA

LOCATION

APPROPRIATION
DURATION

:
:

UNDERTAKEN

BALIWASAN, ZAMBOANGA CITY


Php 4,500,000.00
80 CALENDAR DAYS
BY CONTRACT

PREPARED BY:
MICHILLE M. ASAIN
Engineer I

SCOPE OF WORK
PREPARED BY:

10

20

GERALDINE T. RABAGO
Engineering Assistant

CHECKED BY:
30

N0. OF RECOMMENDED:
DAYS
APPROVAL
40

50

DONALD F. RECINTO
Engineer III

Page 40

60

70

80

90

RODRIGO C. REBOLLOS, SR
Assistant City Engineer

LEX AT BALIWASAN

AYS
90

100

110

120

130

140

150

Page 41

LEX AT BALIWASAN

AYS
90

100

110

120

130

140

150

Page 42

LEX AT BALIWASAN

AYS
90

100

110

120

130

140

150

Page 43

LEX AT BALIWASAN

AYS
90

100

110

120

130

140

150

Page 44

LEX AT BALIWASAN

AYS
90

100

110

120

130

140

150

Page 45

LEX AT BALIWASAN

AYS
90

100

110

120

130

140

150

Page 46

LEX AT BALIWASAN

AYS
90

100

110

120

130

140

150

Page 47

LEX AT BALIWASAN

AYS
90

100

110

120

130

140

150

Page 48

LEX AT BALIWASAN

AYS
90

100

110

120

130

140

150

Page 49

LEX AT BALIWASAN

AYS
90

100

110

120

130

140

150

Page 50

LEX AT BALIWASAN

AYS
90

100

ECOMMENDED:

REBOLLOS, SR.
City Engineer

110

120

130

140

150

APPROVED:
LUIS VICENTE L. DESPALO
City Engineer

Page 51

LEX AT BALIWASAN

AYS
ECOMMENDED:
90

APPROVED:
100

REBOLLOS, SR.
City Engineer

110

120

130

140

150

LUIS VICENTE L. DESPALO


City Engineer

Page 52

APPROVED BUDGET FOR THE CONTRACT


CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMP
Project Name and Location
Stations:
Length:
ITEM NO.

DESCRIPTION

QTY.

UNIT

ESTIMATED DIRECT
COST

(1)

(2)

(3)

(4)

(5)

TOTAL MARK-UP

MARK-UPS IN PERCENT
OCM1

PROFIT

(6)

(7)

(9)

188,102.50
2,790,226.00
683,960.00
945,093.00
6,092.00
214,285.50
1,241,399.00
607,933.00
1,994,254.50
988,341.50

7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%
8.00%
8.00%
8.00%
8.00%
8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%

A. EXISTING BLEACHERS
A1. BLEACHER I (MAIN BLEACHER): AREA = 3,094.45 SQUARE METERS
I
II
III
IV
V
VI
VII
VIII
IX
X

MASONRY WORKS
ROOFING WORKS
DOORS
WINDOWS
WINDOW GRILLES
SEPTIC VAULT
TILE WORKS
PLUMBING WORKS
ELECTRICAL WORKS
PAINTING WORKS
General Repaintings

125.000
3,838.600
25.000
100.000
6.0920
2.000
1,662.990
25.000
389.000
13,368.500

SQ.M.
SQ.M.
UNITS
UNITS
SQ.M.
UNITS
SQ.M.
UNITS
OUTLETS
SQ.M.

A2. OFFICE AREA


I
II

III
IV

V
VI
VII

REINFORCED CONCRETE WORKS


Includes: Lavatory Counter
FABRICATION OF CABINET
(Note: Use well-seasoned lumber)
Includes: Fabrication & installation of wooden hanging cabinet
DOOR
Doors (Job Order)
PLUMBING WORKS
Includes: Repiping of Sanitary System & Water Supply System;
Supply & Installation of Plumbing Fixtures and Accessories
TILEWORKS
Includes: Supply & Installation of Tiles
ELECTRICAL WORKS
Pleb Office (Ground Floor) and Sports Office (Second & Third Floor)
PAINTING WORKS
Includes: Repainting

0.0708

CU.M.

3,191.53

7.0000000000%

8.00%

15.0000000000%

3.00

UNITS

11,887.25

7.0000000000%

8.00%

15.0000000000%

1.00

UNIT

2,644.00

7.0000000000%

8.00%

15.0000000000%

1.0000

UNIT

11,212.50

7.0000000000%

8.00%

15.0000000000%

14.7500

SQ.M.

13,002.50

7.0000000000%

8.00%

15.0000000000%

59.0000

OUTLETS

344,008.00

7.0000000000%

8.00%

15.0000000000%

44.8570

SQ.M.

5,074.25

7.0000000000%

8.00%

15.0000000000%

81.1500

SQ.M.

17,848.00

7.0000000000%

8.00%

15.0000000000%

A3. COMFORT ROOM NO.1


CR #1 TOTAL FLOOR AREA = 130,977 SQ.M.
I

REMOVAL OF STRUCTURE AND OBSTRUCTION


Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.

II

LAYOUT AND EXCAVATION


Includes: Wall footing

III

REINFORCING STEEL
Includes: Stiffener Column, Lintel Beam, Wall footing,

IV

Concrete Slab, Ramp, Steps, Floor Lintel Beam,


Suspended Concrete Partitions
STRUCTURAL CONCRETE

4.6620

CU.M.

1,680.00

7.0000000000%

8.00%

15.0000000000%

457.4640

KGS.

27,051.00

7.0000000000%

8.00%

15.0000000000%

8.404400

CU.M.

76,940.50

7.0000000000%

8.00%

15.0000000000%

17.000

SQ.M.

15,129.75

7.0000000000%

8.00%

15.0000000000%

6.000
15.0000
170.6650
0.9150

UNITS
OUTLETS
SQ.M.
CU.M.

146,240.50
43,655.75
99,234.50
45,924.75

7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%

10.0000

UNITS

25,800.00

7.0000000000%

8.00%

15.0000000000%

5.0000
6.0920

UNITS
SQ.M.

2,094.00
6,092.00

7.0000000000%
7.0000000000%

8.00%
8.00%

15.0000000000%
15.0000000000%

1.000

UNIT

33,000.00

7.0000000000%

8.00%

15.0000000000%

57.230

LN.M.

86,512.00

7.0000000000%

8.00%

15.0000000000%

11.000

EACH

16,760.00

7.0000000000%

8.00%

15.0000000000%

76.470

SQ.M.

19,528.00

7.0000000000%

8.00%

15.0000000000%

2.3840

CU.M.

560.00

7.0000000000%

8.00%

15.0000000000%

147.9480

KGS.

8,104.50

7.0000000000%

8.00%

15.0000000000%

10.6600

CU.M.

74,307.00

7.0000000000%

8.00%

15.0000000000%

(Includes 14 days curing period)


Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
V
VI
VII
VIII
IX

X
XI
XII
XIII
XIV

XV

Suspended Concrete Partitions, Repair of Wall Cracks


MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)
PLUMBING WORKS
ELECTRICAL WORKS
TILE WORKS
CARPENTRY WORKS
Includes: Installation of new Ceiling Board, Ceiling Joist,
Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs
DOORS
Includes: Painting
WINDOWS
WINDOW GRILLES
Includes: Painting
ROLL-UP DOOR SHUTTER
Includes: Painting
STEEL RAILING
Supply, Fabrication & Installation of Stair Rail, and Wall
Mounted Rail
SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign

A4. COMFORT ROOM NO. 2

CR #2 TOTAL AREA = 107.813 SQ.M.


I

II
III

IV

REMOVAL OF STRUCTURE AND OBSTRUCTION


Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.
LAYOUT AND EXCAVATION
Includes: Wall Footing
REINFORCING STEEL
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions
STRUCTURAL CONCRETE
(Includes 28 days curing period)
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,

Suspended Concrete partitions


MASONRY WORKS

45.3100

SQ.M.

41,175.00

7.0000000000%

8.00%

15.0000000000%

VI
VII

(Note: Use Washed Fine and Coarse Aggregates)


PLUMBING WORKS
ELECTRICAL WORKS

10.0000
15.0000

UNITS
OUTLETS

186,872.75
41,534.75

7.0000000000%
7.0000000000%

8.00%
8.00%

15.0000000000%
15.0000000000%

VIII
IX

TILE WORKS
CARPENTRY WORKS

228.9570
0.8530

SQ.M.
CU.M.

177,534.50
53,944.50

7.0000000000%
7.0000000000%

8.00%
8.00%

15.0000000000%
15.0000000000%

12.0000

UNITS

29,400.00

7.0000000000%

8.00%

15.0000000000%

3.0000
4.0284

UNITS
SQ.M.

1,435.00
4,028.40

7.0000000000%
7.0000000000%

8.00%
8.00%

15.0000000000%
15.0000000000%

1.000

UNIT

33,000.00

7.0000000000%

8.00%

15.0000000000%

18.800

LN.M.

29,580.00

7.0000000000%

8.00%

15.0000000000%

11.000

EACH

16,760.00

7.0000000000%

8.00%

15.0000000000%

100.550

SQ.M.

27,304.00

7.0000000000%

8.00%

15.0000000000%

10.4820

CU.M.

2,520.00

7.0000000000%

8.00%

15.0000000000%

1,124.4240

KGS.

60,029.00

7.0000000000%

8.00%

15.0000000000%

27.9160

CU.M.

184,433.50

7.0000000000%

8.00%

15.0000000000%

70.6320

SQ.M.

60,277.00

7.0000000000%

8.00%

15.0000000000%

9.0000
23.0000
349.7600
3.5450

UNITS
OUTLETS
SQ.M.
CU.M.

217,471.00
53,162.50
264,346.00
154,044.50

7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%

Includes: Installation of new Ceiling Board, Ceiling Joist,


Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs
X

DOORS

Includes: Painting
XI
WINDOWS
XII
WINDOW GRILLES
Includes: Painting
XIII
ROLL-UP DOOR SHUTTER
Includes: Painting
XIV
STEEL RAILING
Supply, Fabrication & Installation of Mid Rail, and Wall
Mounted Rail
XV
SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign
A5. COMFORT ROOM NO. 3

CR # 3 TOTAL FLOOR AREA = 249.984 SQ.M.


I

II
III

IV

REMOVAL OF STRUCTURE AND OBSTRUCTION


Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.
LAYOUT AND EXCAVATION
Includes: Wall Footing
REINFORCING STEEL
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions
STRUCTURAL CONCRETE
(Includes 28 days curing period)
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,

V
VI
VII
VIII
IX

Suspended Concrete partitions, Repair of Wall Cracks


MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)
PLUMBING WORKS
ELECTRICAL WORKS
TILE WORKS
CARPENTRY WORKS
Includes: Installation of new Ceiling Board, Ceiling Joist,
Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs,
Lockers and Pre-fab stool

DOORS
Includes: Painting

XI
XII

WINDOWS
WINDOW GRILLES

XIII

Includes: Painting
ROLL-UP DOOR SHUTTER
Includes: Painting

XIV

STEEL RAILING
Supply, Fabrication & Installation of Stair Rail, and Wall
Mounted Rail
XV
SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign
A6. COMFORT ROOM NO. 4

25.0000

UNITS

73,200.00

7.0000000000%

8.00%

15.0000000000%

7.0000
7.0928

UNITS
SQ.M.

3,170.00
7,092.80

7.0000000000%
7.0000000000%

8.00%
8.00%

15.0000000000%
15.0000000000%

1.000

UNIT

33,000.00

7.0000000000%

8.00%

15.0000000000%

58.810

LN.M.

88,902.00

7.0000000000%

8.00%

15.0000000000%

13.000

EACH

17,320.00

7.0000000000%

8.00%

15.0000000000%

90.930

SQ.M.

24,366.00

7.0000000000%

8.00%

15.0000000000%

1.61480

CU.M.

560.00

7.0000000000%

8.00%

15.0000000000%

398.5080

KGS.

20,856.00

7.0000000000%

8.00%

15.0000000000%

1.4500

CU.M.

44,588.25

7.0000000000%

8.00%

15.0000000000%

5.2500

SQ.M.

5,887.50

7.0000000000%

8.00%

15.0000000000%

CR #4 TOTAL FLOOR AREA = 175.184 SQ.M.


I

II
III

IV

REMOVAL OF STRUCTURE AND OBSTRUCTION


Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.
LAYOUT AND EXCAVATION
Includes: Wall Footing
REINFORCING STEEL
Includes: Stiffener Column, Lintel Beam, Wall Footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended concrete partitions
STRUCTURAL CONCRETE
(Includes 28 days curing period)
Includes: Stiffener Column, Lintel Beam, Wall Footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,

XI
XII

Suspended concrete partitions


MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)
PLUMBING WORKS
ELECTRICAL WORKS
TILE WORKS
CARPENTRY WORKS
Includes: Installation of new Ceiling Board, Ceiling Joist,
Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs,
Lockers and Pre-fab stool
DOORS
Includes: Painting
WINDOWS
WINDOW GRILLES

XIII

Includes: Painting
ROLL-UP DOOR SHUTTER

XIV

Includes: Painting
STEEL RAILING

V
VI
VII
VIII
IX

Supply, Fabrication & Installation of Stair Rail, and Wall

8.0000
21.0000
189.0480
2.0620

UNITS
OUTLETS
SQ.M.
CU.M.

170,778.25
51,629.25
187,853.00
81,887.50

7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%

13.0000

UNITS

35,700.00

7.0000000000%

8.00%

15.0000000000%

5.0000
4.8940

UNITS
SQ.M.

1,704.00
4,894.00

7.0000000000%
7.0000000000%

8.00%
8.00%

15.0000000000%
15.0000000000%

1.000

UNIT

33,000.00

7.0000000000%

8.00%

15.0000000000%

58.810

LN.M.

88,902.00

7.0000000000%

8.00%

15.0000000000%

XV

Mounted Rail
SIGNAGES

12.000

EACH

682.560
32.000

SQ.M.
OUTLETS

17,040.00

7.0000000000%

8.00%

15.0000000000%

1,389,526.00
405,938.75

7.0000000000%
7.0000000000%

8.00%
8.00%

15.0000000000%
15.0000000000%

339,938.00

7.0000000000%

8.00%

15.0000000000%

1,288,485.50
568,157.00
218,843.00
334,401.50
261,959.00
27,440.00
43,588.00

7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%
8.00%
8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%

Fabrication, Supply & Installation of Stainless 3D Signages


and Fiber glass comfort Room Sign
A7. BLEACHER II: AREA = 578.28 SQUARE METERS
I
II

ROOFING WORKS
ELECTRICAL WORKS

III

PAINTING WORKS

2,360.010

SQ.M.

407.40
758.640
9.000
48.000
1,451.400
27.440
16.000

SQ.M.
SQ.M.
UNITS
OUTLETS
SQ.M.
SQ.M.
UNITS

A8. BLEACHER III: AREA = 358.76 SQUARE METERS


I
II
III
IV
V
VI
VII

ROOFING WORKS
TILE WORKS
PLUMBING WORKS
ELECTRICAL WORKS
PAINTING WORKS
GRILLES
DOORS AND WINDOWS

B. REHABILITATION / IMPROVEMENT OF SWIMMING POOL AREA


AREA = 2,055 SQUARE METERS
Includes:
1. SWIMMING POOL SHED
2. ELECTRICAL
3. GATES
4. PAINTING WORKS OF BLEACHERS
B1. SWIMMING POOL SHED
103
LAYOUT AND EXCAVATION WORKS
SPL-1
BACKFILLING WORKS
104
EMBANKMENT
Note: Provide 200mm Thick Embankment
405
STRUCTURAL CONCRETE
(Includes 14 days curing period)
Note: Includes Footing & Column
409
BUILT-UP STEEL FRAMES
(Note: Includes Fabrication and Painting of Steel Frame,
Sway Brace, Base Plate)
1013
ROOFING WORKS
(Note: Use Pre-painted Rib Motiff Roofing)
(Includes: Installation of Pre-prepainted Rib Motiff Longspan
Roofing Sheets, Pre-painted EF & Pre-painted Ridge Roll,
Fascia Holder, Fascia Board, Sag Rod, Tension Rod, Turn Buckle & Purlins)
SPL-2
ELECTRICAL WORKS
1032
PAINTING WORKS
(Includes: Double Coating Paint)

163.20
121.040
344.00

CU.M.
CU.M.
CU.M.

34,948.00
27,200.00
166,966.00

7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%

43.00000

CU.M.

408,850.00

7.0000000000%

8.00%

15.0000000000%

24.000

UNITS

1,813,976.00

7.0000000000%

8.00%

15.0000000000%

1,578.960

SQ.M.

1,179,621.78

7.0000000000%

8.00%

15.0000000000%

40.000
2,775.02

OUTLETS
SQ.M.

191,322.50
142,572.50

7.0000000000%
7.0000000000%

8.00%
8.00%

15.0000000000%
15.0000000000%

1.000
2.000
1,410.130

LOT
UNITS
SQ.M.

301,994.00
18,000.00
171,843.00

7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%

(Includes: Structural Steel, Fascia Board, Movable Goal, Roof Marking & Line Marking)
B2.
B3.
B4.

ELECTRICAL WORKS
GATES
PAINTING WORKS (BLEACHER)

C. SCUPPER DRAIN AND CONCRETING OF WALKWAY


I
II

DEMOLITION AND EXCAVATION WORKS


REINFORCING STEEL BARS
(Includes Steel Grating)

III

CONCRETE WORKS
(Includes 14 days curing period)
IV
AGGREGATE SUB-BASE COURSE
(Loose Volume)
V
PORTLAND CEMENT CONCRETE PAVEMENT
Vol. of Concrete = 5.31 cu.m.
D. CONCRETE PAVEMENT
I
SUB-GRADE PREPARATION
II
AGGREGATE SUB-BASE COURSE
III
PORTLAND CEMENT CONCRETE PAVEMENT
(Includes 28 days curing period)
Thickness (Pavement): 0.15 m.
Area of Pavement: 42.18 sq.m.
Volume of Concrete: 6.33 cu.m.
E. PERIMETER LIGHTS AT PLAYING FIELD AND STREETLIGHTS
E.1. PERIMETER LIGHTS AT PLAYING FIELD
I
PEDESTAL FOOTING
II
CONCRETE POST (1 UNIT)
III
UNDERGROUND ENCASEMENT
IV
ELECTRICAL WORKS
Includes 3 units 7,000W, LED Field Lights
E.2. TENNIS COURT AT BLEACHER #2
I
PEDESTAL FOOTING
II
UNDERGROUND ENCASEMENT
III
ELECTRICAL WORKS
E.3. TENNIS COURT AT BLEACHER #3
I
PEDESTAL FOOTING
II
UNDERGROUND ENCASEMENT
III
ELECTRICAL WORKS
E.4
FLOOD LIGHTS
F. RUBBERIZED PLAYING FIELD
I
RUBBERIZED PLAYING FIELD
G. SITE DEVELOPMENT
104
EMBANKMENT
105
SUB-GRADE PREPARATION
200
AGGREGATE SUB-BASE COURSE PREPARATION
311
PORTLAND CEMENT CONCRETE PAVEMENT

73.6500
1,188.6480

SQ.M.
KGS.

29,308.00
80,048.00

7.0000000000%
7.0000000000%

8.00%
8.00%

15.0000000000%
15.0000000000%

6.380

CU.M.

38,612.00

7.0000000000%

8.00%

15.0000000000%

7.000

CU.M.

6,090.00

7.0000000000%

8.00%

15.0000000000%

53.100

SQ.M.

30,576.00

7.0000000000%

8.00%

15.0000000000%

42.180
7.590
42.180

SQ.M.
CU.M.
SQ.M.

2,135.00
9,790.00
44,721.00

7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%

6.02
0.8770
442.0000
14.0000

CU.M.
CU.M.
LN.M.
POSTS

89,992.75
15,741.50
221,970.00
5,923,740.50

7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%

1.5050
442.0000
1.0000

CU.M.
LN.M.
LOT

23,553.50
161,520.00
828,198.75

7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%

1.5050
442.0000
1.0000
50.00

CU.M.
LN.M.
LOT
OUTLETS

23,553.50
161,520.00
453,932.75
2,393,394.50

7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%

24,099.00

SQ.M.

75,509,031.00

7.0000000000%

8.00%

15.0000000000%

3,726.5700
34,096.5600
5,114.4800
12,703.9800

CU.M.
SQ.M.
CU.M.
SQ.M.

2,013,935.00
291,298.00
3,777,857.00
10,710,723.00

7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%

2,373.08
38,855.7180

cu.m.
KGS.

58,270.00
1,767,713.50

7.0000000000%
7.0000000000%

8.00%
8.00%

15.0000000000%
15.0000000000%

782.6300
1.0000

CU.M.
LOT

4,538,002.20
587,600.00

7.0000000000%
7.0000000000%

8.00%
8.00%

15.0000000000%
15.0000000000%

H. DRAINAGE SYSTEM
I
II

EXCAVATION
REINFORCING STEEL BAR

III
IV

CONCRETE WORKS
DISPOSAL OF EXCAVATED MATERIALS

I. FENCE:
I
II
III
IV
V
VI
VII

L=465.32 m.
REMOVAL OF STRUCTURE AND OBSTRUCTIONS
LAYOUT AND EXCAVATION
REINFORCING STEEL BAR
STRUCTURAL CONCRETE
MASONRY WORKS
GATE
PAINTING WORKS

1,395.9600
370.3344
21,611.1360
191.4320
2,838.4540
25.1500
5,583.8400

sq.m.
cu.m.
KGS.
CU.M.
SQ.M.
SQ.M.
SQ.M.

274,320.00
109,160.00
1,040,500.00
1,021,923.85
2,394,892.25
125,750.00
323,152.00

7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%
8.00%
8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%

34.4400
1,734.4020
15.0000
125.0000
16.0000
1.0000
350.0000

cu.m.
KGS.
CU.M.
SQ.M.
UNITS
LOT
SQ.M.

17,628.00
95,092.00
149,375.00
123,756.50
160,000.00
578,755.00
28,801.50

7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%
8.00%
8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%

5,271.2160
45.9100
793.3800
2,380.1400

KGS.
CU.M.
SQ.M.
SQ.M.

277,276.00
257,869.25
618,940.50
145,543.00

7.0000000000%
7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%
15.0000000000%

32.9600

cu.m.

8,885.00

7.0000000000%

8.00%

15.0000000000%

6,046.9500

KGS.

306,369.00

7.0000000000%

8.00%

15.0000000000%

33.8360

CU.M.

252,505.00

7.0000000000%

8.00%

15.0000000000%

77.2000

SQ.M.

29,336.00

7.0000000000%

8.00%

15.0000000000%

80.0000
234.1940

SQ.M.
KGS.

46,773.00
209,848.83

7.0000000000%
7.0000000000%

8.00%
8.00%

15.0000000000%
15.0000000000%

177.4330

SQ.M.

11,904.25

7.0000000000%

8.00%

15.0000000000%

1.0000

UNIT

143,734.84

7.0000000000%

8.00%

15.0000000000%

J. FENCE FRONTING WMSU

I
II
III
IV
V
VI
VII

LENGTH = 60.61 M.
POST = 17 POST
LAYOUT AND EXCAVATION
REINFORCING STEEL BAR
STRUCTURAL CONCRETE
MASONRY WORKS
GRILLE'S FENCE
GATE AND GUARD HOUSE
PAINTING WORKS

K. FENCE ALONG WEST NATIONAL HIGH SCHOOL (EXTENSION)


LENGTH = 264.46 LN.M. (89 POST)
I
II
III
IV

REINFORCING STEEL BAR


STRUCTURAL CONCRETE
MASONRY WORKS
PAINTING WORKS

L. WATER SYSTEM
1. CONCRETE WATER TANK: AREA = 16 SQUARE METERS
I
LAYOUT AND EXCAVATION
Includes:
Layout and excavation works for footing and tie beam
II

REINFORCING STEEL BAR


(Note; Use Grade 40 Reinforcing Steel Bars)
Includes: Fabrication and Installation of Reinforcing Steel
Bars and tiewire for: columns, footings, tie beams and
beams, concrete elevated tank, steel ladder base
III
STRUCTURAL CONCRETE
(Includes 14 days curing period)
Includes: Concrete Works and Formworks, Scaffolding
for Columns, Tie Beam and Beams, Concrete Elevated
Tank, Steel Ladder Base
IV
WATER PROOFING
Includes: Supply and Application of Approved type superior
quality watertite waterproofing or approved equal with instant
plug, crystalline waterproofing
V
TILE WORKS
VI
STEEL WORKS
Includes: Fabrication and Installation of Steel ladder
and Stainless ladder, Manhole Cover
VII
PAINTING WORKS
(Apply two (2) coatings)
Includes: Concrete Structure and Steel Member
2. CISTERN TANK: AREA = 9 SQUARE METERS
I
CISTERN TANK

Includes:
Layout and excavation works for footing and tie beam,
Reinforcing Steel, Concrete Works,
Fabrication and Installation of
Stainless ladder, Manhole Cover, Water Proofing,
Tile Works, Paintings
3. DISTRIBUTION LINE
I
DISTRIBUTION LINE
Includes: Layout and Excavation, Backfilling, Chipping Works,
Restoration Works

892.0000

LN.M.

272,480.24

7.0000000000%

8.00%

15.0000000000%

7.0000000000%

8.00%

15.0000000000%

7.0000000000%
7.0000000000%
7.0000000000%

8.00%
8.00%
8.00%

15.0000000000%
15.0000000000%
15.0000000000%

M. EQUIPMENT, MACHINERIES AND SUPPLIES


I
SPL-1
SPL-2
SPL-3

Supply and Installation of Equipment, Machineries and Supplies

1.0000

lot

23,000,000.00

Project Billboard/Signage
Safety & Health
Temporary Facility

5.7600
1.0000
1.0000

sq.m.
lot
unit

1,854.72
155,215.00
11,529.25
164,749,920.19
164,749,920.19

TOTAL

PREPARED/SUBMITTED BY:

LUIS VICENTE L. DESPALO


City Engineer
(Signature over printed name)
DATE PREPARED: April 30, 2015
ABC/lanie

RECOMMENDING APPROVAL:

VIRGINIA SAN AGUSTIN GARA


City Budget Officer
(Signature over printed name)

ATTACHMENT "A"
D.O. No. 29 S. 2011

RTS COMPLEX AT BALIWASAN


Project Amount:

Php

13,000,000.00

Budget Classification:
Contract Duration : 360 Calendar days

L MARK-UP

TOTAL INDIRECT
COST

VAT

VALUE

TOTAL COST

UNIT COST

(10)

(11)

(12)

(13)

(14)

(5) x (9)

(12%)[(5)+(10)]

(10) + (11)

(5) + (12)

(13)/ (3)

28,215.38
418,533.90
102,594.00
141,763.95
913.80
32,142.83
186,209.85
91,189.95
299,138.18
148,251.23

25,958.15
385,051.19
94,386.48
130,422.83
840.70
29,571.40
171,313.06
83,894.75
275,207.12
136,391.13

54,173.53
803,585.10
196,980.49
272,186.78
1,754.50
61,714.22
357,522.91
175,084.70
574,345.30
284,642.35

242,276.03
3,593,811.10
880,940.49
1,217,279.78
7,846.50
275,999.72
1,598,921.91
783,017.70
2,568,599.80
1,272,983.85

1,938.21
936.23
35,237.62
12,172.80
1,288.00
137,999.86
961.47
31,320.71
6,603.08
95.22

478.73

440.43

919.16

4,110.69

58,060.59

1,783.09

1,640.44

3,423.53

15,310.78

5,103.59

396.60

364.87

761.47

3,405.47

3,405.47

1,681.88

1,547.33

3,229.20

14,441.70

14,441.70

1,950.38

1,794.35

3,744.72

16,747.22

1,135.40

51,601.20

47,473.10

99,074.30

443,082.30

7,509.87

497,098.16

761.14

700.25

1,461.38

6,535.63

145.70

503,633.79

2,677.20

2,463.02

5,140.22

22,988.22

283.28

12,441,676.88

252.00

231.84

483.85

2,163.85

464.15

4,057.65

3,733.04

7,790.69

34,841.69

76.16

11,541.08

10,617.79

22,158.86

99,099.36

11,791.37

2,269.46

2,087.91

4,357.37

19,487.12

1,146.30

21,936.08
6,548.36
14,885.18
6,888.71

20,181.19
6,024.49
13,694.36
6,337.62

42,117.25
12,572.86
28,579.54
13,226.33

188,357.75
56,228.61
127,814.04
59,151.08

31,392.96
3,748.57
748.92
64,645.99

3,870.00

3,560.40

7,430.40

33,230.40

3,323.04

314.10
913.80

288.97
840.70

603.07
1,754.51

2,697.07
7,846.51

539.41
1,288.00

4,950.00

4,554.00

9,504.01

42,504.01

42,504.01

12,976.80

11,938.66

24,915.46

111,427.46

1,947.01

2,514.00

2,312.88

4,826.88

21,586.88

1,962.44

2,929.20

2,694.86

5,624.06

25,152.06

328.91

84.00

77.28

161.28

721.28

302.55

1,215.68

1,118.42

2,334.11

10,438.61

70.56

11,146.05

10,254.37

21,400.42

95,707.42

8,978.18

829,424.05

6,176.25

5,682.15

11,858.39

53,033.39

1,170.46

28,030.91
6,230.21

25,788.44
5,731.80

53,819.36
11,962.01

240,692.11
53,496.76

24,069.21
3,566.45

26,630.18
8,091.68

24,499.76
7,444.34

51,129.94
15,536.02

228,664.44
69,480.52

998.72
81,454.30

4,410.00

4,057.20

8,467.19

37,867.19

3,155.60

215.25
604.26

198.03
555.92

413.28
1,160.17

1,848.28
5,188.57

616.09
1,288.00

4,950.00

4,554.00

9,504.01

42,504.01

42,504.01

4,437.00

4,082.04

8,519.04

38,099.04

2,026.54

2,514.00

2,312.88

4,826.88

21,586.88

1,962.44

4,095.60

3,767.95

7,863.55

35,167.55

349.75

378.00

347.76

725.76

3,245.76

309.65

9,004.35

8,284.00

17,288.35

77,317.35

68.76

27,665.03

25,451.82

53,116.85

237,550.35

8,509.47

9,041.55

8,318.23

17,359.78

77,636.78

1,099.17

32,620.65
7,974.38
39,651.90
23,106.68

30,011.00
7,336.43
36,479.75
21,258.14

62,631.65
15,310.81
76,131.65
44,364.82

280,102.65
68,473.31
340,477.65
198,409.32

31,122.52
2,977.10
973.46
55,968.78

924,480.56

10,980.00

10,101.60

21,081.60

94,281.60

3,771.26

475.50
1,063.92

437.46
978.81

912.95
2,042.73

4,082.95
9,135.53

583.28
1,288.00

4,950.00

4,554.00

9,504.01

42,504.01

42,504.01

13,335.30

12,268.48

25,603.78

114,505.78

1,947.05

2,598.00

2,390.16

4,988.16

22,308.16

1,716.01

3,654.90

3,362.51

7,017.41

31,383.41

345.14

84.00

77.28

161.28

721.28

446.67

3,128.40

2,878.13

6,006.53

26,862.53

67.41

6,688.24

6,153.18

12,841.42

57,429.67

39,606.67

883.13

812.48

1,695.60

7,583.10

1,444.40

25,616.74
7,744.39
28,177.95
12,283.13

23,567.40
7,124.84
25,923.71
11,300.48

49,184.14
14,869.23
54,101.66
23,583.59

219,962.39
66,498.48
241,954.66
105,471.09

27,495.30
3,166.59
1,279.86
51,149.90

5,355.00

4,926.60

10,281.60

45,981.60

3,537.05

255.60
734.10

235.15
675.37

490.75
1,409.47

2,194.75
6,303.47

438.95
1,288.00

4,950.00

4,554.00

9,504.01

42,504.01

42,504.01

13,335.30

12,268.48

25,603.78

114,505.78

1,947.05

1,605,198.75

2,556.00

2,351.52

4,907.52

21,947.52

1,828.96

208,428.90
60,890.81

191,754.59
56,019.55

400,183.49
116,910.36

1,789,709.49
522,849.11

2,622.05
16,339.03

50,990.70

46,911.44

97,902.14

437,840.14

185.52

2,750,398.74

193,272.83
85,223.55
32,826.45
50,160.23
39,293.85
4,116.00
6,538.20

177,811.00
78,405.67
30,200.33
46,147.41
36,150.34
3,786.72
6,015.14

371,083.83
163,629.22
63,026.78
96,307.63
75,444.19
7,902.72
12,553.34

1,659,569.33
731,786.22
281,869.78
430,709.13
337,403.19
35,342.72
56,141.34

4,073.56
964.60
31,318.86
8,973.11
232.47
1,288.00
3,508.83

3,532,821.71

5,242.20
4,080.00
25,044.90

4,822.82
3,753.60
23,041.31

10,065.03
7,833.59
48,086.22

45,013.03
35,033.59
215,052.22

275.82
289.44
625.15

61,327.50

56,421.30

117,748.80

526,598.80

12,246.48

272,096.40

250,328.69

522,425.09

2,336,401.09

97,350.05

176,943.27

162,787.81

339,731.07

1,519,352.85

962.25

28,698.38
21,385.88

26,402.51
19,675.01

55,100.88
41,060.89

246,423.38
183,633.39

6,160.58
66.17

45,299.10
2,700.00
25,776.45

41,675.17
2,484.00
23,714.33

86,974.28
5,184.00
49,490.78

388,968.28
23,184.00
221,333.78

388,968.28
11,592.00
156.96

991,303.74

5,107,508.35

388,968.28
23,184.00
221,333.78

4,396.20
12,007.20

4,044.50
11,046.62

8,440.71
23,053.82

37,748.71
103,101.82

512.54
86.74

5,791.80

5,328.46

11,120.26

49,732.26

7,795.03

913.50

840.42

1,753.92

7,843.92

1,120.56

4,586.40

4,219.49

8,805.89

39,381.89

741.66

237,808.60

320.25
1,468.50
6,708.15

294.63
1,351.02
6,171.50

614.88
2,819.52
12,879.65

2,749.88
12,609.52
57,600.65

65.19
1,661.33
1,365.59

72,960.05

13,498.91
2,361.23
33,295.50
888,561.08

12,419.00
2,172.33
30,631.86
817,476.19

25,917.91
4,533.55
63,927.36
1,706,037.26

115,910.66
20,275.05
285,897.36
7,629,777.76

19,254.26
23,118.64
646.83
544,984.13

8,051,860.83

3,533.03
24,228.00
124,229.81

3,250.38
22,289.76
114,291.43

6,783.41
46,517.76
238,521.24

30,336.91
208,037.76
1,066,719.99

20,157.42
470.67
1,066,719.99

1,305,094.66

3,533.03
24,228.00
68,089.91
359,009.18

3,250.38
22,289.76
62,642.72
330,288.44

6,783.41
46,517.76
130,732.63
689,297.62

30,336.91
208,037.76
584,665.38
3,082,692.12

20,157.42
470.67
584,665.38
61,653.84

3,905,732.17

11,326,354.65

10,420,246.28

21,746,600.93

97,255,631.93

4,035.67

97,255,631.93

302,090.25
43,694.70
566,678.55
1,606,608.45

277,923.03
40,199.12
521,344.27
1,478,079.77

580,013.28
83,893.82
1,088,022.82
3,084,688.22

2,593,948.28
375,191.82
4,865,879.82
13,795,411.22

696.07
11.00
951.39
1,085.91

21,630,431.14

8,740.50
265,157.03

8,041.26
243,944.46

16,781.76
509,101.49

75,051.76
2,276,814.99

31.63
58.60

680,700.33
88,140.00

626,244.30
81,088.80

1,306,944.63
169,228.80

5,844,946.83
756,828.80

7,468.34
756,828.80

8,953,642.38

41,148.00
16,374.00
156,075.00
153,288.58
359,233.84
18,862.50
48,472.80

37,856.16
15,064.08
143,589.00
141,025.49
330,495.13
17,353.50
44,594.98

79,004.17
31,438.08
299,664.00
294,314.07
689,728.97
36,216.00
93,067.78

353,324.17
140,598.08
1,340,164.00
1,316,237.92
3,084,621.22
161,966.00
416,219.78

253.10
379.65
62.01
6,875.75
1,086.73
6,440.00
74.54

6,813,131.17

2,644.20
14,263.80
22,406.25
18,563.48
24,000.00
86,813.25
4,320.23

2,432.66
13,122.70
20,613.75
17,078.40
22,080.00
79,868.19
3,974.61

5,076.86
27,386.50
43,019.99
35,641.87
46,080.01
166,681.43
8,294.83

22,704.86
122,478.50
192,394.99
159,398.37
206,080.01
745,436.43
37,096.33

659.26
70.62
12,826.33
1,275.19
12,880.00
745,436.43
105.99

1,485,589.49

41,591.40
38,680.39
92,841.08
21,831.45

38,264.09
35,585.96
85,413.79
20,084.93

79,855.49
74,266.34
178,254.86
41,916.38

357,131.49
332,135.59
797,195.36
187,459.38

67.75
7,234.49
1,004.81
78.76

1,673,921.82

1,332.75

1,226.13

2,558.88

11,443.88

347.21

45,955.35

42,278.92

88,234.26

394,603.26

65.26

37,875.75

34,845.69

72,721.44

325,226.44

9,611.85

4,400.40

4,048.37

8,448.77

37,784.77

489.44

7,015.95
31,477.32

6,454.67
28,959.14

13,470.62
60,436.46

60,243.62
270,285.29

753.05
1,154.11

1,785.64

1,642.79

3,428.42

15,332.67

86.41

1,114,919.93

21,560.23

19,835.41

41,395.62

185,130.46

185,130.46

185,130.46

40,872.04

37,602.27

78,474.31

350,954.55

393.45

3,450,000.00

3,174,000.00

6,624,000.00

29,624,000.00

29,624,000.00

278.21
23,282.25
1,729.39
24,712,488.03

255.95
21,419.67
1,591.04
22,735,488.99

534.16
44,701.92
3,320.41

2,388.88
199,916.92
14,849.66
212,197,897.27

414.74
199,916.92
14,849.66

24,712,488.03

22,735,488.99

APPROVED:

MARIA ISABELLE G. CLIMACO


City Mayor
(Signature over printed name)

350,954.55

29,624,000.00

217,155.46
#REF!

Republic of the Philippines


OFFICE OF THE CITY ENGINEER
City of Zamboanga

SUMMARY

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT


BALIWASAN
Project Name and Location
ITEM NO.

DESCRIPTION

QTY.

UNIT

A. EXISTING BLEACHERS
A1. BLEACHER I (MAIN BLEACHER): AREA = 3,094.45 SQUARE METERS
I
II
III
IV
V
VI
VII
VIII
IX
X

MASONRY WORKS
ROOFING WORKS
DOORS
WINDOWS
WINDOW GRILLES
SEPTIC VAULT
TILE WORKS
PLUMBING WORKS
ELECTRICAL WORKS
PAINTING WORKS
General Repaintings

125.000
3,838.600
25.000
100.000
6.092
2.000
1,662.990
25.000
389.000
13,368.500

SQ.M.
SQ.M.
UNITS
UNITS
SQ.M.
UNITS
SQ.M.
UNITS
OUTLETS
SQ.M.

