Escolar Documentos
Profissional Documentos
Cultura Documentos
Engineering Department
Maintenance Division
Production Planning and Control Section
S/N
A/C
Good for
Current
N/Stop Day's
Flying
Description
Alert
Fly. Hrs
ACA
ACB
Daily Inspection
AKW
Daily Inspection
ABU
36597
ABT
ABX
34889
AOG
AKS
346
Daily Inspection
AKQ
685
AOG
Remarks
Due Hrs
Date
AOG
800hrs
A2 CHECK
Note: Good for Night stop only in case A/C were in KTM on previous day otherwise must be at KTM.
For information:-
9N ABT should bein KTM for weekly inspection &1hr transit before nights 9N-AKQ :
night stop.
9N-ABT:
1. EMMA CHK no.29 due on 36154 AFH.
9N-AKS :
1. 100 hrs check due at 389 AFH.
Prepared By:-
Received By :-
Engineering Department
Maintenance Division
Production Planning and Control Section
A/C
Job List
ACA
ACB
AKW
ABU
AOG
ABX
AOG
ABT
Daily Inspection
AKQ
AKS
A/C
Accomplishment Status
(
P)
Signature: ..
PPCS
Maint. Div., Engg. Dept.
Aircraft
9N-ABT
9N-AKS
9N-ABU
9N-AKQ
Maintenance Day
Sunday
Monday
Thursday
Saturday
Nomenclature
Flap SelectorValve
Verticle Speed Ind.
100 Hrs check
Battery change
Verticle Speed Ind.
100 Hrs check
Battery change
3 + 6 Monthly Insp.
Burner Cleaning
Oil + P3 Filter
Oil Cooler
100 Hrs check
Burner Cleaning
P3 Filter
Longeron repair
CT 01
Battery change
SB 6/438
100 Hrs check
Battery change
PCU change
100 Hrs check
R.C. Relay
SB 6/268
Compass Swing
3 Monthly Insp.
Battery change
100 Hrs check
100 Hrs check
Battery change
Flap Actuator
Fire detecting, Thermal Unit
Fire Extingusher Bottle
Battery change
Burner Cleaning
Check of Service Bulletin
"
"
"
Position
Single
Port
Due Hrs
31428
31443
31500
Due Date
10-Mar
Stbd
31579
31600
9-Apr
16-Apr
Port
Port
Port
Stbd
Stbd
31714
31730
31738
31700
31779
31800
At the earliest
At the earliest
31787
31800
8-May
21-May
31-May
Stbd
Port
31950
31897
32000
31987
24-Jun
11-Jul
5-Jul
31991
32089
Single
SF I/B & PA O/B
Stbd
due defect
32171
Stbd
SB 6/421
SB 6/512
SB 6/521
ADCF 2000-14
32171
32187
"
"
"
Last Aug
25-Aug
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
Stbd
Stbd
Port
32192
32244
32237
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
Battery change
Due problem.
100 Hrs check
R.C. Relay
Port
100 Hrs check
Burner Cleaning
Port
Over Speed Governor
Port
Battery change
SB 6/502(Flight Control Rods)
Burner Cleaning
Stbd
Accumulator
Brake
100 Hrs check
Battery change
Oil & P3 Folter
Port
100 Hrs check
3 Monthly Insp.,SB 6/421,364, 399,521,522,ADCF
Megger Test
Battery change
Battery change
100 Hrs check
Starter Genrator
Port
Burner Cleaning
Port
100 Hrs check
Battery change
Burner Cleaning
Stbd
R.C. Relay
Stbd
3 & 6 Monthly Insp.SB 6/268, 364,399, 438 &ADCF 2000-14
Hot Section Insp.
Port
Altimeter Ind.
Port
Battery change
100 Hrs check
Installation of Emg. Flash light
Battery change
C of A Isnp. & CPCP(CT1)
100 Hrs check
Altimeter Ind.
STBD
Altimeter Ind.
PORT
R.C. Relay
port
Oxygen Regulator
Prt
Ni. Cd Battery change
Main
Ni.
Cd
Battery
change
Aux
Removal & Installation of GPS NAV Data
Card
Removal of CVR
100 Hrs check
33145
33191
33235
33218
33228
12-Oct-10
25-Oct-10
11-May-10
33268
33283
33332
33427
33431
24-Nov-10
28-Nov-10
20-Dec-10
At the earliest
23-Dec-10
23-Jan-11
33522
Due brush worn out.
33615
33616
22-Feb-11
33666
20-Mar-11
33677
25-Mar-11
22-Mar-11
33711
At the earliest
24-Apr
23-Apr-11
35083
15-Jun-13
35086
35093
501743
8504375
At the earliest
at the earliest
35114
27-Jul-14
27-Jul-14
31-Aug-14
Main
Aux
35180
Main + Aux
35276
Main + Aux
STBD
PORT
PORT
Main+ aux
Check No .23
Single
Mian + Aux
35370
35414
35414
35474
35461
35474
At the earliest
35542
35778
35549
35667
Main+ Aux
35787
Main+ Aux
PORT
PORT
STBD
LH/RH
LH/RH
PORT
STBD
STBD
PORT
21-Aug-14
22-Aug-14
22-Aug-14
2-Oct
28-Oct-14
29-Sep
28-Nov
28-Oct
27-Nov
6-Jan
26-Dec
1-Feb
18-Jan-15
28-02-2015
26-Jan-15
1-Feb-15
21-Mar-15
23-Feb-15
35789 AFH
35906
35809
35809
29-Mar-15
29-Mar-15
36133 Hrs
36057 Hrs
36014 Hrs
36014 Hrs
35909 Hrs
Main+ APU
22-Mar-15
Earliest
16-Apr-15
27-Apr-15
Main + Aux
20-Apr-15
169
170
171
172
173
174
176
At the earliest
PORT
STBD
36206 AFH
36206 AFH
36214 AFH
36214 AFH
At the earliest
At the earliest
29-Apr-15
29-Apr-15
36028 AFH
9N-ABU:
Receive Date
Accomplish.date
15-Feb-08
Done.
2-Mar-08
9-Mar-08
21-Mar-08
9-Apr-08
9-Apr-08
12-Apr-08
14-Apr-08
19-Apr-08
19-Apr-08
12-Apr-08
9-May-08
17-May-08
25-Apr-08
24-Apr-08
29-Apr
8-May-08
27-Apr
9-May-08
17-May-08
25-May
5-Jun-08
27-May
17-Jun-08
5-Jun-08
13-Jun
27-Jun-08
24-Jun-08
.
22-Jun-08
25-Jun
12-Jul-08
27-Jun
6-Jul-08
29-Jun
30-Jun-08
29-Jul
13-Aug-08
25-Jul-08
24-Jul-08
13-Aug
3-Sep-08
16-Aug
30-Aug
16-Aug
25-Aug
19-Aug
5-Sep
25-Aug
10-Sep
"
10-Sep
"
10-Sep
"
10-Sep
Remarks
S/N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
5-Sep
5-Sep
13-Oct
16-Oct
16-Oct
16-Oct
1-Dec
7-Dec
28-May
19-Jun
9-Mar
23-Apr
10-May
10-May
10-May
21-May
26-May
26-May
28-May
9-Jun
17-Jun
17-Jun
5-Jul
7-Jul
7-Jul
8-Jul
15-Jul
4-Aug
5-Aug
23-May
5-Sep
5-Sep
12-Sep
12-Sep
10-Sep
27-Sep
26-Sep
10-Sep
9/226
27-Sep
26-Sep
6-Oct
6-Oct
17-Nov
17-Nov
17-Nov
3-Dec
22-Dec
13-Dec
Done.
19-Jun
Done.
30-Mar
30-Mar
12-May
13-May
18-May
21-May
11-Jun
31-May
11-Jun
11-Jun
11-Jun
22-Jun
4-Jul
27-Jul
14-Jul
16-Jul
10-Jul
30-Jul
9-Aug
27-Aug
11-Sep
14-Sep
8-Sep
21-Sep
20-Sep
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
28-Sep
13-Oct
20-Oct
20-Oct
24-Oct
11-Jan
4-Nov
4-Nov
5-Nov
23-Nov
30-Nov
16-Dec
19-Dec
19-Jan
2-Feb
18-Feb
18-Feb
18-Feb
4-Mar-11
4-Mar-11
9-Mar
9-Mar
16-Mar
18-Mar
21-Mar
22-Apr
29th Mar-2014
1st-May-2014
9th June 2014
9th June 2014
9-Jun
9-Jun
23-Jul
23-Jul
8-Aug
16-Aug
19-Aug
25-Sep
10-Oct
20-Oct
27-Oct
25-Oct
26-Oct
3-Nov
5-Nov
7-Nov
21-Nov
23-Nov
18-Jan
17-Jan
29-Dec
22-Dec
23-Dec
22-Jan
10-Feb
10-Feb
12-Mar
12-Mar
22-Feb
Eng install to ABO.
21-Mar
14-Mar
24-Mar
21-Mar
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
21-Aug
29-Aug
29-Aug
22-Sep
23-Sep
24-Sep
16-Oct
22-Oct
17-Nov
17-Nov
17-Nov
17-Nov
21-Nov
28-Nov
11-Dec
12-Dec
16-Dec
21-Dec
25-Dec
11-Jan
21-Aug
28-Aug
28-Aug
30-Sep
30-Sep
28-Sep
19-Oct
27-Oct
8-Nov
18-Nov
18-Nov
11-Dec
26-Nov
11-Dec
11-Dec
28-Dec
18-Feb
26-Dec
29-Dec
17-Jan
23-Jan
23-Jan
1-Feb
20-Feb
22-Feb
20-Feb
24-Mar
24-Feb
24-Feb
29-Mar
29-Mar
21-Jan
1-Feb
10-Feb
17-Feb
20-Feb
20-Feb
20-Feb
20-Feb
10-Mar
10-Mar
12-Mar-15
12-Mar-15
12-Mar-15
12-Mar-15
16-Mar-15
19-Mar-15
31-Mar-15
6-Apr-15
25-Apr
25-Apr
25-Mar
20-Mar
2-Apr-15
16-Apr-15
NAC129, TLP#312988
NAC129, TLP#312988
By NAC 129, 282,174,242
By NAC 174
12-Apr-15
28-Apr
By NAC 258
30-Dec-99
19-Apr
By NAC 174
By NAC 129
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
13-Apr-15
15-Apr-15
15-Apr-15
15-Apr-15
15-Apr-15
16-Apr-15
18-Apr-15
16-Apr
By NAC 129
16-Apr-15
19-Apr-15
By NAC 129
By NAC 242
18-Apr-15
28-Apr-15
By NAC 129
18-Apr-15
28-Apr-15
By NAC 258
19-Apr-15
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
9N-ABU:
Nomenclature
6 Monthly Inspection
100 Hrs Inspeciton
Battery change
Burner Cleaning
Oil Cooler
P3 Filter
Battery change
Burner Cleaning
100 Hrs Inspeciton
Nose Oleo Assy
100 Hrs Inspeciton
Battery change
Oil Filter & P3 Filter
100 Hrs Inspeciton
Starter Gen.