SUB-TOTAL =
A2. OFFICE AREA
I
REINFORCED CONCRETE WORKS
Includes: Lavatory Counter
II
FABRICATION OF CABINET
(Note: Use well-seasoned lumber)
Includes: Fabrication & installation of wooden hanging cabinet
III
DOOR
Doors (Job Order)
IV
PLUMBING WORKS
Includes: Repiping of Sanitary System & Water Supply System;
Supply & Installation of Plumbing Fixtures and Accessories
V
TILEWORKS
Includes: Supply & Installation of Tiles
VI
ELECTRICAL WORKS
VII

Pleb Office (Ground Floor) and Sports Office (Second & Third Floor)
PAINTING WORKS
Includes: Repainting

0.071

CU.M.

3.000

UNITS

1.000

UNIT

1.000

UNIT

14.750

SQ.M.

59.000

OUTLETS

44.857

SQ.M.

81.150

SQ.M.

4.662

CU.M.

SUB-TOTAL =
A3. COMFORT ROOM NO.1
CR #1 TOTAL FLOOR AREA = 130,977 SQ.M.
I

REMOVAL OF STRUCTURE AND OBSTRUCTION


Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions

II

d.) Removal of existing plumbing fixtures and accessories


e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.
LAYOUT AND EXCAVATION

Page 69

SUMMARY

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT


BALIWASAN
Project Name and Location
ITEM NO.

III

IV

DESCRIPTION

QTY.

Includes: Wall footing


REINFORCING STEEL
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete Partitions
STRUCTURAL CONCRETE
(Includes 14 days curing period)

UNIT

457.464

KGS.

8.404

CU.M.

17.000

SQ.M.

6.000

UNITS

Includes: Stiffener Column, Lintel Beam, Wall footing,


Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete Partitions, Repair of Wall Cracks
V
VI

MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)
PLUMBING WORKS

Page 70

SUMMARY

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT


BALIWASAN
Project Name and Location
ITEM NO.

VII
VIII
IX

X
XI
XII
XIII
XIV

XV

DESCRIPTION

QTY.

ELECTRICAL WORKS
TILE WORKS
CARPENTRY WORKS
Includes: Installation of new Ceiling Board, Ceiling Joist,
Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs
DOORS
Includes: Painting
WINDOWS
WINDOW GRILLES
Includes: Painting
ROLL-UP DOOR SHUTTER
Includes: Painting
STEEL RAILING

UNIT

15.000
170.665
0.915000

Supply, Fabrication & Installation of Stair Rail, and Wall


Mounted Rail
SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages

OUTLETS
SQ.M.
CU.M.

10.000

UNITS

5.000
6.09200

UNITS
SQ.M.

1.000

UNIT

57.230

LN.M.

11.000

EACH

76.470

SQ.M.

2.384

CU.M.

147.948

KGS.

10.660

CU.M.

45.310

SQ.M.

10.000
15.000
228.957
0.853

UNITS
OUTLETS
SQ.M.
CU.M.

12.000

UNITS

and Fiber glass comfort Room Sign


SUB-TOTAL =
A4. COMFORT ROOM NO. 2
CR #2 TOTAL AREA = 107.813 SQ.M.
I

II
III

IV

V
VI
VII
VIII
IX

REMOVAL OF STRUCTURE AND OBSTRUCTION


Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.
LAYOUT AND EXCAVATION
Includes: Wall Footing
REINFORCING STEEL
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions
STRUCTURAL CONCRETE
(Includes 28 days curing period)
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions
MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)
PLUMBING WORKS
ELECTRICAL WORKS
TILE WORKS
CARPENTRY WORKS
Includes: Installation of new Ceiling Board, Ceiling Joist,
Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs
DOORS

Page 71

SUMMARY

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT


BALIWASAN
Project Name and Location
ITEM NO.

XI
XII
XIII
XIV

XV

DESCRIPTION

QTY.

Includes: Painting
WINDOWS
WINDOW GRILLES
Includes: Painting
ROLL-UP DOOR SHUTTER
Includes: Painting
STEEL RAILING
Supply, Fabrication & Installation of Mid Rail, and Wall
Mounted Rail
SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign
SUB-TOTAL =

Page 72

UNIT

3.000
4.028

UNITS
SQ.M.

1.000

UNIT

18.800

LN.M.

11.000

EACH

SUMMARY

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT


BALIWASAN
Project Name and Location
ITEM NO.

DESCRIPTION

QTY.

UNIT

A5. COMFORT ROOM NO. 3


CR # 3 TOTAL FLOOR AREA = 249.984 SQ.M.
I

II
III

IV

V
VI
VII
VIII
IX

X
XI
XII
XIII
XIV

XV

REMOVAL OF STRUCTURE AND OBSTRUCTION


Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.
LAYOUT AND EXCAVATION
Includes: Wall Footing
REINFORCING STEEL
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions
STRUCTURAL CONCRETE
(Includes 28 days curing period)
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions, Repair of Wall Cracks
MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)
PLUMBING WORKS
ELECTRICAL WORKS
TILE WORKS
CARPENTRY WORKS
Includes: Installation of new Ceiling Board, Ceiling Joist,
Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs,
Lockers and Pre-fab stool
DOORS
Includes: Painting
WINDOWS
WINDOW GRILLES
Includes: Painting
ROLL-UP DOOR SHUTTER
Includes: Painting
STEEL RAILING
Supply, Fabrication & Installation of Stair Rail, and Wall
Mounted Rail
SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign
SUB-TOTAL =

A6. COMFORT ROOM NO. 4


CR #4 TOTAL FLOOR AREA = 175.184 SQ.M.

Page 73

100.550

SQ.M.

10.482

CU.M.

1,124.424

KGS.

27.9160

CU.M.

70.6320

SQ.M.

9.000
23.000
349.760
3.545

UNITS
OUTLETS
SQ.M.
CU.M.

25.000

UNITS

7.000
7.093

UNITS
SQ.M.

1.000

UNIT

58.810

LN.M.

13.000

EACH

SUMMARY

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT


BALIWASAN
Project Name and Location
ITEM NO.

DESCRIPTION

QTY.

REMOVAL OF STRUCTURE AND OBSTRUCTION

UNIT

90.930

SQ.M.

1.61480

CU.M.

Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions

II

& masonry walls including floor and wall tiles


b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.
LAYOUT AND EXCAVATION
Includes: Wall Footing

Page 74

SUMMARY

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT


BALIWASAN
Project Name and Location
ITEM NO.

III

IV

V
VI
VII
VIII
IX

X
XI
XII
XIII
XIV

XV

DESCRIPTION

QTY.

REINFORCING STEEL
Includes: Stiffener Column, Lintel Beam, Wall Footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended concrete partitions
STRUCTURAL CONCRETE
(Includes 28 days curing period)
Includes: Stiffener Column, Lintel Beam, Wall Footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended concrete partitions
MASONRY WORKS
(Note: Use Washed Fine and Coarse Aggregates)
PLUMBING WORKS
ELECTRICAL WORKS
TILE WORKS
CARPENTRY WORKS
Includes: Installation of new Ceiling Board, Ceiling Joist,
Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs,
Lockers and Pre-fab stool
DOORS
Includes: Painting
WINDOWS
WINDOW GRILLES
Includes: Painting
ROLL-UP DOOR SHUTTER
Includes: Painting
STEEL RAILING
Supply, Fabrication & Installation of Stair Rail, and Wall
Mounted Rail
SIGNAGES
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign

UNIT

398.508

KGS.

1.4500

CU.M.

5.250

SQ.M.

8.000
21.000
189.048
2.062

UNITS
OUTLETS
SQ.M.
CU.M.

13.000

UNITS

5.000
4.894

UNITS
SQ.M.

1.000

UNIT

58.810

LN.M.

12.000

EACH

SUB-TOTAL =
A7. BLEACHER II: AREA = 578.28 SQUARE METERS
I
ROOFING WORKS
II
ELECTRICAL WORKS
III
PAINTING WORKS

682.560
32.000
2,360.010

SQ.M.
OUTLETS
SQ.M.

407.400
758.640
9.000
48.000
1,451.400
27.440
16.000

SQ.M.
SQ.M.
UNITS
OUTLETS
SQ.M.
SQ.M.
UNITS

SUB-TOTAL =
A8. BLEACHER III: AREA = 358.76 SQUARE METERS
I
ROOFING WORKS
II
TILE WORKS
III
PLUMBING WORKS
IV
ELECTRICAL WORKS
V
PAINTING WORKS
VI
GRILLES
VII
DOORS AND WINDOWS
SUB-TOTAL =

Page 75

SUMMARY

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT


BALIWASAN
Project Name and Location
ITEM NO.

DESCRIPTION

QTY.

UNIT

B. REHABILITATION / IMPROVEMENT OF SWIMMING POOL AREA


AREA = 2,055 SQUARE METERS
Includes:
1. SWIMMING POOL SHED
2. ELECTRICAL
3. GATES
4. PAINTING WORKS OF BLEACHERS
B1. SWIMMING POOL SHED
103
LAYOUT AND EXCAVATION WORKS
SPL-1
BACKFILLING WORKS
104
EMBANKMENT
Note: Provide 200mm Thick Embankment
405
STRUCTURAL CONCRETE

409

1013

SPL-2
1032

B2.

(Includes 14 days curing period)


Note: Includes Footing & Column
BUILT-UP STEEL FRAMES
(Note: Includes Fabrication and Painting of Steel Frame,
Sway Brace, Base Plate)
ROOFING WORKS
(Note: Use Pre-painted Rib Motiff Roofing)
(Includes: Installation of Pre-prepainted Rib Motiff Longspan
Roofing Sheets, Pre-painted EF & Pre-painted Ridge Roll,
Fascia Holder, Fascia Board, Sag Rod, Tension Rod, Turn Buckle & Purlins)
ELECTRICAL WORKS
PAINTING WORKS
(Includes: Double Coating Paint)
(Includes: Structural Steel, Fascia Board, Movable Goal, Roof Marking & Line Marking)
SUB-TOTAL =
ELECTRICAL WORKS

163.200
121.040
344.000

CU.M.
CU.M.
CU.M.

43.000

CU.M.

24.000

UNITS

1,578.960

SQ.M.

40.000
2,775.020

OUTLETS
SQ.M.

1.000

LOT

2.000

UNITS

1,410.130

SQ.M.

73.650
1,188.648

SQ.M.
KGS.

6.380

CU.M.

7.000

CU.M.

SUB-TOTAL =
B3.

GATES
SUB-TOTAL =

B4.

PAINTING WORKS (BLEACHER)


SUB-TOTAL =

C. SCUPPER DRAIN AND CONCRETING OF WALKWAY


I
DEMOLITION AND EXCAVATION WORKS
II
REINFORCING STEEL BARS
(Includes Steel Grating)
III
IV

CONCRETE WORKS
(Includes 14 days curing period)
AGGREGATE SUB-BASE COURSE
(Loose Volume)

Page 76

SUMMARY

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT


BALIWASAN
Project Name and Location
ITEM NO.

DESCRIPTION

QTY.

PORTLAND CEMENT CONCRETE PAVEMENT


Vol. of Concrete = 5.31 cu.m.

UNIT

53.100
SUB-TOTAL =

Page 77

SQ.M.

SUMMARY

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT


BALIWASAN
Project Name and Location
ITEM NO.

DESCRIPTION

QTY.

D. CONCRETE PAVEMENT
I
SUB-GRADE PREPARATION
II
AGGREGATE SUB-BASE COURSE
III
PORTLAND CEMENT CONCRETE PAVEMENT
(Includes 28 days curing period)
Thickness (Pavement): 0.15 m.
Area of Pavement: 42.18 sq.m.

UNIT

42.180
7.590
42.180

SQ.M.
CU.M.
SQ.M.

6.020
0.877

CU.M.
CU.M.

442.000
14.000

LN.M.
POSTS

1.505
442.000

CU.M.
LN.M.

Volume of Concrete: 6.33 cu.m.


SUB-TOTAL =
E. PERIMETER LIGHTS AT PLAYING FIELD AND STREETLIGHTS
E.1. PERIMETER LIGHTS AT PLAYING FIELD
I
PEDESTAL FOOTING
II
CONCRETE POST (1 UNIT)
III
IV

UNDERGROUND ENCASEMENT
ELECTRICAL WORKS
Includes 3 units 7,000W, LED Field Lights
SUB-TOTAL =

I
II

E.2. TENNIS COURT AT BLEACHER #2


PEDESTAL FOOTING
UNDERGROUND ENCASEMENT

III

ELECTRICAL WORKS

1.000

LOT

SUB-TOTAL =
I
II
III

E.3. TENNIS COURT AT BLEACHER #3


PEDESTAL FOOTING
UNDERGROUND ENCASEMENT
ELECTRICAL WORKS

1.505
442.000
1.000

CU.M.
LN.M.
LOT

50.000

OUTLETS

SUB-TOTAL =
E.4

FLOOD LIGHTS
SUB-TOTAL =

F. RUBBERIZED PLAYING FIELD


I
RUBBERIZED PLAYING FIELD

24,099.000

SQ.M.

3,726.570
34,096.560
5,114.480
12,703.980

CU.M.
SQ.M.
CU.M.
SQ.M.

2,373.080
38,855.718
782.630
1.000

cu.m.
KGS.
CU.M.
LOT

SUB-TOTAL =
G. SITE DEVELOPMENT
104
EMBANKMENT
105
SUB-GRADE PREPARATION
200
AGGREGATE SUB-BASE COURSE PREPARATION
311
PORTLAND CEMENT CONCRETE PAVEMENT
SUB-TOTAL =
H. DRAINAGE SYSTEM
I
II
III
IV

EXCAVATION
REINFORCING STEEL BAR
CONCRETE WORKS
DISPOSAL OF EXCAVATED MATERIALS
SUB-TOTAL =

Page 78

SUMMARY

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT


BALIWASAN
Project Name and Location
ITEM NO.

I. FENCE:
I
II
III
IV
V
VI
VII

DESCRIPTION

QTY.

L=465.32 m.
REMOVAL OF STRUCTURE AND OBSTRUCTIONS
LAYOUT AND EXCAVATION
REINFORCING STEEL BAR
STRUCTURAL CONCRETE
MASONRY WORKS
GATE
PAINTING WORKS
SUB-TOTAL =

Page 79

UNIT

1,395.960
370.334
21,611.136
191.432
2,838.454
25.150

sq.m.
cu.m.
KGS.
CU.M.
SQ.M.
SQ.M.

5,583.840

SQ.M.

SUMMARY

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT


BALIWASAN
Project Name and Location
ITEM NO.

DESCRIPTION

QTY.

J. FENCE FRONTING WMSU


LENGTH = 60.61 M.
POST = 17 POST
I
LAYOUT AND EXCAVATION
II
REINFORCING STEEL BAR
III
STRUCTURAL CONCRETE
IV

MASONRY WORKS

GRILLE'S FENCE

VI
VII

GATE AND GUARD HOUSE


PAINTING WORKS

UNIT

34.440
1,734.402
15.000

cu.m.
KGS.
CU.M.

125.000

SQ.M.

16.000

UNITS

1.000
350.000

LOT
SQ.M.

5,271.216
45.910
793.380
2,380.140

KGS.
CU.M.
SQ.M.
SQ.M.

32.960

cu.m.

6,046.950

KGS.

33.836

CU.M.

77.200

SQ.M.

80.000
234.194

SQ.M.
KGS.

177.433

SQ.M.

SUB-TOTAL =

K. FENCE ALONG WEST NATIONAL HIGH SCHOOL (EXTENSION)


LENGTH = 264.46 LN.M. (89 POST)
I
II
III
IV

REINFORCING STEEL BAR


STRUCTURAL CONCRETE
MASONRY WORKS
PAINTING WORKS
SUB-TOTAL =

L. WATER SYSTEM
1. CONCRETE WATER TANK: AREA = 16 SQUARE METERS
I
LAYOUT AND EXCAVATION

II

III

IV

V
VI

VII

Includes:
Layout and excavation works for footing and tie beam
REINFORCING STEEL BAR
(Note; Use Grade 40 Reinforcing Steel Bars)
Includes: Fabrication and Installation of Reinforcing Steel
Bars and tiewire for: columns, footings, tie beams and
beams, concrete elevated tank, steel ladder base
STRUCTURAL CONCRETE
(Includes 14 days curing period)
Includes: Concrete Works and Formworks, Scaffolding
for Columns, Tie Beam and Beams, Concrete Elevated
Tank, Steel Ladder Base
WATER PROOFING
Includes: Supply and Application of Approved type superior
quality watertite waterproofing or approved equal with instant
plug, crystalline waterproofing
TILE WORKS
STEEL WORKS
Includes: Fabrication and Installation of Steel ladder
and Stainless ladder, Manhole Cover
PAINTING WORKS
(Apply two (2) coatings)

Page 80

SUMMARY

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT


BALIWASAN
Project Name and Location
ITEM NO.

DESCRIPTION

QTY.

Includes: Concrete Structure and Steel Member


SUB-TOTAL =

Page 81

UNIT

SUMMARY

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT


BALIWASAN
Project Name and Location
ITEM NO.

DESCRIPTION

QTY.

2. CISTERN TANK: AREA = 9 SQUARE METERS


I
CISTERN TANK
Includes:
Layout and excavation works for footing and tie beam,
Reinforcing Steel, Concrete Works,
Fabrication and Installation of
Stainless ladder, Manhole Cover, Water Proofing,
Tile Works, Paintings

UNIT

1.000

UNIT

892.000

LN.M.

SUB-TOTAL =
3. DISTRIBUTION LINE
I
DISTRIBUTION LINE
Includes: Layout and Excavation, Backfilling, Chipping Works,
Restoration Works
SUB-TOTAL =
M. EQUIPMENT, MACHINERIES AND SUPPLIES
I
Supply and Installation of Equipment, Machineries and Supplies

1.000

lot

5.760
1.000
1.000

sq.m.
lot
unit

SUB-TOTAL =
SPL-1
SPL-2
SPL-3

Project Billboard/Signage
Safety & Health
Temporary Facility
SUB-TOTAL =
TOTAL (ABC)
ESAO
TOTAL PROJECT COST

Page 82

TOTAL COST

242,276.03
3,593,811.10
880,940.49
1,217,279.78
7,846.50
275,999.72
1,598,921.91
783,017.70
2,568,599.80
1,272,983.85
12,441,676.88

4,110.69
15,310.78

3,405.47
14,441.70

16,747.22
443,082.30
6,535.63
503,633.79

22,988.22

2,163.85

Page 83

TOTAL COST

34,841.69

99,099.36

19,487.12
188,357.75

Page 84

TOTAL COST

56,228.61
127,814.04
59,151.08

33,230.40
2,697.07
7,846.51
42,504.01
111,427.46

21,586.88

829,424.05

25,152.06

721.28
10,438.61

95,707.42

53,033.39
240,692.11
53,496.76
228,664.44
69,480.52

37,867.19

Page 85

TOTAL COST

1,848.28
5,188.57
42,504.01
38,099.04

21,586.88

924,480.56

Page 86

TOTAL COST

35,167.55

3,245.76
77,317.35

237,550.35

77,636.78
280,102.65
68,473.31
340,477.65
198,409.32

94,281.60
4,082.95
9,135.53
42,504.01
114,505.78

22,308.16

1,605,198.75

Page 87

TOTAL COST

31,383.41

721.28

Page 88

TOTAL COST

26,862.53

57,429.67

7,583.10
219,962.39
66,498.48
241,954.66
105,471.09

45,981.60
2,194.75
6,303.47
42,504.01
114,505.78

21,947.52

991,303.74

1,789,709.49
522,849.11
437,840.14
2,750,398.74

1,659,569.33
731,786.22
281,869.78
430,709.13
337,403.19
35,342.72
56,141.34
3,532,821.71

Page 89

TOTAL COST

45,013.03
35,033.59
215,052.22
526,598.80

2,336,401.09

1,519,352.85

246,423.38
183,633.39

5,107,508.35
388,968.28
388,968.28
23,184.00
23,184.00
221,333.78
221,333.78

37,748.71
103,101.82
49,732.26
7,843.92

Page 90

TOTAL COST

39,381.89
237,808.60

Page 91

TOTAL COST

2,749.88
12,609.52
57,600.65

72,960.05

115,910.66
20,275.05
285,897.36
7,629,777.76
8,051,860.83
30,336.91
208,037.76
1,066,719.99
1,305,094.66
30,336.91
208,037.76
584,665.38
823,040.05
3,082,692.12
3,082,692.12

97,255,631.93
97,255,631.93

2,593,948.28
375,191.82
4,865,879.82
13,795,411.22
21,630,431.14

75,051.76
2,276,814.99
5,844,946.83
756,828.80
8,953,642.38

Page 92

TOTAL COST

353,324.17
140,598.08
1,340,164.00
1,316,237.92
3,084,621.22
161,966.00
416,219.78
6,813,131.17

Page 93

TOTAL COST

22,704.86
122,478.50
192,394.99
159,398.37
206,080.01
745,436.43
37,096.33
1,485,589.49

357,131.49
332,135.59
797,195.36
187,459.38
1,673,921.82

11,443.88

394,603.26

325,226.44

37,784.77

60,243.62
270,285.29

15,332.67

Page 94

TOTAL COST

1,114,919.93

Page 95

TOTAL COST

185,130.46

185,130.46
350,954.55

350,954.55

29,624,000.00
29,624,000.00
2,388.88
199,916.92
14,849.66
217,155.46
212,197,897.20
1,802,102.80
214,000,000.00

Page 96

Republic of the Philippines


OFFICE OF THE CITY ENGINEER
City of Zamboanga

DATE PREPARED

:
:

PROJECT TITLE

LOCATION

: BALIWASAN, ZAMBOANGA CITY

WORK TO BE DONE

: BY CONTRACT

DURATION

SCOPE

: PLEASE SEE ATTACHED SHEET

PROGRAM OF WORK NO.

31-Jul-15

ANNUAL

SUPPLEMENTAL

BUDGET CLASSIFICATION:
CDF
TRUST FUND

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS CO


BALIWASAN

360 CALENDAR DAYS

MINIMUM EQUIPMENT REQUIREMENT :

TECHNICAL PERSONNEL REQ

Description

No.

Description

No.

Descript

Bagger Mixer

20 Tonner Crane

Engineer

Concrete Vibrator

Welding Machine

Skilled Workers

Tile Cutter

Cutting Outfit

Unskilled Workers

Electric Planer

Jackhammer

Safety Practitioner

Concrete Cutter

Electric Grinder

Reg. Electrical Engine

Bar Cutter

Walk Behind Roller

Welding Machine

Truck with Boom

Electric Planer

Payloader

Bar Bender

Water Truck

Backhoe

Transit Mixer

Plate Compactor

Batching Pant

Road Grader

Dumptruck

Road Roller

Speed Cutter

SUMMARY OF COST ESTIMATE


I.

COST OF MATERIALS

--------------------

II.

COST OF LABOR

--------------------

III.

COST OF EQUIPMENT UTILIZATION

--------------------

(Inclusive of Rental, Fuel, Operator, etc.)


IV.

COST OF JOB ORDER

--------------------

V.

TEMPORARY FACILITY

--------------------

VI.

BILLBOARDS/SIGNAGES

--------------------

VII.

SAFETY AND HEALTH

--------------------

VIII.

MOBILIZATION/DEMOBILIZATION

IX.

OVERHEAD CONTINGENCIES

164

SUB-TOTAL ESTIMATED DIRECT COST


--------------------

164

TOTAL ESTIMATED DIRECT COST


AND MISCELLANEOUS (OCM)

7.000000000%

( Of I-VII )

--------------------

X.

CONTRACTOR'S PROFIT

8.000000000%

( Of I-VII )

--------------------

XI.

VALUE ADDED TAX (VAT)

12.000000%

( Of I-X )

--------------------

APPROVED BUDGET FOR THE CONTRACT (ABC)

--------------------

ENGINEERING ADMINISTRATIVE OVERHEAD (EAO)

--------------------

TOTAL PROJECT COST

--------------------

212

214

Prepared by:

Prepared by:

As to Electrical:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

GONZALO V. GRAFIA

CHRISTOPH

Engineer I

Engineering Assistant

Engineer II

Engineer III

LEONARD S. ALCALA

ABBAS S. ASKARI

JOEL E. LOCSON

Building Inspector

Engineering Assistant

Engineering Assistant

Reviewed by:

Recommending Approval:

Approved by:

DONALD F. RECINTO

RODRIGO C. REBOLLOS, SR.

LUIS VICENTE L. DESPALO

Engineer III

Assistant City Engineer

City Engineer

f the Philippines
HE CITY ENGINEER
Zamboanga
FY:

PROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX AT

TECHNICAL PERSONNEL REQUIRED :


Description

No.
2
6

Unskilled Workers

30

Safety Practitioner

Reg. Electrical Engineer

F COST ESTIMATE
51,284,121.42
7,469,543.00
4,141,225.00
101,686,431.80
11,529.25
1,854.72
155,215.00
164,749,920.19
164,749,920.19
11,532,494.41
13,179,993.61
22,735,488.99
212,197,897.20
1,802,102.80
214,000,000.00
Checked by:

CHRISTOPHER Q. NAVARRO
Engineer III

Page 101 of 570


A. EXISTING BLEACHERS
A1. BLEACHER I (MAIN BLEACHER): AREA = 3,094.45 SQUARE METERS

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

MASONRY WORKS

SQ.M.

125.00

Quantity:

Name and Specification

Quantity

A. Materials
4" CHB

Unit

1600

pcs.

Portland Cement
Washed Sand

138
10

bags
cu.m.

10mm. dia. x 6.0m Def. Bars


#16 GI Tie Wire

90
3.5

pcs.
kgs.

Unit Cost
17.25
255.00
1,100.00
140.00
75.00

Sub - total for A

Php

Designation

No. of
Manpower

No. of Days

1
2

25
25

616.00
321.00

10

25

280.00

B. Labor
a. Engineer
b. Skilled Laborers
c. Unskilled Worker

Daily Rate

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

F.
G.
H.
I.
J.
K.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 102 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II

ROOFING WORKS

SQ.M.

3838.60

Quantity:

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
3,874

ln.m.

343.00

0.60mm thk. Twin Rib-Type Prepainted G.I. Gutter 12'

68

ln.m.

885.00

0.60mm thk. Twin Rib-Type Prepainted G.I. End Flashing 12'

78

ln.m.

885.00

5mm x 37.50mm Flat Bar

40

pcs.

850.00

6mm x 50mm Flat Bar

42

pcs.

650.00

3mm x 37.50mm Flat Bar

20

pcs.

640.00

0.60mm thk. Twin Rib-Type Longspan Prepainted G.I. Roofing


Sheet

5/8" x 7/8" Blind rivets

boxes

520.00

5/8" dia Drillbits

dozen

1,080.00

4" dia PVC Elbow x 90 deg.


4" dia PVC Elbow x 45 deg.
4" dia PVC Pipe S -1000

40

pcs.

100.00

40

pcs.

77.00

114

pcs.

845.00

Hacksaw blade

dozen

Solvent Cement

gal.

1,340.00

Vulcaseal
Form Lumber

708.00

gals.

1,419.00

172

cu.m.

6,000.00

boxes

1,625.00

Asstd. C.W. Nails

Sub - total for A


Designation
B. Labor
a. Engineer
b. Skilled Laborers
c. Unskilled Worker

Php
No. of
Manpower

No. of Days

1
2
10

25
25
25

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php

D. Job-Order

F.
G.
H.
I.
J.
K.

Prepared by:

7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 103 of 570


MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 104 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III
UNITS

Quantity:

DOORS

25.000

Scope:

Includes: Painting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Designation

Php
No. of
Manpower

No. of Days

Daily Rate

B. Labor

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
D1 - Tempered Glass Double Swing-Type Door complete
with superior quality Door Lock & Hinges and in conformity
with plans & specifications (2.50m x 2.10m)

unit

68,750.00

D2- Tempered Glass Double Swing-Type Door complete


with superior quality Door Lock & Hinges and in conformity
with plans & specifications (2.40m x 2.10m)

units

66,000.00

D3- Panel Door Swing type complete with superior


quality Door Lock & Hinges and in conformity
with plans & specifications (1.0m x 2.10m)

11

units

3,500.00

D4- Panel Door Swing type complete with superior


quality Door Lock & Hinges and in conformity
with plans & specifications (0.90m x 2.10m)

units

3,500.00

D5- Panel Door Swing type complete with superior


quality Door Lock & Hinges and in conformity
with plans & specifications (0.80m x 2.10m)

unit

3,400.00

D2a- Tempered Glass Double Swing-Type Door complete


with superior quality Door Lock & Hinges and in conformity
with plans & specifications (2.50m x 2.10m)

unit

77,000.00

D2b- Tempered Glass Double Swing-Type Door complete


with superior quality Door Lock & Hinges and in conformity
with plans & specifications (2.40m x 2.10m)

unit

78,310.00

units

4,000.00

Third Floor:
D-5 (0.80m X 2.10m)

Sub - total for D


F.

Direct Cost (A+B+C+D)

Php
Php

Page 105 of 570


G. Overhead, Contingencies and Miscellaneous

7.000000000%

H. Contractor's Profit (CP)


I.
J.

8.000000000%

Value Added Tax (VAT)


Total

12.000000000%

K. Total Unit Cost


Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 106 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IV
UNITS

Quantity:

WINDOWS

100.00000
Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

B. Labor

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Windows:
W1- 6mm thk Smoke Jalousie glass on Aluminum Frame

unit

4,000.00

unit

4,800.00

unit

4,000.00

unit

2,500.00

unit

4,000.00

unit

2,250.00

units

2,000.00

15

units

1,800.00

(5.40m x 0.90m)
W2- 6mm thk Smoke Jalousie glass on Aluminum Frame
(4.20m x 1.50m)
W3- 6mm thk Smoke Jalousie glass on Aluminum Frame
(3.60m x 1.50m)
W4- 6mm thk Smoke Jalousie glass on Aluminum Frame
(3.60m x 0.90m)
W5- 6mm thk Smoke Jalousie glass on Aluminum Frame
(3.20m x 1.40m)
W6- 6mm thk Smoke Jalousie glass on Aluminum Frame
(3.00m x 0.90m)
W8- 6mm thk Smoke Jalousie glass on Aluminum Frame
(2.60m x 0.90m)
W10- 6mm thk Smoke Jalousie glass on Aluminum Frame
(2.40m x 0.90m)

Page 107 of 570


W11- 6mm thk Smoke Jalousie glass on Aluminum Frame

units

1,800.00

units

1,300.00

units

1,400.00

19

units

1,750.00

unit

1,225.00

units

1,000.00

units

875.00

unit

1,400.00

unit

900.00

15

unit

700.00

unit

350.00

(2.0m x 1.0m)
W12- 6mm thk Smoke Jalousie glass on Aluminum Frame
(1.800m x 0.90m)
W13- 6mm thk Smoke Jalousie glass on Aluminum Frame
(1.900m x 0.90m)
W14- 6mm thk Smoke Jalousie glass on Aluminum Frame
(1.20m x 1.50m)

W15- 6mm thk Smoke Jalousie glass on Aluminum Frame


(2.40m x 0.60m)
W16- 6mm thk Smoke Jalousie glass on Aluminum Frame
(1.20m x 0.90m)
W17- 6mm thk Smoke Jalousie glass on Aluminum Frame
(0.60m x 1.50m)
W19- 6mm thk Smoke Jalousie glass on Aluminum Frame
(2.20m x 0.60m)
W20- 6mm thk Smoke Jalousie glass on Aluminum Frame
(1.65m x 0.60m)
W21- 6mm thk Smoke Jalousie glass on Aluminum Frame
(1.20m x 0.60m)
W22- 6mm thk Smoke Jalousie glass on Aluminum Frame
(0.50m x 0.50m)
Second Floor:
W1a : (4.20m x 1.50m); 5mm thk Bronze Glass

26

units

15,000.00

10

units

6,000.00

unit

11,100.00

unit

10,667.00

unit

12,000.00

Sliding Window using 2" x 4" Open Back


& Tubular Analok Framing with Snap-on Moulding
(with Complete Accessories)
W10a : (4.20m x 0.60m); 5mm thk Bronze Glass
Sliding Window using 2" x 4" Open Back
& Tubular Analok Framing with Snap-on Moulding
(with Complete Accessories)
W5a : (3.33m x 1.40m); 5mm thk Bronze Glass
Sliding Window using 2" x 4" Open Back
& Tubular Analok Framing with Snap-on Moulding
(with Complete Accessories)
W6a : (3.20m x 1.40m); 5mm thk Bronze Glass
Sliding Window using 2" x 4" Open Back
& Tubular Analok Framing with Snap-on Moulding
(with Complete Accessories)
W3a : (3.60m x 1.40m); 5mm thk Bronze Glass

Page 108 of 570


Sliding Window using 2" x 4" Open Back
& Tubular Analok Framing with Snap-on Moulding
(with Complete Accessories)
W7a : (2.50m x 1.40m); 5mm thk Bronze Glass

unit

8,350.00

26

units

5,476.00

10

units

11,900.00

unit

17,350.00

unit

5,850.00

Sliding Window using 2" x 4" Open Back


& Tubular Analok Framing with Snap-on Moulding
(with Complete Accessories)
Third Floor:
W8a : (2.30m x 1.00m); 5mm thk Bronze Glass
Sliding Window using 2" x 4" Open Back
& Tubular Analok Framing with Snap-on Moulding
(with Complete Accessories)
W4a : (3.57m x 1.40m); 5mm thk Bronze Glass
Sliding Window using 2" x 4" Open Back
& Tubular Analok Framing with Snap-on Moulding
(with Complete Accessories)
W2a : (5.20m x 1.40m); 5mm thk Bronze Glass
Sliding Window using 2" x 4" Open Back
& Tubular Analok Framing with Snap-on Moulding
(with Complete Accessories)

W9a : (1.75m x 1.40m); 5mm thk Bronze Glass


Sliding Window using 2" x 4" Open Back
& Tubular Analok Framing with Snap-on Moulding
(with Complete Accessories)

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 109 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

WINDOW GRILLES

SQ.M.

Quantity:

Includes: Painting

6.0920

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
GW1-1 unit (3.00m x 0.56m)

1.680

sq.m.

GW4-2 units (1.20m x 0.56m)

1.344

sq.m.

GW5-2 units (1.30m x 1.18m)

3.068

sq.m.

6.092

1,000.00

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 110 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VI

SEPTIC VAULT

UNITS

Quantity:

2.0000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
255.00

Portland Cement

114

bags

4" CHB

826

pcs.

17.25

Sand

cu.m.

Fine Sand

cu.m.

1,100.00
1,200.00

Gravel

cu.m.

Plyforms (11mm thk Ord. Plywood)

shts.

1,100.00
780.00

0.30

cu.m.

6,000.00

118

pcs.

18

pcs.

140.00
187.00

#16 GI Tie Wire

kgs.

CW Nails (Asstd. Size)

kgs.

4" dia. PVC Tee

pcs.

4" dia. PVC Cleanout with Cover

pcs.

4" dia.x 3m PVC Pipe (S-1000)

pcs.

Assorted Form Lumber


10mm x 6m DRB
10mm x 7.5m DRB

75.00
61.00
180.00
79.00
845.00

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

40

616.00

2
6

40
40

321.00
280.00

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

1
1

1
1

1,600.00
1,000.00

C. Equipment
Bagger Mixer
Concrete Vibrator

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN

Checked by:

GERALDINE T. RABAGO

DONALD F. RECINTO

Page 111 of 570


Engineer I

Engineering Assistant

Engineer III

OIC-Chief, Planning, Designing & Prog

Page 112 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VII

TILE WORKS

SQ.M.

Quantity:

1,662.9900

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
6mm thk x 400mm x 400mm Glazed Ceramic Floor Tiles

6,020

pcs.

85.00

6mm thk x 200mm x 200mm Unglazed Ceramic Floor Tiles

4,920

pcs.

17.50

6mm thk x 200mm x 300mm Glazed Ceramic Wall Tiles

8,515

pcs.

33.00

Tile Grout

238

packs

79.00

Tile Adhesive

333

bags

300.00

PVC Tile Trim 8'

118

pcs.

149.00

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

1
2
15

40
40
40

Daily Rate

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

616.00
321.00
280.00

Sub - total for B

Php

Name and Capacity

No. of
Equipment

No. of Days

Daily Rate

20

400.00

C. Equipment
Tile Cutter

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 113 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

UNITS

Quantity:

25.00

VIII

PLUMBING WORKS

Scope:
Name and Specification

Quantity

Unit

Unit Cost

A. Materials
6" dia x 10' PVC Pipe Series 1000

55

pcs.

1,609.25

4" dia x 10' PVC Pipe Series 1000

41

pcs.

845.00

2" dia x 10' PVC Pipe Series 1000

38

pcs.

296.00

4 x 4 PVC Wye

43

pcs.

160.00

4 x 2 PVC Wye

34

pcs.

140.00

2 x 2 PVC Wye

30

pcs.

43.00

4" dia. PVC P-Trap

62

pcs.

246.00

4" dia. PVC Clean-out

15

pcs.

79.00

PVC Solvent Cement

ltr.

335.00

4 x 4 PVC Sanitary Tee

18

pcs.

180.00

4 x 2 PVC Sanitary Tee

26

pcs.

140.00

2 x 2 PVC Sanitary Tee

34

pcs.

46.00

6 x 4 PVC Wye

47

pcs.

745.00

6" dia PVC Clean out

22

pcs.

650.00

4 x 1/4 PVC Elbow

38

pcs.

100.00

4 x 1/8 PVC Elbow

26

pcs.

77.00

2 x 1/4 PVC Elbow

38

pcs.

34.00

2 x 1/8 PVC Elbow

25

pcs.

27.25

6 x 6 Floor Drain NP Stainless

55

pcs.

165.00

Water Closet with complete fittings & accessories

25

pcs.

4,500.00

Double Faucet Lavatories

14

units

3,500.00

Soap Holder

45

pcs.

145.00

Tissue Holder

33

pcs.

450.00

Facial Mirror (Male)

units

300.00

Facial Mirror (Female)

units

300.00

3" dia x 3/4 Saddle Clamp, Brass Fitting

pcs.

384.00

1/2" dia x 10' UPVC Pipe Blue w/ coupling

55

pcs.

45.00

3/4" dia x 10' UPVC Pipe Blue w/ coupling

55

pcs.

60.00

1/2" dia UPVC Threaded Tee

48

pcs.

10.00

1/2" dia UPVC Threaded Elbow

58

pcs.

10.00

(Female, PWD, Male)

ELSON Blue PVC Solvent Cement

ltr.

335.00

1/2" dia UPVC Plain Tee

60

pcs.

1/2" dia UPVC Plain Elbow

62

pcs.