3 Monthly Insp.
Battery change
100 Hrs Inspection
Burner Cleaning
Battery change
MLG Leg
Hot Section Insp.
Fire Detecting Unit
Fire Detector, Thermal unit
100 Hrs Inspection
Battery change
100 Hrs check
Steering Actuator
Hot Section Insp.
Burner Cleaning
3 & 6 Monthly Insp
Battery change
100 Hrs ck
Starter Gen.
Battery change
100 Hrs check
100 Hrs check
Flap Selector Valve
Battery change
Position
Due Hrs
Due Date
17-Feb
30900
29-Feb
Stbd
Stbd
Port
31041
31114
31120
2-May
Port
Single
31157
31090
31236
31189
3-Jun
Stbd
35528:27
Port
31296
31286
due brush wear.
2-Jul
30-Jun
Stbd
Port
Stbd
31374
31441
4-Aug
31-Jul
31546
At Earliest
At Earliest
31469
5-Sep
Single
Port
Port
31562
31573
31615
At the earliest
5-Sep
30-Sep
3-Oct
Stbd
31654
31682
2-Nov
Single
31747
31845
Due defective
2-Dec
31944
31945
31993
Stbd
Port
26-Dec
32040
2-Jan
32088
32063
Due T5 High.
Due T5 High.
Due brush worn out
32133
32127
32127
Port
Port
Port
Port
Port
Port
28-Jan
4-Feb
STBD
Stbd
Stbd
32171
Due defect.
Due defect.
32200
Stbd
Stbd
Port
Stbd
32224
32284
32302
32303
32340
3-Mar
24-Mar
26-Mar
4-Apr
2-Apr
Port
Stbd
32410
32997
32503
18-Jul
Stbd
Stbd
32584
32627
Single
Port
18-Aug
Stbd
Port
32661
32704
32691
17-Sep
Port
Port
Stbd
32784
30-Sep
32782
32739
19-Sep
Stbd
Port
Port
32795
Brush Worn out.
32874
18-Oct
Port
Stbd
32971
32941
32985
33003
17-Nov
Stbd
33057
17-Dec
33069
19-Dec
33165
Both
Stbd
Port
Port
Stbd
33193
33260
33268
33278
33262
21-Jan
31-Dec
31-Jan
R.C. Relay
Battery change
Fire Ext. Bottle
Air Speed Indicator
100 Hrs check
Altimeter Indicator
3 Monthly Insp.
S/B 6/364, 6/399
6/421, 6/438, 6/513
6/540, 6/268
Battery change
Over Speed Gov.
100 Hrs ck.
100 Hrs ck.
Burner Cleaning
Battery change
Gyro Horizon
Altimeter Indicator
Nose Oleo Assy
Oil & P3 Filter
Hot Section Insp.
Engine change
Battery change
Compass Swing
100 Hrs chk.
Battery change
3 Monthly Insp.
100 Hrs ck
Battery change
C of A Inspection
3,6 & 12 Monthly Insp.
Mod 6/1869
SB 6/268, 6/364, 6/399,
6/421, 6/438, 6/454A
6/502, 6/512, 6/521
6/540, ADCF 2000-14
ADCF 99-11
Battery change
Engine change
100 Hrs ck.
O2 Bottle
Compreesor Bleed
Battery change
33334
21-Feb
28-Feb
Stbd
33384
33353
Stbd
17-Mar
17-Mar
20-Mar
Stbd
Both
33423
33449
33539
33587
14-Apr
Port
Port
Port
Port
Port
33533
26-Apr
33633
33656
33655
33670
13-May
After Engine change
33734
33862
12-Jun
15-Jun
17-Jun
26-Jun
Port
Single
Stbd
At the earliest
At the earliest
33928
31-Oct
33918
6-Nov
Battery change
Hot Section Insp.
Burner Cleaning
100 Hrs Insp.
Starter Gen.
Battery change
3 Monthly Insp., SB 6/421, 364, 399
100 Hrs Insp.
Megger Test
Battery change
Burner Cleaning
Starter Gen.
100 Hrs check
Oil & P3 Filter
Battery change
Engine change
100 Hrs check
Battery change
3 & 6 Monthly Insp. SB 6/364, 399 & 438
100 Hrs check
Starter Gen.
Installation of Emg. Flash light
Altimeter Indicator
Altimeter Indicator
R.C. Relay
Battery change
100 Hrs check
R.C. Relay
MLG Leg
Battery change
100 Hrs check
Burner Cleaning
100 Hrs Check
Burner Cleaning
3 Monthly Insp, SB 6/268,364,
399,438,513,V6/540
Battery change
Flap Actuator
Starter Gen.