6.50

3/4" dia UPVC Plain Tee

23

pcs.

11.00

3/4" dia UPVC Plain Elbow

20

pcs.

10.00

pcs.

300.00

3/4" dia x 1/2" dia UPVC Male Adaptor

24

pcs.

87.00

Faucet, Elegant Stainless Wall Mounted H.B.

14

pcs.

500.00

unit

600.00

1/2" dia Brass Quarter Turn Gate Valve

10

pcs.

282.25

1/2" dia Brass Nipple x 2" Long

10

pcs.

8.25

3/4" dia SDR-II PPR Pipe x 10'

10

pcs.

17.75

Teflon Tape

43

rolls

15.00

Bidet Faucet / Genital Spray; Chrome/ Stainless

25

sets

2,145.00

3/4" dia Gate Valve

1.2mm x 37.5mm dia Stainless Grabrail w/

10.00

stainless wall flange (1.80m)

Page 114 of 570


elegant set with 1/2" stainless flex hose
6mm thk elegant set wall-mounted mirror w/ 3"

unit

1,394.00

unit

1,972.00

Shower Valve

32

sets

760.00

Shower Head

Hardwood moulded frame (1.20m x 1.10m) Male


6mm thk elegant set wall-mounted mirror w/ 3"
Hardwood moulded frame (2.69m x 1.10m) Female
32

sets

897.00

1.2mm thk x 1/2" x 2" Stainless Tubular Curtain Rod

pcs.

1,273.75

4" dia x 2" dia PVC Reducer

pcs.

40.00

Sub - total for A

Php

Page 115 of 570


Designation
B. Labor
Engineer

No. of
Manpower

No. of Days

Daily Rate

12

616.00

Skilled Laborers

12

321.00

Unskilled Worker

12

280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

F.

Direct Cost (A+B+C+D)

G.
H.
I.
J.
K.

Overhead, Contingencies and Miscellaneous


Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php

Prepared by:

7.000000000%
8.000000000%
12.000000000%

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 116 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


IX
ELECTRICAL WORKS

Unit of Measurement:
Quantity:

OUTLETS
389.00

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
BLEACHER I
3.5mm2 THW Wire

rolls

4,628.75

5.5mm2 THW Wire

rolls

6,774.00

15mm dia RSC Pipes

144

pcs.

200.50

20mm dia RSC Pipes

120

pcs.

240.00

15mm dia RSC Couplings

324

pcs.

13.00

20mm dia RSC Couplings

200

pcs.

19.00

15mm dia x 90 deg. RSC Elbows

108

pcs.

15.00

15mm dia LB Condulets

72

pcs.

90.00

25W LED Low Bay Lights (LEMNIS Brand)

36

sets

10,700.00

45W LED Low Bay Lights (LEMNIS Brand)

36

sets

12,100.00

4" x 4" x 4" Metal PullBox w/ cover G.A. 18

108

pcs.

400.00

15mm dia Lock nuts

432

pcs.

5.00

15mm dia Bushing

216

pcs.

8.00

15mm dia Metal Pipe Clamps

576

pcs.

3.00

20mm dia Metal Pipe Clamps

360

pcs.

#7 PVC Tox (100 pcs/box)

boxes

#7 Metal Screws (100pcs/box)

boxes

Panel Board, 2P, 12 Branches,

set

5.00
75.00
100.00
13,400.00

Center Main, (Bolt-on Type)


MCB: 100AT, 125AF, 2P, 240V, 60Hz ACB
Branches: 8x20AT, 50AF, 2P, 240V, 60Hz ACB (Bolt-on Type)
4 X SPARE
1/2" dia Mica Tube

18

mtrs.

#16 G.I. Tie Wire

kgs.

75.00

12"x12"x4" Metal Pull Box w/ cover

pcs.

600.00

50mm dia RSC Pipes

pcs.

860.00

50mm dia x 90 deg. RSC Elbows

pcs.

150.00

50mm dia RSC Coupling

pcs.

75.00

10

pcs.

13.25

50mm dia Bushing

pcs.

18.00

50mm dia LB Condulet

pcs.

450.00

65mm dia Metal Pipe Clamps

24

pcs.

60.00

3/8" dia x 2 1/2" Expansion Bolts

65

pcs.

23.00

pc.

6,000.00

50mm dia Lock Nuts

36"x16"x10" Wire Gutter w/ cover G. A. 18

20.00

30mm2 THW Wire

10

mtrs.

281.00

200mm2 THW Wire

20

mtrs.

1,200.00

80mm dia RSC Pipes

pcs.

490.00

80mm dia Entrance Cap

pcs.

275.00

80mm dia Lock nuts

pcs.

35.00

80mm dia Bushing


80mm dia Metal Pipe Clamps

pcs.

35.00

16

pcs.

75.00

12

mtrs.

1,600.00

(GROUND AND SECOND FLOOR)


250mm2 THW Wire
Secondary Rack w/ 2x1 3/4"dia Spool Groove insulator

set

175.00

10W, LED Daylight Bulbs

pcs.

1,030.00

4" dia PVC Ceiling Sockets


1x28W, T5 Flourescent Fixtures, Troffer Type w/
Electronic Ballast, Mirrorized Reflector, Recessed Mounted

pcs.

24.75

20

sets

1,500.00

Page 117 of 570


2x28W, T5 Flourescent Fixtures, Troffer Type w/

184

sets

2,000.00

1 Gang Switch

20

sets

103.00

2 Gang Switch

27

sets

161.00

3 Gang Switch

sets

220.00

Duplex Convenience outlets

70

sets

173.00

Ceiling Fans (Orbit Type)

38

sets

1,960.00

sets

10,200.00

sets

11,950.00

22mm2 THW Wire

350

mtrs.

198.00

30mm2 THW Wire

20

mtrs.

281.00

40mm dia RSC Pipes

60

pcs.

658.00

40mm dia x 90 degree RSC Elbows

24

pcs.

40.00

40mm dia RSC Couplings

95

pcs.

50.00

40mm dia LB Condulets

16

pcs.

400.00

40mm dia Lock nuts

16

pcs.

12.00

40mm dia Bushings

pcs.

12.00

Panel Boards, 2P, 6 Branches, Center Main Breaker

sets

7,100.00

Electronic Ballast, Mirrorized Reflector, Recessed Mounted

Panel Boards, 2P, 10 Branches, Center Main Breaker


(Bolt-on Type pane)
MCB: 80AT, 100AF, 2P, 240v, 60Hz ACB, Bolt-on type
Branches: 3x15AT, 50AF, 2P, 240V, 60Hz ACB, Bolt-on type
3x20AT, 50AT, 2P, 240v, 60Hz ACB, Bolt-on type
4XSPARE
Panel Boards, 2P, 12 Branches, Center Main Breaker
MCB: 100AT, 100AF, 2P, 240V, 60Hz ACB, Bolt-on type
Branches: 4x15AT, 50AF, 2P, 240V, 50Hz ACB, Bolt-on type
3x20AT, 50AF, 2P, 240V, 60Hz ACB, Bolt-on type
5 x SPARE

MCB: 60AT, 80AF, 2P, 240V, 60Hz ACB, Bolt-on Type


Branches: 2x15AT, 50AF, 2P, 240V, 60Hz, Bolt-on type
2x20AT, 50AF, 2P, 240v, 60Hz, Bolt-on-type
2XSPARE
14mm2 THW Wire

rolls

17,216.00

32mmdia RSC Pipes

45

pcs.

530.00

32mmdia X 90degree RSC Elbows

20

pcs.

30.00

32mm dia RSC Couplings

70

pcs.

28.50

32mm LB Condulets

pcs.

300.00

32mmdia Lock nuts

16

pcs.

10.00

32mm dia Bushings

pcs.

10.00

Sub - total for A


Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
2
6

40
40
40

616.00
321.00
280.00
Php

Sub - total for B


F.
G.
H.
I.
J.
K.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Daily Rate

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 118 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


X
PAINTING WORKS

Unit of Measurement:

SQ.M.

Quantity:

General Repaintings

13,368.50

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Paint Remover
Comcrete Neutralizer
Masonry Putty

120

gals.

420.00

20

gals.

200.00

20

gals.

276.00

L/T Primer

513

gals.

555.00

L/T Gloss

513

gals.

545.50

gals.

602.00

Enamel Primer
Gloss Enamel Paint

gals.

589.50

Red Oxide

19

gals.

406.00

Marine Epoxy Paint

19

gals.

750.00

Sand paper

10

dozen

118.00

Brush Roller

30

pcs

60.00

Asstd. Paint Brush

30

pcs.

55.00

1" Maskin Tape

30

rolls

17.00

Waste Cotton

60

kls.

Putty Knife

dozen

68.50
420.00

Acreex Paint

15

gals.

1,200.00

Acreex Reducer

15

gals.

950.00

L/T Penetrating Sealer

15

gals.

541.00

L/T Tinting Color

15

pint

84.00

Sub - total for A


Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
4
20

38
38
38

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

F.
G.
H.
I.
J.
K.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Page 119 of 570


Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

A2. OFFICE AREA

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

REINFORCED CONCRETE WORKS

CU.M.

Quantity:

0.07080
Includes: Lavatory Counter

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
12mm dia. DSB x 6.0m
#16 G.I. Wire

pcs.

255.00

0.07

kgs.

79.00

Portland Cement

bags

255.00

Sand

0.25

cu.m.

1,100.00

Gravel

0.25

cu.m.

1,100.00

0.1

cu.m.

6,000.00

Form Lumber
9mm thk. Ord. Plywood

pc.

650.00

Asstd. C.W. Nails

kg.

61.00

Sub - total for A


Name and Designation
B. Labor
Unskilled Worker

Php
No. of
Manpower

No. of Days

Daily Rate
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)

Php
7.000000000%
8.000000000%
12.000000000%

Page 120 of 570


I.

Total

J.

Total Unit Cost

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

DONALD F. RECINTO

Engineer I

Engineering Assistant

Engineer III

OIC-Chief, Planning, Designing

Page 121 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II

FABRICATION OF CABINET

UNITS

Quantity:

3.00000
(Note: Use well-seasoned lumber)
Includes: Fabrication & installation of wooden hanging cabinet

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
3/4" thk. Plyboard
3/16"x1 1/2"x1 1/2" Angle Bar

pcs.

962.00
615.00

pcs.

108

pcs.

1.75

Finishing Nails

kg.

62.00

Asstd. C.W. Nails

kgs.

61.00

Solignum

gal.

1,118.25

1/8" dia. X 3/4" Screw

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
1
2

2
2
2

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity
C. Equipment
Electric Planer

Php
No. of
Equipment

No. of Days

Daily Rate

400.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

DONALD F. RECINTO

Engineer I

Engineering Assistant

Engineer III

OIC-Chief, Planning, Designing

Page 122 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III

DOOR

UNIT

Quantity:

1.00000
Doors (Job Order)

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
D1- Panel-Type Door (0.70m x 2.10m)

unit

2,644.00

Wood Panelling on Wooden Framing complete with


Door Lock & Hinges, and Fiber Glass CR Signage
(Please see plans for specifications)

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 123 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IV

PLUMBING WORKS

UNIT

Quantity:

1.00000
Includes: Repiping of Sanitary System & Water Supply System;
Supply & Installation of Plumbing Fixtures and Accessories

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
2"dia.x 10' PVC Pipe Series 1000

pcs.

296.00

2" dia. PVC Wye

pc.

43.00

1/2" dia x 6" Nipple

pcs.

19.25

2" dia. PVC P-Trap

pc.

102.00

PVC Solvent Cement

liter

335.00

4"x4" Floor Drain NP Brass

pc.

75.00

1/2"dia G.I. Union Patent

pc.

27.00

Teflon Tape

roll

15.00

6mm thk elegant set wall-mounted mirror w/ 3"

unit

510.00

set

6,350.00

pc.

400.00

Hardwood moulded frame (600m x 800m)


Package Water closet , Lavatories, and Faucet with
accessories (HC6 C5777LT) (Lever type)
1/2" dia Wall Faucet NP P.P.

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

1
1
2

2
2
2

No. of
Equipment

No. of Days

Daily Rate

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 124 of 570

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 125 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

TILEWORKS

SQ.M.

Quantity:

14.75000
Includes: Supply & Installation of Tiles

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
6mmx200mmx200mm Unglazed Ceramic Floor Tiles

64

pcs.

17.50

180

pcs.

33.00

6mmx200mmx200mm Glazed Ceramic Floor Tiles

25

pcs.

17.50

6mmx50mmx200mm Glazed Ceramic Wall Border Tiles

30

pcs.

12.00

PVC Tile Trim

pcs.

149.00

Tile Adhesive (25 kgs.)

bags

300.00

Tile Grout (2 kgs.)

packs

85.00

6mmx200mmx300mm Glazed Ceramic Wall Tiles

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

1
1
2

2
2
2

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate
616.00
321.00
280.00

Sub - total for B

Php

Name and Capacity

No. of
Equipment

No. of Days

Daily Rate

400.00

C. Equipment
Tile Cutter

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 126 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VI
OUTLETS

Quantity:
Scope of Work:

ELECTRICAL WORKS

59.00
Pleb Office (Ground Floor) and Sports Office (Second & Third Floor)

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
PLEB OFFICE (GROUND FLOOR)
3.5mm2 THW Wire
20mm dia PVC Electrical Pipes
2x28W, T5 Flourescent Fixtures, Troffer Type w/
Electronic Ballast, Mirrorized Reflector, Recessed mounted
10W, LED Daylight Bulb
4" dia PVC Ceiling Socket
1 Gang Switch
2 Gang Switch
Duplex Convenience outlets

4
50
8

rolls
pcs.
sets

4,628.75
96.50
2,000.00

1
1
3
3
10

pc.
pc.
sets
sets
sets

1,030.00
24.75
103.00
161.00
173.00

Aircon Outlets
PVC Junction Box w/ coveres
PVC Utility Box
PVC Electrical Tapes
PVC Solvent
Panel Board, 2P, 8 Branches, Centermain Breaker
(Bolt-on type panel)
MCB: 80AT, 100AF, 2P, 240V, 60HZ, Bolt-on type
Branches: 1x15AT, 50AF, 2P, 240V, 60Hz, Bolt-on type
3x20AT, 50AF, 2P, 240V, 60Hz, Bolt-on-type
1x40AT, 50AT, 2P, 240V, 60Hz, Bolt-on type
3 SPARE
22mm2 THW Wire
40mm dia RSC Pipes
40mm dia x 90 deg. RSC Elbows
40mm dia RSC Couplings
40mm dia LB Condulets
40mm dia Lock nuts
40mm dia Bushings
#16 G.I. Tie Wire
1/2" dia Mica Tube

2
9
18
8
1
1

sets
pcs.
pcs.
rolls
qrt.
set

310.00
24.75
17.00
28.50
335.00
8,900.00

100
40
6
50
8
6
3
1
3

mtrs
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
lg.
mtrs.

198.00
658.00
40.00
50.00
400.00
12.00
12.00
79.00
20.00

4
50
4
10

rolls
pcs.
sets
sets

4,628.75
96.50
1,228.00
1,500.00

sets

2,000.00

4
4
2
6
13
3
22
32
8
1
2

sets
sets
sets
sets
sets
sets
pcs.
pcs.
rolls
qrt.
sets

103.00
161.00
220.00
220.00
173.00
310.00
24.75
17.00
28.50
335.00
7,700.00

SPORTS OFFICE (SECOND & THIRD FLOOR)


3.5mm2 THW Wire
20mm dia PVC Electrical pipes
10W, 5" dia. LED Recessed Downlights
1x28W, T5 Flourescent Fixtures, Troffer Type w/
Electronic Ballast, Mirrorized Reflector, Recessed Mounted
2x28W, T5 Flourescent Fixtures, Troffer Type w/
Electronic Ballast, Mirrorized Reflector, Recessed Mounted
1 Gang Switch
2 Gang Switch
3 Gang Switch
1 Gang-3Way Switch
Duplex Convenience Outlets
Aircon outlets
PVC Junction Box w/ covers

PVC Utility Box


PVC Electrical Tapes
PVC Solvent
Panel Boards, 2p, 6 Branches, Center Main Breaker
(Bolt-on-type)

Page 127 of 570


MCB: 60AT, 80AF, 2P, 240V, 60Hz, Bolt-on Type
Branches: 1x15AT, 50AF, 2P, 240V 60Hz, Bolt-on type
3x20AT, 50AF, 2P, 240V, 60Hz, Bolton-type
1x40AT, 50AF, 2P, 240V, 60Hz, Bolt-on-type
1 X SPARE
14mm2 THW Wire
32mm dia RSC Pipes
32mm dia x 90 deg. RSC Elbows
32mm dia RSC Couplings
32mm dia LB Condulets
32mm dia Locknuts
32mm dia Bushing
#16 G.I. Tie Wire
1/2" dia Mica Tube

100
40
6
50
8
10
5
1
6

mtrs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
kg.
mtrs.

128.00
530.00
30.00
28.50
300.00
10.00
10.00
79.00
20.00

Sub - total for A


Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

40

616.00

2
6

40
40

321.00
280.00
Php

Sub - total for B


F.
G.
H.
I.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)

Daily Rate

Php
7.000000000%
8.000000000%
12.000000000%

J. Total
K. Total Unit Cost
Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 128 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VII

PAINTING WORKS

SQ.M.

Quantity:

44.85700
Includes: Repainting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Paste Wood Filler

gals

522.00

Semi-Gloss QDE Premix Paint

gal.

622.50

Red Oxide Metal Primer Paint

gals

406.00

Enamel Paint

gals

531.00

Acrylic Latex Paint (Semi-Gloss)

gals

555.50

Paint Thinner

gal.

321.75

Asstd. Sand Paper

doz

113.00

Asstd. Paint Brush

pcs.

55.00

Bontite

qrts.

150.00

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

B. Labor
Unskilled Worker

Daily Rate
280.00

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 129 of 570

Page 130 of 570


A3. COMFORT ROOM NO.1
CR #1 TOTAL FLOOR AREA = 130,977 SQ.M.

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Unit of Measurement:
Quantity:

REMOVAL OF STRUCTURE AND OBSTRUCTION

SQ.M.

Includes:

81.1500

a.) Removal of existing concrete floor slab, stair, concrete partitions


& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php

Designation

No. of
Manpower

No. of Days

1
2
5

6
6
6

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate
616.00
321.00
280.00

Sub - total for B

Php

Name and Capacity

No. of
Equipment

No. of Days

C. Equipment
Concrete Cutter

Daily Rate
1,900.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

F.
G.
H.
I.
J.
K.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

Page 131 of 570

OIC-Chief, Planning, Designing & Prog

Page 132 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:

II

Unit of Measurement:
Quantity:

CU.M.

LAYOUT AND EXCAVATION


Includes: Wall footing

4.6620

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php

Designation

No. of
Manpower

No. of Days

B. Labor
Unskilled Worker

Daily Rate
280.00

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

F.

Direct Cost (A+B+C+D)

G.
H.
I.
J.
K.

Overhead, Contingencies and Miscellaneous


Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 133 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


III

Unit of Measurement:

KGS.

Quantity:

457.464

REINFORCING STEEL
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete Partitions

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
12mm dia x 9m Def. Bar

10

pcs.

326.00

12mm dia x 7.5m Def. Bar

pcs.

312.50

12mm dia x 6m Def. Bar

37

pcs.

255.00

10mm dia x 7.5m Def. Bar

20

pcs.

186.00

10mm dia x 6m Def. Bar

13

pcs.

140.00

12.00

kgs.

75.00

# 16 G.I. Tie Wire

Sub - total for A

Php

Designation

No. of
Manpower

No. of Days

1
1
2

3
3
3

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate
616.00
321.00
280.00

Sub - total for B

Php

Name and Capacity

No. of
Equipment

No. of Days

1
1

0.5
0.5

C. Equipment
Bar Cutter
Welding Machine

Daily Rate
400.00
2,700.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

F.
G.
H.
I.
J.
K.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 134 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IV

STRUCTURAL CONCRETE

CU.M.

Quantity:

8.40440

Scope:

Includes: Stiffener Column, Lintel Beam, Wall footing,


Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete Partitions, Repair of Wall Cracks

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Portland Cement
Sand
Gravel
Asstd. Form Lumber

80

bags

255.00

5.0

cu.m.

1,100.00

7.50

cu.m.

1,100.00

0.200

cu.m.

6,000.00

11mm thk Ord. Plywood

pcs.

780.00

0.5

box

1,625.00

Concrete Epoxy A & B (paired)

gals.

2,550.00

Bond Concrete 400 (4 liters)

gals.

2,600.00

Asstd. C.W. Nails

Sub - total for A


Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker
(Includes 14 days curing period)
Sub - total for B
Name and Capacity
C. Equipment
Bagger Mixer
Concrete Vibrator

Php
No. of
Manpower

No. of Days

616.00

2
3

6
6

321.00
280.00

Daily Rate

Php
No. of
Equipment

No. of Days

1,600.00

1,000.00

Daily Rate

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

F.
G.
H.
I.
J.
K.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

DONALD F. RECINTO

Engineer I

Engineering Assistant

Engineer III

Page 135 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

MASONRY WORKS

SQ.M.

Quantity:
Scope:

17.000
(Note: Use Washed Fine and Coarse Aggregates)

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
4" CHB
Portland Cement
Washed Sand
Washed Fine Sand
10mm dia. Def. Bar x 6.0 m
#16 G.I. Tie Wire
Hacksaw Blade

213
19
1
0.5
13
0.5
1

pcs.
bags
cu.m.
cu.m.
pcs.
kl.
pc.

17.25
255.00
1,100.00
1,200.00
140.00
75.00
59.00

Sub - total for A


Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
1
2

2
2
2

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php

D. Job-Order

F.
G.
H.
I.
J.
K.

Prepared by:

7.000000000%
8.000000000%
12.000000000%

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

DONALD F. RECINTO

Engineer I

Engineering Assistant

Engineer III

Page 136 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VI

PLUMBING WORKS

UNITS

Quantity:

6.00

Scope:

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
6" dia x 10' PVC Pipe Series 1000

10

pcs.

1,609.25

4" dia x 10' PVC Pipe Series 1000

12

pcs.

845.00

2" dia x 10' PVC Pipe Series 1000

10

pcs.

296.00

4 x 4 PVC Wye

14

pcs.

160.00

4 x 2 PVC Wye

12

pcs.

140.00

2 x 2 PVC Wye

pcs.

43.00

4" dia. PVC P-Trap

pcs.

246.00

4" dia. PVC Clean-out

pcs.

PVC Solvent Cement

ltr.

335.00

4 x 4 PVC Sanitary Tee

pcs.

180.00

4 x 2 PVC Sanitary Tee

pcs.

140.00

2 x 2 PVC Sanitary Tee

pcs.

46.00

6 x 4 PVC Wye

pcs.

745.00

6" dia PVC Clean out

pcs.

650.00

4 x 1/4 PVC Elbow

pcs.

100.00

4 x 1/8 PVC Elbow

pcs.

77.00

2 x 1/4 PVC Elbow

pcs.

34.00

2 x 1/8 PVC Elbow

pcs.

27.25

6 x 6 Floor Drain NP Stainless

pcs.

165.00

Water Closet with complete fittings & accessories

pcs.

4,500.00

Soap Holder

pcs.

145.00

Tissue Holder

pcs.

450.00

3" dia x 3/4 Saddle Clamp, Brass Fitting

pcs.

384.00

1/2" dia x 10' UPVC Pipe Blue w/ coupling

15

pcs.

45.00

3/4" dia x 10' UPVC Pipe Blue w/ coupling

10

pcs.

60.00

1/2" dia UPVC Threaded Tee

12

pcs.

10.00

1/2" dia UPVC Threaded Elbow

14

pcs.

10.00

ELSON Blue PVC Solvent Cement

ltr.

79.00

335.00

1/2" dia UPVC Plain Tee

15

pcs.

10.00

1/2" dia UPVC Plain Elbow

14

pcs.

6.50

3/4" dia UPVC Plain Tee

pcs.

11.00

3/4" dia UPVC Plain Elbow

pcs.

10.00

3/4" dia Gate Valve

pcs.

300.00

3/4" dia x 1/2" dia UPVC Male Adaptor

pcs.

87.00

Faucet, Elegant Stainless Wall Mounted H.B.

pcs.

500.00

1/2" dia Brass Quarter Turn Gate Valve

pcs.

282.25

1/2" dia Brass Nipple x 2" Long

pcs.

8.25
17.75

3/4" dia SDR-II PPR Pipe x 10'


Teflon Tape
Bidet Faucet / Genital Spray; Chrome/ Stainless

pcs.

10

rolls

15.00

sets

2,145.00

unit

1,394.00

unit

1,972.00

elegant set with 1/2" stainless flex hose


6mm thk elegant set wall-mounted mirror w/ 3"
Hardwood moulded frame (1.20m x 1.10m) Male
6mm thk elegant set wall-mounted mirror w/ 3"
Hardwood moulded frame (2.69m x 1.10m) Female

Page 137 of 570


Double Faucet Lavatories

units

3,500.00

Sub - total for A


Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker
Sub - total for B

Php
No. of
Manpower

No. of Days

12

616.00

2
5

12
12

321.00
280.00

Daily Rate

Php

Page 138 of 570


Name and Capacity

No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

F.

Direct Cost (A+B+C+D)

Php

G. Overhead, Contingencies and Miscellaneous


H. Contractor's Profit (CP)
I. Value Added Tax (VAT)
J. Total
K. Total Unit Cost

7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 139 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


VII

Unit of Measurement:
Quantity:

ELECTRICAL WORKS

OUTLETS
15.00

Scope:
Name and Specification

Quantity

Unit

Unit Cost

A. Materials
3.5mm2 THW Wire

5.5mm2 THW Wire

85

mtrs.

60.00

20mm dia PVC Electrical Pipes

30

pcs.

96.50

25mm dia PVC Electrical Pipes

22

pcs.

153.00

units

1,250.00

11

sets

1,030.00

sets

2,000.00

1/2" dia Mica tube

mtrs.

20.00

1 Gang Switch

set

78.50

Exhaust Fan 12" x 12"


10W,5" dia LED Recessed Downlights
2x28W, T5 Flourescent Lighting Fixtures, Troffer Type

roll

4,628.75

w/ Electrical Ballast, Recess type w/ aluminum Reflector

2 Gang Switch

sets

121.00

11

pcs.

24.50

PVC Utility Box

pcs.

17.00

PVC Electrical Tape

rolls

28.50

PVC Solvent

can

95.00

20mm dia Metal Pipe Clamps

50

pcs.

9.00

25mm dia Metal Pipe Clamps

10

pcs.

10.00

#7 PVC Tox

50

pcs.

0.75

#7 Metal Screws

50

pcs.

PVC Junction Box w/ cover

1.00

30 AT, 2P, 230V ACB, Enclosed Type

set

310.00

#16 G.I. Tie Wire

kg.

79.00

Sub - total for A


Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
1
2

5
5
5

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

F. Direct Cost (A+B+C+D)


G. Overhead, Contingencies and Miscellaneous
H. Contractor's Profit (CP)

Php
7.000000000%
8.000000000%

Page 140 of 570


I.

Value Added Tax (VAT)

J.

Total

12.000000000%

K. Total Unit Cost


Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

DONALD F. RECINTO

Engineer II

Engineering Assistant

Engineer III

Page 141 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VIII

TILE WORKS

SQ.M.

Quantity:

170.6650

Scope:

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
6mmthkx0.30mx0.30m Ceramic Unglazed Tiles

322

pcs.

27.00

6mmthkx0.20mx0.30m Ceramic Glazed Tiles

2,194

pcs.

23.50

6mmthkx0.20mx0.20m Ceramic Glazed Tiles

65

pcs.

17.50

12mmthkx0.60mx0.60m Granite Tiles

14

pcs.

184.00

6mmthkx0.05mx0.20m glazed ceramic Belt tiles

269

pcs.

12.00

Tile trim

20

pcs.

149.00

Tile Adhesive

24

packs

300.00

Tile Grout

34

packs

85.00

Sub - total for A


Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

10

616.00

1
3

10
10

321.00
280.00

Daily Rate

Sub - total for B


Name and Capacity
C. Equipment
Tile Cutter

Php
No. of
Equipment

No. of Days

Daily Rate
400.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

F.
G.
H.
I.
J.
K.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 142 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:

IX

Unit of Measurement:
Quantity:

0.9150

CARPENTRY WORKS

CU.M.

Scope:

Includes: Installation of new Ceiling Board, Ceiling Joist,


Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Asstd. 2" x 2" Good Lumber
Asstd. 1" x 2" Good Lumber
4.5mm thk Hardiflex
6mm thk Hardiflex
Hardiflex Nail
1" x 4" Cornice Moulding
Aluminum Urinal Partition 1.2mm Grade Frame
(Frosted Panel) (0.40m x 0.95m)
Wood glue
Solignum
Asstd. C.W. Nails

0.87500
0.04000
0.91500
28
3
28
60
3

cu.m.
cu.m.
pcs.
pcs.
packs
ln.m.
pcs.

11,000.00
441.00
610.00
87.00
90.00
240.00

1
2
10.25

gal.
gals.
kls.

579.00
1,118.25
61.00

Sub - total for A

Php

Designation

No. of
Manpower

No. of Days

1
1
3

5
5
5

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate
616.00
321.00
280.00

Sub - total for B

Php

Name and Capacity

No. of
Equipment

No. of Days

C. Equipment
Electric Planer

Daily Rate
400.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

F. Direct Cost (A+B+C+D)


G. Overhead, Contingencies and Miscellaneous
H. Contractor's Profit (CP)
I. Value Added Tax (VAT)
J. Total
K. Total Unit Cost
Prepared by:

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 143 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


X

Unit of Measurement:

UNITS

Quantity:
Scope:

10.000

DOORS

Includes: Painting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Designation

Php
No. of
Manpower

No. of Days

Daily Rate

B. Labor

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
D2 - Panel Door Swing type complete with superior

units

3,500.00

units

2,000.00

units

3,400.00

quality Door Lock & Hinges and in conformity


with plans & specifications (0.90m x 2.10m)

D4- Low Louver Panel Door Swing type complete with


superior quality Door lock & Hinges and in conformity
with plans & specifications (0.65m x 1.5m)
D5- Panel Door Swing type complete with superior
quality Door Lock & Hinges and in conformity with
plans & specifications (0.80m x 2.10m)

Sub - total for D


F.
G.
H.
I.
J.
K.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
Php
7.000000000%
8.000000000%
12.000000000%

Page 144 of 570


Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 145 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


XI

Unit of Measurement:

UNITS

Quantity:

WINDOWS
Includes: Replacement of Windows with complete accessories 50%

5.00000
Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

B. Labor

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Windows:
W1- 6mm thk Smoke Jalousie glass on Aluminum Frame

unit

598.00

units

239.00

units

509.00

(3.00m x 0.56m)
W4- 6mm thk Smoke Jalousie glass on Aluminum Frame
(1.20m x 0.56m)
W5- 6mm thk Smoke Jalousie glass on Aluminum Frame
(1.30m x 1.18m)

Sub - total for D


E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN

Checked by:

GERALDINE T. RABAGO

DONALD F. RECINTO

Page 146 of 570


Engineer I

Engineering Assistant

Engineer III

OIC-Chief, Planning, Designing & Prog

Page 147 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


XII

Unit of Measurement:

WINDOW GRILLES

SQ.M.

Quantity:

Includes: Painting

6.0920

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
GW1-1 unit (3.00m x 0.56m)

1.6800

sq.m.

GW4-2 units (1.20m x 0.56m)

1.3440

sq.m.

GW5-2 units (1.30m x 1.18m)

3.0680

sq.m.

6.0920

1,000.00

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 148 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XIII

ROLL-UP DOOR SHUTTER

UNIT

Quantity:

Includes: Painting
1.00

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Fabrication and installation of Roll-up Door Shutter

unit

33,000.00

with complete accessories and in conformity with


plans and specification (5.60 m x 2.30m)

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 149 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XIV

STEEL RAILING

LN.M.

Quantity:

57.230

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Supply, Fabrication & Installation of Stair Rail, and Wall
Mounted Rail
a. Stair Rail

6.660

ln.m.

2,500.00

43.510

ln.m.

1,200.00

7.060

ln.m.

2,500.00

(Type I)
b. Wall - Mounted Rail
(Type 2)
c. Mid Rail

57.230

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 150 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XV

SIGNAGES

EACH

Quantity:

11.000
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
1.2mm x 8" high x 3/4" Emboss
Stainless 3D Signages
"ENTRANCE 1"

each

1,800.00

6mm thk Fiber Glass Comfort Room Sign

each

280.00

(Male, Female)

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

Page 151 of 570

OIC-Chief, Planning, Designing & Prog

Page 152 of 570


A4. COMFORT ROOM NO. 2
CR #2 TOTAL AREA = 107.813 SQ.M.

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:

Unit of Measurement:
Quantity:

SQ.M.

REMOVAL OF STRUCTURE AND OBSTRUCTION


76.4700

Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
2

6
6

616.00
321.00

280.00

Daily Rate

Sub - total for B


Name and Capacity
C. Equipment
Concrete Cutter

Php
No. of
Equipment

No. of Days

Daily Rate

1,900.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 153 of 570

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 154 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II
CU.M.

Quantity:

2.3840

LAYOUT AND EXCAVATION


Includes: Wall Footing

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Specification

Php
No. of Persons

No. of Days

B. Labor
Unskilled Worker

Daily Rate
280.00

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C


D. Direct Cost (A+B+C)
E. Overhead, Contingencies and Miscellaneous
F.
G.
H.
I.

Php
Php
7.000000000%

Contractor's Profit (CP)


Value Added Tax (VAT)
Total
Total Unit Cost

8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 155 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


III

Unit of Measurement:

REINFORCING STEEL

KGS.

Quantity:

147.9480
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
12mm dia x 6m Def. Bar

15

pcs.

255.00

pcs.

312.50

12mm dia x 7.5m Def. Bar


10mm dia x 6m Def. Bar

13

pcs.

140.00

Hacksaw Blade

pcs.

59.00

# 16 G.I. Tie Wire

kgs.

75.00

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

B. Labor
Unskilled Worker

Daily Rate
280.00

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 156 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


IV

Unit of Measurement:

STRUCTURAL CONCRETE

CU.M.

Quantity:

10.6600
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Portland Cement

101

bags

255.00

Sand

6.5

cu.m.

1,100.00

Gravel

9.5

cu.m.

1,100.00

Asstd. Form Lumber

0.2

cu.m.

6,000.00

11mm thk Ord. Plywood


Asstd. C.W. Nails

pcs.

780.00

4.0

kls.

61.00

Concrete Epoxy A & B paired

gals.

2,550.00

Bond Concrete 400 (4 liters)

gal.

2,600.00

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
2
4

6
6
6

Daily Rate
616.00
321.00
280.00

(Includes 28 days curing period)


Sub - total for B
Name and Capacity
C. Equipment
Bagger Mixer
Concrete Vibrator

Php
No. of
Equipment

No. of Days

Daily Rate

1
1

2
2

1,600.00
1,000.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 157 of 570


MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 158 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


V

Unit of Measurement:

MASONRY WORKS

SQ.M.

Quantity:

45.3100
(Note: Use Washed Fine and Coarse Aggregates)

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
4" CHB

567

Portland Cement

10mm dia. Def. Bar x 6.0 m


#16 G.I. Tie Wire

17.25

48

bags

255.00

cu.m.

1,100.00

1.50

cu.m.

1,200.00

Washed Sand
Washed Fine Sand

pcs.

33

pcs.

140.00

1.75

kls.

75.00

pcs.

59.00

Hacksaw Blade

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

1
1
4

5
5
5

No. of
Equipment

No. of Days

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate
616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 159 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VI

PLUMBING WORKS

UNITS

Quantity:

10.0000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
6" dia x 10' PVC Pipe Series 1000

13

pcs.

1,609.25

4" dia x 10' PVC Pipe Series 1000

pcs.

845.00

2" dia x 10' PVC Pipe Series 1000

pcs.

296.00

4 x 4 PVC Wye

pcs.

160.00

4 x 2 PVC Wye

pcs.

140.00

2 x 2 PVC Wye

pcs.

43.00
246.00

4" dia. PVC P-Trap

13

pcs.

4" dia. PVC Clean-out

pcs.

PVC Solvent Cement

ltr.

335.00

4 x 4 PVC Sanitary Tee

pcs.

180.00

4 x 2 PVC Sanitary Tee

pcs.

140.00

2 x 2 PVC Sanitary Tee

pcs.

46.00

13

pcs.

745.00

6 x 4 PVC Wye
6" dia PVC Clean out

79.00

pcs.

650.00

4 x 1/4 PVC Elbow

10

pcs.

100.00

4 x 1/8 PVC Elbow

pcs.

77.00

2 x 1/4 PVC Elbow

10

pcs.

34.00

2 x 1/8 PVC Elbow

pcs.

27.25

13

pcs.

165.00

pcs.

4,500.00

Soap Holder

10

pcs.

145.00

Tissue Holder

10

pcs.

450.00

Teflon Tape

6 x 6 Floor Drain NP Stainless


Water Closet with complete fittings & accessories
(Female, Male, PWD)

13

rolls

15.00

1/2" dia Brass Quarter Turn Gate Valve

pcs.

282.25

1/2" dia Brass Nipple x 2" Long

pcs.

8.25

3/4" dia SDR-II PPR Pipe x 10'

pcs.

17.75

1.2mm x 37.5mm dia Stainless Grabrail w/

unit

600.00

set

6,350.00

3/4" dia x 10' UPVC Pipe Blue w/ coupling

15

pcs.

45.00

1/2" dia x 10' UPVC Pipe Blue w/ coupling

10

pcs.

60.00

stainless wall flange (1.80m)


Package Water closet, and lavatories w/ complete
accessories (HC6 C5777LT) (Lever type)

3'' dia x 3/4 Saddle Clamp, Brass Fitting

pcs.

384.00

1/2" dia UPVC Threaded Tee

10

pcs.

10.00

1/2" dia UPVC Threaded Elbow

18

pcs.

10.00

1/2" dia UPVC Plain Tee

16

pcs.

10.00

1/2" dia UPVC Plain Elbow

20

pcs.

6.50

3/4" dia Gate Valve

pcs.

300.00

3/4" dia x 1/2" dia UPVC Male Adaptor

pcs.

87.00

Faucet, Elegant Stainless Wall Mounted

10

pcs.

500.00

Bidet Faucet / Genital Spray; Chrome/ Stainless

10

sets

2,145.00

unit

1,900.00

unit

1,091.00

elegant set with 1/2" stainless flex hose


6mm thk elegant set wall-mounted mirror w/ 3"
Hardwood moulded frame (1.68m x 1.10m) Male
6mm thk elegant set wall-mounted mirror w/ 3"
Hardwood moulded frame (0.935m x 1.10m) Female

Page 160 of 570


Double Faucet Lavatories

units

3,500.00

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

1
2

15
15

616.00
321.00

15

280.00

Daily Rate

B. Labor
Engineer
Skilled Laborers
Unskilled Worker
Sub - total for B

Php

Page 161 of 570


No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

E. Direct Cost (A+B+C+D)


F. Overhead, Contingencies and Miscellaneous

Php

D. Job-Order

G.
H.
I.
J.

7.000000000%

Contractor's Profit (CP)


Value Added Tax (VAT)
Total
Total Unit Cost

8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 162 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VII

ELECTRICAL WORKS

OUTLETS

Quantity:

15.0000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
3.5mm2 THW Wire

8.0mm2 THW Wire

65

mtrs.

20mm dia PVC Electrical Pipes

20

pcs.

96.50

32mm dia PVC Electrical Pipes

18

pcs.

198.00

units

1,250.00

11

sets

1,030.00

sets

2,000.00

1/2" dia Mica tube

mtrs.

20.00

1 Gang Switch

set

78.50

2 Gang Switch

sets

121.00

15

pcs.

24.50

Exhaust Fans 12" x 12"


10W,5" dia LED Recessed Downlights
2x28W, T5 Flourescent Lighting Fixtures, Troffer Type

roll

4,628.75
76.00

w/ Electrical Ballast, Recess type w/ aluminum Reflector

PVC Junction Box w/ cover


PVC Utility Box

pcs.

17.00

PVC Electrical Tape

rolls

28.50

PVC Solvent

can

95.00

20mm dia Metal Pipe Clamps

30

pcs.

9.00

32mm dia Metal Pipe Clamps

72

pcs.

10.00

#7 PVC Tox

50

pcs.

0.75

#7 Metal Screws

50

pcs.

1.00

30 AT, 2P, 230V ACB, Enclosed Type


#16 G.I. Tie Wire

set

310.00

0.50

kg.

79.00

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
1
2

4
4
4

No. of
Equipment

No. of Days

Daily Rate
616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E. Direct Cost (A+B+C+D)


F. Overhead, Contingencies and Miscellaneous

Php
7.000000000%

Page 163 of 570


G. Contractor's Profit (CP)

8.000000000%

H. Value Added Tax (VAT)


I.
J.

12.000000000%

Total
Total Unit Cost

Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 164 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VIII

TILE WORKS

SQ.M.

Quantity:

228.95700

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
6mmthkx0.30mx0.30m Ceramic Unglazed Tiles

500

pcs.

43.00

6mmthkx0.20mx0.30m Ceramic Glazed Tiles

2,867

pcs.

33.00

6mmthkx0.20mx0.20m Ceramic Glazed Tiles

85

pcs.

17.50

12mmthkx0.60mx0.60m Granite Tiles

15

pcs.

184.00

367

pcs.

12.00

6mmthkx0.05mx0.20m glazed ceramic Belt tiles


Tile trim

30

pcs.

149.00

Tile Adhesive

33

packs

300.00

Tile Grout

46

packs

85.00

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

1
2
4

14
14
14

No. of
Equipment

No. of Days

Daily Rate

400.00

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate
616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity
C. Equipment
Tile Cutter

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 165 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IX

CARPENTRY WORKS

CU.M.

Quantity:

0.8530
Includes: Installation of new Ceiling Board, Ceiling Joist,
Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Asstd. 2" x 2" Good Lumber
Asstd. 1" x 2" Good Lumber

0.81300

cu.m.

0.04000

cu.m.

0.85300
4.5mm thk Hardiflex

27

6mm thk Hardiflex

11,000.00
pcs.

441.00

pcs.

610.00

Hardiflex Nail

27

packs

87.00

1" x 4" Cornice Moulding

60

ln.m.

190.00

pcs.

240.00

Aluminum Urinal partition 1.2mm Grade Frame


(Frosted Panel) (0.40m x 0.95m)
Wood glue

gal.

579.00

Solignum

gals.

1,118.25

Asstd. C.W. Nails

10

kls.

61.00

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

616.00

2
4

5
5

321.00
280.00
Php

No. of
Equipment

No. of Days

Daily Rate

400.00

Daily Rate

Sub - total for B


Name and Capacity
C. Equipment
Electric Planer

Sub - total for C

Php

Sub - total for D

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Prepared by:

7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 166 of 570


MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 167 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

DOORS

UNITS

Quantity:

12.0000
Includes: Painting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

B. Labor

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
D2 - Panel Door Swing type complete with superior

units

3,500.00

unit

4,400.00

units

2,000.00

quality Door Lock & Hinges and in conformity


with plans & specifications (0.90m x 2.10m)
D3- Panel Door Swing type complete w/ superior
quality door lock & hinges and in conformity with plans
& specifications (1.00m x 2.10m)
D4- Low Louver Panel Door Swing type complete with
superior quality Door lock & Hinges and in conformity
with plans & specifications (0.65m x 1.5m)

Sub - total for D


E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 168 of 570


MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 169 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XI

WINDOWS

UNITS

Quantity:

3.0000
Includes: Painting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
W1- 6mm thk Smoke Jalousie glass on Aluminum Frame

unit

598.00

unit

478.00

unit

359.00

(3.00m x 0.56m)
W2- 6mm thk Smoke Jalousie glass on Aluminum Frame
(2.40m x 0.56m)
W3- 6mm thk Smoke Jalousie glass on Aluminum Frame
(1.80m x 0.558m)

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 170 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XII

WINDOW GRILLES

SQ.M.

Quantity:

4.02840
Includes: Painting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
GW1-1 unit (3.00m x 0.56m)

1.68000

sq.m.

GW2-1 unit (2.40m x 0.56m)

1.34400

sq.m.

GW3-1 unit (1.80m x 0.558m)

1.00440

sq.m.

4.02840

E.
F.
G.
H.
I.
J.

1,000.00

Sub - total for D

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 171 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:
Unit of Measurement:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


XIII

ROLL-UP DOOR SHUTTER

UNIT

Quantity:

1.00000
Includes: Painting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Fabrication and installation of Roll-up Door Shutter

unit

33,000.00

with complete accessories and in conformity with


plans and specification (5.60 m x 2.30m)

E.
F.
G.
H.
I.
J.

Sub - total for D

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 172 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XIV

STEEL RAILING

LN.M.

Quantity:

18.80000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Supply, Fabrication & Installation of Mid Rail, and Wall
Mounted Rail
a. Mid Rail
b. Wall - Mounted Rail

5.400

ln.m.

2,500.00

13.400

ln.m.

1,200.00

(Type 2)
18.800

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 173 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XV

SIGNAGES

EACH

Quantity:

11.00000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign
1.2mm x 8" high x 3/4" Emboss
Stainless 3D Signages
"ENTRANCE 2"

each

1,800.00

6mm thk Fiber Glass Comfort Room Sign

each

280.00

(Male, Female)

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 174 of 570

Page 175 of 570


A5. COMFORT ROOM NO. 3
CR # 3 TOTAL FLOOR AREA = 249.984 SQ.M.

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

REMOVAL OF STRUCTURE AND OBSTRUCTION

SQ.M.

Quantity:

100.5500
Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

616.00

2
6

8
8

321.00
280.00

Daily Rate

Sub - total for B


Name and Capacity
C. Equipment
Concrete Cutter

Php
No. of
Equipment

No. of Days

Daily Rate

1,900.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 176 of 570

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 177 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II
CU.M.

Quantity:

LAYOUT AND EXCAVATION


Includes: Wall Footing

10.4820
Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Specification

Php
No. of Persons

No. of Days

B. Labor
Unskilled Worker

Daily Rate
280.00

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C


D. Direct Cost (A+B+C)
E. Overhead, Contingencies and Miscellaneous
F.
G.
H.
I.

Php
Php
7.000000000%

Contractor's Profit (CP)


Value Added Tax (VAT)
Total
Total Unit Cost

8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 178 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III

REINFORCING STEEL

KGS.

Quantity:

1,124.4240
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
12mm dia x 9m Def. Bar

11

pcs.

326.00

12mm dia x 6m Def. Bar

105

pcs.

255.00

10mm dia x 9m Def. Bar

pcs.

220.00

10mm dia x 7.5m Def. Bar

40

pcs.

186.00

10mm dia x 6m Def. Bar

48

pcs.

140.00

16.0

kgs.

75.00

# 16 G.I. Tie Wire

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

1
2
3

6
6
6

No. of
Equipment

No. of Days

Daily Rate

1
1

0.5
0.5

400.00
400.00

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate
616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity
C. Equipment
Bar Bender
Bar Cutter

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 179 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IV

STRUCTURAL CONCRETE

CU.M.

Quantity:

27.9160
Includes: Stiffener Column, Lintel Beam, Wall footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended Concrete partitions, Repair of Wall Cracks

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Portland Cement
Sand
Gravel
Asstd. Form Lumber

265

bags

255.00

17.0

cu.m.

1,100.00

25

cu.m.

1,100.00

0.2

cu.m.

6,000.00

11mm thk Ord. Plywood

pcs.

780.00

0.5

box

1,625.00

Concrete Epoxy A & B (paired)

gals.

2,550.00

Bond Concrete 400 ( 4 liters)

gals.

2,600.00

Asstd. C.W. Nails

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

1
2
6

12
12
12

B. Labor
Engineer
Skilled Laborers
Unskilled Worker
(Includes 28 days curing period)

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

1
1

3
3

1,600.00
1,000.00

C. Equipment
Bagger Mixer
Concrete Vibrator

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN

Checked by:

GERALDINE T. RABAGO

DONALD F. RECINTO

Page 180 of 570


Engineer I

Engineering Assistant

Engineer III

OIC-Chief, Planning, Designing & Prog

Page 181 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


V

Unit of Measurement:

MASONRY WORKS

SQ.M.

Quantity:

70.6320
(Note: Use Washed Fine and Coarse Aggregates)

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
4" CHB

884

Portland Cement

10mm dia. Def. Bar x 6.0 m


#16 G.I. Tie Wire

17.25

78

bags

255.00

cu.m.

1,100.00

2.0

cu.m.

1,200.00

Washed Sand
Washed Fine Sand

pcs.

52

pcs.

140.00

2.0

kls.

75.00

pcs.

59.00

Hacksaw Blade

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

1
2
4

5
5
5

No. of
Equipment

No. of Days

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate
616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 182 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VI

PLUMBING WORKS

UNITS

Quantity:

9.0000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
6" dia x 10' PVC Pipe Series 1000

12

pcs.

1,609.25

4" dia x 10' PVC Pipe Series 1000

10

pcs.

845.00

2" dia x 10' PVC Pipe Series 1000

10

pcs.

296.00

4 x 4 PVC Wye

15

pcs.

160.00

4 x 2 PVC Wye

pcs.

140.00

2 x 2 PVC Wye

pcs.

43.00
246.00

4" dia. PVC P-Trap

28

pcs.

4" dia. PVC Clean-out

pcs.

PVC Solvent Cement

ltr.

335.00

4 x 4 PVC Sanitary Tee

pcs.

180.00

4 x 2 PVC Sanitary Tee

pcs.

140.00

2 x 2 PVC Sanitary Tee

10

pcs.

46.00

6 x 4 PVC Wye

17

pcs.

745.00

6" dia PVC Clean out

79.00

pcs.

650.00

4 x 1/4 PVC Elbow

10

pcs.

100.00

4 x 1/8 PVC Elbow

pcs.

77.00

2 x 1/4 PVC Elbow

10

pcs.

34.00

2 x 1/8 PVC Elbow

pcs.

27.25

22

pcs.

165.00

units

4,500.00

6 x 6 Floor Drain NP Stainless


Water Closet with complete fittings and accessories
(Female, Male)
Soap Holder

21

pcs.

175.00

Tissue Holder

pcs.

450.00

4" dia x 2" dia PVC Reducer

pcs.

40.00

3'' dia x 3/4 Saddle Clamp, Brass Fitting

pcs.

384.00

1/2" dia x 10' UPVC Pipe Blue w/ coupling

15

pcs.

45.00

3/4" dia x 10' UPVC Pipe Blue w/ coupling

10

pcs.

60.00

1/2" dia UPVC Threaded Tee

14

pcs.

10.00

1/2" dia UPVC Threaded Elbow

12

pcs.

ELSON Blue PVC Solvent Cement

ltr.

10.00
335.00

1/2" dia UPVC Plain Tee

14

pcs.

1/2" dia UPVC Plain Elbow

14

pcs.

6.50

3/4" dia UPVC Plain Tee

12

pcs.

11.00

3/4" dia UPVC Plain Elbow

pcs.

10.00

3/4" dia Gate Valve

pcs.

300.00

14

pcs.

500.00

sets

2,145.00

unit

1,400.00

unit

1,867.00

units

3,500.00

Shower Valve

12

sets

760.00

Shower Head

12

sets

897.00

1.2mm thk x 1/2" x 2" Stainless Tubular Curtain Rod

pcs.

1,273.75

1/2" dia Brass Quarter Turn Gate Valve

pcs.

282.25

Faucet, Elegant Stainless Wall Mounted


Bidet Faucet / Genital Spray; Chrome/ Stainless

10.00

elegant set with 1/2" stainless flex hose


6mm thk elegant set wall-mounted mirror w/ 3"
Hardwood moulded frame (1.20m x 1.10m) Male
6mm thk elegant set wall-mounted mirror w/ 3"
Hardwood moulded frame (1.60m x 1.10m) Female
Double Faucet Lavatories w/ complete fittings

Page 183 of 570


1/2" dia Brass Nipple x 2" Long

pcs.

8.25

3/4" dia SDR-II PPR Pipe x 10'

pcs.

17.75

10

rolls

15.00

Teflon Tape

Sub - total for A

Php
No. of
Manpower

No. of Days

15

616.00

Skilled Laborers

15

321.00

Unskilled Worker

15

280.00
Php

Name and Designation


B. Labor
Engineer

Sub - total for B

Daily Rate

Page 184 of 570


No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

E. Direct Cost (A+B+C+D)


F. Overhead, Contingencies and Miscellaneous

Php

D. Job-Order

G.
H.
I.
J.

7.000000000%

Contractor's Profit (CP)


Value Added Tax (VAT)
Total
Total Unit Cost

8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 185 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VII

ELECTRICAL WORKS

OUTLETS

Quantity:

23.00

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
3.5mm2 THW Wire

rolls

4,628.75

8.0mm2 THW Wire

15

mtrs.

76.00

20mm dia PVC Electrical Pipes

40

pcs.

96.50

32mm dia PVC Electrical Pipes

pcs.

198.00

Exhaust Fan 12" x 12"

units

1,250.00

11

sets

1,030.00

sets

2,000.00

5.5

mtrs.

20.00

1 Gang Switch

sets

78.50

2 Gang Switch

10

sets

121.00

sets

121.00

PVC Junction Box w/ cover

39

pcs.

24.50

PVC Utility Box

17

pcs.

17.00

PVC Switch Box

pcs.

29.00

PVC Electrical Tape

rolls

28.50

PVC Solvent

can

95.00

20mm dia Metal Pipe Clamps

50

pcs.

9.00

32mm dia Metal Pipe Clamps

10

pcs.

10.00

#7 PVC Tox

70

pcs.

0.75

#7 Metal Screws

70

pcs.

10W,5" dia LED Recessed Downlights


2x28W, T5 Flourescent Lighting Fixtures, Troffer Type
w/ Electrical Ballast, Recess type w/ aluminum Reflector
1/2" dia Mica tube

Duplex Convenience Outlets

1.00

40 AT, 2P, 230V ACB, Enclosed Type

set

375.00

#16 G.I. Tie Wire

kg.

75.00

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
1
3

6
6
6

No. of
Equipment

No. of Days

Daily Rate
616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

Page 186 of 570


E. Direct Cost (A+B+C+D)

Php

F. Overhead, Contingencies and Miscellaneous


G. Contractor's Profit (CP)

7.000000000%
8.000000000%

H. Value Added Tax (VAT)


I. Total
J.

12.000000000%

Total Unit Cost

Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 187 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VIII

TILE WORKS

SQ.M.

Quantity:

349.76000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
6mmthkx0.30mx0.30m Ceramic Unglazed Tiles

776

pcs.

43.00

4,300

pcs.

33.00

6mmthkx0.20mx0.20m Ceramic Unglazed Tiles

68

pcs.

17.50

12mmthkx0.60mx0.60m Granite tiles

14

pcs.

184.00

1,347

pcs.

12.00

6mmthkx0.20mx0.30m Ceramic Glazed Tiles

6mmthkx0.05mx0.20m glazed ceramic Belt tiles


Tile trim

30

pcs.

149.00

Tile Adhesive

50

packs

300.00

Tile Grout

70

packs

85.00

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

1
2
5

16
16
16

No. of
Equipment

No. of Days

Daily Rate

400.00

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate
616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity
C. Equipment
Tile Cutter

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 188 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IX

CARPENTRY WORKS

CU.M.

Quantity:

3.5450
Includes: Installation of new Ceiling Board, Ceiling Joist,
Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs,
Lockers and Pre-fab stool

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Asstd. 2" x 2" Good Lumber

2.05000

cu.m.

Asstd. 2" x 3" Good Lumber

0.51900

cu.m.

Asstd. 1" x 2" Good Lumber

0.09000

cu.m.

Asstd. 1" x 3" Good Lumber

0.18600

cu.m.

2.84500
Asstd. 2" x 4" Hardwood
Asstd. 1/2" x 3" Hardwood

11,000.00

0.45000

cu.m.

0.25000

cu.m.

0.70000

14,000.00

4.5mm thk Hardiflex

61

pcs.

441.00

6mm thk Ficem Hardiflex

21

pcs.

610.00

Hardiflex Nail

61

packs

171

ln.m.

90.00

pcs.

240.00

1" x 4" Cornice Moulding


Aluminum Urinal partition 1.2mm Grade Frame

87.00

(Frosted Panel) (0.40m x 0.95m.)


Wood glue

gal.

579.00

Solignum

gals.

1,118.25

Asstd. C.W. Nails

10

kls.

61.00

Lockset Cast Brass w/ U-Clip Lock Flange

36

pcs.

111.00

Metal Piece
4" Superior Quality Brass Cabinet Handle set
Cabinet Hinges
Pre-fab Stool

36

pcs.

54.00

144

pcs.

15.00

18

units

600.00

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
2
4

12
12
12

No. of
Equipment

No. of Days

Daily Rate

400.00

Daily Rate
616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity
C. Equipment
Electric Planer

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

Page 189 of 570


E. Direct Cost (A+B+C+D)
F.

Php

Overhead, Contingencies and Miscellaneous

7.000000000%

G. Contractor's Profit (CP)


H. Value Added Tax (VAT)
I.
J.

8.000000000%
12.000000000%

Total
Total Unit Cost

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 190 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:
Unit of Measurement:
Quantity:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


X

DOORS

UNITS
25.0000
Includes: Painting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

B. Labor

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
D2 - Panel Door Swing type complete with superior

units

3,500.00

units

2,000.00

units

3,400.00

quality Door Lock & Hinges and in conformity


with plans & specifications (0.90m x 2.10m)
D4- Low Louver Panel Door Swing type complete with
superior quality Door lock & Hinges and in conformity
with plans & specifications (0.65m x 1.5m)
D5- Panel Door Swing type complete with superior
quality Door Lock & Hinges and in conformity with
plans & specifications (0.80m x 2.10m)

Sub - total for D


E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 191 of 570


MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 192 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XI

WINDOWS

UNITS

Quantity:

7.0000
Includes: Painting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
W3- 6mm thk Smoke Jalousie glass on Aluminum Frame

units

359.00

units

478.00

units

509.00

(1.80m x 0.558m)
W4- 6mm thk Smoke Jalousie glass on Aluminum Frame
(1.20m x 0.56m)
W5- 6mm thk Smoke Jalousie glass on Aluminum Frame
(1.30m x 1.18m)

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 193 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XII

WINDOW GRILLES

SQ.M.

Quantity:

7.09280
Includes: Painting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
GW3-2 units (1.80m x 0.558m)

2.0088

sq.m.

GW4- 3 units (1.20m x 0.56m)

2.0160

sq.m.

GW5-2 units (1.30m x 1.18m)

3.0680

sq.m.

7.0928

E.
F.
G.
H.
I.
J.

1,000.00

Sub - total for D

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 194 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:
Unit of Measurement:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


XIII

ROLL-UP DOOR SHUTTER

UNIT

Quantity:

1.00000
Includes: Painting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Fabrication and installation of Roll-up Door Shutter

unit

33,000.00

with complete accessories and in conformity with


plans and specification (5.60 m x 2.30m)

E.
F.
G.
H.
I.
J.

Sub - total for D

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 195 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XIV

STEEL RAILING

LN.M.

Quantity:

58.81000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Supply, Fabrication & Installation of Stair Rail, and Wall
Mounted Rail
a. Stair Rail

6.600

ln.m.

2,500.00

44.710

ln.m.

1,200.00

7.500

ln.m.

2,500.00

(Type 1)
b. Wall - Mounted Rail
(Type 2)
c. Mid Rail

58.810

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 196 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XV

SIGNAGES

EACH

Quantity:

13.00000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign
1.2mm x 8" high x 3/4" Emboss
Stainless 3D Signages
"ENTRANCE 2"

each

1,800.00

6mm thk Fiber Glass Comfort Room Sign

each

280.00

(2Male, 2Female)

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 197 of 570

Page 198 of 570


A6. COMFORT ROOM NO. 4
CR #4 TOTAL FLOOR AREA = 175.184 SQ.M.

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:

Unit of Measurement:
Quantity:

SQ.M.

REMOVAL OF STRUCTURE AND OBSTRUCTION


90.930

Includes:
a.) Removal of existing concrete floor slab, stair, concrete partitions
& masonry walls including floor and wall tiles
b.) Removal of existing doors & windows with jamb
c.) Chipping works for the preparation of new wall partitions
d.) Removal of existing plumbing fixtures and accessories
e.) Disposal of wastes & debris at area designated by the
project Engineer of the implementing Agency.

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
2

7
7

616.00
321.00

280.00

Daily Rate

Sub - total for B


Name and Capacity
C. Equipment
Concrete Cutter

Php
No. of
Equipment

No. of Days

Daily Rate

1,900.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 199 of 570

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 200 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II
CU.M.

Quantity:

1.6148

LAYOUT AND EXCAVATION


Includes: Wall Footing

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Specification

Php
No. of Persons

No. of Days

B. Labor
Unskilled Worker

Daily Rate
280.00

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C


D. Direct Cost (A+B+C)
E. Overhead, Contingencies and Miscellaneous
F.
G.
H.
I.

Php
Php
7.000000000%

Contractor's Profit (CP)


Value Added Tax (VAT)
Total
Total Unit Cost

8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 201 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III

REINFORCING STEEL

KGS.

Quantity:

398.5080
Includes: Stiffener Column, Lintel Beam, Wall Footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended concrete partitions

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
12mm dia x 7.5m Def. Bar

pcs.

312.50

12mm dia x 6m Def. Bar

10

pcs.

255.00

10mm dia x 6m Def. Bar

88

pcs.

140.00

pcs.

59.00

3.5

kgs.

75.00

Hacksaw Blade
# 16 G.I. Tie Wire

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

1
1
2

3
3
3

No. of
Equipment

No. of Days

Daily Rate

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 202 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IV

STRUCTURAL CONCRETE

CU.M.

Quantity:

1.4500
Includes: Stiffener Column, Lintel Beam, Wall Footing,
Concrete Slab, Ramp, Steps, Floor Lintel Beam,
Suspended concrete partitions

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Portland Cement
Sand

14

bags

255.00

1.0

cu.m.

1,100.00

cu.m.

1,100.00

0.2

cu.m.

6,000.00

Gravel
Asstd. Form Lumber
11mm thk Ord. Plywood

pcs.

780.00

0.25

box

1,625.00

Concrete Epoxy A & B (paired)

gals.

2,550.00

Bond Concrete 400 ( 4 liters)

gals.

2,600.00

Asstd. C.W. Nails

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

1
2
4

4
4
4

B. Labor
Engineer
Skilled Laborers
Unskilled Worker
(Includes 28 days curing period)

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN

Checked by:

GERALDINE T. RABAGO

DONALD F. RECINTO

Page 203 of 570


Engineer I

Engineering Assistant

Engineer III

OIC-Chief, Planning, Designing & Prog

Page 204 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

MASONRY WORKS

SQ.M.

Quantity:

5.2500
(Note: Use Washed Fine and Coarse Aggregates)

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
4" CHB

66

pcs.

17.25

bags

255.00

Washed Sand

0.5

cu.m.

1,100.00

Washed Fine Sand

0.5

cu.m.

1,200.00

Portland Cement

10mm dia. Def. Bar x 6.0 m

#16 G.I. Tie Wire

pcs.

140.00

1.0

kls.

75.00

pcs.

59.00

Hacksaw Blade

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

No. of
Equipment

No. of Days

B. Labor
Unskilled Worker

Daily Rate
280.00
Php

Sub - total for B


Name and Capacity

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 205 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VI

PLUMBING WORKS

UNITS

Quantity:

8.0000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
6" dia x 10' PVC Pipe Series 1000

10

pcs.

1,609.25

4" dia x 10' PVC Pipe Series 1000

pcs.

845.00

2" dia x 10' PVC Pipe Series 1000

10

pcs.

296.00

4 x 4 PVC Wye

10

pcs.

160.00

4 x 2 PVC Wye

pcs.

140.00

2 x 2 PVC Wye

pcs.

43.00
246.00

4" dia. PVC P-Trap

12

pcs.

4" dia. PVC Clean-out

pcs.

PVC Solvent Cement

ltr.

335.00

4 x 4 PVC Sanitary Tee

pcs.

180.00

4 x 2 PVC Sanitary Tee

pcs.

140.00

2 x 2 PVC Sanitary Tee

pcs.

46.00

10

pcs.

745.00

6 x 4 PVC Wye
6" dia PVC Clean out

79.00

pcs.

650.00

4 x 1/4 PVC Elbow

10

pcs.

100.00

4 x 1/8 PVC Elbow

pcs.

77.00

2 x 1/4 PVC Elbow

pcs.

34.00

2 x 1/8 PVC Elbow

pcs.

27.25

11

pcs.

165.00

set

6,350.00

units

4,500.00

Soap Holder

pcs.

175.00

Tissue Holder

pcs.

450.00

Facial Mirror

unit

300.00

1.2mm x 37.5mm dia Stainless Grabrail w/

unit

600.00

6 x 6 Floor Drain NP Stainless


Package: Water Closet, Lavatories with
accessories (HC6 C5777LT (Lever Type)
Water Closet with complete fittings and accessories
(Female,PWD, Male)

stainless wall flange (1.80m)


3" dia x 3/4 Saddle Clamp, Brass Fitting

pcs.

384.00

1/2" dia x 10' UPVC Pipe Blue w/ coupling

15

pcs.

45.00

3/4" dia x 10' UPVC Pipe Blue w/ coupling

10

pcs.

60.00

1/2" dia UPVC Threaded Tee

12

pcs.

10.00

1/2" dia UPVC Threaded Elbow

14

pcs.

10.00

ELSON Blue PVC Solvent Cement

ltr.

335.00

1/2" dia UPVC Plain Tee

15

pcs.

10.00

1/2" dia UPVC Plain Elbow

14

pcs.

6.50

3/4" dia UPVC Plain Tee

pcs.

11.00

3/4" dia UPVC Plain Elbow

pcs.

10.00

3/4" dia Gate Valve

pcs.

300.00

3/4" dia x 1/2" dia UPVC Male Adaptor

pcs.

87.00

Faucet, Elegant Stainless Wall Mounted


Bidet Faucet / Genital Spray; Chrome/ Stainless

12

pcs.

500.00

sets

2,145.00

unit

1,400.00

unit

2,477.00

elegant set with 1/2" stainless flex hose


6mm thk elegant set wall-mounted mirror w/ 3"
Hardwood moulded frame (1.98m x 1.10m) Male
6mm thk elegant set wall-mounted mirror w/ 3"
Hardwood moulded frame (2.123m x 1.10m) Female

Page 206 of 570


Double Faucet Lavatories w/ complete fittings

units

3,500.00

1/2" dia Brass Quarter Turn Gate Valve

pcs.

282.25

1/2" dia Brass Nipple x 2" Long

pcs.

8.25

pcs.

17.75

10

rolls

15.00

3/4" dia SDR-II PPR Pipe x 10'


Teflon Tape

Sub - total for A

Php
No. of
Manpower

No. of Days

Engineer

15

616.00

Skilled Laborers
Unskilled Worker

1
4

15
15

321.00
280.00

Name and Designation

Daily Rate

B. Labor

Sub - total for B

Php

Page 207 of 570


No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

E. Direct Cost (A+B+C+D)


F. Overhead, Contingencies and Miscellaneous

Php

D. Job-Order

G.
H.
I.
J.

7.000000000%

Contractor's Profit (CP)


Value Added Tax (VAT)
Total
Total Unit Cost

8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 208 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VII

ELECTRICAL WORKS

OUTLETS

Quantity:

21.00

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
3.5mm2 THW Wire

rolls

4,628.75

8.0mm2 THW Wire

65

mtrs.

76.00

20mm dia PVC Electrical Pipes

36

pcs.

96.50

32mm dia PVC Electrical Pipes

18

pcs.

198.00

units

1,250.00

11

sets

1,030.00

sets

2,000.00

5.5

mtrs.

20.00

1 Gang Switch

sets

78.50

2 Gang Switch

sets

121.00

Duplex Convenience Outlets

sets

121.00

Exhaust Fan 12" x 12" (Ceiling Mounted)


10W,5" dia LED Recessed Downlights
2x28W, T5 Flourescent Lighting Fixtures, Troffer Type
w/ Electrical Ballast, Recess type w/ aluminum Reflector
1/2" dia Mica tube

PVC Junction Box w/ cover

21

pcs.

24.50

PVC Utility Box

pcs.

17.00

PVC Switch Box

pcs.

29.00

PVC Electrical Tape

rolls

28.50

PVC Solvent

can

95.00

20mm dia Metal Pipe Clamps

50

pcs.

9.00

32mm dia Metal Pipe Clamps

72

pcs.

10.00

#7 PVC Tox

70

pcs.

0.75

#7 Metal Screws

70

pcs.

1.00

30 AT, 2P, 230V ACB, Enclosed Type

set

310.00

#16 G.I. Tie Wire

kg.

75.00

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
1
3

6
6
6

No. of
Equipment

No. of Days

Daily Rate
616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

Page 209 of 570


E. Direct Cost (A+B+C+D)

Php

F. Overhead, Contingencies and Miscellaneous


G. Contractor's Profit (CP)

7.000000000%
8.000000000%

H. Value Added Tax (VAT)


I. Total
J.

12.000000000%

Total Unit Cost

Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 210 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VIII

TILE WORKS

SQ.M.

Quantity:

189.04800

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
6mmthkx0.30mx0.30m Ceramic Unglazed Tiles
6mmthkx0.20mx0.30m Ceramic Glazed Tiles
6mmthkx0.20mx0.20m Ceramic Unglazed Tiles

407

pcs.

43.00

2,358

pcs.

33.00

60

pcs.

17.50

243

pcs.

184.00

6mmthkx0.05mx0.20m glazed ceramic Belt tiles

16

pcs.

12.00

Tile trim

26

pcs.

149.00

Tile Adhesive

27

packs

300.00

Tile Grout

38

packs

85.00

12mmthkx0.60mx0.60m Granite tiles

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

1
2
6

10
10
10

No. of
Equipment

No. of Days

Daily Rate

400.00

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate
616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity
C. Equipment
Tile Cutter

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 211 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IX

CARPENTRY WORKS

CU.M.

Quantity:

2.0620
Includes: Installation of new Ceiling Board, Ceiling Joist,
Hanger, Runner, Ceiling Moulding, partitions between Urinals, Jambs,
Lockers and Pre-fab stool

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Asstd. 2" x 2" Good Lumber

1.50300

cu.m.

Asstd. 2" x 3" Good Lumber

0.17300

cu.m.

Asstd. 1" x 2" Good Lumber

0.09000

cu.m.

Asstd. 1" x 3" Good Lumber

0.06200

cu.m.

1.82800
Asstd. 2" x 4" Hardwood
Asstd. 1/2" x 3" Hardwood

11,000.00

0.15000

cu.m.

0.08400

cu.m.

0.23400
4.5mm thk Hardiflex

14,000.00

43

pcs.

441.00

pcs.

610.00

6mm thk Ficem Hardiflex


Hardiflex Nail

43

packs

1" x 4" Cornice Moulding

98

ln.m.

90.00

pcs.

240.00

Aluminum Urinal partition 1.2mm Grade Frame

87.00

(Frosted Panel) (0.40m x 0.95m.)


Wood glue

gal.

579.00

Solignum

gals.

1,118.25

Asstd. C.W. Nails

10

kls.

61.00

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

616.00

2
3

8
8

321.00
280.00
Php

No. of
Equipment

No. of Days

Daily Rate

400.00

Daily Rate

Sub - total for B


Name and Capacity
C. Equipment
Electric Planer

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total

Php
7.000000000%
8.000000000%
12.000000000%

Page 212 of 570


J.

Total Unit Cost

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 213 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

DOORS

UNITS

Quantity:

13.0000
Includes: Painting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

B. Labor

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
D2 - Panel Door Swing type complete with superior

units

3,500.00

unit

4,400.00

units

2,000.00

units

3,400.00

quality Door Lock & Hinges and in conformity


with plans & specifications (0.90m x 2.10m)
D3- Panel Door Swing type complete w/ superior
quality door lock & hinges and in conformity with plans
& specifications (1.00m x 2.10m)

D4- Low Louver Panel Door Swing type complete with


superior quality Door lock & Hinges and in conformity
with plans & specifications (0.65m x 1.5m)

D5- Panel Door Swing type complete with superior


quality Door Lock & Hinges and in conformity with
plans & specifications (0.80m x 2.10m)

Sub - total for D


E.
F.
G.
H.
I.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total

Php
Php
7.000000000%
8.000000000%
12.000000000%

Page 214 of 570


J.

Total Unit Cost

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 215 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XI

WINDOWS

UNITS

Quantity:

5.0000
Includes: Painting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
W2- 6mm thk Smoke Jalousie glass on Aluminum Frame

unit

478.00

units

239.00

unit

509.00

(2.40m x 0.56m)
W4- 6mm thk Smoke Jalousie glass on Aluminum Frame
(1.20m x 0.56m)
W5- 6mm thk Smoke Jalousie glass on Aluminum Frame
(1.30m x 1.18m)

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 216 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XII

WINDOW GRILLES

SQ.M.

Quantity:

4.89400
Includes: Painting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
GW2-1 unit (2.40m x 0.56m)

1.344

sq.m.

GW4-3 units (1.20m x 0.56m)

2.016

sq.m.

GW5-1 unit (1.30m x 1.18m)

1.534

sq.m.

4.894

E.
F.
G.
H.
I.
J.

1,000.00

Sub - total for D

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 217 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:
Unit of Measurement:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


XIII

ROLL-UP DOOR SHUTTER

UNIT

Quantity:

1.00000
Includes: Painting

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Fabrication and installation of Roll-up Door Shutter

unit

33,000.00

with complete accessories and in conformity with


plans and specification (5.60 m x 2.30m)

E.
F.
G.
H.
I.
J.

Sub - total for D

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 218 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XIV

STEEL RAILING

LN.M.

Quantity:

58.81000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Supply, Fabrication & Installation of Stair Rail, and Wall
Mounted Rail
a. Stair Rail

6.600

ln.m.

2,500.00

44.710

ln.m.

1,200.00

7.500

ln.m.

2,500.00

(Type 1)
b. Wall - Mounted Rail
(Type 2)
c. Mid Rail

58.810

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 219 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

XV

SIGNAGES

EACH

Quantity:

12.00000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Fabrication, Supply & Installation of Stainless 3D Signages
and Fiber glass comfort Room Sign
1.2mm x 8" high x 3/4" Emboss
Stainless 3D Signages
"ENTRANCE 4"

each

1,800.00

6mm thk Fiber Glass Comfort Room Sign

each

280.00

(Male, Female, PWD)

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 220 of 570

Page 221 of 570


A7. BLEACHER II: AREA = 578.28 SQUARE METERS

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Unit of Measurement:
Quantity:

ROOFING WORKS

SQ.M.

682.56
Name and Specification

Quantity

Unit

Unit Cost

A. Materials
0.60mm thk. Twin Rib-Type Longspan Prepainted Roofing Sheet
0.60mm thk. Twin Rib-Type Prepainted G.I. Gutter 12'
0.60mm thk. Twin Rib-Type Prepainted G.I. End Flashing 12'

692

ln.m.

343.00

20

ln.m.

885.00

26

ln.m.

885.00

pcs.

850.00

10

pcs.

650.00
640.00

5mm x 37.50mm Flat Bar


6mm x 50mm Flat Bar
3mm x 37.50mm Flat Bar

pcs.

5/8" x 7/8" Blind rivets

boxes

520.00

5/8" dia Drillbits

dozen

1,080.00

4" dia PVC Elbow x 90 deg.

22

pcs.

4" dia PVC Elbow x 45 deg.

11

pcs.

100.00
77.00

4" dia PVC Pipe S -1000

11

pcs.

845.00

Hacksaw blade

dozen

Solvent Cement

gal.

1,340.00

Vulcaseal
Form Lumber

708.00

gals.

1,419.00

172

cu.m.

6,000.00

boxes

1,625.00

Asstd. C.W. Nails

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

1
2
6

14
14
14

Daily Rate

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

E. Direct Cost (A+B+C+D)


F. Overhead, Contingencies and Miscellaneous
G. Contractor's Profit (CP)

Php

D. Job-Order

7.000000000%
8.000000000%

Page 222 of 570


H. Value Added Tax (VAT)
I.

Total

J.

Total Unit Cost

12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 223 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II
OUTLETS

Quantity:

ELECTRICAL WORKS

32.00

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
BLEACHER 2
3.5mm2 THW Wire

rolls

4,628.75

5.5mm2 THW Wire

rolls

6,774.00

15mm dia RSC Pipes

40

pcs.

200.50

15mm dia x 90 deg. RSC Elbows

33

pcs.

15.00

15mm dia RSC Couplings

88

pcs.

13.00

15mm dia LB Condulets

22

pcs.

90.00

15mm dia Lock nuts

66

pcs.

5.00

15mm dia Bushing

33

pcs.

8.00

20mm dia RSC Pipes

38

pcs.

240.00

20mm dia x 90 deg. RSC Elbows


20mm dia RSC Couplings
20mm dia LB Condulets

pcs.

25.00

30

pcs.

20.00

pcs.

120.00

20mm dia Lock nuts

37

pcs.

7.00

20mm dia Bushing

19

pcs.

7.00

4" x 4" x 4" Metal PullBox w/ cover G.A. 18

32

pcs.

400.00

25W LED Low Bay Lights (LEMNIS Brand)

11

sets

10,700.00

45W LED Low Bay Lights (LEMNIS Brand)

11

sets

12,100.00

Panel Board, 2P, 4 Branches,

set

5,300.00

Center Main, (Bolt-on Type)


MCB: 60AT, 60AF, 2P, 240V, 60Hz ACB
Branches: 2x20AT, 50AF, 2P, 240V, 60Hz ACB (Bolt-on Type)
2 x SPARE
12"x12"x4" Metal Pull Box w/ cover
22mm2 THW Wire

1
10

pc.