ELT Battery
100 Hrs Inspection
Battery change
Oil & P3 Filter
6-Nov
Stbd
Stbd
Stbd
34043
33984
34022
34092
5-Dec
24-Dec
34112
At the earliest
5-Jan-11
Port
Stbd
Stbd
34228
34237
34207
34257
4-Feb
Stbd
Port
34296
34303
4-Mar
1-Mar
24-Mar
34394
34410
At the earliest
Port
Stbd
Port
34456
Stbd
Stbd
34490
34524
due crack
3-May
7-May
25-Apr
29-Apr
28-May
Port
Stbd
34584
34623
34687
34694
22-Jun
26-Jun
Single
Stbd
34743
34753
30-Jun
34781
25-Jul
Port
34828
34872
21-Aug
35758
35769
35764
35860
35926
35939
501794
9805955
35949
6-Jun
16-May
27-May
16th June
26th June
24th June
36084
Jun-14
36111
36043
36160
36167
18-Aug
23-Jul-14
24-Jul-14
36111
36137
at the earliest
36230
17-Sep
at the earliest
23-Aug
24-Aug
13-Sep
23-Sep
26-Oct
at the earliest
36369
36364
36326
36416
22-Oct
30-Nov
20-Dec
26-Nov
22-Nov
36557
36557
36619
36619
36551
12-Dec
36664
36604
31-Dec
21-Dec
30-Dec-14
3-Feb-14
28-Feb-15
11-Mar-15
Earliest
at the earliest
At the earliest
9N-ABX:
Receive Date Accomplish.date
17-Feb-08
17-Feb-08
29-Feb-08
23-Apr-08
8-May-08
8-May-08
2-May-08
18-May-08
29-Apr
3-May-08
18-May
6-Jun
26-May
25-May
2-Jun
27-May
20-Jun
20-Jun
20-Jun
25-Jun
2-Jul
25-Jun
4-Jul
14-Jul
14-Jul
10-Aug
27-Jul
5-Aug
5-Aug
7-Aug
14-Sep
11-Aug
12-Aug
11-Aug
12-Aug
21-Aug
27-Aug
4-Sep
7-Sep
17-Sep
5-Sep
19-Sep
27-Sep
17-Sep
18-Sep
27-Sep
27-Sep
2-Oct
9-Oct
12-Oct
13-Oct
24-Oct
2-Nov
28-Oct
5-Nov
14-Nov
6-Nov
23-Nov
1-Dec
Remark
S/N
1
2
3
4
5
6
7
24-Apr 8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
Nomenclature
Oxygen Regulator
Battery change
R.C. Relay
100 Hrs check
100 Hrs check
Battery change
SB 6/25, 27
Fuel Pump(S)
Burner Clean
P3 Filter
Battery change
Propeller assy
100 Hrs check
3m & 6 Monthly Insp.
100 Hrs check
C of A Inspection
Propeller assy
Oil Cooler
R.C. Relay
Battery change
Altimeter
100 Hrs check
Battery change
Burner Cleaning
Hot Section Insp.
Ni. Cd. Battery
Fire Detecting Unit
Fire Detecting Unit
Fire Detecting Unit
MLG Leg
Altimeter
100 Hrs check
3 Monthly Insp.
Starter Generator
Battery change
Oil + P3 Filter
Comp. Bleed Valve
100 Hrs check
Battery change
Position
Stbd
Port
Stbd
Port
Port
Stbd
Port
Stbd
Port
Port
Stbd
Port
Main+Aux.
PF O/B
SA I/B
SF I/B
Stbd
Stbd
Port
Stbd
Stbd
26-Nov
29-Nov
29-Nov
19-Dec
3-Dec
3-Dec
14-Dec
24-Dec
24-Dec
22-Dec
23-Dec
23-Dec
23-Dec
11-Jan
1-Jan
25-Jan
21-Jan
25-Dec
2-Jan
11-Jan
6-Feb
6-Feb
6-Feb
28-Jan
3-Feb
8-Feb
9-Feb
9-Feb
21-Feb
2-Mar
27-Feb
10-Mar
15-Mar
15-Mar
23-Mar
23-Mar
23-Mar
22-Jun
3-Feb
19-Jan
19-Jan
25-Jan
3-Feb
12-Feb
26-Feb
1-Mar
1-Mar
1-Mar
11-Mar
19-Mar
19-Mar
18-Mar
23-Mar
25-Mar
23-Mar
7-Jul
12-Jul
26-Jul
10-Aug
10-Jun
20-Jun
20-Jul
17-Jul
10-Aug
During C Of A
,,
7-Aug
3-Aug
2-Aug
During C Of A
14644 S/N
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
,,
,,
,,
,,
,,
,,
,,
12-Aug
19-Aug
19-Aug
1-Sep
11-Sep
14-Sep
15-Sep
23-Sep
4-Oct
21-Oct
1-Nov
12-Nov
18-Nov
1-Dec
25-Nov
15-Dec
21-Dec
17-Jan
19-Jan
25-Jan
25-Jan
26-Jan
17-Aug
15-Aug
15-Aug
23-Aug
1-Sep
10-Sep
7-Sep
17-Sep
26-Sep
25-Sep
26-Sep
18-Sep
18-Sep
1-Oct
1-Oct
1-Oct
21-Oct
17-Oct
12-Nov
5-Nov
12-Nov
12-Nov
18-Nov
10-Dec
21-Dec
12-Dec
21-Dec
15-Jan
21-Jan
21-Jan
31-Jan
11-Feb
11-Feb
11-Feb
11-Feb
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
Battery change
Starting Control Valve
Stbd
Over Speed Governor
Stbd
Fuel Control Unit
Stbd
3 Monthly Insp.
6 Monthly Insp.
C of A Insp.
Engine Assy change
Stbd
Hot Section Insp.
Port
Hydraulic Pump Assy.
A/C Weighing
Compass Swing
Battery change
Starter Generator
Port
Nose Oleo Assy.
100 Hrs check
100 Hrs check
Starter Generator
Battery change
100 Hrs check
Steering Actuator
Single
Fire Exstingusher Bottle
Port
Battery change
100 Hrs check
Burner Cleaning
Both
Oil & P3 Filter
Port
R.C. Relay
Stbd
3 & 6 Monthly Insp.
S/B 6/268, 6/364,6/399,6/438
Starter Generator
Stbd
Battery change
100 Hrs check
Battery change
100 Hrs check
100 Hrs check
Battery change
100 Hrs check
Burner Cleaning
Both
3 Monthly Insp.
Battery change
100 Hrs check
R.C. Relay
Port
Battery change
16-Feb
18-Feb
21-Feb
24-Feb
24-Feb
3-Mar
3-Mar
11-Mar
12-Mar
14-Mar
5-Apr
6-Apr
9-Apr
9-Apr
12-Apr
20-Apr
20-Apr
20-Apr
10-May
10-May
10-May
21-May
9-Jun
9-Jun
21-Jun
18-Jul
13-Oct
20-Oct
20-Oct
3-Nov
26-Feb
20-Feb
26-Feb
9-Mar
3-Mar
17-Mar
17-Mar
14-Mar
17-Mar
22-Mar
11-Apr
21-Apr
13-Apr
9-Apr
26-Apr
30-Apr
Engine change
Engine change
12-May
13-May
13-May
4-Jun
12-Jun
14-Jun
Done
20-Jun
Done
Done
Done
30-Dec
Sl. n/o not tally.
23-Oct
5-Nov
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
Accumulator, Brake
100 Hrs check
Oil & P3 Filter
Battery change
Air Speed Ind.
Stbd
Turn & Slip Indicator
Port
100 Hrs check
Engine Assy change
Port
Propeller assy
Both
MLG Leg assy
Stbd
Air Speed Ind.
Stbd
Fire Exstingusher Bottle
Both
R.C. Relay
Port
Battery change
Installation of Emg. Flash light
Altimeter Indicator
Both
4-Nov
14-Nov
4-Nov
5-Nov
24-Nov
1-Dec
5-Dec
8-Dec
16-Dec
3-Jan-11
17-Jan
25-Jan
25-Jan
28-Jan
2-Feb
10-Feb
18-Feb
9-Mar
10-Apr
17-Apr
22-Apr
25-Apr
25-Apr
26-Apr
3-May
8-May
23-May
25-May
1-Jun
16-Jun
14-Jun
16-Jun
23-Jun
29-Jun
29-Jun
30-Jun
17-Jul
20-Jul
22-Jul
5-Nov
6-Dec
14-Nov
24-Nov
Sl. n/o not tally.
6-Dec
24-Dec
8-Jan
24-Dec
4-Jan
10-Feb
12-Feb
5-Feb
14-Feb
4-Feb
17-Mar
31-Mar
29-Mar
25-Mar
26-Apr
2-May
6-May
6-May
29-Apr
18-May
24-May
18-May
May-72
6-Jun
13-Jun
30-Jun
30-Jun
22-Jun
25-Jun
16-Jul
20-Jul
30-Jun
28-Jul
21-Jul
3-Aug
18-Aug
20-Apr
20-Apr
20-Apr
1st May 2014
13th May 2014
26-Mar
14-May
16-05--2014
16-05--2015
3-Jun
8th June, 2014
18th June,2014
23-Jun
23-Jun
23-Jun
2-Jul
16-Jul
16-Jul
20-Jul
20-Jul
23-Jul
28-Jul
6-Aug
16-Aug
18-Aug
24-Aug
5-Sep
18-Sep
26-Sep
28-Sep
13-Oct
13-Oct
15-Oct
17-Oct
8-Nov
17-Nov
18-Nov
4-Dec
4-Dec
4-Dec
4-Dec
4-Dec
7-Dec
16-Dec
16-Dec
17-Dec
28-Dec
29-Dec
1-Jan
6-Mar
12-Mar
12-Apr
15-Apr-15
25-Nov
21-Nov
21-Dec
21-Dec
By NAC 282
By NAC 282
18-Dec
14-Dec
By NAC 242
By NAC 282
21-Dec
By NAC 243
15-Mar
12-Apr
NAC 242
Due Hrs
28664
29347
29446
29467
29490
29503
Due to Brush
12-Nov
12-Nov
15-Nov
3-Dec
29539
29539
18-Dec
29574
29629
23-Nov
26-Nov
28-Nov
7-Dec
7-Dec
22-Dec
1-Jan
29729
29598/At the earliest
29722
25-Jan
31-Jan
29778
29761
28-Feb
29826
29896
29929
29953
17-Mar
29925
29989
3-Apr
30105
25-Apr
30020
30119
30-Apr
3-May
30161
30244
30271
30211
30292
30312
30308
23-Dec
3-Feb
25-Jan
3-Feb
3-Feb
15-Feb
1-Mar
9-Mar
11-Mar
11-Mar
22-Mar
23-Mar
16-Apr
16-Apr
17-Apr
17-Apr
23-Apr
25-Apr
30-Apr
15-May
15-May
20-May
24-May
24-May
31-Oct
17-Nov
20-Nov
1-Dec
6-Dec
17-Nov
1-Dec
17-Dec
17-Dec
17-Dec
17-Dec
17-Dec
29-Dec
14-Jan
31-Dec
9-Feb
17-Jan
7-Feb
30-Jan
17-Feb
16-Feb
28-Feb
1-Mar
16-Mar
21-Mar
27-Mar
16-Mar
21-Mar
3-Apr
3-Apr
24-Apr
24-Apr
11-Apr
27-Apr
27-Apr
3-May
7-May
22-May
28-May
16-Apr
2-Jun
6-Jun
6-Jun
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
3-Jun
30332
30332
30332
9-Jun
15-Jun
26-Jun
30332
30353
30376
During C of A
During C of A
30-Aug
30430
30456
30434
30529
30505
29-Sep
30617
30650
30-Oct
29-Oct
30708
30730
30764
30837
4-Dec
30816
28-Nov
30801
26-Dec
30892
30983
7-Feb
31079
31116
3-Mar
6-Mar
31172
31179
Due defective.