600.00

mtrs.

198.00

pc.

658.00
75.75

40mm dia RSC Pipes

40mm dia Entrance Cap

pc.

40mm dia Lock Nuts

pcs.

9.00

40mm dia Bushing

pc.

13.00

Secondary Rack w/ 1 3/4" dia Spool


Groove Insulator

pc.

175

14mm2 THW Wire

mtrs.

128.00

32mm dia RSC Pipes

pc.

530.00

32mm dia Lock Nuts

pcs.

5.00

32mm dia Bushing

pcs.

8.00

pc.

4,000.00
3.00

28"x8" x 8" Wire Gutter w/ cover G.A. 18

15mm dia Metal Pipe Clamps

120

pcs.

20mm dia Metal Pipe Clamps

160

pcs.

5.00

25mm dia Metal Pipe Clamps

10

pc.

10.00

32mm dia Metal Pipe Clamps

10

pcs.

10.00

40mm dia Metal Pipe Clamps

10

pcs.

18.00

1/2" dia Mica Tube

pcs.

20.00

#16 G.I. Tie Wire

kg.

75.00

10

sets

1,900.00

1 Gang Switch

set

103.00

2 Gang Switch

set

161.00

20mm dia PVC Electrical Pipes

18

pcs.

96.50

PVC Junction box w/ covers

10

pcs.

24.75

pcs.

180.00

1x28W, T5 Flourescent Fixtures, Troffer Type


w/ Electronic Ballast, Mirrorized Reflector, Recessed Mounted

PVC Switch Box

Page 224 of 570


3/4" x 3' PVC Electrical Moldings

pcs.

PVC Electrical Tapes

rolls

28.50

PVC Solvent

qrt.

335.00

Sub - total for A

100.00

Php

Page 225 of 570


Designation
B. Labor
Engineer

No. of
Manpower

No. of Days

20

616.00

Skilled Laborers

20

321.00

Unskilled Worker

20

280.00

Sub - total for B


F.

Php

Direct Cost (A+B+C+D)

Php

G. Overhead, Contingencies and Miscellaneous


H. Contractor's Profit (CP)
I.
J.

Daily Rate

Value Added Tax (VAT)


Total

7.000000000%
8.000000000%
12.000000000%

K. Total Unit Cost


Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 226 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

III

Item No./Description:
Unit of Measurement:

PAINTING WORKS

SQ.M.

Quantity:

2,360.01

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Roofing paint

50

gals.

573.00

L/T Primer

70

gals.

690.75

L/T Semi-Gloss

83

gals.

856.00

sacks

440.00

Patching Compound
#80 Sand paper

30

ft.

8.75

#120 Sand paper

30

ft.

9.65

Easytite

gals.

530.00

Epoxy Primer

10

gals.

727.50

L/T Reducer

50

gals.

406.50

dozen

708.00

dozen

660.00

6" L/T Brush Roller


Asstd. Paint Brush
1" Maskin Tape

20

rolls

17.00

kls.

68.50

dozen

Waste Cotton
Putty Knife

420.00

Acreex Paint

55

gals.

1,200.00

Acreex Reducer

10

gals.

950.00

gals.

541.00

L/T Penetrating Sealer

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
3
10

18
18
18

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)

Php
7.000000000%
8.000000000%
12.000000000%

Page 227 of 570


I.

Total

J.

Total Unit Cost

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 228 of 570


A8. BLEACHER III: AREA = 358.76 SQUARE METERS

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:

Unit of Measurement:
Quantity:

SQ.M.

ROOFING WORKS

407.40
Name and Specification

Quantity

Unit

Unit Cost

A. Materials
0.60mm thk. Twin Rib-Type Longspan Prepainted Roofing Sheet

415

ln.m.

343.00

0.60mm thk. Twin Rib-Type Prepainted G.I. Gutter 12'

12

ln.m.

885.00

0.60mm thk. Twin Rib-Type Prepainted G.I. End Flashing 12'

19

ln.m.

885.00

5mm x 37.50mm Flat Bar

pcs.

850.00

6mm x 50mm Flat Bar

pcs.

650.00

3mm x 37.50mm Flat Bar

pcs.

640.00

5/8" x 7/8" Blind rivets

boxes

520.00

5/8" dia Drillbits

dozen

1,080.00

4" dia PVC Elbow x 90 deg.

pcs.

4" dia PVC Elbow x 45 deg.

16

pcs.

77.00

4" dia PVC Pipe S -1000

pcs.

845.00

Hacksaw blade

dozen

Solvent Cement

gal.

1,340.00

Vulcaseal

gals.

1,419.00

172

cu.m.

6,000.00

1.5

boxes

1,625.00

Form Lumber
Asstd. C.W. Nails

100.00

708.00

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

1
2
6

20
20
20

Daily Rate

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Page 229 of 570


Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 230 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


II

Unit of Measurement:
Quantity:

TILE WORKS

SQ.M.

758.64
Name and Specification

Quantity

Unit

Unit Cost

A. Materials
6mm thk x 200mm x 200mm unglazed tiles

490

pcs.

17.50

6mm thk x 200mm x 300mm glazed tiles

7,550

pcs.

33.00

6mm thk x 200mm x 200mm glazed tiles

7,200

pcs.

22.50

Tile Grout

109

packs

85.00

Tile Adhesive

152

bags

300.00

PVC Tile Trim

43

pcs.

149.00

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

1
2
10

20
20
20

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate
616.00
321.00
280.00

Sub - total for B

Php

Name and Capacity

No. of
Equipment

No. of Days

Daily Rate

15

400.00

C. Equipment
Tile Cutter

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 231 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III

PLUMBING WORKS

UNITS

Quantity:

9.0000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
6" dia x 10' PVC Pipe Series 1000

12

pcs.

1,609.25

4" dia x 10' PVC Pipe Series 1000

10

pcs.

845.00

2" dia x 10' PVC Pipe Series 1000

10

pcs.

296.00

4 x 4 PVC Wye

15

pcs.

160.00

4 x 2 PVC Wye

pcs.

140.00

2 x 2 PVC Wye

pcs.

43.00
246.00

4" dia. PVC P-Trap

28

pcs.

4" dia. PVC Clean-out

pcs.

PVC Solvent Cement

ltr.

335.00

4 x 4 PVC Sanitary Tee

pcs.

180.00

4 x 2 PVC Sanitary Tee

pcs.

140.00

2 x 2 PVC Sanitary Tee

10

pcs.

46.00

6 x 4 PVC Wye

17

pcs.

745.00

6" dia PVC Clean out

79.00

pcs.

650.00

4 x 1/4 PVC Elbow

10

pcs.

100.00

4 x 1/8 PVC Elbow

pcs.

77.00

2 x 1/4 PVC Elbow

10

pcs.

34.00

2 x 1/8 PVC Elbow

pcs.

27.25

6 x 6 Floor Drain NP Stainless

22

pcs.

165.00

Water Closet with complete fittings and accessories

10

units

4,500.00

(Female, Male)
Soap Holder

21

pcs.

175.00

Tissue Holder

pcs.

450.00

4" dia x 2" dia PVC Reducer

pcs.

40.00

3'' dia x 3/4 Saddle Clamp, Brass Fitting

pcs.

384.00

1/2" dia x 10' UPVC Pipe Blue w/ coupling

15

pcs.

45.00

3/4" dia x 10' UPVC Pipe Blue w/ coupling

10

pcs.

60.00

1/2" dia UPVC Threaded Tee

14

pcs.

10.00

1/2" dia UPVC Threaded Elbow

12

pcs.

ELSON Blue PVC Solvent Cement

ltr.

10.00
335.00

1/2" dia UPVC Plain Tee

14

pcs.

1/2" dia UPVC Plain Elbow

14

pcs.

6.50

3/4" dia UPVC Plain Tee

12

pcs.

11.00

3/4" dia UPVC Plain Elbow

pcs.

10.00

3/4" dia Gate Valve

pcs.

300.00

14

pcs.

500.00

sets

2,145.00

unit

1,400.00

unit

1,867.00

Double Faucet Lavatories w/ complete fittings

units

3,500.00

Shower Valve

sets

760.00

Shower Head

sets

897.00

1.2mm thk x 1/2" x 2" Stainless Tubular Curtain Rod

pcs.

1,273.75

1/2" dia Brass Quarter Turn Gate Valve

pcs.

282.25

Faucet, Elegant Stainless Wall Mounted


Bidet Faucet / Genital Spray; Chrome/ Stainless

10.00

elegant set with 1/2" stainless flex hose


6mm thk elegant set wall-mounted mirror w/ 3"
Hardwood moulded frame (1.20m x 1.10m) Male
6mm thk elegant set wall-mounted mirror w/ 3"
Hardwood moulded frame (1.60m x 1.10m) Female

Page 232 of 570


1/2" dia Brass Nipple x 2" Long

pcs.

8.25

3/4" dia SDR-II PPR Pipe x 10'

pcs.

17.75

10

rolls

15.00

Teflon Tape

Sub - total for A

Php
No. of
Manpower

No. of Days

15

616.00

Skilled Laborers

15

321.00

Unskilled Worker

15

280.00
Php

Name and Designation


B. Labor
Engineer

Sub - total for B

Daily Rate

Page 233 of 570


No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

E. Direct Cost (A+B+C+D)


F. Overhead, Contingencies and Miscellaneous

Php

D. Job-Order

G.
H.
I.
J.

7.000000000%

Contractor's Profit (CP)


Value Added Tax (VAT)
Total
Total Unit Cost

8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 234 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IV
OUTLETS

Quantity:

ELECTRICAL WORKS

48.00

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
BLEACHER 3
3.5mm2 THW Wire

rolls

4,628.75

5.5mm2 THW Wire

rolls

6,774.00

15mm dia RSC Pipes

20

pcs.

200.50

15mm dia x 90 deg. RSC Elbows

27

pcs.

15.00

15mm dia RSC Couplings

50

pcs.

13.00

15mm dia LB Condulets

14

pcs.

90.00

20mm dia RSC Pipes

24

pcs.

240.00
25.00

20mm dia x 90 deg. RSC Elbows

pcs.

24

pcs.

20.00

pcs.

120.00

20mm dia Lock nuts

26

pcs.

7.00

20mm dia Bushing

13

pcs.

7.00

4" x 4" x 4" Metal PullBox w/ cover G.A. 18

22

pcs.

400.00

25W LED Low Bay Lights (LEMNIS Brand)

sets

10,700.00

45W LED Low Bay Lights (LEMNIS Brand)

sets

12,100.00

12

sets

1,900.00

1 Gang Switch

set

103.00

2 Gang Switch

set

161.00

3 Gang Switch

set

220.00

Duplex Convenient Outlets

10

sets

173.00

20mm dia PVC Electrical Pipes

30

pcs.

96.50

PVC Junction box w/ covers

30

pcs.

24.75

PVC Switch Box

16

pcs.

180.00

3/4" x 3' PVC Electrical Moldings

10

pcs.

100.00

PVC Electrical Tapes

rolls

28.50

PVC Solvent

qrt.

335.00

Panel Board, 2P, 6 Branches,

set

7,200.00

20mm dia RSC Couplings


20mm dia LB Condulets

1x28W, T5 Flourescent Fixtures, Troffer Type


w/ Electronic Ballast, Mirrorized Reflector, Recessed Mounted

Center Main, (Bolt-on Type)


MCB: 60AT, 60AF, 2P, 240V, 60Hz ACB
Branches: 4x20AT, 50AF, 2P, 240V, 60Hz ACB (Bolt-on Type)
2 x SPARE
12"x12"x4" Metal Pull Box w/ cover
22mm2 THW Wire

1
10

pc.

600.00

mtrs.

198.00

40mm dia RSC Pipes

pc.

658.00

40mm dia Entrance Cap

pc.

75.75

40mm dia Lock Nuts

pcs.

9.00

40mm dia Bushing

pc.

13.00

pc.

175.00

Secondary Rack w/ 1 3/4" dia Spool


Groove Insulator

14mm2 THW Wire

mtrs.

128.00

32mm dia RSC Pipes

pc.

530.00

32mm dia Lock Nuts

pcs.

5.00

32mm dia Bushing

pcs.

8.00

pc.

4,000.00

sets

2,000.00

28"x8" x 8" Wire Gutter w/ cover G.A. 18


2x28W, T5 Flourescent Fixtures, Troffer Type

1
12

w/ Electronic Ballast, Mirrorized Reflector, Recessed Mounted

Sub - total for A

Php

Page 235 of 570


Designation
B. Labor
Engineer

No. of
Manpower

No. of Days

20

616.00

Skilled Laborers

20

321.00

Unskilled Worker

20

280.00

Sub - total for B


F.

Php

Direct Cost (A+B+C+D)

Php

G. Overhead, Contingencies and Miscellaneous


H. Contractor's Profit (CP)
I.
J.

Daily Rate

Value Added Tax (VAT)


Total

7.000000000%
8.000000000%
12.000000000%

K. Total Unit Cost


Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 236 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


V

Unit of Measurement:
Quantity:

PAINTING WORKS

SQ.M.

1451.40
Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Roofing paint
L/T Primer
L/T Semi-Gloss

33
42
84

gals.
gals.
gals.

573.00
690.75
856.00

sacks

440.00

Patching Compound
#80 Sand paper

20

ft.

#120 Sand paper

20

ft.

8.75
9.65

Easytite

gals.

530.00

Epoxy Primer

gals.

727.50

L/T Reducer

gals.

406.50

6" L/T Brush Roller

20
2

dozen

708.00

Asstd. Paint Brush

dozen

660.00

1" Maskin Tape

10

rolls

Waste Cotton

kls.

Putty Knife

dozen

Acreex Paint

17.00
68.50
420.00

29

gals.

1,200.00

Acreex Reducer

gals.

950.00

L/T Penetrating Sealer

gals.

541.00

36

gals.

541.00

L/T Ptinting Color

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

18

616.00

2
7

18
18

321.00
280.00

Daily Rate

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)

Php
7.000000000%
8.000000000%
12.000000000%

Page 237 of 570


I.

Total

J.

Total Unit Cost

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 238 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:
Unit of Measurement:
Quantity:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


VI

GRILLES

SQ.M.

27.4400
Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C


D. Job-Order
W1- (2.80m x 0.70m) 2 units

Php

W2 - (4.20m x 0.70m) 8 units

E.
F.
G.
H.
I.
J.

3.9200

sq.m.

23.5200
27.4400

sq.m.
1,000.00

Sub - total for D

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 239 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


VII

Unit of Measurement:
Quantity:

DOORS AND WINDOWS

UNITS

16.0000
Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Doors:
D1 (1.20m x 2.10m)

2.0000

units

4,794.00

D2 ( (0.60m x 1.50m)

2.0000

units

2,400.00

D3 ( (1.00m x 2.10m)

2.0000

units

4,300.00

Window 1 (2.80m x 0.70m)

2.0000

units

1,500.00

Window 2 ( 4.20m x 0.70m)

8.0000

units

2,200.00

Windows:

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 240 of 570

B. REHABILITATION / IMPROVEMENT OF SWIMMING POOL AREA


AREA = 2,055 SQUARE METERS
Includes:
1. SWIMMING POOL SHED
2. ELECTRICAL
3. GATES
4. PAINTING WORKS OF BLEACHERS

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


B1. SWIMMING POOL SHED

Item No./Description:

103

Unit of Measurement:

CU.M.

Quantity:

LAYOUT AND EXCAVATION WORKS


163.20

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

616.00

1
10

4
4

321.00
280.00

Daily Rate

Sub - total for B


Name and Capacity
C. Equipment
Backhoe

Php
No. of
Equipment

No. of Days

Daily Rate

10,000.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 241 of 570


MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 242 of 570

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


SPL-1
BACKFILLING WORKS

Unit of Measurement:

CU.M.

Quantity:

121.0400
Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Specification

Php
No. of Persons

No. of Days

10

Daily Rate

B. Labor
Unskilled Worker

280.00

Sub - total for B

Php
No. of
Equipment

Name and Capacity


C. Equipment
Plate Compactor

No. of Days
1

Sub - total for C

2,400.00

Php
Php

D. Direct Cost (A+B+C)


E.
F.
G.
H.
I.

Daily Rate

Overhead, Contingencies and Miscellaneous


Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 243 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

104

EMBANKMENT

CU.M.

Quantity:

344.0000
Note: Provide 200mm Thick Embankment

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Filling Materials

344

cu.m.

370.00

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

616.00

1
6

8
8

321.00
280.00
Php

No. of
Equipment

No. of Days

Daily Rate

1
1

1
1

9,750.00
9,000.00

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate

Sub - total for B


Name and Capacity
C. Equipment
Road Grader
Road Roller

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 244 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

405

STRUCTURAL CONCRETE

CU.M.

Quantity:

43.0000
Note: Includes Footing & Column

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
412

bags

255.00

Sand

22

cu.m.

1,100.00

Gravel

44

cu.m.

1,100.00

10mm X 6.0m Def Bars

48

pcs.

140.00

16mm X 9.0m Def Bars

108

pcs.

610.00

25mm X 7.50m Def Bars

48

pcs.

1,093.00

1/2" x 4' x 8' Ord. Plywood

12

pcs.

Portlant Cement

Form Lumber

0.54

cu.m.

780.00
6,000.00

#16 GI Tie Wire

34

kgs.

75.00

Assorted Common Wire Nail

12

kgs.

61.00

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
2
10

18
18
18

Daily Rate
616.00
321.00
280.00

(Includes 14 days curing period)

Sub - total for B


Name and Capacity
C. Equipment
Bar Cutter
Bagger Mixer
Concrete Vibrator

Php
No. of
Equipment

No. of Days

Daily Rate

1
1
1

4
6
6

400.00
1,600.00
1,000.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 245 of 570


MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 246 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

409

BUILT-UP STEEL FRAMES

UNITS

Quantity:

24.00
(Note: Includes Fabrication and Painting of Steel Frame,
Sway Brace, Base Plate)

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
2 1/2" x 2 1/2" x 5.0mm thk Angle Bar

336

pcs.

1,800.00

2" x 2" x 5.0mm thk Angle Bar

290

pcs.

1,100.00

2" x 2" x 3.0mm thk Angle Bar

pcs.

750.00

264

pcs.

850.00

50mm x 150mm x 6mm thk Channel

20

pcs.

3,200.00

1200mm x 2400mm x 9mm thk Steel Plate

16

pcs.

12,000.00

pcs.

25,000.00

72

pcs.

40.50

1 1/2" x 1 1/2" x 5.0mm thk Angle Bar

1200mm x 2400mm x 15.0mm thk Steel Plate


16mm x 75mm H.S. Machine Bolt w/ Nut & Washer
16mm x 300mm H.S. Machine Bolt w/ Nut & Washer
Welding Rod

72

pcs.

80.00

180

kgs.

150.00

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

1
2
15

50
50
50

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

1
1
1

1.0
7
7

13,000.00
2,700.00
1,900.00

C. Equipment
20 Tonner Crane
Welding Machine
Cutting Outfit
Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN

Checked by:

GERALDINE T. RABAGO

DONALD F. RECINTO

Page 247 of 570


Engineer I

Engineering Assistant

Engineer III

OIC-Chief, Planning, Designing & Prog

Page 248 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

1013

ROOFING WORKS

SQ.M.

Quantity:

1,578.96
(Note: Use Pre-painted Rib Motiff Roofing)
(Includes: Installation of Pre-prepainted Rib Motiff Longspan
Roofing Sheets, Pre-painted EF & Pre-painted Ridge Roll,
Fascia Holder, Fascia Board, Sag Rod, Tension Rod, Turn Buckle & Purlins)

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
12mm x 6m Plain Round Bar

108

pcs.

265.00

64

pcs.

50.00

2" x 6" G.A.16 C-Purlins

386

pcs.

959.73

1" x 1" x 5mm thk Angle Bar

100

pcs.

250.00

20

kgs.

150.00

ln. m.

302.40

12mm Turn Buckle

Welding Rod
0.40mm thk x 1.22m x Special Cut Roofing

1,550

0.40mm thk x 0.457m x 2.44m RR

30

pcs.

300.00

0.40mm thk x 0.610m x 2.44m EF

42

pcs.

408.00

5,800

pcs.

1.50

16

kgs.

210.00

qrts.

354.75

36

pcs.

1,144.75

Teckscrew
Blind Rivets
Vulcaseal
12mm thk x 1220mm x 2440mm Hardiflex Board

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
4
15

30
30
30

No. of
Equipment

No. of Days

Daily Rate

1
1

4
4

2,700.00
1,500.00

Daily Rate
616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity
C. Equipment
Welding Machine
Cutting Outfit

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 249 of 570

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 250 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

SPL-2

ELECTRICAL WORKS

OUTLETS

Quantity:

40.00000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
24

pcs.

450.00

15mm PVC Pipe

236

pcs.

89.50

15mm PVC Coupling

160

pcs.

10.00

50mm RSC Pipe

pcs.

814.00

50mm RSC Coupling

pcs.

54.75

50mm RSC Entrance Cap

pcs.

112.50

30

pcs.

12.00

unit

2,600.00

1 x 40w Flourescent Lighting Fixture

50mm Conduit Clamp


Class 100, Kilowatthour Meter

pcs.

260.00

24

mts.

281.00

Two Spool Secondary Rock, (Insulator)


30mm THW
2

rolls

4,628.75

16

pcs.

3,920.00

set

3,800.00

Utility Box

16

pcs.

17.00

Octagonal Box

16

pcs.

19.00

6.0 mm Micatube

mts.

12.00

12.0 mm Micatube

mts.

20.00

12

kgs

79.00

qrts

320.00

40

rolls

28.50

3.5mm THW
2

Halogen Floodlight, 1000w, 220v (AMCO)


Panel Board
Main Circuit Breaker
100AT; 100AF; 2P; 220v
Branches:
10 x 20AT; 50AF; 2P; 220v
2 SPARE

#16 GI Tie wire


Solvent Cement (S-Glue)
Electrical Tape (Big)

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
2
6

10
10
10

No. of
Equipment

No. of Days

Daily Rate
616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E. Direct Cost (A+B+C+D)


F. Overhead, Contingencies and Miscellaneous
G. Contractor's Profit (CP)

Php
7.000000000%
8.000000000%

Page 251 of 570


H. Value Added Tax (VAT)
I.

Total

J.

Total Unit Cost

12.000000000%

Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 252 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

1032

PAINTING WORKS

SQ.M.

Quantity:

2,775.02
(Includes: Double Coating Paint)
(Includes: Structural Steel, Fascia Board, Movable Goal, Roof Marking & Line Marking)

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Quick Drying Enamel

12

gals

576.00

Roofing Paint

12

gals

573.00

gals

506.75

152

gals

406.00

Maskin Tape 2"

16

rolls

321.75

Paint Thinner

90

gals

325.00

2" Paint Brush

90

pcs

55.00

Latex Paint
Red Oxide Metal Primer

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

1
1
4

12
12
12

No. of
Equipment

No. of Days

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate
616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 253 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

B2.

ELECTRICAL WORKS

LOT

Quantity:

1.00000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
25W LED Low Bay Lights, Cool Day Light (LEMNIS Brand)

10

sets

10,700.00

60W LED Outdoor Flood Lights, Cool Day Light

10

sets

19,200.00

(Lemnis Brand)

Sub - total for A

Php

Name and Designation


B. Labor
Engineer
Skilled Laborers
Unskilled Worker

No. of
Manpower

No. of Days

616.00

1
2

2
2

321.00
280.00
Php

No. of
Equipment

No. of Days

Daily Rate

Sub - total for B


Name and Capacity

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 254 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

B3.

GATES

UNITS

Quantity:

2.00000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php
No. of
Manpower

Name and Designation

No. of Days

Daily Rate

B. Labor

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Gate (2.2 x 2.5 meters)

2.00

units

9,000.00

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 255 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

B4.

PAINTING WORKS (BLEACHER)

SQ.M.

Quantity:

1,410.130

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Concrete Neutralizer

gals

200.00

Non-Grain Raising Woodstain (Mahogany)

gal

434.00

Paint Thinner

gal.

321.75

Red Oxide Paint

gals.

406.00

Clear Gloss Acrylic Emulsion Top Coat

gals.

520.00

Acreex Green Floor Paint

10

gals.

950.00

Acreex Red Floor Paint

32

gals.

950.00

L.T. Semi-Gloss

50

gals.

856.00

L.T. Primer

30

gals.

690.75

L.T. Cast

10

gals.

457.50

L.T. Putty

10

gals.

612.00

gals.

530.00

13

gals.

406.50

Easytite
L.T. Reducer
Penetrating Sealer

gals.

541.00

L.T. Tinting Color

pints

84.00

#80 Sand paper

20

ft.

9.65

Waste Cotton

kls.

Epoxy Primer Grey

gals.

727.50

68.50

Rust Converter

gals.

650.00

Asstd. Paint Brush

pcs.

55.00

Roller Brush w/ tray

sets

59.00

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
2
5

12
12
12

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)

Php
7.000000000%
8.000000000%
12.000000000%

Page 256 of 570


I.

Total

J.

Total Unit Cost

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

C. SCUPPER DRAIN AND CONCRETING OF WALKWAY

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:
Quantity:

DEMOLITION AND EXCAVATION WORKS

SQ.M.
73.65000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

1
2
7

6
6
6

No. of
Equipment

No. of Days

Daily Rate

2,500.00

Daily Rate

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

616.00
321.00
280.00
Php

Sub - total for B


Name and Capacity
C. Equipment
Jackhammer

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E. Direct Cost (A+B+C+D)


F. Overhead, Contingencies and Miscellaneous
G. Contractor's Profit (CP)

Php
7.000000000%
8.000000000%

Page 257 of 570


H. Value Added Tax (VAT)
I.

Total

J.

Total Unit Cost

12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 258 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II

REINFORCING STEEL BARS

KGS.

Quantity:

1,188.648
(Includes Steel Grating)

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
10mm dia DSB x 6.0m

73

pcs.

140.00

5mm x 25mm x 25mm Angle Bar

78

pcs.

590.00

Welding Rod

kls.

150.00

Hacksaw Blade

doz

708.00

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

1
1

6
6

616.00
321.00

280.00
Php

No. of
Equipment

No. of Days

Daily Rate

2,700.00

400.00

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate

Sub - total for B


Name and Capacity
C. Equipment
Welding Machine
Electric Grinder

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 259 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III

CONCRETE WORKS

CU.M.

Quantity:

6.38000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Portland Cement

61

bags

255.00

Sand

cu.m.

1,100.00

Gravel

cu.m.

1,100.00

0.40

cu.m.

6,000.00

Form Lumber
11mm thk Ord. Plywood

pcs.

780.00

Asstd. C.W. Nails

kls.

61.00

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

616.00

1
4

3
3

321.00
280.00

B. Labor
Engineer
Skilled Laborers
Unskilled Worker
(Includes 14 days curing period)
Sub - total for B

Daily Rate

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 260 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IV

AGGREGATE SUB-BASE COURSE

CU.M.

Quantity:

7.00000 (Loose Volume)

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Aggregate Sub-Base course

cu.m.

550.00

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

Daily Rate

B. Labor
Unskilled Worker

280.00

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 261 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

PORTLAND CEMENT CONCRETE PAVEMENT

SQ.M.

Quantity:

53.10000
Vol. of Concrete = 5.31 cu.m.

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Portland Cement
Sand

50

bags

255.00

3.5

cu.m.

1,100.00

cu.m.

1,100.00

Gravel

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

1
2

2
2

616.00
321.00

280.00

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate

Sub - total for B

Php

Name and Capacity

No. of
Equipment

No. of Days

Daily Rate

1
1

1
1

1,600.00
1,000.00

C. Equipment
Bagger Mixer
Concrete Vibrator

Sub - total for C

Php

D. Job-Order

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 262 of 570


D. CONCRETE PAVEMENT

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


I

Unit of Measurement:

SUB-GRADE PREPARATION

SQ.M.

Quantity:

42.18000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

Daily Rate

B. Labor

Unskilled Worker

280.00

Sub - total for B

Php

Name and Capacity

No. of
Equipment

No. of Days

Daily Rate

0.5

3,150.00

C. Equipment
Walk Behind Roller

Sub - total for C

Php

D. Job-Order

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 263 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II

AGGREGATE SUB-BASE COURSE

CU.M.

Quantity:

7.59000 (Loose Volume)

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Aggregate Sub-Base course

cu.m.

550.00

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

Daily Rate

B. Labor
Unskilled Worker

280.00

Sub - total for B

Php

Name and Capacity

No. of
Equipment

No. of Days

Daily Rate

3,150.00

C. Equipment
Walk Behind Roller

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 264 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III

PORTLAND CEMENT CONCRETE PAVEMENT

Thickness (Pavement): 0.15 m.

SQ.M.

Quantity:

Area of Pavement: 42.18 sq.m.

42.18000

Volume of Concrete: 6.33 cu.m.


Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Portland Cement

62

bags

255.00

Sand

4.0

cu.m.

1,100.00

6.0

cu.m.

1,100.00

0.10

cu.m.

6,000.00

Gravel
Assorted Form Lumber
Curing Compound

gal.

200.00

Hot Asphalt Filler

kgs.

50.00

16mm dia. x 6m plain round bar

pcs.

472.00

Assorted C.W. Nails

kg.

61.00

Sub - total for A

Php

Name and Designation

No. of
Manpower

No. of Days

1
1
6

4
4
4

B. Labor
Engineer
Skilled Laborers
Unskilled Worker
(Includes 28 days curing period)
Sub - total for B

Daily Rate
616.00
321.00
280.00
Php

Name and Capacity

No. of
Equipment

No. of Days

Daily Rate

1,600.00

1
1

1
0.5

1,000.00
1,900.00

C. Equipment
Bagger Mixer
Concrete Vibrator
Concrete Cutter
Sub - total for C

Php

D. Job-Order

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 265 of 570

Page 266 of 570


E. PERIMETER LIGHTS AT PLAYING FIELD AND STREETLIGHTS

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


E.1. PERIMETER LIGHTS AT PLAYING FIELD

Item No./Description:
Unit of Measurement:

PEDESTAL FOOTING

CU.M.

Quantity:

6.02000

Name and Specification

Quantity

A. Materials
Portland Cement

Unit

Unit Cost

58

bags

255.00

cu.m.

1,100.00

cu.m.

1,100.00

Sand
Gravel
20mm dia x 6.0m Deformed Bars

40

pcs.

585.00

16mm dia x 6.0m Deformed Bars


10mm dia x 6.0m Deformed Bars

16

pcs.

370.00

16

pcs.

140.00

#16 Tie Wire


Form Lumber
Assorted C.W. Nails

12

kgs.

75.00

570

bd.ft.

16.00

9.75

kgs.

61.00

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
2
6

6
6
6

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order

Sub - total for D


E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 267 of 570


GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 268 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II

CONCRETE POST (1 UNIT)

CU.M.

Quantity:

0.87700

Name and Specification

Quantity

Unit

A. Materials
Portland Cement

Unit Cost

bags

255.00

0.50

cu.m.

1,100.00

Gravel
16mm dia x 7.5m Deformed Bars

cu.m.

1,100.00

pcs.

498.00

16mm dia x 6.0m Deformed Bars


10mm dia x 6.0m Deformed Bars

pcs.

370.00

pcs.

140.00

pcs.

780.00

Sand

1/2" thk. Ordinary Plywood

Form Lumber
Assorted C.W. Nails

65

bd.ft.

16.00

5.50

kgs.

61.00

Sub - total for A

Php

Name and Designation


B. Labor
Engineer
Skilled Laborers
Unskilled Worker

No. of
Manpower

No. of Days

1
1
4

2
2
2

Daily Rate
616.00
321.00
280.00

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 269 of 570

Page 270 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III

UNDERGROUND ENCASEMENT

LN.M.

Quantity:

442.00000

Name and Specification

Quantity

A. Materials
Portland Cement
Sand
Gravel
50mm dia P.E. Pipe SDR II
#16 Tie Wire

Unit

Unit Cost

250

bags

255.00

20.00

cu.m.

1,100.00

24

cu.m.

1,100.00

500

pcs.

130.00

10

pcs.

75.00

Sub - total for A

Php

Name and Designation


B. Labor
Engineer
Skilled Laborers
Unskilled Worker

No. of
Manpower

No. of Days

1
2

15
15

616.00
321.00

15

280.00

Daily Rate

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 271 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IV

ELECTRICAL WORKS

POSTS

Quantity:

14.00000

Scope of Work:

Includes 3 units 7,000W, LED Field Lights

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
LEMNIS ELLIPS SL3 150 WATTS

14

pcs.

28,000.00

LED STREETLIGHT 150 WATSS


IP RATING: 1P66
S/P RATIO: 1.9
POWER FACTOR:>0.90
BURNING HOURS: 50,000 HOURS
30mm2 Aluminum Wire, Stranded

1,000

60.00

Electric Photocell

pcs.

588.00

Photocell Adaptor

pcs.

1,500.00

Magnetic Contactor, 2P, 50A, 220V

pcs.

1,103.00

Circuit Breaker, 50AT, 50AM, 2P, 230VAC

pcs.

1,200.00

3.5mm2 THW

roll

4,628.75

pcs.

360.00

20mm dia RSC

1/4in x 1in Flat Bar

pcs.

530.00

40mm dia RSC Entrance Cap

pcs.

28.50

Single Pool Insulator

pcs.

130.00

14

pcs.

11,500.00

90

pcs.

12.00

Electrical Tape Big

20

rolls

28.00

Rubber Tape Big

10

rolls

110.00

Panel Board (Steel Box, Water Tight)

pc.

2,500.00

Washer, 2 / 1/4 x 3 1/6 x 3 1/6 Hole

pcs.

18.25

Locknuts

pcs.

15.00

kilowatt hour meter (Zamcelco Standard)

unit

2,700.00

Bolt Machine 5/8" x 10"

pcs.

92.00

7,000W, LED Field Lights

units

1,500,000.00

7.62m, 2500mm x 2500mm Base Plate


150mm dia, Streetlight Post with Anchor Bolts
3/8in x 3in Expansion Bolt

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

2
6
20

84
84
84

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity
C. Equipment
Truck with Boom

Php
No. of
Equipment

No. of Days

Daily Rate

9,600.00

Sub - total for C

Php

D. Job-Order
Energization

Sub - total for D

lot

8,500.00

Php

Page 272 of 570


E. Direct Cost (A+B+C+D)

Php

F. Overhead, Contingencies and Miscellaneous


G. Contractor's Profit (CP)

7.000000000%
8.000000000%

H. Value Added Tax (VAT)


I. Total
J.

12.000000000%

Total Unit Cost

Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 273 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


E.2. TENNIS COURT AT BLEACHER #2

Item No./Description:

Unit of Measurement:

CU.M.

Quantity:

PEDESTAL FOOTING
1.50500

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Portland Cement

15

bags

255.00

cu.m.

1,100.00

cu.m.

1,100.00

Sand
Gravel
20mm dia x 6.0m Deformed Bars
16mm dia x 6.0m Deformed Bars

10

pcs.

585.00

pcs.

370.00

10mm dia x 6.0m Deformed Bars

pcs.

140.00

#16 Tie Wire


Form Lumber

kgs.

75.00

142.50

bd.ft.

16.00

2.50

kgs.

61.00

Assorted C.W. Nails


Sub - total for A

Php

Name and Designation


B. Labor
Engineer
Skilled Laborers
Unskilled Worker

No. of
Manpower

No. of Days

1
1
3

3
3
3

Daily Rate
616.00
321.00
280.00

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

Page 274 of 570

OIC-Chief, Planning, Designing & Prog

Page 275 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II

UNDERGROUND ENCASEMENT

LN.M.

Quantity:

442.000

Name and Specification

Quantity

A. Materials
Portland Cement
Sand
Gravel
50mm dia P.E. Pipe SDR II

Unit

Unit Cost

168

bags

255.00

11.00

cu.m.

1,100.00

16

cu.m.

1,100.00

455

pcs.

130.00

pcs.

75.00

#16 Tie Wire


Sub - total for A

Php

Name and Designation


B. Labor
Engineer
Skilled Laborers
Unskilled Worker

No. of
Manpower

No. of Days

1
2

10
10

616.00
321.00

10

280.00

Daily Rate

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 276 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III

ELECTRICAL WORKS

LOT

Quantity:

1.00000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Panel Board

set

3,000.00

8.0mm2 THW

76.00

5.5mm2 THW

rolls

6,774.00

3.5mm2 THW

roll

4,628.75

Main Circuit Breaker


40AT; 50AF; 2P; 230V; MCCB; Bolt-On
Branches:
4x 20AT; 50AF; 2P; 230V

25mm dia RSC

115

pcs.

398.00

25mm dia. RSC Coupling

114

pcs.

26.00

Locknut & Bushing, RSC


25mm dia RSC Elbow
Electric Tape (Big)
Rubber Tape (Big)

pcs.

10.00

16

pcs.

30.00

20

rolls

28.50

10

rolls

105.00

Mica Tube (1/2")

7.6m, 5" dia, Floodlight Post

pcs.

135W, LM-8A40AC, LEMNIS, LED Floodlights

pcs.

24,800.00

100 KVA, Distribution Transformer

unit

250,000.00

pcs.

18,000.00

35ft. Steel Pole


#1 ACSR

200

20.00
12,000.00

m.

60.00

Cut-Out w/ lighting Arrester

pc.

8,000.00

Pin, Insulator

pcs.

300.00

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
2
12

20
20
20

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity
C. Equipment
Truck with Boom

Php
No. of
Equipment

No. of Days

Daily Rate

9,600.00

Sub - total for C

Php

D. Job-Order
Energization

Sub - total for D


E.
F.
G.
H.
I.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total

lot

8,500.00

Php
Php
7.000000000%
8.000000000%
12.000000000%

Page 277 of 570


J.

Total Unit Cost

Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 278 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


E.3. TENNIS COURT AT BLEACHER #3

Item No./Description:

Unit of Measurement:

CU.M.

Quantity:

PEDESTAL FOOTING
1.50500

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Portland Cement

15

bags

255.00

cu.m.

1,100.00

cu.m.

1,100.00

Sand
Gravel
20mm dia x 6.0m Deformed Bars
16mm dia x 6.0m Deformed Bars

10

pcs.

585.00

pcs.

370.00

10mm dia x 6.0m Deformed Bars

pcs.

140.00

#16 Tie Wire


Form Lumber

kgs.

75.00

142.50

bd.ft.

16.00

2.50

kgs.

61.00

Assorted C.W. Nails


Sub - total for A

Php

Name and Designation


B. Labor
Engineer
Skilled Laborers
Unskilled Worker

No. of
Manpower

No. of Days

1
1
3

3
3
3

Daily Rate
616.00
321.00
280.00

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

Page 279 of 570

OIC-Chief, Planning, Designing & Prog

Page 280 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II

UNDERGROUND ENCASEMENT

LN.M.

Quantity:

442.00000

Name and Specification

Quantity

A. Materials
Portland Cement
Sand
Gravel
50mm dia P.E. Pipe SDR II

Unit

Unit Cost

168

bags

255.00

11.00

cu.m.