26-May
28-May
28-May
28-May
9-Jun
9-Jun
28-Oct
8-Nov
30-Nov
18-Nov
2-Jun
During C of A
During C of A
During C of A
During C of A
During C of A
During C of A
During C of A
During C of A
15-Apr
During C of A
During C of A
29-Aug
5-Sep
12-Sep
6-Sep
20-Sep
20-Sep
29-Sep
16-Oct
28-Oct
28-Oct
28-Oct
11-Nov
15-Nov
26-Nov
21-Dec
3-Dec
23-Nov
24-Nov
25-Nov
20-Dec
21-Dec
22-Jan
2-Feb
8-Feb
21-Feb
23-Feb
4-Mar
4-Mar
5-Mar
13-Mar
16-Dec
26-Nov
8-Dec
25-Dec
7-Jan
4-Feb
6-Feb
25-Feb
5-Mar
3-Mar
5-Mar
16-Mar
18-Mar
13-Mar
3-Aug
3-Aug
23-Aug
23-Aug
23-Aug
22-Sep
4-Oct
4-Oct
21-Oct
22-Oct
31267
31270
31330
13-Apr
31378
31375
31365
at the earliest
at the earliest
at the earliest
at the earliest
at the earliest
at the earliest
at the earliest
At the earliest
at the earliest
22-Mar
22-Mar
2-Apr
13-Apr
12-Apr
12-Apr
15-Apr
18-Jun
18-Jun
18-Jun
18-Jun
18-Jun
18-Jun
8-Jul
22-Apr
24-Aug
4-Apr
4-Apr
16-Apr
12-Apr
9N-ACA:
Nomenclature
Position
Started from April 2014
Removal & Inst.of Battery
A10 Check
Removal & Inst.of Battery
Main
Boroscope Inspection
A11 Check
Removal & Inst.of Door power Assist Botle
Removal & inst.of off-wing Escape Slide inflate Bottle
Removal & Installation of Battery (APU)
C of A test flight & Survey Inspection
Pax/Crew Emergency Lockout Cam Inspection
Cockpit Voice Readout
TAP TEST
Removal and Installation of Escape Slide Inflate Bottle
Update NAV Data RA1
Battery Change
APU
'A12'' Check
Boroscope Inspection
Update NAV Data RA1
Removal and Installation of Ni.cd Battery
Boroscope Inspection on RH Engine
A1 Check
Inspection of Drain Hole of MLG Truck Beam
Removal and Installation of Ni.cd Battery
APU
Ultrasonic Inspection of Fan Blades
LH
Re-lubrication of Fan Blades
LH
Removal and Installation of Ni.cd Battery
Main
Remov. and Inst. of Mega Phone Battery
Remv. And Inst.of Mega Phone Battery
Apply Concession
Removal and Installation of HP Fuel Pump(L/H)
Removal and Installation of HP Fuel Pump (R/H)
TAP TEST
Remov. & Inst. of Portable O2 Bottle.