1,100.00

16

cu.m.

1,100.00

455

pcs.

130.00

pcs.

75.00

#16 Tie Wire


Sub - total for A

Php

Name and Designation


B. Labor
Engineer
Skilled Laborers
Unskilled Worker

No. of
Manpower

No. of Days

1
2

10
10

616.00
321.00

10

280.00

Daily Rate

Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order

Sub - total for D


E.
F.
G.
H.
I.
J.

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 281 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III

ELECTRICAL WORKS

LOT

Quantity:

1.00000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Panel Board

set

3,000.00

8.0mm2 THW

76.00

5.5mm2 THW

rolls

6,774.00

3.5mm2 THW

roll

4,628.75

Main Circuit Breaker


40AT; 50AF; 2P; 230V; MCCB; Bolt-On
Branches:
4x 20AT; 50AF; 2P; 230V

25mm dia RSC

116

pcs.

398.00

25mm dia. RSC Coupling

115

pcs.

26.00

Locknut & Bushing, RSC


25mm dia RSC Elbow
Electric Tape (Big)
Rubber Tape (Big)

pcs.

10.00

16

pcs.

30.00

20

rolls

28.50

10

rolls

105.00

Mica Tube (1/2")

7.6m, 5" dia, Floodlight Post

pcs.

12,000.00

20.00

135W, LM-8A40AC, LEMNIS, LED Floodlights

pcs.

24,800.00

Sub - total for A

Php

Name and Designation


B. Labor
Engineer
Skilled Laborers
Unskilled Worker

No. of
Manpower

No. of Days

1
2
10

15
15
15

Daily Rate
616.00
321.00
280.00

Sub - total for B

Php

Name and Capacity


C. Equipment
Truck with Boom

No. of
Equipment

No. of Days

Daily Rate

9,600.00

Sub - total for C

Php

D. Job-Order
Energization

E.
F.
G.
H.
I.
J.

lot

8,500.00

Sub - total for D

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:
GONZALO V. GRAFIA

Checked by:
JOEL E. LOCSON

DONALD F. RECINTO

Page 282 of 570


Engineer II

Engineering Assistant

Engineer III

OIC-Chief, Planning, Designing & Prog

Page 283 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

E.4
OUTLETS

Quantity:

FLOOD LIGHTS

50.00

Scope of Work: Includes 1 unit 50KVA, Distribution Transformer


Name and Specification

Quantity

Unit

Unit Cost

A. Materials
5.5mm2 THW Wire
25mm dia RSC Pipes
25mm dia x 90 deg. RSC Elbows
25mm dia RSC Couplings
25mm dia LB Condulets
50mm dia RSC Pipes
50mm dia x 90 deg. RSC Elbows
50mm dia RSC Coupling
50mm dia Lock Nuts
50mm dia Bushing
50mm dia LB Condulet
50mm dia Metal Pipe Clamps
3/8" dia x 2 1/2" Expansion Bolts
30mm2 THW Wire
4" x 4" x 4" Metal PullBox w/ cover G.A. 18
25mm dia Lock nuts
25mm dia Bushing
135W LED Outdoor Flood Lights, Cool Day litht
(LEMNIS BRAND)
Panel Board, 2P, 14 Branches,
Center Main, (Bolt-on Type)
MCB: 100AT, 125AF, 2P, 240V, 60Hz ACB
Branches: 10x20AT, 50AF, 2P, 240V, 60Hz ACB (Bolt-on Type)
4 X SPARE
167KVA, Distribution Transformer
35ft. Steel Pole
Cut-out w/ lighting arrester
Hot line Clamp
Pin Insulator
5mm thk x 2 1/2" x 2 1/2" Angle Bar

12
133
30
115
10
5
4
8
10
5
2
24
54
10
10
20
10
50
1

1
1
1
1
1
40

rolls
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
mtrs.
pcs.
pcs.
pcs.
sets

6,774.00
398.00
25.00
26.00
250.00
860.00
150.00
54.75
13.25
18.00
450.00
50.00
23.00
281.00
400.00
7.00
7.00
24,800.00

set

15,300.00

unit
pc.
pc.
pc.
pc.
pcs.

360,000.00
18,000.00
8,000.00
250.00
3,000.00
1,800.00

Sub - total for A


Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
2
15

70
70
70

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity
C. Equipment
Truck with Boom

Php
No. of
Equipment

No. of Days

Daily Rate

9,600.00

Sub - total for C

Php

D. Job-Order
Energization

Sub - total for D


F. Direct Cost (A+B+C+D)
G. Overhead, Contingencies and Miscellaneous

lot

100,000.00

Php
Php
7.000000000%

Page 284 of 570


H. Contractor's Profit (CP)
I.

8.000000000%

Value Added Tax (VAT)

12.000000000%

J. Total
K. Total Unit Cost
Prepared by:

Checked by:

GONZALO V. GRAFIA

JOEL E. LOCSON

Engineer II

Engineering Assistant

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 285 of 570


F. RUBBERIZED PLAYING FIELD

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


I

Unit of Measurement:

RUBBERIZED PLAYING FIELD

SQ.M.

Quantity:

24,099.000

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

B. Labor

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Supply and Installation of Olympic Type Synthetic Rubber
Surface for Track Oval; Tennis, Basketball, Volleyball, Sipa and
SepakTakraw playing courts and Artificial Grass Turf for Main
Soccer Field and Carabao Grass for Junior Soccer
Field/Multipurpose Field.

I. TRACK OVAL

7,580.00

SQ.M.

a.Running Lanes
Curves 2,578.76 sq.m.
Straight 1,677.67
b.Start Extension 180.06
Finish Extension 36.16
c.Two (2) D. Areas 2,459.09
d.Water Jump 9.15
e.Warm-Up Area 412.00
f.Est. Cutting Losses 227.00
edges and curves
1.Synthetic surface should be Sandwich-Type, Athletic Track Surface, Durable, Impermeable, Spike
Resistant and Certified IAAF Class I. System Thickness 13.4 mm consisting of
1-1.Prefabricated Bottom Layer BLACK

3,339.00

Page 286 of 570


Polymerically bound, selected rubber particles, engineered and pre-fabricated into
a roll, uniform in thickness and density. Thickness = 10mm
1-2.In-Sites Wet pour Top Layer RED
Self-leveling, wear resistant and seamless coating consisting of solid polyurethane
with broadcast EPDM rubber granules. Polyurethane compound is MDI based and
must not contain lead, mercury or any other heavy metal. Thickness = 3.4mm
1-3.Provide all other components needed such as PUR primer, adhesive, seal coat,
wear coat and line paint.

Page 287 of 570


II.

PLAYING COURTS:

8,138.00

SQ.M.

3,150.00

SQ.M.

2,931.00

Dual-layered Multifunction Game Surface, consisting of Pre-fabricated 4mm base


mat and pre-fabricated 4mm EPDM porous wear layer, made of PUR-bonded
rubber granules, engineered into a roll uniform in thickness and density. Binders
are MDI polyurethane and do not contain heavy metals such as lead or mercury.
Guaranteed same thickness, homogenous elasticity. Thickness 4+4=8 mm.

Ball rebound 100%. Colors = Green for play fields and Red for safety zones with a
total area of 7,935.04 sq.m. broken down as follows:
a.Tennis Courts: area (36.57m x 18.27m)=668.1339 sq.m. x 4 units = 2,672.54 sq.m.
Unit measurement = 23.77 x 10.97m
Green playfield areas = 1,043.03 sq.m.
Red safety zone/areas = 1,629.51 sq.m.
b.Sepak, Sipa, Volleyball, Basketball Courts
Court size = 25m x 210..5m = area = 5,262.50 sq.m.
1.SepakTakraw: 6.10m x 13.40m x (2 units)=163.48
2.Sipa: 6.10m x 13.40 (1 unit)=81.74
3.Volleyball: 9.00m x 18.00m (2 units)=324.00
4.Basketball: 15.00m x 28.00 (2 units)
=840.00
Total Green Playfield areas
=1,409.22 sq.m.
Total Red Safety Zone areas5,262.50
3,853.28 sq.m.
'-1409.22
c. Est. Cutting Losses, curve edges and other =203 sq.m.
III. MAIN SOCCER FIELD

8,381.00

1.Artificial Turf
Monofilament, pile height 40mm, 120 stitches/m
Fiber thickness 650 micromenter, Dtex 13,000 incl.
41 MT SBR black rubber for infill, incl. 2. Component PU glue and
tape for the installation
2.Shock Pa
Pre-manufactured elastic mat to be installed under Artificial Turf,
black, 10mm thick
3.Dimensions
FIFA International Size 68m x 105m

=7,140.00 sq.m.

Safety Zones: Minimum 2.00m all around = 708.00 sq.m.


Extensions behind goals to D Sections and est.
Cutting losses on curves, edges and others = 533.00
Total Area
= 8,381.00

Sub - total for D


E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN

Checked by:

GERALDINE T. RABAGO

DONALD F. RECINTO

Page 288 of 570


Engineer I

Engineering Assistant

Engineer III

OIC-Chief, Planning, Designing & Prog

Page 289 of 570


G. SITE DEVELOPMENT

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


104

Unit of Measurement:

EMBANKMENT

CU.M.

Quantity:

3,726.570

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Selected Borrow

3,727

cu.m.

450.00

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

616.00

1
4

5
5

321.00
280.00

Daily Rate

Sub - total for B


Name and Capacity
C. Equipment
Payloader
Road Grader
Road Roller
Water Truck

Php
No. of
Equipment

No. of Days

Daily Rate

1.00
1.00
1.00
1.00

11
10
10
2

11,000.00
9,750.00
9,000.00
9,000.00

Sub - total for C

Php

D. Job-Order

Sub - total for D


E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

LEONARD S. ALCALA
Building Inspector

Php
Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 290 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

105

SUB-GRADE PREPARATION

SQ.M.

Quantity:

34,096.560

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

1
1
4

14
14
14

Daily Rate

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

616.00
321.00
280.00

Sub - total for B


Name and Capacity
C. Equipment
Road Grader
Road Roller

Php
No. of
Equipment

No. of Days

Daily Rate

1.00

14

9,750.00

1.00

14

9,000.00

Sub - total for C

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Sub - total for D

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php

Prepared by:

LEONARD S. ALCALA
Building Inspector

7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 291 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

200

AGGREGATE SUB-BASE COURSE PREPARATION

CU.M.

Quantity:

5,114.480

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Aggregate Sub-base Course Materials

6,137.38

cu.m.

550.00

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

1
1
4

14
14
14

Daily Rate

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

616.00
321.00
280.00

Sub - total for B


Name and Capacity
C. Equipment
Road Grader
Road Roller
Water Truck

Php
No. of
Equipment

No. of Days

Daily Rate

1.00

18

9,750.00

1.00
1.00

18
4

9,000.00
9,000.00

Sub - total for C

Php

D. Job-Order

Sub - total for D


E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

LEONARD S. ALCALA
Building Inspector

Php
Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 292 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

311

PORTLAND CEMENT CONCRETE PAVEMENT

SQ.M.

Quantity:

12,703.980

Name and Specification


A. Materials
Portland Cement

Quantity

Unit

Unit Cost

18104

bags

255.00

Sand

1144

cu.m.

1,100.00

Gravel
16mm Plain Round Bar

1716
485

cu.m.
pcs.

1,100.00
472.00

581
1136.00

pcs.
bd.ft.

370.00
18.00

16m dia. X 6.00m Deform Round Bar


Assorted Form Lumber
Hot Asphat

517.00

kgs.

50.00

Curing Compound
Assorted C.W. Nails

509.00
1.00

packs
box

200.00
1,625.00

2.00

rolls

50.00

Nylon Chord
Sub - total for A
Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

1
1
30

70
70
70

Daily Rate
616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

2.00
1.00
1.00
1.00
1.00
1.00

33
33
33
33
26
20

11,900.00
7,500.00
1,000.00
11,000.00
9,000.00
1,900.00

C. Equipment
Transit Mixer
Batching Pant
Concrete Vibrator
Payloader
Water Truck
Concrete Cutter
Sub - total for C

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Sub - total for D

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php

Prepared by:

7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 293 of 570


LEONARD S. ALCALA
Building Inspector

DONALD F. RECINTO
Engineer III

OIC-Chief, Planning, Designing & Prog

Page 294 of 570


H. DRAINAGE SYSTEM

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


I
EXCAVATION

Unit of Measurement:

cu.m.

Quantity:

2,373.08000
Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

1
2
7

15
15
15

Daily Rate

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

616.00
321.00
280.00

Sub - total for B


Name and Capacity
C. Equipment
Backhoe

Php
No. of
Equipment

No. of Days

Daily Rate

15

10,000.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

LOENARD S. ALCALA
Building Inspector

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 295 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II
KGS.

Quantity:

REINFORCING STEEL BAR

38,855.7180
Name and Specification

A. Materials
16mm dia Plain Round Bar

Quantity

Unit

Unit Cost

41.00

pcs.

472.00

12mm dia x 9.00m Def. Bar

154

pcs.

326.00

12mm dia x 7.50m Def. Bar


12mm dia x 6.0m Def. Bar

2,445
1,291

pcs.
pcs.

312.50
255.00

10mm dia x 6.0m Def. Bar


Tie Wire

3808
10

pcs
rolls

140.00
2,350.00

Sub - total for A


Name and Specification
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of Persons

No. of Days

Daily Rate

15

616.00

2
7

15
15

321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C


D.
E.
F.
G.
H.
I.

Direct Cost (A+B+C)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

LOENARD S. ALCALA
Building Inspector

Php
Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 296 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III
CU.M.

Quantity:

782.63
Name and Specifications

A. Materials
Portland Cement

CONCRETE WORKS

Quantity

Unit

Unit Cost

7,435.000

bags

255.00

Sand

470.000

cu.m.

1,100.00

Gravel
9mm thk Ordinary Plywood

705.000
338.00

cu.m.
pcs.

1,100.00
650.00

18.55620
2.00

cu.m.
boxes

6,000.00
1,625.00

2,028 pcs. - 2" x 3" x 8' Form Lumber


C.W. Nails
Sub - total for A
Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Php
No. of Persons

No. of Days

Unit Cost

95

616.00

6
20

95
95

321.00
280.00

Sub - total for A


Name and Capacity
C. Equipment
Concrete Bagger Mixer
Concrete Vibrator

D.
E.
F.
G.
H.
I.

Sub - total for B


Direct Cost (A+B+C)
Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

LOENARD S. ALCALA
Building Inspector

Php
No. of
Equipment

No. of Days

1
1

93
93

Daily Rate
1,600.00
1,000.00

Php
Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 297 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IV
LOT

Quantity:

DISPOSAL OF EXCAVATED MATERIALS

1.00000
Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

B. Labor

Sub - total for B


Name and Capacity
C. Equipment
Dumptruck

Php
No. of
Equipment

No. of Days

Daily Rate

13

11,300.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

LOENARD S. ALCALA
Building Inspector

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 298 of 570


I. FENCE: L=465.32 m.

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


I
REMOVAL OF STRUCTURE AND OBSTRUCTIONS

Unit of Measurement:

sq.m.

Quantity:

1,395.96000
Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

1
2
20

40
40
40

Daily Rate

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

MICHILLE M. ASAIN
Engineer I

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 299 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II
cu.m.

Quantity:

LAYOUT AND EXCAVATION

370.33440
Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

20

616.00

2
15

20
20

321.00
280.00

Daily Rate

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

MICHILLE M. ASAIN
Engineer I

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 300 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III
KGS.

Quantity:

REINFORCING STEEL BAR

21,611.1360
Name and Specification

A. Materials
12mm dia x 6,0m Def. Bar

Quantity

Unit

Unit Cost

884.00

pcs.

255.00

12mm dia x 7.50m Def. Bar

1,248

pcs.

312.50

10mm dia x 6.0m Def. Bar


#16 G.I. Tie Wire

2324
558

pcs
kgs.

140.00
75.00

Sub - total for A


Name and Specification

Php
No. of Persons

No. of Days

1
2
7

15
15
15

Daily Rate

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

616.00
321.00
280.00

Sub - total for B


Name and Capacity
C. Equipment
Bar Bender
Bar Cutter
Sub - total for C
D. Direct Cost (A+B+C)
E. Overhead, Contingencies and Miscellaneous
F.
G.
H.
I.

Contractor's Profit (CP)


Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

MICHILLE M. ASAIN
Engineer I

Php
No. of
Equipment

No. of Days

12

12

Daily Rate
400.00
400.00
Php
Php

7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 301 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IV
CU.M.

Quantity:

STRUCTURAL CONCRETE

191.432
Name and Specifications

A. Materials
Portland Cement
Sand
Gravel
Form Lumber
11mm thk Plywood
C.W. Nails

Quantity

Unit

Unit Cost

1,819.000

bags

255.00

115.000

cu.m.

1,100.00

172.000
0.992225

cu.m.
cu.m.

1,100.00
6,000.00

4.00
10.50

pcs.
kgs.

780.00
61.00

Sub - total for A


Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Php
No. of Persons

No. of Days

Unit Cost

35

616.00

3
12

35
35

321.00
280.00

Sub - total for A


Name and Capacity
C. Equipment
Concrete Bagger Mixer
Concrete Vibrator

D.
E.
F.
G.
H.
I.

Sub - total for B


Direct Cost (A+B+C)
Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

MICHILLE M. ASAIN
Engineer I

Php
No. of
Equipment

No. of Days

1
1

23
23

Daily Rate
1,600.00
1,000.00

Php
Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 302 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

V
SQ.M.

Quantity:

MASONRY WORKS

2,838.45400
Name and Specification

A. Materials
4" CHB

Quantity

Unit Cost

35,481

pcs.

17.25

3,019

bags

255.00

124.50
85

cu.m.
cu.m.

1,100.00
1,200.00

pcs.
kls.

140.00
75.00

Portland Cement
Sand
Fine Sand

Unit

10mm dia x 6.0m Def. Bar


#16 G.I. Tie Wire

2,025
74

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

1
4
20

50
50
50

616.00
321.00
280.00

B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Sub - total for B


Name and Capacity
C. Equipment
Bar Cutter
Concrete Bagger Mixer

Php
No. of
Equipment

No. of Days

Daily Rate

1
2.00

123
19

400.00
1,600.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

MICHILLE M. ASAIN
Engineer I

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 303 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VI
SQ.M.

Quantity:

GATE

25.15000
Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

B. Labor

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C


D. Job-Order
Gate (10.06m x 2.50m)

E.
F.
G.
H.
I.
J.

Php
25.15

sq.m.

5,000.00

Sub - total for D

Php

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php

Prepared by:

MICHILLE M. ASAIN
Engineer I

7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 304 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VII
SQ.M.

Quantity:

PAINTING WORKS

5,583.84000
Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Concrete Neutralizer

140

gals.

200.00

Latex Primer

224

gals.

555.00

Semi-gloss Latex
Sand Paper

224
10

gals.
dozen

555.50
118.00

pcs.
pcs.

55.00
60.00

Paint Brush
Roller Brush

10
10
Sub - total for A
Name and Designation

B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Php
No. of
Manpower

No. of Days

Daily Rate

15

616.00

2
6

15
15

321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

MICHILLE M. ASAIN
Engineer I

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 305 of 570

J. FENCE FRONTING WMSU


LENGTH = 60.61 M.
Includes: Gate and Guard House
POST = 17 POST

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

I
cu.m.

Quantity:

LAYOUT AND EXCAVATION

34.44000
Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of
Manpower

No. of Days

616.00

2
6

6
6

321.00
280.00

Daily Rate

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

ABBAS S. ASKARI
Engineering Assistant

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 306 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II
KGS.

Quantity:

REINFORCING STEEL BAR

1,734.4020
Name and Specification

Quantity

Unit

Unit Cost

16mm dia x 6,0m Def. Bar

89.00

pcs.

370.00

12mm dia x 6,0m Def. Bar


10mm dia x 6.0m Def. Bar

32.00
195

pcs.
pcs

255.00
140.00

33

kgs.

75.00

A. Materials

#16 G.I. Tie Wire


Sub - total for A
Name and Specification
B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Php
No. of Persons

No. of Days

Daily Rate

1
1

11
11

616.00
321.00

11

280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment
Bar Bender
Bar Cutter

1
1

2
2

Sub - total for C

Php
Php

D. Direct Cost (A+B+C)


E.
F.
G.
H.
I.

Overhead, Contingencies and Miscellaneous


Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

ABBAS S. ASKARI
Engineering Assistant

400.00
400.00

7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 307 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III
CU.M.

Quantity:

15.00
Name and Specifications

STRUCTURAL CONCRETE

Quantity

A. Materials
Portland Cement

Unit

Unit Cost

143.00

bags

255.00

9.00

cu.m.

1,100.00

Gravel
Form Lumber

13.50
0.20

cu.m.
cu.m.

1,100.00
6,000.00

6mm thk Plywood


C.W. Nails

20.00
5.00

pcs.
kgs.

360.00
61.00

25mm x 100mm x 200mm Terra-Cotta (Clay

2,800

pcs.

14.00

Sand

Bricks) Wall Cladding

Sub - total for A


Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Php
No. of Persons

No. of Days

Unit Cost

1
1
5

15
15
15

616.00
321.00
280.00

Sub - total for A


Name and Capacity
C. Equipment
Concrete Bagger Mixer
Concrete Vibrator

D.
E.
F.
G.
H.
I.

Sub - total for B


Direct Cost (A+B+C)
Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

ABBAS S. ASKARI
Engineering Assistant

Php
No. of
Equipment

No. of Days

1
1

Daily Rate
2
2

1,600.00
1,000.00

Php
Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 308 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IV
SQ.M.

Quantity:

MASONRY WORKS

125.00000

Scope of Work: Fence and Guard House


Name and Specification

Quantity

Unit

Unit Cost

A. Materials
4" CHB

pcs.

17.25

Portland Cement
Sand

1,550
150
5.50

bags
cu.m.

255.00
1,100.00

Fine Sand
10mm dia x 6.0m Def. Bar

5.00
90

cu.m.
pcs.

1,200.00
140.00

4.0

kls.

75.00

pcs.

59.00

#16 G.I. Tie Wire


Hacksaw Blade
Sub - total for A
Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Php
No. of
Manpower

No. of Days

Daily Rate

1
2
6

9
9
9

616.00
321.00
280.00

Sub - total for B


Name and Capacity
C. Equipment
Bar Cutter
Concrete Bagger Mixer

Php
No. of
Equipment

No. of Days

400.00

1,600.00

Daily Rate

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

ABBAS S. ASKARI
Engineering Assistant

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 309 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

V
UNITS

Quantity:

GRILLE'S FENCE

16.00000
Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

B. Labor

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C


D. Job-Order
Fence's Grille (see detail)

Php
16.00

units

Sub - total for D


E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

ABBAS S. ASKARI
Engineering Assistant

10,000.00

Php
Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 310 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VI
LOT

Quantity:

GATE AND GUARD HOUSE

1.00000
Name and Specification

Quantity

Unit

A. Materials
25mm dia x 6.0m Def. Bar

18

pcs.

912.00

20mm dia x 6.0m Def. Bar

80

pcs.

585.00

12mm dia x 6.0m Def. Bar


10mm dia x 6.0m Def. Bar

48
129

pcs.
pcs.

255.00
140.00

5
3

pcs.
pcs.

1,100.00
310.00

6mmthk x 50mm x 50mm Angle Bar


3mmthk x 25mm x 25mm Flat Bar
Tie Wire

Unit Cost

30

kgs.

Portland Cement
Sand

160
10

bags
cu.m.

255.00
1,100.00

Gravel
Formworks
8mm thk Ord. Plywood

15
1
30
625

cu.m.
cu.m.
pcs.
pcs.

1,100.00
6,000.00
650.00
14.00

9
1

kgs.
kg.

25mm x 100mm x 200mm Terra-Cotta (Clay

75.00

Bricks) Wall Cladding


Asstd. C. W Nails

Welding Rod

61.00
150.00

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Php
No. of
Manpower

No. of Days

Daily Rate

1
2
6

20
20
20

616.00
321.00
280.00

Sub - total for B


Name and Capacity
C. Equipment
Bagger Mixer
Concrete Vibrator
Welding Rod

Php
No. of
Equipment

No. of Days

Daily Rate

1
1
1

2
2
0.5

1,600.00
1,000.00
2,700.00

Sub - total for C


D. Job-Order
Gate 1
Gate 2
Gate 3
Gate 4

(see
(see
(see
(see

detailed
detailed
detailed
detailed

plan)
plan)
plan)
plan)

Globe (see detailed plan)


1.2mm x 12" High Stainless Steel letterings

Php
1.000
2.000
4.00
2.00

unit
units
units
units

135,000.00
2,000.00
6,500.00
7,500.00

1.00

unit

17,000.00

37.00

each

3,000.00

(JOAQUIN F. ENRIQUEZ MEMORIAL SPORTS COMPLEX)

Sub - total for D


E. Direct Cost (A+B+C+D)

Php
Php

Page 311 of 570


F.

Overhead, Contingencies and Miscellaneous

G. Contractor's Profit (CP)


H. Value Added Tax (VAT)
I. Total
J.

7.000000000%
8.000000000%
12.000000000%

Total Unit Cost

Prepared by:

ABBAS S. ASKARI
Engineering Assistant

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 312 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VII
SQ.M.

Quantity:

PAINTING WORKS

350.00000
Name and Specification

Quantity

A. Materials
Concrete Neutralizer

Unit

Unit Cost

gals.

200.00

Latex Primer

15

gals.

555.00

Gloss Latex Paint


Masonry Putty

15
4

gals.
gals.

555.50
307.00

Sand Paper
Paint Brush

7
7

dozen
pcs.

118.00
55.00

Roller Brush

pcs.

60.00

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

1
1
2

5
5
5

616.00
321.00
280.00

B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

ABBAS S. ASKARI
Engineering Assistant

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 313 of 570

K. FENCE ALONG WEST NATIONAL HIGH SCHOOL (EXTENSION)


LENGTH = 264.46 LN.M. (89 POST)

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


I
REINFORCING STEEL BAR

Unit of Measurement:
Quantity:

KGS.
5,271.2160
Name and Specification

Quantity

Unit

Unit Cost

356.00
913

pcs.
pcs

255.00
140.00

180

kgs.

75.00

A. Materials
12mm dia x 6,0m Def. Bar
10mm dia x 6.0m Def. Bar
#16 G.I. Tie Wire
Sub - total for A
Name and Specification

Php
No. of Persons

No. of Days

1
2
8

12
12
12

Daily Rate

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

616.00
321.00
280.00

Sub - total for B


Name and Capacity
C. Equipment
Bar Bender
Bar Cutter

D.
E.
F.
G.

Sub - total for C


Direct Cost (A+B+C)
Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)

Php
No. of
Equipment

No. of Days

1
1

Daily Rate
4
4

400.00
400.00
Php
Php

7.000000000%
8.000000000%
12.000000000%

H. Total
I. Total Unit Cost
Prepared by:

MICHILLE M. ASAIN
Engineer I

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 314 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II
CU.M.

Quantity:

45.91
Name and Specifications

A. Materials
Portland Cement
Sand
Gravel
Form Lumber
11mm thk Plywood
C.W. Nails

STRUCTURAL CONCRETE

Quantity

Unit

Unit Cost

436.000

bags

255.00

27.500

cu.m.

1,100.00

41.500
0.150000

cu.m.
cu.m.

1,100.00
6,000.00

2.00
4.25

pcs.
kgs.

780.00
61.00

Sub - total for A


Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Php
No. of Persons

No. of Days

Unit Cost

15

616.00

2
8

15
15

321.00
280.00

Sub - total for A


Name and Capacity
C. Equipment
Concrete Bagger Mixer
Concrete Vibrator

D.
E.
F.
G.
H.
I.

Sub - total for B


Direct Cost (A+B+C)
Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

MICHILLE M. ASAIN
Engineer I

Php
No. of
Equipment

No. of Days

1
1

Daily Rate
6
6

1,600.00
1,000.00

Php
Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 315 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III
SQ.M.

Quantity:

MASONRY WORKS

793.38000
Name and Specification

Quantity

A. Materials
4" CHB
Portland Cement
Sand
Fine Sand
10mm dia x 6.0m Def. Bar
#16 G.I. Tie Wire

Unit

Unit Cost

9,918

pcs.

17.25

874

bags

255.00

35.00
26.00

cu.m.
cu.m.

1,100.00
1,200.00

pcs.
kls.

140.00
75.00

566
21

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Php
No. of
Manpower

No. of Days

Daily Rate

15

616.00

2
8

15
15

321.00
280.00

Sub - total for B


Name and Capacity
C. Equipment
Bar Cutter
Concrete Bagger Mixer

Php
No. of
Equipment

No. of Days

Daily Rate

1
1

11
11

400.00
1,600.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

MICHILLE M. ASAIN
Engineer I

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 316 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IV
SQ.M.

Quantity:

PAINTING WORKS

2,380.14000
Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Concrete Neutralizer

40

gals.

200.00

Latex Primer

96

gals.

555.00

Gloss Latex Paint


Masonry Putty

96
10

gals.
gals.

555.50
307.00

Sand Paper
Paint Brush

20
15

dozen
pcs.

118.00
55.00

Roller Brush

15

pcs.

60.00

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

1
2
4

10
10
10

616.00
321.00
280.00

B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

MICHILLE M. ASAIN
Engineer I

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

DONALD F.

Enginee
OIC-Chief, Planning

Page 317 of 570


L. WATER SYSTEM
1. CONCRETE WATER TANK: AREA = 16 SQUARE METERS

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:

Unit of Measurement:
Quantity:

cu.m.
32.96000
Name and Specification

LAYOUT AND EXCAVATION


Includes:
Layout and excavation works for footing and tie beam

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

1
1

5
5

616.00
321.00

280.00

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN
Engineer I

Checked by:

GERALDINE T. RABAGO
Engineering Assistant

DONALD F.

Enginee
OIC-Chief, Planning

Page 318 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

II
KGS.

Quantity:

REINFORCING STEEL BAR


(Note; Use Grade 40 Reinforcing Steel Bars)

6,046.9500
Includes: Fabrication and Installation of Reinforcing Steel
Bars and tiewire for: columns, footings, tie beams and
beams, concrete elevated tank, steel ladder base

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
25mm dia x 9mm Def. Bar
25mm dia x 6mm Def. Bar

44
24

pcs.
pcs.

1,364.00
912.00

20mm dia x 9.0mm Def. Bar

32

pcs.

860.00

16mm dia x 10.50mm Def. Bar


16mm dia x 7.50mm Def. Bar

40
76

pcs.
pcs.

580.00
498.00

16mm dia x 9.00mm Def. Bar


16mm dia x 6.00mm Def. Bar
10mm dia x 6.00mm Def. Bar
#16 G.I. Tie Wire

28
56
207
53

pcs.
pcs.
pcs.
kgs.

610.00
370.00
140.00
75.00

Sub - total for A


Name and Specification

Php
No. of Persons

No. of Days

1
2

19
19

616.00
321.00

19

280.00

B. Labor
Engineer
Skilled Laborers
Unskilled Worker

Daily Rate

Sub - total for B


Name and Capacity

Php
No. of
Equipment

C. Equipment
Bar Bender
Bar Cutter

D.
E.
F.
G.
H.
I.

Sub - total for C


Direct Cost (A+B+C)
Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

1
1

Daily Rate
5
5

400.00
400.00
Php
Php

7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN
Engineer I

No. of Days

Checked by:

GERALDINE T. RABAGO
Engineering Assistant

DONALD F.

Enginee
OIC-Chief, Planning

Page 319 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

III
CU.M.

Quantity:

33.836

STRUCTURAL CONCRETE

Includes: Concrete Works and Formworks, Scaffolding


for Columns, Tie Beam and Beams, Concrete Elevated
Tank, Steel Ladder Base

Name and Specifications

Quantity

Unit

Unit Cost

A. Materials
322

bags

Sand

20

cu.m.

255.00
1,100.00

Gravel

30

cu.m.

1,100.00

cu.m.

55

pcs.

1,100.00
780.00

Asstd. Form Lumber

cu.m.

Asstd. C.W. Nails

box

Portland Cement

Boulders
11mm thk Ord. Plywood

6,000.00
1,625.00

Sub - total for A


Designation

Php
No. of Persons

No. of Days

Unit Cost

1
2
6

15
15
15

616.00
321.00
280.00

B. Labor
Engineer
Skilled Laborers
Unskilled Laborers
(Includes 14 days curing period)
Sub - total for A
Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment
Concrete Bagger Mixer
Concrete Vibrator

D.
E.
F.
G.
H.
I.

Sub - total for B


Direct Cost (A+B+C)
Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

1
1

1,600.00
1,000.00

Php
Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN
Engineer I

4
4

Checked by:

GERALDINE T. RABAGO
Engineering Assistant

DONALD F.

Enginee
OIC-Chief, Planning

Page 320 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

IV
SQ.M.

Quantity:

WATER PROOFING

77.20000
Includes: Supply and Application of Approved type superior
quality watertite waterproofing or approved equal with instant
plug, crystalline waterproofing

Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

B. Labor

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

D. Job-Order
Approved type superior quality watertite

77.20

SQ.M.

380.00

waterproofing or approved equal with instant plug,


crystalline waterproofing

Sub - total for D


E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN
Engineer I

Checked by:

GERALDINE T. RABAGO
Engineering Assistant

DONALD F.

Enginee
OIC-Chief, Planning

Page 321 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

V
SQ.M.

Quantity:

TILE WORKS

80.00000
Name and Specification

Quantity

Unit

Unit Cost

A. Materials
889

pcs.

33.00

Tile Adhesive

11

bags

300.00

Tile Grout

16

packs

85.00

6mm thk x 0.30m x 0.30m Ceramic Tiles

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

616.00

1
2

8
8

321.00
280.00

B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

400.00

C. Equipment
Tile Cutter

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN
Engineer I

Checked by:

GERALDINE T. RABAGO
Engineering Assistant

DONALD F.

Enginee
OIC-Chief, Planning

Page 322 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VI
KGS.

Quantity:

STEEL WORKS

234.19400
Includes: Fabrication and Installation of Steel ladder
and Stainless ladder, Manhole Cover

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
5mm thk x 25mm Flat Bar

pcs.

5mm thk x 37.50mm Angle Bar

pcs.

850.00

5mm thk x 50mm Angle Bar

pcs.

1,100.00

Welding Rod

kls.

150.00

3mm thk Steel Plate

250.00

0.563

sq.m.

Hinges

pcs.

1,910.00
50.75

10mm dia Plain Round Bar

pc.

165.00

1 1/2" dia Stainless Pipe

pcs.

6,578.00

3/4" dia Stainless Pipe

25

pcs.

3,289.00

Stainless Welding Rod

kls.

640.00

1 1/2" dia Tubular Stainless

pcs.

2,000.00

6mm dia x 3" Long Stainless Bolt with nut

sets

70.00

& washer on flange

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

1
2
4

15
15
15

616.00
321.00
280.00

B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Sub - total for B


Name and Capacity
C. Equipment
Speed Cutter
Welding Machine
Electric Grinder

Php
No. of
Equipment

No. of Days

Daily Rate

1
1
1

2
2
1

1,900.00
2,700.00
400.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Prepared by:

Php
7.000000000%
8.000000000%
12.000000000%

Checked by:

Page 323 of 570

MICHILLE M. ASAIN
Engineer I

GERALDINE T. RABAGO
Engineering Assistant

DONALD F.

Enginee
OIC-Chief, Planning

Page 324 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

VII
SQ.M.

Quantity:

PAINTING WORKS

177.43300
(Apply two (2) coatings)
Includes: Concrete Structure and Steel Member

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Concrete Neutralizer

gals

200.00

Latex Primer

gals

555.00

Semi-gloss Latex

gals

555.50

Red Oxide

gal.

406.00

Bondtite

gal.

376.75

Sand Paper

doz.

118.00

Paint Brush

pc.

55.00

Paint Roller w/ tray

pc.

60.00

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

280.00

B. Labor

Unskilled Laborers

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN

Checked by:

GERALDINE T. RABAGO

DONALD F.

Page 325 of 570


Engineer I

Engineering Assistant

Enginee
OIC-Chief, Planning

Page 326 of 570

2. CISTERN TANK: AREA = 9 SQUARE METERS

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


I
CISTERN TANK

Unit of Measurement:

UNIT

Quantity:

1.00000
Includes:
Layout and excavation works for footing and tie beam,
Reinforcing Steel, Concrete Works,
Fabrication and Installation of
Stainless ladder, Manhole Cover, Water Proofing,
Tile Works, Paintings

Name and Specification

Quantity

A. Materials
12mm dia x 7.50mm Def. Bar
#16 G.I. Tie Wire
Portland Cement
Sand
Gravel
Gravel Bedding
11mm thk Ord. Plywood
Asstd. Form Lumber
Asstd. C.W. Nails
6mm thk x 0.20m x 0.20m Ceramic Tiles
Tile Adhesive
Tile Grout
3/8" x 3" Flat Bar
1/8" thk Steel Plate
3/16" x 3" x 3" Angle Bar
Padlock
Hinges
Welding Rod
Stainless Welding Rod
1 " dia Tubular Stainless
6mm dia x 3" Long Stainless Bolt with nut
& washer on flange
Red Oxide
Paint Brush
Sub - total for A
Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Unit

110
10
60
4
5.5
1
10
1
5
783
5
6
1
0.563
1
1
2
2
2
1
4
1
1

pcs.
kgs.
bags
cu.m.
cu.m.
cu.m.
pcs.
cu.m.
kls.
pcs.
bags
packs
pc.
sq.m.
pc.
pc.
pcs.
kls.
kls.
pc.
sets

Unit Cost
312.50
75.00
255.00
1,100.00
1,100.00
1,100.00
780.00
6,000.00
61.00
17.50
300.00
85.00
1,520.00
2,845.00
1,500.00
50.00
24.00
150.00
620.00
1,250.00
70.00

gal.
pc.

406.00
55.00
Php

No. of
Manpower

No. of Days

Daily Rate

1
2
4

10
10
10

616.00
321.00
280.00

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

day
day
day
day
day
day
day
day

400.00
400.00
1,600.00
1,000.00
400.00
1,900.00
2,700.00
400.00

C. Equipment
One unit Bar Cutter
One unit Bar Bender
One unit Bagger Mixer
One unit Concrete Vibrator
One unit Tile Cutter
One unit Speed Cutter
One unit Welding Machine
One unit Electric Grinder

1
1
1
1
1
0.5
0.5
0.5

Sub - total for C

Php

D. Job-Order
Approved type superior quality watertite

35.82

sq.m.

380.00

waterproofing or approved equal with instant plug,


crystalline waterproofing

Sub - total for D

Php

Page 327 of 570


E. Direct Cost (A+B+C+D)

Php

F. Overhead, Contingencies and Miscellaneous


G. Contractor's Profit (CP)

7.000000000%
8.000000000%

H. Value Added Tax (VAT)


I. Total
J.

12.000000000%

Total Unit Cost

Prepared by:

Checked by:

MICHILLE M. ASAIN

GERALDINE T. RABAGO

Engineer I

DONALD F.