Reomv. & Inst. Of Escape Slide (2RH)
Borescope Inspection on L/H Engine
Borescope Inspection
Removal & Installation of Oxygen Generator
Pax/Crew Emergency Lockout Cam Inspection
Due Hrs
Due Date
120181
26-Apr-14
11-May-14
19-May-14
80402
22-Jun-14
30-Jun-14
30-Jun-14
26-Jun-14
29-Jun-14
11-Jul-14
At the earliest
28588
Maint. Day
21-Aug-14
26-Aug-14
24-Aug-14
81397AFH
18-Sep-14
18-Sep-14
81448AFH
12-Oct
5-Oct
26-Oct
28766CYCS
Maint. Day
17-Nov
With in Nov
With in Nov
At the earliest
At the earliest
At the earliest
28885 CYCS
With in Dec 2014
With in Dec 2014
82342 AFH
82433 AFH
31-Dec
5-Jan
7-Jan-15
31-Mar-15
31-Jan-15
31-Jan-15
25-Apr-15
31-Jan-15
30-Jan-15
4-Feb-15
Jul-15
Jun-15
Jun-15
17-Feb-15
AFH 80334
4-Mar-15
30-Apr-15
Remark
26-Apr-14
11-May-14
18-Jun-14
31-May-14
25-Jun-14
ADD
ADD
26-Jun-14
29-Jun-14
9-Jul-14
13-Jul-14
20-Aug-14
24-Aug-14
20-Aug-14
26-Aug-14
24-Aug-14
81438AFH
17-Oct-14
17-Oct-14
15-Sep-14
5-Oct-14
26-Oct-14
1-Nov-14
17-Nov-14
30-Nov-14
30-Nov-14
22-Nov-14
22-Nov-14
22-Nov-14
11-Dec-14
21-Dec-14
21-Dec-14
12-Dec-14
24-Dec-14
27-Dec-14
BRK 184
CMB
NM 142
KBT-127
NM/142
NM/142
MJO B757-1821
Postponded
RNB
MJO B757-1828
MJO B757-1829
MJO B757-1832
MJO B757-1835
MJO B757-1836
MJO B757-1837
NAC 184
MJO B757-1842
MJO B757-1841
MJO B757-1846
MJO B757-1847
HKG 244872
S/N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
31-Dec-14
1-Jan-15
1-Jan-15
1-Jan-15
22-Jan-15
25-Jan-15
27-Jan-15
3-Feb-15
6-Feb-15
6-Feb-15
6-Feb-15
10-Feb-15
10-Feb-15
2-Mar-15
27-Apr-15
8-Jan-15
MJO B757-001
4-Feb-15
MJO B757-020
MJO B757-0022
MJO B757-0023
MJO B757-0024
4-Mar-15
By
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
9N-ACB:
Nomenclature
Started from April 2014
Removal and Inst.of Battery
Update NAV Data RA1-1407-001
Removal and Inst.of Slat Actuator
Boroscope Inspection RH ESN
Boroscope Inspection LH ESN
Cockpit Voice Readout
TAP TEST
Battery Change
Battery Change
Update NAV Data RA1
Pax Crew-Emergency LockOut Cam
Boroscope Inspection on LH Engine
A5 Check
Update NAV Data RA1
Operational test of Hydraulic quantity transmitter
Removal & Installation of Battery
Update NAV Data RA1-1407-001
Removal & Installation of Battery
Detailed Insp. Of Stabilizer Ballscrew Assy
Borscope Inspection on L/H Engine
Boroscope Inspection on R/H Engine
Apply Concession
Slat Actuator
Slat Actuator
Slat Actuator
A6 Check
Remov. & Inst. of Portable O2 Bottle.
Remov. and Inst. of Mega Phone Battery
Remov. and Inst. of Mega Phone Battery
Update NAV Data
Removal and Installation of Ni.Cd Battery
TAP TEST
Removal and Installation of Ni.Cd Battery
Update NAV Data
Fire Extinguisher
Slat Actuator #18
Fire Extinguisher ( Engine)
Fire Extinguisher
Position
Due Hrs
APU
Due Date
14th June
26-Jun-14
27226
78495
78486
At the earliest
27293
APU
Main
14-Aug-14
21-Aug-14
21-Aug-14
5-Sep-14
78930
3-Sep-14
18-Sep-14
Maint. Day
12-Oct-14
16-Oct-14
20-Oct-14
APU
Main
#18
#13
#4
79397 AFH
79396 AFH
79405 AFH
At the Earliest
27633 CYC
27879 CYC
27889 cyc
9-Nov-14
AFT Cabin
FWD Cabi
APU
Main
C of A Renewal
Removal and Installation of Ni.Cd Battery
Removal & Installation of LP Compressor Fan Blade
Removal and Installation of Slat Actuator #4
Removal and Installation of Slat Actuator #13
Update NAV Data
Boroscope Inspection
Pax Crew-Emergency Lock Out Cam
Self-Test of KANNAD ELT 406AS
Update NAV Data RA1-1503-001
Remov. & Inst. Of Ni. Cd Battery
Inspection as per SB 757-53-0097 REV 1
Operational check of stand by Engine Indica.
Update NAV Data RA1-1504-001
R/H Engine Boroscope Inspection
L/H Engine Boroscope Inspection
Removal &b Installation of Ni.cd Battery
Operational check of stand by Engine Indicator
TAP TEST Engine S/N 30624 and 30656
Removal and Installation of Ni.Cd. Battery
Update NAV Data RA1-1505-001
Main
26-Jan-15
19-Jan-15
17600 engine CYC/27991 AGC
27889 CYC
27879 CYC
4-Feb-15
AFH 80360
23-Feb-15
4-Mar-15
12-Mar-15
APU
With in 27719 cyc
Ealiest
1-Apr-15
80615
80611
Main
18-Apr-15
80671
27781 CYCS
APU
30-Apr-15
30-Apr-15
14th June
26-Jun-14
12-Jul-14
6-Jul-14
3-Jul-14
12-Jul-14
10-Aug-14
12-Aug-14
20-Aug-14
18-Aug-14
1-Sep-14
3-Sep-14
3-Sep-14
17-Oct-14
10-Oct-14
15-Oct-14
19-Oct-14
20-Oct-14
21-Oct-14
21-Oct-14
24-Dec-14
16-Dec-14
16-Dec-14
15-Dec-14
12-Dec-14
14-Dec-14
19-Dec-14
7-Jan-15
14-Jan-15
11-Mar-15