Engineering Assistant

Enginee
OIC-Chief, Planning

3. DISTRIBUTION LINE

DETAILED ESTIMATES
Project Name:
Item No./Description:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


I
DISTRIBUTION LINE

Unit of Measurement:
Quantity:

LN.M.
892.00000
Includes: Layout and Excavation, Backfilling, Chipping Works,
Restoration Works

Name and Specification

Quantity

Unit

Unit Cost

A. Materials
2" dia P.E. Pipe SDR-II

15

rolls

6,532.00

2" dia Plasson Coupling

10

pcs.

293.25

2" dia Plasson Elbow 90 deg.

pcs.

137.00

2" dia Plasson Tee

pcs.

330.00

14

pcs.

177.75

42 liter Pressure Tank

unit

2,530.00

Ball Cock

pcs.

700.00

3HP Centrifugal Pump

unit

23,900.00

2" dia Gate Valve

pcs.

540.00

1" dia Gate Vale

pc.

370.00

1" dia Plasson Male Adaptor

pcs.

52.00

2" dia G.I. Pipe

pc.

1,320.00

1" dia Foot Valve

pc.

500.00

Pressure Switch

pc.

560.00

30

mtrs.

35.00

Pressure Gauge

pc.

260.24

2" dia Check Valve

pc.

533.00

1" dia Check Valve

pc.

364.00

3/4" dia Teflon Tape

10

rolls

15.00

Sand Bedding

25

cu.m.

Portland Cement

98

bags

255.00

Sand

cu.m.

1,100.00

Gravel

cu.m.

1,100.00

2" dia Plasson Male Adaptor

1" dia P.E. Pipe SDR-II

1,100.00

Sub - total for A


Name and Designation
B. Labor
Engineer
Skilled Laborers
Unskilled Laborers

Php
No. of
Manpower

No. of Days

Daily Rate

1
2
8

15
15
15

616.00
321.00
280.00

Page 328 of 570


Sub - total for B

Php
No. of
Equipment

Name and Capacity

No. of Days

Daily Rate

C. Equipment
One unit Bagger Mixer

day

One unit Concrete Vibrator

day

1,600.00
1,000.00

One unit Concrete Cutter

day

1,900.00

Sub - total for C

Php

Sub - total for D

Php

D. Job-Order

E. Direct Cost (A+B+C+D)

Php

F. Overhead, Contingencies and Miscellaneous


G. Contractor's Profit (CP)

7.000000000%
8.000000000%

H. Value Added Tax (VAT)


I. Total
J. Total Unit Cost

12.000000000%

Prepared by:

Checked by:

MICHILLE M. ASAIN
Engineer I

GERALDINE T. RABAGO
Engineering Assistant

DONALD F.

Enginee
OIC-Chief, Planning

M. EQUIPMENT, MACHINERIES AND SUPPLIES

DETAILED ESTIMATES
Project Name:
Item No./Description:
Unit of Measurement:
Quantity:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX


I
Supply and Installation of Equipment, Machineries and Supplies
lot
1.00000
Name and Specification

Quantity

Unit

Unit Cost

A. Materials
Sub - total for A
Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

B. Labor
Sub - total for B
Name and Capacity

Php
No. of
Equipment

No. of Days

1.00

LOT

1.00
2.00
8.00
4.00
4.00

sets
sets
pcs
pcs
pcs

4.00

pcs

Daily Rate

C. Equipment

D. Job
A.
1
2
3
4
5
6
7

Sub - total for C


Order
ATHLETIC EQUIPMENTS
ATHLETICS - Elementary & Secondary (B/G)
Electronice Timing Device
Wind Gauge Apparatus
Relay Batons hallow aluminum for all levels (Imported)
Javelin Aluminum for tertiary men (800g)
Javelin Aluminum for boys (700g)
Javelin Aluminum for girls sec. & tertiary women (600g)

Php
23,000,000.00

Page 329 of 570


8

Javelin Aluminum for boys elem. (400g)

4.00

pcs

Javelin Aluminum for girls elem. (300g)

4.00

pcs

10 Discus (wood) for boys sec & tertiary men (2 kgs)


11 Discus (wood( for girls sec & tertiary women (1 kg)

2.00
2.00

pcs
pcs

12 Discus (wood) forboys elem. (1.5 kgs)


13 Discus (wood) for girls elem. (0.75 kg0

2.00
2.00

pcs
pcs

14 Iron shot for tertiary men (IAAF standard, 7.250kgs)

2.00

pcs

15 Iron shot for boys secondary (IAAF standard, 6 kgs)

2.00

pcs

2.00

pcs

17 Iron shot forboys elementary 9IAAF standard, 5.44 kgs)

2.00

pcs

18 Iron shot for girls elementary (IAAF standard, 2.72 kgs)

2.00

pcs

19 Finishing Post painted white, IAAF standard

2.00

pcs

20.00

pcs

2.00

pcs

Starting blocks made of high quality stainless materials, nonslip


designed with tapered locking surface for positive positioning of
22
blocks and provide with 7"center blocking base space
adjustable, IAAF olympic series

8.00

sets

23 Cross for pole Vault, fiberglass with square ends

6.00

pcs

24 Crossbar for high jump, fiberglass with square ends

6.00

pcs

25 Vaulting pole (all 14ft long)


1 pc. For 110 lbs. - fiberglass

3.00

pcs

16

Iron shot for girls secondary & tertiary women (IAAF standard, 4
kgs)

20

Lane Umpire Stool, aluminum structure with canvas seat and


folding

21

Height and distance Indicator, Side plates and rotating 350


degrees

1 pc. For 120 lbs. - fiberglass


1 pc. For 130 lbs. - fiberglass
26 Fiberglass tape imported, IAAF Specification

3.00

pcs

Lap Counter (1-25 laps) with bell brass materials imported, IAAF
27
sepicification

1.00

pc

Upright posts pole vault with adoptor forheight from lowest


weihtof 2.25 m.

2.00

pcs

29 Upright posts for high jump, standard materials

2.00

pcs

30 Measuring rod for pole vault for up to at least 6m. - height gauge

1.00

pc

31

Measuring rod for pole vault for up to at least 2.5m. - height


gauge

1.00

pc

32

Landing foam for high jump, with canvass cover, standard (3m x
5m)

1.00

set

33

Landing foam pole vault, with canvass cover, standard (5m x


5m)

1.00

set

90.00

pcs

28

34 Sprint hurdles with 6 heights


Lowest - .686
- .762
- .840
- .838
- .914

m.
m.
m.
m.
m.

Page 330 of 570


Highest - 1.067 m.
35 Plasticine marker

4.00

pcs

36 Plasticine (clay)

2.00

sets

37

Signal flaglets for lane umpires, 24 yellow, 24 white w/


aluminum handle

24.00

sets

38

Signal flaglets for field and finish judges and starters assistant,
16 red and 16 white w/ aluminum handle

16.00

sets

2688.00
50.00

pcs
pcs

41 16" colored TV with VHS Recorder/player and rewinder

1.00

set

42 Flag (6 1/2 ft.)cutting signal for 800m

2.00

pcs

43 Staring Piston
44 Stipple chase Race (1 obstacle with water jump)

2.00
5.00

pcs
pcs

45 Aquatics Scoreboards
46 Tochpads (Swimming pool)

1.00
1.00

set
set

47 Softball/Baseball Scoreboards
48 Basketball Scoreboards
49 Soccer Scoreboards

1.00
1.00
1.00

set
set
set

50 Tennis Scoreboards
51 Volleyball Scoreboards

1.00
1.00

set
set

16.00

pcs

636.00

kl.

4.00
4.00
4.00

sets
sets
sets

6.00
6.00

sets
sets

1.00

unit

10.00
4.00
8.00
4.00
2.00
2.00
10.00
3.00
36.00

sets or pairs
sets or pairs
pairs
pairs
pcs
pcs
pcs
pairs
pcs

39 Athletes Number, with number - 0001 - 1344 x 2


40 Without number, white cloth

B. WEIGHTLIFTING EQUIPMENTS
1 4 Platform 4 inches x 12 feetx 12 feet
Plywood marine 1 inch x 12 feet
2
3
4
5

Rubber Sheet 1 inch x 1/2 meter x 36 meter


36 meter
Squat Racks
Training box
Hyper extension

6
7
8

Olympic standard barbell


training bar for women
Training gym 9 x 18 meters

C. BOXING EQUIPMENTS
1. Boxing ring and Accessories 20' x 20'
1 pc.Canvass
4 pcs. Corner Pad
4 pcs.Ring Ropes
16 pcs. Turn Buckle
2. Boxing Gear
10 oz. Boxing Gloves
14 oz. Sparing Gloves
Head Gear (medium & large)
Foul Protector
Heavy Sandbag
Medium Sandbag
Skipping Rope
Punch Mitt
Matts of Foam

D. PENCAT SILAT EQUIPMENT

Page 331 of 570


1

Punching Bag (size 8)

1.00

pc

Thai pads (Kicking pads)

2.00

pairs

3
4

Head gear junior size (taekwondo type)


Pencat Silat Body Armor

2.00
2.00

pcs
pcs

5 Mats (interlocking)

20.00
20.00

pcs
pcs

Size - 1 meter x 1 meter


Thickness - 1 inch
- red
- blue
6
7

Shin Guard (senior size)


Shin Guard (junior size)

2.00
2.00

pairs
pairs

Pencat Silat Power Bags

3.00

pcs

E. MUAY THAI EQUIPMENT


1

Thai Pads

Twins

1.00

pair

2
3

Pinch Mitts
Belly Pads (large)s

Twins
Twins

1.00
1.00

pair
pc

4
5
6
7
8

Gloves (10 0z)


Punching Bag (6 feet0
Head Gear (medium)
Shin Guards (medium)
Chest Protector (medium)

Twins
Twins
Twins
Twins
Twins

2.00
1.00
2.00
2.00
2.00

pairs
pc
pcs
pairs
pcs

2.00
2.00
64.00

pairs
pcs
pcs

4.00

pairs

4.00
4.00
4.00
3.00
3.00
3.00
3.00
100.00

pairs
pairs
pairs
pairs
pairs
pairs
pcs
pcs

144.00
1.00
1.00
1.00
4.00
6.00
6.00
2.00
8.00
8.00
8.00

pcs
pc
pc
pc
pcs
pcs
pcs
pcs.
pcs.
pcs.
sets

9 Elbow Pad (medium)


Twins
10 Groin Cap (medium)
Twins
11 Matts (interlocking 1 meter x 1 meter x 1 inch thick)

E. WUSHU EQUIPMENT
1 Gloves red and black
2
3
4
5
6
7
8
9

F.
1
2
3
4
5
6
7
8
9
10
11

Head Gear red and black


Chest Protector red and black
Training sheen guard red and black
Groin Protector
Thigh Pads
focus Mitts
Long Bag
Rubber matts 1 mx 1 m x 1 inch
note: training equipment must be made of pure leather

TAEKWONDO EQUIPMENT
Rubber Matts 1 m x 1 m x 1 inch
Punching Bag (large)
Punching Bag (medium)
Punching Bag (small)
Mirror (4' x 8')
Kicking Pad
Double Kicking Pad
Kick Shield
Body Protectior #1,2,3,4
Head Gear
PU Arm & Shin Guard

Page 332 of 570


12 Groin Guard for Female

4.00

pcs.

13 Groin Guard for Male

4.00

pcs.

14 Hand Gloves #5,6,7,8


15 Electronic Scoring System (ESS)

8.00
1.00

pcs.
set

4.00

pcs

3.00

sets

4.00

dozens

8.00

pcs.

8.00

pcs.

8.00
3.00
10.00
60.00

pcs.
pcs.
pcs.
pcs.

12.00

pcs.

G. TABLE TENNIS EQUIPMENT


1

Table Tennis Collapsible type


Portable folding (fiber wood lamination)

H. ARCHERY EQUIPMENT AND ACCESSORIES


1

Recurve Bow
Intermediate Set (Right-hander)
- Aluminum handle riser
- Carbon limbs (36-38 pounds, 68 inches)
- Long Sight, with Micro Adjustment
- Carbon clicker
- Stabilizer set (with long rod, 2 side rods, v-bar,

4
5
6
7
8
9

extension rod)
Arrow
Carbon arrow (700 spine stiffness) with spin wing
vanes and insert type nocks
Finger Tab
Smart Tab with anchorage guide and finger
separator - Medium Size (Right-hander)
Arm Guard
Plastic material
Chest Guard (Medium size (Right-hander)
Bow Stand (Stainless Steel material)
Arrow vane (Spin wing type)
Arrow nock (Insert type (G nocks)
Bow String
(Fast Flight (Dynima material - 68 inches)

Sub - total for D


E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:
MICHILLE M. ASAIN
Engineer I

Checked by:
GERALDINE T. RABAGO
Engineering Assistant

DONALD F.

Enginee
OIC-Chief, Planning

Page 333 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

SPL-1
sq.m.

Quantity:

Project Billboard/Signage

5.76000
Name and Specification

Quantity

Unit

Unit Cost

A. Materials

Sub - total for A


Name and Designation

Php
No. of
Manpower

No. of Days

Daily Rate

B. Labor

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for C


D. Job-Order
(Note: Inclusive materials, labor and equipment)
Supply, Fabrication and Installation of
a. Billboard/signage (1.20m x 2.40m) 2 units

Php

5.76

sq.m.

Sub - total for D


E.
F.
G.
H.
I.
J.

Direct Cost (A+B+C+D)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN
Engineer I

322.00

Checked by:

GERALDINE T. RABAGO
Engineering Assistant

DONALD F.

Enginee
OIC-Chief, Planning

Page 334 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

SPL-2
lot

Safety & Health

Output per hour:


Quantity:

1.00
Name and Specification

Quantity

Unit

Unit Cost

A. Materials
1.00

lot

1,000.00

b. Safety Shoes
c. Gloves

a. First Aid Kit

30
30

pairs
pairs

390.00
55.00

d. Rubber Shoes
e. Hard Hat

30
30

pairs
pcs

390.00
400.00

Sub - total for A


Name and Specification

Php
No. of Persons

No. of Days

Daily Rate

365

321.00

B. Labor
a. Safety Practitioner

Sub - total for B


Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment
a. Personal Protective Equipment
(See Attached Worksheet)

D.
E.
F.
G.
H.
I.

Sub - total for C


Direct Cost (A+B+C)
Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

lot

Php
Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN
Engineer I

Checked by:

GERALDINE T. RABAGO
Engineering Assistant

DONALD F.

Enginee
OIC-Chief, Planning

Page 335 of 570

DETAILED ESTIMATES
Project Name:

CONSTRUCTION/REHABILITATION/IMPROVEMENT OF JOAQUIN F. ENRIQUEZ SPORTS COMPLEX

Item No./Description:
Unit of Measurement:

SPL-3
unit

Temporary Facility

Output per hour:


Quantity:

1
Name and Specifications

Quantity

Unit

Unit Cost

2"x2" Good Lumber

0.215

cu.m.

11,000.00

2"x3" Good Lumber


4"x4" Good Lumber

0.056
0.178

cu.m.
cu.m.

11,000.00
11,000.00

Asstd. Common Nails


5mm thk. Ordinary Plywood

2.25
6.00

kgs.
pcs.

61.00
360.00

Portland Cement

1.00

bags

255.00

Sand
Gravel

1.00
1.00

sack
sack

28.00
28.00

G.a. No. 26 Corr. Roofing Sheets(8' long)


G.a. No. 26 Plain Sheet(8'x3')
2" Roofing Nails

7.00
1.00
1.00

pcs.
pcs.
kgs.

256.00
310.00
62.00

A. Materials

Sub - total for A


Designation

Php
No. of Persons

No. of Days

Unit Cost

1
1

1
2

616.00
321.00

280.00

B. Labor
a. Engineer
b. Skilled Laborers
c. Unskilled Laborers
Sub - total for A
Name and Capacity

Php
No. of
Equipment

No. of Days

Daily Rate

C. Equipment

Sub - total for B


D.
E.
F.
G.
H.
I.

Direct Cost (A+B+C)


Overhead, Contingencies and Miscellaneous
Contractor's Profit (CP)
Value Added Tax (VAT)
Total
Total Unit Cost

Php
Php
7.000000000%
8.000000000%
12.000000000%

Prepared by:

MICHILLE M. ASAIN
Engineer I

Checked by:

GERALDINE T. RABAGO
Engineering Assistant

DONALD F.

Enginee
OIC-Chief, Planning

Page 336 of 570

EX AT BALIWASAN

Amount
27,600.00
35,190.00
11,000.00
12,600.00
262.50
86,652.50
Amount
15,400.00
16,050.00
70,000.00
101,450.00
Amount

0.00

0.00
188,102.50
13,167.18
15,048.20
25,958.15
242,276.02
1,938.21

TO

ogramming Div.

Page 337 of 570

EX AT BALIWASAN

Amount
1,328,782.00
60,180.00
69,030.00
34,000.00
27,300.00
12,800.00
2,600.00
3,240.00
4,000.00
3,080.00
96,330.00
2,124.00
1,340.00
7,095.00
1,032,000.00
4,875.00

2,688,776.00
Amount
15,400.00
16,050.00
70,000.00
101,450.00
Amount

0.00

0.00
2,790,226.00
195,315.82
223,218.08
385,051.19
3,593,811.09
936.23

TO

ogramming Div.

Page 338 of 570

Page 339 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00

68,750.00

396,000.00

38,500.00

14,000.00

3,400.00

77,000.00

78,310.00

8,000.00

683,960.00
683,960.00

Page 340 of 570


47,877.20
54,716.80
94,386.48
880,940.48
35,237.62

TO

ogramming Div.

Page 341 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00

12,000.00

9,600.00

8,000.00

22,500.00

8,000.00

2,250.00

2,000.00

27,000.00

Page 342 of 570


3,600.00

10,400.00

2,800.00

33,250.00

1,225.00

4,000.00

6,125.00

1,400.00

2,700.00

10,500.00

1,050.00

390,000.00

60,000.00

11,100.00

10,667.00

12,000.00

Page 343 of 570

8,350.00

142,376.00

119,000.00

17,350.00

5,850.00

945,093.00
945,093.00
66,156.51
75,607.44
130,422.83
1,217,279.77
12,172.79

TO

ogramming Div.

Page 344 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

TO

ogramming Div.

0.00

6,092.00

6,092.00
6,092.00
426.44
487.36
840.70
7,846.51
1,288.00

Page 345 of 570

EX AT BALIWASAN

TO

Amount
29,070.00
14,248.50
7,700.00
1,200.00
6,600.00
6,240.00
1,800.00
16,520.00
3,366.00
675.00
122.00
1,080.00
474.00
5,070.00
94,165.50
Amount
24,640.00
25,680.00
67,200.00
117,520.00
Amount
1,600.00
1,000.00

2,600.00

0.00
214,285.50
14,999.99
17,142.84
29,571.40
275,999.73
137,999.87

ogramming Div.

Page 346 of 570

Page 347 of 570

EX AT BALIWASAN

Amount
511,700.00
86,100.00
280,995.00
18,802.00
99,900.00
17,582.00
1,015,079.00
Amount
24,640.00
25,680.00
168,000.00
218,320.00
Amount
8,000.00

8,000.00

0.00
1,241,399.00
86,897.93
99,311.92
171,313.06
1,598,921.92
961.47

TO

ogramming Div.

Page 348 of 570

EX AT BALIWASAN

Amount
88,508.75
34,645.00
11,248.00
6,880.00
4,760.00
1,290.00
15,252.00
1,185.00
1,340.00
3,240.00
3,640.00
1,564.00
35,015.00
14,300.00
3,800.00
2,002.00
1,292.00
681.25
9,075.00
112,500.00
49,000.00
6,525.00
14,850.00
900.00
600.00
3,072.00
2,475.00
3,300.00
480.00
580.00
1,005.00
600.00
403.00
253.00
200.00
2,700.00
2,088.00
7,000.00
1,200.00
2,822.50
82.50
177.50
645.00
53,625.00

Page 349 of 570


5,576.00
7,888.00
24,320.00
28,704.00
2,547.50
200.00

576,037.00

Page 350 of 570


Amount
7,392.00
7,704.00
16,800.00
31,896.00
Amount

0.00

0.00
607,933.00
42,555.31
48,634.64
83,894.75
783,017.69
31,320.71

ogramming Div.

Page 351 of 570

EX AT BALIWASAN

Amount

32,401.25
40,644.00
28,872.00
28,800.00
4,212.00
3,800.00
1,620.00
6,480.00
385,200.00
435,600.00
43,200.00
2,160.00
1,728.00
1,728.00
1,800.00
375.00
500.00
13,400.00

360.00
150.00
1,200.00
4,300.00
600.00
600.00
132.50
90.00
900.00
1,440.00
1,495.00
6,000.00
2,810.00
24,000.00
980.00
550.00
140.00
70.00
1,200.00

19,200.00
175.00
5,150.00
123.75
30,000.00

Page 352 of 570


368,000.00
2,060.00
4,347.00
1,320.00
12,110.00
74,480.00
20,400.00

23,900.00

69,300.00
5,620.00
39,480.00
960.00
4,750.00
6,400.00
192.00
96.00
28,400.00

51,648.00
23,850.00
600.00
1,995.00
2,400.00
160.00
80.00

1,876,734.50
Amount
24,640.00
25,680.00
67,200.00
117,520.00
1,994,254.50
139,597.82
159,540.36
275,207.12
2,568,599.80
6,603.08

TO

ogramming Div.

Page 353 of 570

EX AT BALIWASAN

Amount
50,400.00
4,000.00
5,520.00
284,715.00
279,841.50
2,408.00
2,358.00
7,714.00
14,250.00
1,180.00
1,800.00
1,650.00
510.00
4,110.00
1,260.00
18,000.00
14,250.00
8,115.00
1,260.00

703,341.50
Amount
23,408.00
48,792.00
212,800.00
285,000.00
Amount

0.00

0.00
988,341.50
69,183.91
79,067.32
136,391.13
1,272,983.85
95.22

Page 354 of 570

TO

ogramming Div.

EX AT BALIWASAN

Amount
510.00
5.53
255.00
275.00
275.00
600.00
650.00
61.00

2,631.53
Amount
560.00
560.00
Amount

0.00

0.00
3,191.53
223.41
255.32
440.43

Page 355 of 570


4,110.68
58,060.46

ng & Programming Div.

Page 356 of 570

EX AT BALIWASAN

Amount
5,772.00
1,230.00
189.00
62.00
122.00
1,118.25

8,493.25
Amount
1,232.00
642.00
1,120.00
2,994.00
Amount
400.00

400.00

0.00
11,887.25
832.11
950.98
1,640.44
15,310.78
5,103.59

ng & Programming Div.

Page 357 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

TO

ogramming Div.

0.00
2,644.00

2,644.00
2,644.00
185.08
211.52
364.87
3,405.47
3,405.47

Page 358 of 570

EX AT BALIWASAN

Amount
296.00
43.00
38.50
102.00
335.00
75.00
54.00
15.00
510.00
6,350.00
400.00

8,218.50
Amount
1,232.00
642.00
1,120.00
2,994.00
Amount

0.00

0.00
11,212.50
784.88
897.00
1,547.33
14,441.70
14,441.70

TO

ogramming Div.

Page 359 of 570

Page 360 of 570

EX AT BALIWASAN

Amount
1,120.00
5,940.00
437.50
360.00
596.00
900.00
255.00

9,608.50
Amount
1,232.00
642.00
1,120.00
2,994.00
Amount
400.00

400.00

0.00
13,002.50
910.18
1,040.20
1,794.35
16,747.23
1,135.41

TO

ogramming Div.

Page 361 of 570

EX AT BALIWASAN

Amount

18,515.00
4,825.00
16,000.00
1,030.00
24.75
309.00
483.00
1,730.00
620.00
222.75
306.00
228.00
335.00
8,900.00

19,800.00
26,320.00
240.00
2,500.00
3,200.00
72.00
36.00
79.00
60.00

18,515.00
4,825.00
4,912.00
15,000.00
16,000.00
412.00
644.00
440.00
1,320.00
2,249.00
930.00
544.50
544.00
228.00
335.00
15,400.00

Page 362 of 570

12,800.00
21,200.00
180.00
1,425.00
2,400.00
100.00
50.00
79.00
120.00

226,488.00
Amount
24,640.00
25,680.00
67,200.00
117,520.00
344,008.00
24,080.56
27,520.64
47,473.10
443,082.30
7,509.87

TO

ogramming Div.

Page 363 of 570

EX AT BALIWASAN

Amount
522.00
1,245.00
406.00
531.00
555.50
321.75
113.00
110.00
150.00

3,954.25
Amount
1,120.00
1,120.00
Amount

TO

ogramming Div.

0.00

0.00
5,074.25
355.20
405.94
700.25
6,535.63
145.70

Page 364 of 570

Page 365 of 570

EX AT BALIWASAN

TO

Amount

0.00
Amount
3,696.00
3,852.00
8,400.00
15,948.00
Amount
1,900.00

1,900.00

0.00
17,848.00
1,249.36
1,427.84
2,463.02
22,988.22
283.28

ogramming Div.

Page 366 of 570

Page 367 of 570

EX AT BALIWASAN

Amount

0.00
Amount
1,680.00
1,680.00
Amount

TO

ogramming Div.

0.00

0.00
1,680.00
117.60
134.40
231.84
2,163.84
464.14

Page 368 of 570

EX AT BALIWASAN

Amount
3,260.00
1,875.00
9,435.00
3,720.00
1,820.00
900.00

21,010.00
Amount
1,848.00
963.00
1,680.00
4,491.00
Amount
200.00
1,350.00
1,550.00

0.00
27,051.00
1,893.57
2,164.08
3,733.04
34,841.69
76.16

TO

ogramming Div.

Page 369 of 570

EX AT BALIWASAN

Amount
20,400.00
5,500.00
8,250.00
1,200.00
2,340.00
812.50
7,650.00
15,600.00

61,752.50
Amount
3,696.00
3,852.00
5,040.00
12,588.00
Amount
1,600.00
1,000.00

2,600.00

76,940.50
5,385.84
6,155.24
10,617.79
99,099.36
11,791.37

Page 370 of 570

EX AT BALIWASAN

Amount
3,674.25
4,845.00
1,100.00
600.00
1,820.00
37.50
59.00

12,135.75
Amount
1,232.00
642.00
1,120.00
2,994.00
Amount

0.00

0.00
15,129.75
1,059.08
1,210.38
2,087.91
19,487.12
1,146.30

Page 371 of 570

EX AT BALIWASAN

Amount
16,092.50
10,140.00
2,960.00
2,240.00
1,680.00
344.00
2,214.00
474.00
335.00
720.00
840.00
322.00
5,215.00
3,900.00
800.00
462.00
306.00
163.50
1,485.00
27,000.00
870.00
2,700.00
768.00
675.00
600.00
120.00
140.00
335.00
150.00
91.00
44.00
60.00
900.00
696.00
1,000.00
564.50
16.50
35.50
150.00
12,870.00
1,394.00
1,972.00

Page 372 of 570


10,500.00

114,344.50
Amount
7,392.00
7,704.00
16,800.00
31,896.00

Page 373 of 570


Amount

0.00

0.00
146,240.50
10,236.84
11,699.24
20,181.19
188,357.75
31,392.96

ogramming Div.

Page 374 of 570

EX AT BALIWASAN

Amount
4,628.75
5,100.00
2,895.00
3,366.00
2,500.00
11,330.00
4,000.00
160.00
157.00
484.00
269.50
102.00
57.00
95.00
450.00
100.00
37.50
50.00
310.00
79.00

36,170.75
Amount
3,080.00
1,605.00
2,800.00
7,485.00
Amount

0.00

0.00
43,655.75
3,055.90
3,492.46

Page 375 of 570


6,024.49
56,228.61
3,748.57

Page 376 of 570

EX AT BALIWASAN

Amount
8,694.00
51,559.00
1,137.50
2,576.00
3,228.00
2,980.00
7,200.00
2,890.00

80,264.50
Amount
6,160.00
3,210.00
8,400.00
17,770.00
Amount
1,200.00

1,200.00

0.00
99,234.50
6,946.42
7,938.76
13,694.36
127,814.04
748.92

ogramming Div.

Page 377 of 570

EX AT BALIWASAN

Amount

10,065.00
12,348.00
1,830.00
2,436.00
5,400.00
720.00
579.00
2,236.50
625.25

36,239.75
Amount
3,080.00
1,605.00
4,200.00
8,885.00
Amount
800.00

800.00

0.00
45,924.75
3,214.73
3,673.98
6,337.62
59,151.08
64,645.99

TO

ogramming Div.

Page 378 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00

7,000.00

12,000.00

6,800.00

25,800.00
25,800.00
1,806.00
2,064.00
3,560.40
33,230.40
3,323.04

TO

ogramming Div.

Page 379 of 570

Page 380 of 570

EX AT BALIWASAN

TO

Amount

0.00
Amount

0.00
Amount

0.00

598.00

478.00

1,018.00

2,094.00
2,094.00
146.58
167.52
288.97
2,697.06
539.40

ogramming Div.

Page 381 of 570

Page 382 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

TO

ogramming Div.

0.00

6,092.00

6,092.00
6,092.00
426.44
487.36
840.70
7,846.51
1,288.00

Page 383 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00
33,000.00

33,000.00
33,000.00
2,310.00
2,640.00
4,554.00
42,504.01
42,504.01

TO

ogramming Div.

Page 384 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00

16,650.00
52,212.00
17,650.00

86,512.00
86,512.00
6,055.84
6,920.96
11,938.66
111,427.46
1,947.01

TO

ogramming Div.

Page 385 of 570

EX AT BALIWASAN

TO

Amount

0.00
Amount

0.00
Amount

0.00

16,200.00
560.00

16,760.00
16,760.00
1,173.20
1,340.80
2,312.88
21,586.88
1,962.44

ogramming Div.

Page 386 of 570

Page 387 of 570

EX AT BALIWASAN

Amount

0.00
Amount
3,696.00
3,852.00
10,080.00

17,628.00
Amount
1,900.00

1,900.00

0.00
19,528.00
1,366.96
1,562.24
2,694.86
25,152.06
328.91

TO

ogramming Div.

Page 388 of 570

Page 389 of 570

EX AT BALIWASAN

Amount

0.00
Amount
560.00
560.00
Amount

TO

ogramming Div.

0.00
560.00
39.20
44.80
77.28
721.28
302.55

Page 390 of 570

EX AT BALIWASAN

Amount
3,825.00
937.50
1,820.00
177.00
225.00

6,984.50
Amount
1,120.00

1,120.00
Amount

0.00

0.00
8,104.50
567.32
648.36
1,118.42
10,438.61
70.56

TO

ogramming Div.

Page 391 of 570

EX AT BALIWASAN

Amount
25,755.00
7,150.00
10,450.00
1,200.00
2,340.00
244.00
5,100.00
2,600.00

54,839.00
Amount
3,696.00
3,852.00
6,720.00
14,268.00
Amount
3,200.00
2,000.00

5,200.00

0.00
74,307.00
5,201.49
5,944.56
10,254.37
95,707.42
8,978.18

TO

ogramming Div.

Page 392 of 570

Page 393 of 570

EX AT BALIWASAN

Amount
9,780.75
12,240.00
2,200.00
1,800.00
4,620.00
131.25
118.00

30,890.00
Amount
3,080.00
1,605.00
5,600.00
10,285.00
Amount

0.00

0.00
41,175.00
2,882.25
3,294.00
5,682.15
53,033.39
1,170.46

TO

ogramming Div.

Page 394 of 570

EX AT BALIWASAN

Amount
20,920.25
5,070.00
2,368.00
640.00
1,120.00
258.00
3,198.00
158.00
335.00
720.00
840.00
414.00
9,685.00
3,250.00
1,000.00
462.00
340.00
218.00
2,145.00
40,500.00
1,450.00
4,500.00
195.00
564.50
16.50
35.50
600.00
6,350.00
675.00
600.00
768.00
100.00
180.00
160.00
130.00
600.00
696.00
5,000.00
21,450.00
1,900.00
1,091.00

Page 395 of 570


10,500.00

151,202.75
Amount
9,240.00
9,630.00
16,800.00
35,670.00

Page 396 of 570


Amount

0.00

0.00
186,872.75
13,081.09
14,949.82
25,788.44
240,692.10
24,069.21

TO

ogramming Div.

Page 397 of 570

EX AT BALIWASAN

Amount
4,628.75
4,940.00
1,930.00
3,564.00
2,500.00
11,330.00
4,000.00
60.00
78.50
484.00
367.50
85.00
57.00
95.00
270.00
720.00
37.50
50.00
310.00
39.50

35,546.75
Amount
2,464.00
1,284.00
2,240.00
5,988.00
Amount

0.00

0.00
41,534.75
2,907.43

Page 398 of 570


3,322.78
5,731.80
53,496.76
3,566.45

TO

ogramming Div.

Page 399 of 570

EX AT BALIWASAN

Amount
21,500.00
94,611.00
1,487.50
2,760.00
4,404.00
4,470.00
9,900.00
3,910.00

143,042.50
Amount
8,624.00
8,988.00
15,680.00
33,292.00
Amount
1,200.00

1,200.00

0.00
177,534.50
12,427.42
14,202.76
24,499.76
228,664.44
998.72

TO

ogramming Div.

Page 400 of 570

EX AT BALIWASAN

Amount

9,383.00
11,907.00
1,830.00
2,349.00
11,400.00
960.00
579.00
2,236.50
610.00

41,254.50
Amount
3,080.00
3,210.00
5,600.00
11,890.00
Amount
800.00

800.00

0.00
53,944.50
3,776.12
4,315.56
7,444.34
69,480.53
81,454.31

TO

ogramming Div.

Page 401 of 570

Page 402 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00
7,000.00

4,400.00

18,000.00

29,400.00
29,400.00
2,058.00
2,352.00
4,057.20
37,867.20
3,155.60

TO

ogramming Div.

Page 403 of 570

Page 404 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

TO

ogramming Div.

0.00
598.00

478.00

359.00

1,435.00
1,435.00
100.45
114.80
198.03
1,848.28
616.09

Page 405 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

TO

ogramming Div.

0.00

4,028.40

4,028.40
4,028.40
281.99
322.27
555.92
5,188.59
1,288.00

Page 406 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00
33,000.00

33,000.00
33,000.00
2,310.00
2,640.00
4,554.00
42,504.01
42,504.01

TO

ogramming Div.

Page 407 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00

13,500.00
16,080.00

29,580.00
29,580.00
2,070.60
2,366.40
4,082.04
38,099.04
2,026.54

TO

ogramming Div.

Page 408 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00

16,200.00
560.00

16,760.00
16,760.00
1,173.20
1,340.80
2,312.88
21,586.88
1,962.44

TO

ogramming Div.

Page 409 of 570

Page 410 of 570

EX AT BALIWASAN

Amount

0.00
Amount
4,928.00
5,136.00
13,440.00

23,504.00
Amount
3,800.00

3,800.00

0.00
27,304.00
1,911.28
2,184.32
3,767.95
35,167.55
349.75

TO

ogramming Div.

Page 411 of 570

Page 412 of 570

EX AT BALIWASAN

Amount

0.00
Amount
2,520.00
2,520.00
Amount

TO

ogramming Div.

0.00
2,520.00
176.40
201.60
347.76
3,245.76
309.65

Page 413 of 570

EX AT BALIWASAN

Amount
3,586.00
26,775.00
1,320.00
7,440.00
6,720.00
1,200.00

47,041.00
Amount
3,696.00
3,852.00
5,040.00
12,588.00
Amount
200.00
200.00

400.00

0.00
60,029.00
4,202.03
4,802.32
8,284.00
77,317.35
68.76

TO

ogramming Div.

Page 414 of 570

EX AT BALIWASAN

TO

Amount
67,575.00
18,700.00
27,500.00
1,200.00
2,340.00
812.50
7,650.00
15,600.00

141,377.50
Amount
7,392.00
7,704.00
20,160.00
35,256.00
Amount
4,800.00
3,000.00

7,800.00

0.00
184,433.50
12,910.35
14,754.68
25,451.82
237,550.35
8,509.47

ogramming Div.

Page 415 of 570

Page 416 of 570

EX AT BALIWASAN

Amount
15,249.00
19,890.00
3,300.00
2,400.00
7,280.00
150.00
118.00

48,387.00
Amount
3,080.00
3,210.00
5,600.00
11,890.00
Amount

0.00

0.00
60,277.00
4,219.39
4,822.16
8,318.23
77,636.78
1,099.17

TO

ogramming Div.

Page 417 of 570

EX AT BALIWASAN

Amount
19,311.00
8,450.00
2,960.00
2,400.00
840.00
344.00
6,888.00
316.00
335.00
720.00
1,120.00
460.00
12,665.00
3,250.00
1,000.00
616.00
340.00
163.50
3,630.00
40,500.00
3,675.00
4,050.00
200.00
768.00
675.00
600.00
140.00
120.00
335.00
140.00
91.00
132.00
80.00
600.00
7,000.00
19,305.00
1,400.00
1,867.00
10,500.00
9,120.00
10,764.00
2,547.50
1,129.00

Page 418 of 570


33.00
71.00
150.00

181,801.00
Amount
9,240.00
9,630.00
16,800.00
35,670.00

Page 419 of 570


Amount

0.00

0.00
217,471.00
15,222.97
17,397.68
30,011.00
280,102.65
31,122.52

TO

ogramming Div.

Page 420 of 570

EX AT BALIWASAN

Amount
9,257.50
1,140.00
3,860.00
396.00
7,500.00
11,330.00
4,000.00
110.00
549.50
1,210.00
484.00
955.50
289.00
116.00
85.50
95.00
450.00
100.00
52.50
70.00
375.00
75.00

42,500.50
Amount
3,696.00
1,926.00
5,040.00
10,662.00
Amount

0.00

0.00

Page 421 of 570


53,162.50
3,721.38
4,253.00
7,336.43
68,473.31

TO

ogramming Div.

2,977.10

Page 422 of 570

EX AT BALIWASAN

Amount
33,368.00
141,900.00
1,190.00
2,576.00
16,164.00
4,470.00
15,000.00
5,950.00

220,618.00
Amount
9,856.00
10,272.00
22,400.00
42,528.00
Amount
1,200.00

1,200.00

0.00
264,346.00
18,504.22
21,147.68
36,479.75
340,477.65
973.46

TO

ogramming Div.

Page 423 of 570

EX AT BALIWASAN

Amount

31,295.00

9,800.00
26,901.00
12,810.00
5,307.00
15,390.00
480.00
579.00
2,236.50
610.00
3,996.00
1,944.00
2,160.00
10,800.00

124,308.50
Amount
7,392.00
7,704.00
13,440.00
28,536.00
Amount
1,200.00

1,200.00

0.00

Page 424 of 570


154,044.50
10,783.12
12,323.56
21,258.14
198,409.32
55,968.78

TO

ogramming Div.

Page 425 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00
28,000.00

18,000.00

27,200.00

73,200.00
73,200.00
5,124.00
5,856.00
10,101.60
94,281.60
3,771.26

TO

ogramming Div.

Page 426 of 570

Page 427 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

TO

ogramming Div.

0.00
718.00

1,434.00

1,018.00

3,170.00
3,170.00
221.90
253.60
437.46
4,082.95
583.28

Page 428 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

TO

ogramming Div.

0.00

7,092.80

7,092.80
7,092.80
496.50
567.42
978.81
9,135.52
1,288.00

Page 429 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00
33,000.00

33,000.00
33,000.00
2,310.00
2,640.00
4,554.00
42,504.01
42,504.01

TO

ogramming Div.

Page 430 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00

16,500.00
53,652.00
18,750.00

88,902.00
88,902.00
6,223.14
7,112.16
12,268.48
114,505.78
1,947.05

TO

ogramming Div.

Page 431 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00

16,200.00

1,120.00

17,320.00
17,320.00
1,212.40
1,385.60
2,390.16
22,308.16
1,716.01

TO

ogramming Div.

Page 432 of 570

Page 433 of 570

EX AT BALIWASAN

Amount

0.00
Amount
4,312.00
4,494.00
11,760.00

20,566.00
Amount
3,800.00

3,800.00

0.00
24,366.00
1,705.62
1,949.28
3,362.51
31,383.41
345.14

TO

ogramming Div.

Page 434 of 570

Page 435 of 570

EX AT BALIWASAN

Amount

0.00
Amount
560.00
560.00
Amount

TO

ogramming Div.

0.00
560.00
39.20
44.80
77.28
721.28
446.67

Page 436 of 570

EX AT BALIWASAN

Amount
937.50
2,550.00
12,320.00
295.00
262.50

16,365.00
Amount
1,848.00
963.00
1,680.00
4,491.00
Amount

0.00

0.00
20,856.00
1,459.92
1,668.48
2,878.13
26,862.53
67.41

TO

ogramming Div.

Page 437 of 570

EX AT BALIWASAN

TO

Amount
3,570.00
1,100.00
1,650.00
1,200.00
3,900.00
406.25
7,650.00
15,600.00

35,076.25
Amount
2,464.00
2,568.00
4,480.00
9,512.00
Amount

0.00

0.00
44,588.25
3,121.18
3,567.06
6,153.18
57,429.67
39,606.67

ogramming Div.

Page 438 of 570

Page 439 of 570

EX AT BALIWASAN

Amount
1,138.50
1,785.00
550.00
600.00
560.00
75.00
59.00

4,767.50
Amount
1,120.00
1,120.00
Amount

TO

ogramming Div.

0.00

0.00
5,887.50
412.13
471.00
812.48
7,583.10
1,444.40

Page 440 of 570

EX AT BALIWASAN

Amount
16,092.50
6,760.00
2,960.00
1,600.00
1,120.00
344.00
2,952.00
237.00
335.00
1,080.00
840.00
368.00
7,450.00
3,900.00
1,000.00
462.00
306.00
136.25
1,815.00
6,350.00
31,500.00
1,400.00
3,600.00
600.00
600.00
768.00
675.00
600.00
120.00
140.00
335.00
150.00
91.00
77.00
60.00
600.00
696.00
6,000.00
17,160.00
1,400.00
2,477.00

Page 441 of 570


14,000.00
564.50
16.50
35.50
150.00

139,923.25
Amount
9,240.00
4,815.00
16,800.00
30,855.00

Page 442 of 570


Amount

0.00

0.00
170,778.25
11,954.48
13,662.26
23,567.40
219,962.39
27,495.30

TO

ogramming Div.

Page 443 of 570

EX AT BALIWASAN

Amount
4,628.75
4,940.00
3,474.00
3,564.00
5,000.00
11,330.00
4,000.00
110.00
235.50
605.00
484.00
514.50
136.00
116.00
57.00
95.00
450.00
720.00
52.50
70.00
310.00
75.00

40,967.25
Amount
3,696.00
1,926.00
5,040.00
10,662.00
Amount

0.00

0.00

Page 444 of 570


51,629.25
3,614.05
4,130.34
7,124.84
66,498.48

TO

ogramming Div.

3,166.59

Page 445 of 570

EX AT BALIWASAN

Amount
17,501.00
77,814.00
1,050.00
44,712.00
192.00
3,874.00
8,100.00
3,230.00

156,473.00
Amount
6,160.00
6,420.00
16,800.00
29,380.00
Amount
2,000.00

2,000.00

0.00
187,853.00
13,149.71
15,028.24
25,923.71
241,954.66
1,279.86

TO

ogramming Div.

Page 446 of 570

EX AT BALIWASAN

Amount

20,108.00

3,276.00
18,963.00
5,490.00
3,741.00
8,820.00
480.00
579.00
2,236.50
610.00

64,303.50
Amount
4,928.00
5,136.00
6,720.00
16,784.00
Amount
800.00

800.00

0.00
81,887.50
5,732.13
6,551.00
11,300.48
105,471.09

Page 447 of 570


51,149.90

TO

ogramming Div.

Page 448 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00
10,500.00

4,400.00

14,000.00

6,800.00

35,700.00
35,700.00
2,499.00
2,856.00
4,926.60
45,981.60

TO

ogramming Div.

Page 449 of 570


3,537.05

Page 450 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

TO

ogramming Div.

0.00
478.00

717.00

509.00

1,704.00
1,704.00
119.28
136.32
235.15
2,194.75
438.95

Page 451 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

TO

ogramming Div.

0.00

4,894.00

4,894.00
4,894.00
342.58
391.52
675.37
6,303.47
1,288.00

Page 452 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00
33,000.00

33,000.00
33,000.00
2,310.00
2,640.00
4,554.00
42,504.01
42,504.01

TO

ogramming Div.

Page 453 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00

16,500.00
53,652.00
18,750.00

88,902.00
88,902.00
6,223.14
7,112.16
12,268.48
114,505.78
1,947.05

TO

ogramming Div.

Page 454 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00

16,200.00

840.00

17,040.00
17,040.00
1,192.80
1,363.20
2,351.52
21,947.52
1,828.96

TO

ogramming Div.

Page 455 of 570

Page 456 of 570

EX AT BALIWASAN

Amount
237,356.00
17,700.00
23,010.00
4,250.00
6,500.00
2,560.00
1,040.00
2,160.00
2,200.00
847.00
9,295.00
708.00
2,680.00
2,838.00
1,032,000.00
3,250.00

1,348,394.00
Amount
8,624.00
8,988.00
23,520.00
41,132.00
Amount

0.00

0.00
1,389,526.00
97,266.82
111,162.08

Page 457 of 570


191,754.59
1,789,709.49

TO

ogramming Div.

2,622.05

Page 458 of 570

EX AT BALIWASAN

Amount

9,257.50
13,548.00
8,020.00
495.00
1,144.00
1,980.00
330.00
264.00
9,120.00
200.00
600.00
480.00
259.00
133.00
12,800.00
117,700.00
133,100.00
5,300.00

600.00
1,980.00
658.00
75.75
18.00
13.00
175.00
256.00
530.00
20.00
16.00
4,000.00
360.00
800.00
100.00
100.00
180.00
120.00
75.00
19,000.00
103.00
161.00
1,737.00
247.50
360.00

Page 459 of 570


200.00
228.00
335.00

347,178.75

Page 460 of 570


Amount
12,320.00
12,840.00
33,600.00
58,760.00
405,938.75
28,415.71
32,475.10
56,019.55
522,849.11
16,339.03

TO

ogramming Div.

Page 461 of 570

EX AT BALIWASAN

Amount
28,650.00
48,352.50
71,048.00
880.00
262.50
289.50
2,650.00
7,275.00
20,325.00
1,416.00
660.00
340.00
342.50
420.00
66,000.00
9,500.00
2,705.00

261,116.00
Amount
11,088.00
17,334.00
50,400.00
78,822.00
Amount

0.00

0.00
339,938.00
23,795.66
27,195.04
46,911.44

Page 462 of 570


437,840.14

TO

ogramming Div.

185.52

Page 463 of 570

EX AT BALIWASAN

Amount
142,345.00
10,620.00
16,815.00
2,550.00
3,900.00
1,920.00
1,040.00
1,080.00
800.00
1,232.00
6,760.00
708.00
2,680.00
2,838.00
1,032,000.00
2,437.50

1,229,725.50
Amount
12,320.00
12,840.00
33,600.00
58,760.00
Amount

0.00

0.00
1,288,485.50
90,193.99
103,078.84
177,811.00
1,659,569.33
4,073.56

TO

ogramming Div.

Page 464 of 570

Page 465 of 570

EX AT BALIWASAN

Amount
8,575.00
249,150.00
162,000.00
9,265.00
45,600.00
6,407.00

480,997.00
Amount
12,320.00
12,840.00
56,000.00
81,160.00
Amount
6,000.00

6,000.00

0.00
568,157.00
39,770.99
45,452.56
78,405.67
731,786.23
964.60

TO

ogramming Div.

Page 466 of 570

EX AT BALIWASAN

Amount
19,311.00
8,450.00
2,960.00
2,400.00
840.00
344.00
6,888.00
316.00
335.00
720.00
1,120.00
460.00
12,665.00
3,250.00
1,000.00
616.00
340.00
163.50
3,630.00
45,000.00
3,675.00
4,050.00
200.00
768.00
675.00
600.00
140.00
120.00
335.00
140.00
91.00
132.00
80.00
600.00
7,000.00
19,305.00
1,400.00
1,867.00
14,000.00
6,080.00
7,176.00
2,547.50
1,129.00

Page 467 of 570


33.00
71.00
150.00

183,173.00
Amount
9,240.00
9,630.00
16,800.00
35,670.00

Page 468 of 570


Amount

0.00

0.00
218,843.00
15,319.01
17,507.44
30,200.33
281,869.78
31,318.86

TO

ogramming Div.

Page 469 of 570

EX AT BALIWASAN

Amount

13,886.25
6,774.00
4,010.00
405.00
650.00
1,260.00
5,760.00
200.00
480.00
480.00
182.00
91.00
8,800.00
74,900.00
84,700.00
22,800.00
206.00
322.00
440.00
1,730.00
2,895.00
742.50
2,880.00
1,000.00
171.00
335.00
7,200.00

600.00
1,980.00
658.00
75.75
18.00
13.00
175.00
256.00
530.00
20.00
16.00
4,000.00
24,000.00

275,641.50

Page 470 of 570


Amount
12,320.00
12,840.00
33,600.00
58,760.00
334,401.50
23,408.11
26,752.12
46,147.41
430,709.13

TO

ogramming Div.

8,973.11

Page 471 of 570

EX AT BALIWASAN

Amount
18,909.00
29,011.50
71,904.00
880.00
175.00
193.00
2,650.00
5,820.00
8,130.00
1,416.00
660.00
170.00
342.50
420.00
34,800.00
4,750.00
4,328.00
19,476.00

204,035.00
Amount
11,088.00
11,556.00
35,280.00
57,924.00
Amount

0.00

0.00
261,959.00
18,337.13
20,956.72
36,150.34

Page 472 of 570


337,403.20

TO

ogramming Div.

232.47

Page 473 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00

27,440.00

27,440.00
27,440.00
1,920.80
2,195.20
3,786.72
35,342.73
1,288.00

TO

ogramming Div.

Page 474 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00

9,588.00
4,800.00
8,600.00

3,000.00
17,600.00
43,588.00
43,588.00
3,051.16
3,487.04
6,015.14
56,141.35
3,508.83

TO

ogramming Div.

Page 475 of 570

EX AT BALIWASAN

Amount

0.00
Amount
2,464.00
1,284.00
11,200.00

14,948.00
Amount
20,000.00

20,000.00

0.00
34,948.00
2,446.36
2,795.84
4,822.82
45,013.03
275.82

TO

ogramming Div.

Page 476 of 570

Page 477 of 570

EX AT BALIWASAN

Amount

0.00
Amount
22,400.00
22,400.00
Amount
4,800.00

4,800.00
27,200.00
1,904.00
2,176.00
3,753.60
35,033.60
289.44

TO

ogramming Div.

Page 478 of 570

EX AT BALIWASAN

Amount
127,280.00

127,280.00
Amount
4,928.00
2,568.00
13,440.00
20,936.00
Amount
9,750.00
9,000.00

18,750.00

0.00
166,966.00
11,687.62
13,357.28
23,041.31
215,052.22
625.15

TO

ogramming Div.

Page 479 of 570

EX AT BALIWASAN

Amount
105,060.00
24,200.00
48,400.00
6,720.00
65,880.00
52,464.00
9,360.00
3,240.00
2,550.00
732.00

318,606.00
Amount
11,088.00
11,556.00
50,400.00
73,044.00
Amount
1,600.00
9,600.00
6,000.00

17,200.00

0.00
408,850.00
28,619.50
32,708.00
56,421.30
526,598.80
12,246.48

TO

ogramming Div.

Page 480 of 570

Page 481 of 570

EX AT BALIWASAN

TO

Amount
604,800.00
319,000.00
6,000.00
224,400.00
64,000.00
192,000.00
50,000.00
2,916.00
5,760.00
27,000.00

1,495,876.00
Amount
30,800.00
32,100.00
210,000.00
272,900.00
Amount
13,000.00
18,900.00
13,300.00
45,200.00

0.00
1,813,976.00
126,978.32
145,118.08
250,328.69
2,336,401.09
97,350.05

ogramming Div.

Page 482 of 570

Page 483 of 570

EX AT BALIWASAN

Amount
28,620.00
3,200.00
370,455.78
25,000.00
3,000.00
468,720.00
9,000.00
17,136.00
8,700.00
3,360.00
1,419.00
41,211.00

979,821.78
Amount
18,480.00
38,520.00
126,000.00
183,000.00
Amount
10,800.00
6,000.00

16,800.00

0.00
1,179,621.78
82,573.52
94,369.74
162,787.81
1,519,352.85
962.25

TO

ogramming Div.

Page 484 of 570

Page 485 of 570

EX AT BALIWASAN

Amount
10,800.00
21,122.00
1,600.00
3,256.00
109.50
225.00
360.00
5,200.00
1,040.00
6,744.00
37,030.00
62,720.00
7,600.00

272.00
304.00
72.00
120.00
948.00
1,280.00
1,140.00

161,942.50
Amount
6,160.00
6,420.00
16,800.00
29,380.00
Amount

0.00

0.00
191,322.50
13,392.58
15,305.80

Page 486 of 570


26,402.51
246,423.38

TO

ogramming Div.

6,160.58

Page 487 of 570

EX AT BALIWASAN

Amount
6,912.00
6,876.00
3,040.50
61,712.00
5,148.00
29,250.00
4,950.00

117,888.50
Amount
7,392.00
3,852.00
13,440.00
24,684.00
Amount

0.00

0.00
142,572.50
9,980.08
11,405.80
19,675.01
183,633.39
66.17

TO

ogramming Div.

Page 488 of 570

EX AT BALIWASAN

Amount
107,000.00
192,000.00

299,000.00
Amount
1,232.00
642.00
1,120.00
2,994.00
Amount

0.00

0.00
301,994.00
21,139.58
24,159.52
41,675.17
388,968.28
388,968.28

TO

ogramming Div.

Page 489 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00
18,000.00

18,000.00
18,000.00
1,260.00
1,440.00
2,484.00
23,184.00
11,592.00

TO

ogramming Div.

Page 490 of 570

EX AT BALIWASAN

Amount
600.00
434.00
643.50
2,436.00
2,080.00
9,500.00
30,400.00
42,800.00
20,722.50
4,575.00
6,120.00
1,590.00
5,284.50
1,623.00
336.00
193.00
205.50
5,820.00
3,900.00
330.00
354.00

139,947.00
Amount
7,392.00
7,704.00
16,800.00
31,896.00
Amount

0.00

0.00
171,843.00
12,029.01
13,747.44
23,714.33

Page 491 of 570


221,333.78
156.96

TO

ogramming Div.

EX AT BALIWASAN

Amount

0.00
Amount
3,696.00
3,852.00
11,760.00
19,308.00
Amount
10,000.00

10,000.00

0.00
29,308.00
2,051.56
2,344.64

Page 492 of 570


4,044.50
37,748.71

TO

ogramming Div.

512.54

Page 493 of 570

EX AT BALIWASAN

Amount
10,220.00
46,020.00
750.00
1,416.00

58,406.00
Amount
3,696.00
1,926.00
6,720.00
12,342.00
Amount
8,100.00
1,200.00

9,300.00

0.00
80,048.00
5,603.36
6,403.84
11,046.62
103,101.82
86.74

TO

ogramming Div.

Page 494 of 570

EX AT BALIWASAN

Amount
15,555.00
4,400.00
6,600.00
2,400.00
3,120.00
366.00

32,441.00
Amount
1,848.00
963.00
3,360.00
6,171.00
Amount

0.00

0.00
38,612.00
2,702.84
3,088.96
5,328.46
49,732.26
7,795.02

TO

ogramming Div.

Page 495 of 570

EX AT BALIWASAN

Amount
3,850.00

3,850.00
Amount
2,240.00

2,240.00
Amount

TO

ogramming Div.

0.00

0.00
6,090.00
426.30
487.20
840.42
7,843.92
1,120.56

Page 496 of 570

EX AT BALIWASAN

Amount
12,750.00
3,850.00
5,500.00

22,100.00
Amount
1,232.00
1,284.00
3,360.00
5,876.00
Amount
1,600.00
1,000.00

2,600.00

0.00
30,576.00
2,140.32
2,446.08
4,219.49
39,381.89
741.66

TO

ogramming Div.

Page 497 of 570

EX AT BALIWASAN

Amount

0.00
Amount

560.00
560.00
Amount

TO

ogramming Div.

1,575.00

1,575.00

0.00
2,135.00
149.45
170.80
294.63
2,749.88
65.19

Page 498 of 570

EX AT BALIWASAN

Amount
4,400.00

4,400.00
Amount
2,240.00

2,240.00
Amount
3,150.00

3,150.00

0.00
9,790.00
685.30
783.20
1,351.02
12,609.52
1,661.33

TO

ogramming Div.

Page 499 of 570

EX AT BALIWASAN

Amount
15,810.00
4,400.00
6,600.00
600.00
200.00
200.00
2,832.00
61.00

30,703.00
Amount
2,464.00
1,284.00
6,720.00
10,468.00
Amount
1,600.00
1,000.00
950.00
3,550.00

0.00
44,721.00
3,130.47
3,577.68
6,171.50
57,600.65
1,365.59

TO

ogramming Div.

Page 500 of 570

Page 501 of 570

EX AT BALIWASAN

Amount
14,790.00
6,600.00
8,800.00
23,400.00
5,920.00
2,240.00
900.00
9,120.00
594.75

72,364.75
Amount
3,696.00
3,852.00
10,080.00
17,628.00
Amount

0.00

0.00
89,992.75
6,299.49
7,199.42
12,419.00
115,910.66
19,254.26

TO

ogramming Div.

Page 502 of 570

Page 503 of 570

EX AT BALIWASAN

Amount
2,040.00
550.00
1,100.00
1,992.00
1,110.00
1,120.00
2,340.00
1,040.00
335.50

11,627.50
Amount
1,232.00
642.00
2,240.00
4,114.00
Amount

0.00

0.00
15,741.50
1,101.91
1,259.32
2,172.33
20,275.05
23,118.65

TO

ogramming Div.

Page 504 of 570

Page 505 of 570

EX AT BALIWASAN

Amount
63,750.00
22,000.00
26,400.00
65,000.00
750.00

177,900.00
Amount
9,240.00
9,630.00
25,200.00
44,070.00
Amount

0.00

0.00
221,970.00
15,537.90
17,757.60
30,631.86
285,897.36
646.83

TO

ogramming Div.

Page 506 of 570

EX AT BALIWASAN

Amount
392,000.00

60,000.00
1,176.00
3,000.00
2,206.00
2,400.00
9,257.50
720.00
1,060.00
28.50
130.00
161,000.00
1,080.00
560.00
1,100.00
2,500.00
36.50
30.00
2,700.00
184.00
4,500,000.00

5,141,168.50
Amount
103,488.00
161,784.00
470,400.00
735,672.00
Amount
38,400.00
38,400.00
8,500.00

8,500.00

Page 507 of 570


5,923,740.50
414,661.84
473,899.24
817,476.19
7,629,777.76
544,984.13

TO

ogramming Div.

Page 508 of 570

EX AT BALIWASAN

TO

Amount
3,825.00
1,650.00
2,200.00
5,850.00
1,480.00
560.00
225.00
2,280.00
152.50

18,222.50
Amount
1,848.00
963.00
2,520.00
5,331.00
Amount

0.00

0.00
23,553.50
1,648.75
1,884.28
3,250.38
30,336.91
20,157.41

ogramming Div.

Page 509 of 570

Page 510 of 570

EX AT BALIWASAN

Amount
42,840.00
12,100.00
17,600.00
59,150.00
450.00

132,140.00
Amount
6,160.00
6,420.00
16,800.00
29,380.00
Amount

0.00

0.00
161,520.00
11,306.40
12,921.60
22,289.76
208,037.76
470.67

TO

ogramming Div.

Page 511 of 570

EX AT BALIWASAN

Amount
3,000.00

152.00
40,644.00
4,628.75
45,770.00
2,964.00
40.00
480.00
570.00
1,050.00
40.00
48,000.00
198,400.00
250,000.00
72,000.00
12,000.00
8,000.00
1,200.00

688,938.75
Amount
12,320.00
12,840.00
67,200.00
92,360.00
Amount
38,400.00
38,400.00
8,500.00

8,500.00
828,198.75
57,973.91
66,255.90
114,291.43
1,066,719.99

Page 512 of 570


1,066,719.99

TO

ogramming Div.

Page 513 of 570

EX AT BALIWASAN

TO

Amount
3,825.00
1,650.00
2,200.00
5,850.00
1,480.00
560.00
225.00
2,280.00
152.50

18,222.50
Amount
1,848.00
963.00
2,520.00
5,331.00
Amount

0.00

0.00
23,553.50
1,648.75
1,884.28
3,250.38
30,336.91
20,157.41

ogramming Div.

Page 514 of 570

Page 515 of 570

EX AT BALIWASAN

Amount
42,840.00
12,100.00
17,600.00
59,150.00
450.00

132,140.00
Amount
6,160.00
6,420.00
16,800.00
29,380.00
Amount

0.00

0.00
161,520.00
11,306.40
12,921.60
22,289.76
208,037.76
470.67

TO

ogramming Div.

Page 516 of 570

EX AT BALIWASAN

TO

Amount
3,000.00

152.00
40,644.00
4,628.75
46,168.00
2,990.00
40.00
480.00
570.00
1,050.00
40.00
48,000.00
198,400.00

346,162.75
Amount
9,240.00
9,630.00
42,000.00
60,870.00
Amount
38,400.00
38,400.00
8,500.00

8,500.00
453,932.75
31,775.29
36,314.62
62,642.72
584,665.38
584,665.38

ogramming Div.

Page 517 of 570

Page 518 of 570

EX AT BALIWASAN

Amount
81,288.00
52,934.00
750.00
2,990.00
2,500.00
4,300.00
600.00
438.00
132.50
90.00
900.00
1,200.00
1,242.00
2,810.00
4,000.00
140.00
70.00
1,240,000.00
15,300.00

360,000.00
18,000.00
8,000.00
250.00
3,000.00
72,000.00

1,872,934.50
Amount
43,120.00
44,940.00
294,000.00
382,060.00
Amount
38,400.00
38,400.00
100,000.00

100,000.00
2,393,394.50
167,537.62

Page 519 of 570


191,471.56
330,288.44
3,082,692.12
61,653.84

TO

ogramming Div.

Page 520 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00

25,309,620.00

Page 521 of 570

TO

Page 522 of 570


25,634,700.00

24,564,711.00

75,509,031.00
75,509,031.00
5,285,632.17
6,040,722.48
10,420,246.28
97,255,631.93
4,035.67

ogramming Div.

Page 523 of 570

Page 524 of 570

EX AT BALIWASAN

Amount
1,677,150.00

1,677,150.00
Amount
3,080.00
1,605.00
5,600.00
10,285.00
Amount
121,000.00
97,500.00
90,000.00
18,000.00
326,500.00

0.00
2,013,935.00
140,975.45
161,114.80
277,923.03
2,593,948.28
696.0685778075

TO

ogramming Div.

Page 525 of 570

EX AT BALIWASAN

Amount

0.00
Amount
8,624.00
4,494.00
15,680.00
28,798.00
Amount
136,500.00
126,000.00
262,500.00

0.00
291,298.00
20,390.86
23,303.84
40,199.12
375,191.82
11.003802847

TO

ogramming Div.

Page 526 of 570

EX AT BALIWASAN

Amount
3,375,559.00

3,375,559.00
Amount
8,624.00
4,494.00
15,680.00
28,798.00
Amount
175,500.00
162,000.00
36,000.00
373,500.00

0.00
3,777,857.00
264,449.99
302,228.56
521,344.27
4,865,879.82
951.3928720026

TO

ogramming Div.

Page 527 of 570

EX AT BALIWASAN

Amount
4,616,520.00
1,258,400.00
1,887,600.00
228,920.00
214,970.00
20,448.00
25,850.00
101,800.00
1,625.00
100.00
8,356,233.00
Amount
43,120.00
22,470.00
588,000.00
653,590.00
Amount
785,400.00
247,500.00
33,000.00
363,000.00
234,000.00
38,000.00
1,700,900.00

0.00
10,710,723.00
749,750.61
856,857.84
1,478,079.77
13,795,411.22
1085.9125426835

TO

ogramming Div.

Page 528 of 570

Page 529 of 570

EX AT BALIWASAN

Amount
-

0.00
Amount
9,240.00
9,630.00
29,400.00
48,270.00
Amount
10,000.00

10,000.00

0.00
58,270.00
4,078.90
4,661.60
8,041.26
75,051.75
31.63

F. RECINTO

eer III

g & Design Section

Page 530 of 570

EX AT BALIWASAN

Amount
19,352.00
50,204.00
764,062.50
329,205.00
533,120.00
23,500.00
1,719,443.50
Amount
9,240.00
9,630.00
29,400.00
48,270.00
Amount

0.00
1,767,713.50
123,739.95
141,417.08
243,944.46
2,276,814.99
58.60

F. RECINTO

eer III

g & Design Section

Page 531 of 570

EX AT BALIWASAN

Amount
1,895,925.00
517,000.00
775,500.00
219,700.00
111,337.20
3,250.00
3,522,712.20
Amount
58,520.00
182,970.00
532,000.00
773,490.00
Amount
148,800.00
93,000.00

241,800.00
4,538,002.20
317,660.15
363,040.18
626,244.30
5,844,946.83
7,468.34

F. RECINTO

eer III

g & Design Section

Page 532 of 570

EX AT BALIWASAN

Amount
-

0.00
Amount
0.00
0.00

0.00
Amount
587,600.00

587,600.00

0.00
587,600.00
41,132.00
47,008.00
81,088.80
756,828.80
756,828.80

F. RECINTO

eer III

g & Design Section

Page 533 of 570

EX AT BALIWASAN

Amount
-

0.00
Amount
24,640.00
25,680.00
224,000.00
274,320.00
Amount

0.00

0.00
274,320.00
19,202.40
21,945.60
37,856.16
353,324.17
253.10

F. RECINTO

eer III

g & Design Section

Page 534 of 570

EX AT BALIWASAN

Amount
-

0.00
Amount
12,320.00
12,840.00
84,000.00
109,160.00
Amount

0.00

0.00
109,160.00
7,641.20
8,732.80
15,064.08
140,598.08
379.65

F. RECINTO

eer III

g & Design Section

Page 535 of 570

EX AT BALIWASAN

Amount
225,420.00
390,000.00
325,360.00
41,850.00
982,630.00
Amount
9,240.00
9,630.00
29,400.00
48,270.00
Amount
4,800.00
4,800.00
9,600.00
1,040,500.00
72,835.00
83,240.00
143,589.00
1,340,164.00
62.01

F. RECINTO

eer III

g & Design Section

Page 536 of 570

EX AT BALIWASAN

Amount
463,845.00
126,500.00
189,200.00
5,953.35
3,120.00
640.50
789,258.85
Amount
21,560.00
33,705.00
117,600.00
172,865.00
Amount
36,800.00
23,000.00

59,800.00
1,021,923.85
71,534.67
81,753.91
141,025.49
1,316,237.93
6,875.75

F. RECINTO

eer III

g & Design Section

Page 537 of 570

EX AT BALIWASAN

Amount
612,047.25
769,845.00
136,950.00
102,000.00
283,500.00
5,550.00

1,909,892.25
Amount
30,800.00
64,200.00
280,000.00

375,000.00
Amount
49,200.00
60,800.00

110,000.00

0.00
2,394,892.25
167,642.46
191,591.38
330,495.13
3,084,621.22
1,086.73

F. RECINTO

eer III

g & Design Section

Page 538 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00
125,750.00

125,750.00
125,750.00
8,802.50
10,060.00
17,353.50
161,966.00
6,440.00

F. RECINTO

eer III

g & Design Section

Page 539 of 570

EX AT BALIWASAN

Amount
28,000.00
124,320.00
124,432.00
1,180.00
550.00
600.00
279,082.00
Amount
9,240.00
9,630.00
25,200.00

44,070.00
Amount

0.00

0.00
323,152.00
22,620.64
25,852.16
44,594.98
416,219.78
74.54

F. RECINTO

eer III

g & Design Section

Page 540 of 570

EX AT BALIWASAN

Amount
-

0.00
Amount
3,696.00
3,852.00
10,080.00
17,628.00
Amount

0.00

0.00
17,628.00
1,233.96
1,410.24
2,432.66
22,704.86
659.26

F. RECINTO

eer III

g & Design Section

Page 541 of 570

EX AT BALIWASAN

Amount

32,930.00
8,160.00
27,300.00
2,475.00
70,865.00
Amount
6,776.00
3,531.00
12,320.00
22,627.00
Amount
800.00
800.00
1,600.00
95,092.00
6,656.44
7,607.36
13,122.70
122,478.50
70.62

F. RECINTO

eer III

g & Design Section

Page 542 of 570

EX AT BALIWASAN

Amount
36,465.00
9,900.00
14,850.00
1,200.00
7,200.00
305.00
39,200.00

109,120.00
Amount
9,240.00
4,815.00
21,000.00
35,055.00
Amount
3,200.00
2,000.00

5,200.00
149,375.00
10,456.25
11,950.00
20,613.75
192,394.99
12,826.33

F. RECINTO

eer III

g & Design Section

Page 543 of 570

EX AT BALIWASAN

Amount
26,737.50
38,250.00
6,050.00
6,000.00
12,600.00
300.00
177.00
90,114.50
Amount
5,544.00
5,778.00
15,120.00

26,442.00
Amount
800.00
6,400.00

7,200.00

0.00
123,756.50
8,662.96
9,900.52
17,078.40
159,398.37
1,275.19

F. RECINTO

eer III

g & Design Section

Page 544 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00
160,000.00

160,000.00
160,000.00
11,200.00
12,800.00
22,080.00
206,080.01
12,880.00

F. RECINTO

eer III

g & Design Section

Page 545 of 570

EX AT BALIWASAN

Amount
16,416.00
46,800.00
12,240.00
18,060.00
5,500.00
930.00
2,250.00
40,800.00
11,000.00
16,500.00
6,000.00
19,500.00
8,750.00
549.00
150.00
205,445.00
Amount
12,320.00
12,840.00
33,600.00
58,760.00
Amount
3,200.00
2,000.00
1,350.00
6,550.00
135,000.00
4,000.00
26,000.00
15,000.00
17,000.00
111,000.00

308,000.00
578,755.00

Page 546 of 570


40,512.85
46,300.40
79,868.19
745,436.43
745,436.43

F. RECINTO

eer III

g & Design Section

Page 547 of 570

EX AT BALIWASAN

Amount
1,800.00
8,325.00
8,332.50
1,228.00
826.00
385.00
420.00
21,316.50
Amount
3,080.00
1,605.00
2,800.00

7,485.00
Amount

0.00

0.00
28,801.50
2,016.11
2,304.12
3,974.61
37,096.33
105.99

F. RECINTO

eer III

g & Design Section

Page 548 of 570

EX AT BALIWASAN

Amount
90,780.00
127,820.00
13,500.00
232,100.00
Amount
7,392.00
7,704.00
26,880.00
41,976.00
Amount
1,600.00
1,600.00
3,200.00
277,276.00
19,409.32
22,182.08
38,264.09
357,131.49
67.75

F. RECINTO

eer III

g & Design Section

Page 549 of 570

EX AT BALIWASAN

Amount
111,180.00
30,250.00
45,650.00
900.00
1,560.00
259.25
189,799.25
Amount
9,240.00
9,630.00
33,600.00
52,470.00
Amount
9,600.00
6,000.00

15,600.00
257,869.25
18,050.85
20,629.54
35,585.96
332,135.59
7,234.49

F. RECINTO

eer III

g & Design Section

Page 550 of 570

EX AT BALIWASAN

Amount
171,085.50
222,870.00
38,500.00
31,200.00
79,240.00
1,575.00
544,470.50
Amount
9,240.00
9,630.00
33,600.00

52,470.00
Amount
4,400.00
17,600.00

22,000.00

0.00
618,940.50
43,325.84
49,515.24
85,413.79
797,195.36
1,004.81

F. RECINTO

eer III

g & Design Section

Page 551 of 570

EX AT BALIWASAN

Amount
8,000.00
53,280.00
53,328.00
3,070.00
2,360.00
825.00
900.00
121,763.00
Amount
6,160.00
6,420.00
11,200.00

23,780.00
Amount

0.00

0.00
145,543.00
10,188.01
11,643.44
20,084.93
187,459.38
78.76

F. RECINTO

eer III

g & Design Section

Page 552 of 570

EX AT BALIWASAN

Amount
-

0.00
Amount
3,080.00
1,605.00
4,200.00
8,885.00
Amount

0.00

0.00
8,885.00
621.95
710.80
1,226.13
11,443.88
347.21

F. RECINTO

eer III

g & Design Section

Page 553 of 570

EX AT BALIWASAN

Amount
60,016.00
21,888.00
27,520.00
23,200.00
37,848.00
17,080.00
20,720.00
28,980.00
3,975.00
241,227.00
Amount
11,704.00
12,198.00
37,240.00
61,142.00
Amount
2,000.00
2,000.00
4,000.00
306,369.00
21,445.83
24,509.52
42,278.92
394,603.26
65.26

F. RECINTO

eer III

g & Design Section

Page 554 of 570

EX AT BALIWASAN

Amount
82,110.00
22,000.00
33,000.00
4,400.00
42,900.00
12,000.00
1,625.00
198,035.00
Amount
9,240.00
9,630.00
25,200.00
44,070.00
Amount
6,400.00
4,000.00

10,400.00
252,505.00
17,675.35
20,200.40
34,845.69
325,226.44
9,611.85

F. RECINTO

eer III

g & Design Section

Page 555 of 570

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00
29,336.00

29,336.00
29,336.00
2,053.52
2,346.88
4,048.37
37,784.77
489.44

F. RECINTO

eer III

g & Design Section

Page 556 of 570

EX AT BALIWASAN

Amount
29,337.00
3,300.00
1,360.00

33,997.00
Amount
4,928.00
2,568.00
4,480.00

11,976.00
Amount
800.00

800.00

0.00
46,773.00
3,274.11
3,741.84
6,454.67
60,243.62
753.05

F. RECINTO

eer III

g & Design Section

Page 557 of 570

EX AT BALIWASAN

Amount
2,000.00
1,700.00
6,600.00
750.00
1,075.33
101.50
165.00
59,202.00
82,225.00
4,480.00
6,000.00
280.00

164,578.83
Amount
9,240.00
9,630.00
16,800.00

35,670.00
Amount
3,800.00
5,400.00
400.00
9,600.00

0.00
209,848.83
14,689.42
16,787.91
28,959.14
270,285.29
1,154.11

F. RECINTO

eer III

g & Design Section

Page 558 of 570

Page 559 of 570

EX AT BALIWASAN

Amount
600.00
3,885.00
3,888.50
406.00
376.75
118.00
330.00
60.00

9,664.25
Amount

2,240.00

2,240.00
Amount

F. RECINTO

0.00

0.00
11,904.25
833.30
952.34
1,642.79
15,332.67
86.41

eer III

g & Design Section

Page 560 of 570

Page 561 of 570

EX AT BALIWASAN

Amount
34,375.00
750.00
15,300.00
4,400.00
6,050.00
1,100.00
7,800.00
6,000.00
305.00
13,702.50
1,500.00
510.00
1,520.00
1,601.74
1,500.00
50.00
48.00
300.00
1,240.00
1,250.00
280.00
406.00
55.00
100,043.24
Amount
6,160.00
6,420.00
11,200.00
23,780.00
Amount
400.00
400.00
1,600.00
1,000.00
400.00
950.00
1,350.00
200.00
6,300.00
13,611.60

13,611.60

Page 562 of 570


143,734.84
10,061.44
11,498.79
19,835.41
185,130.48
185,130.48

F. RECINTO

eer III

g & Design Section

EX AT BALIWASAN

Amount
97,980.00
2,932.50
1,096.00
1,650.00
2,488.50
2,530.00
4,900.00
23,900.00
3,780.00
370.00
156.00
1,320.00
500.00
560.00
1,050.00
260.24
533.00
364.00
150.00
27,500.00
24,990.00
6,600.00
9,900.00
215,510.24
Amount
9,240.00
9,630.00
33,600.00

Page 563 of 570


52,470.00
Amount
1,600.00
1,000.00
1,900.00
4,500.00

0.00
272,480.24
19,073.62
21,798.42
37,602.27
350,954.55
393.45

F. RECINTO

eer III

g & Design Section

EX AT BALIWASAN

Amount

0.00
Amount

0.00
Amount

0.00
23,000,000.00

Page 564 of 570

Page 565 of 570

Page 566 of 570

Page 567 of 570

23,000,000.00
23,000,000.00
1,610,000.00
1,840,000.00
3,174,000.00
29,624,000.00
29,624,000.00

F. RECINTO

eer III

g & Design Section

Page 568 of 570

EX AT BALIWASAN

Amount
-

0.00
Amount
0.00
0.00

0.00
Amount
0.00

0.00

1,854.72

1,854.72
1,854.72
129.83
148.38
255.95
2,388.89
414.74

F. RECINTO

eer III

g & Design Section

Page 569 of 570

EX AT BALIWASAN

Amount
1,000.00
11,700.00
1,650.00
11,700.00
12,000.00
38,050.00
Amount
117,165.00

117,165.00
Amount

0.00
155,215.00
10,865.05
12,417.20
21,419.67
199,916.92
199,916.92

F. RECINTO

eer III

g & Design Section

Page 570 of 570

EX AT BALIWASAN

Amount
2,365.00
616.00
1,958.00
137.25
2,160.00
255.00
28.00
28.00
1,792.00
310.00
62.00

9,711.25
Amount
616.00
642.00
560.00
1,818.00
Amount

11,529.25
807.05
922.34
1,591.04
14,849.67
14,849.67

F. RECINTO