18-Jan-15
18-Jan-15
Remark
PJ/180
KBT/127
KBT/127
NM/142
MJO-429A
NAC 172
NAC 91
NAC 91
NAC 269
NAC 142
NAC184
NAC 180
NAC 199
NAC 172
NAC 161
NAC 161
S/N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
38
11-Jan-15
12-Jan-15
14-Jan-15
14-Jan-15
14-Jan-15
3-Feb-15
10-Feb-15
16-Feb-15
22-Feb-15
2-Mar-15
6-Mar-15
6-Mar-15
11-Mar-15
29-Mar-15
9-Apr-15
9-Apr-15
12-Apr-15
16-Apr-15
23-Apr-15
23-Apr-15
27-Apr-15
39
18-Jan-15
NAC 175
40
41
42
4-Feb-15
13-Feb-15
22-Feb-15
22-Feb-15
4-Mar-15
11-Mar-15
12-Apr-15
11-Mar-15
1-Apr-15
19-Apr-15
18-Apr-15
16-Apr-15
22-Apr-15
MJO B757-021
KBT/127
NAC 178
NAC 242
NAC 123
PJ#18
KBT/127
KBT/127
By NAC 142
By NAC 142
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
9N-AKQ:
Nomenclature
Removal & Installation of GPS NAV Data Card
Update NAV Data
Check and Replenish left and right air cycle machine oil
Visual Inspection of the Battery Vent Tube
Update NAV Data
Check and Replenish left and right air cycle machine oil
Visual Inspection of the Battery Vent Tube
Update NAV Data
Visual Inspection of the Battery Vent Tube
Check and Replenish left and right air cycle machine oil
Weighing of Fire Extinguisher Bottle
Update NAV Data
Replace AC Generator
Check and Replenish left and right air cycle machine oil
Visual Inspection of the Battery Vent Tube
Update NAV Data
Check and Replenish the left and right air cycle machine oil
Replace Battery of the emergency Speaker
Update NAV Data
Check and Replenish the left and right air cycle machine oil
Check and lubricate the nose landing gear mechanical indi.
Visual Inspection of the Battery Vent Tube
A1 Check
Removal & Installation of Portable O2 Bottle (ZONE 213)
Removal & Installation of Portable O2 Bottle (ZONE 252)
Update NAV Data
Weight Inspection of portable Fire Extinguisher
Apply anti-aging compound to deicing boot
Check & Replenish the and right air cycle machine oil
Detail Inspection of External Structure of Nose Radome
Visual Check of contamination indicator of pump body return
filter, main filter and return filter
Update NAV Data
Visual Inspection of the Battery Vent Tube
Check & Replenish the left and right air cycle machine oil
Landng gear system position indi. Syst. Improvements
Service bulletinepower unit micro switch XK1/XK6 mounting
base replacement.
Update NAV Data
Position
Due Hrs
Portable
600 AFH
773 Hrs
536 AFH
586 AFH
800 FH
9N-AKS:
Due Date
at the earliest
24-Jul-14
at the earliest
11-Aug-14
21-Aug-14
100 AFH
9-Sep-14
18-Sep-14
9-Oct-14
at the earliest
Maint. Day
16-Oct-14
at the earliest
With in 250 AHF
9-Nov-14
13-Nov-14
300 AFH
at the earliest
11-Dec-14
at the earliest
today, at the earliest
at the earliest
400 Hrs
At the earliest
At the earliest
7-Jan-15
8-Jan-15
During A CHK
400 AFH
During A CHK
26-Jan-15
4-Feb-15
10-Feb-15
6-Feb-15
16-Feb-15
7-Mar-15
3-Feb-15
8-Feb-15
26-Feb-15
2-Mar-15
2-Mar-15
Not Applicable
MJO MA60-09, Performed
while AOG
MJO permormed while AOG
By NAC 244
4-Mar-15
4-Mar-15
6-Mar-15
By NAC 242
S/N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
16-Mar-15
Aftr receiving the
materials
10 Days after receiving
the materials
After receiving materials
5 Days after receiving
the materials
During AC Gen. Fail
Within 491 FH
12-Mar-15
13-Mar-15
13-Mar-15
13-Mar-15
14-Apr-15
1-Apr-15
19-Jun-15
7-Apr-15
25-Sep-15
7-Apr-15
13-May-15
15-Apr-15
15-Apr-15
16-Apr-15
27-Apr-15
18-Jun-15
30-Apr-15
NAC 243
13-Mar-15
13-Mar-15
13-Mar-15
19-Mar-15
19-Mar-15
24-Mar-15
25-Mar-15
26-Mar-15
26-Mar-15
29-Mar-15
9-Apr-15
After receiving materials
At the earliest
15-Mar-15
18-Mar-15
12-Apr-15
25-Mar-15
12-Apr-15
13-Apr-15
31-Mar-15
By NAC 244
By NAC 242
By NAC 243
28-Apr-15
By NAC 240
28-Apr-15
By NAC 243
9N-AKS:
Nomenclature
Engine Start
Check after long period of parking
100 Hrs Check
Operational Checkof Hand Operated Pump
100 Hrs Check no.2
Operational Check of Hand Operated Pump
3rd 100 Hrs nspection
6 Monthly Check Package
Operational Check of Hand Operated Pump
Position
Due Hrs
At the Earliest
At the Earliest
100 Hrs
18th Jan 2015
196 Hrs
332 FH
293 Hrs
413 AFH
Due Date
18-Jan-15
18-Mar-15
2-May-15
17-May-15
Receive Date
17-Nov
3-Dec-14
28-Dec-14
18-Jan-15
23-Jan-15
13-Mar-15
29-Mar-15
10-Apr-15
19-Apr-15
Accomplish.date
Remark
S/N
1
30-Dec-14
18-Jan-15
22-Feb-15
18-Mar-15
22-Apr-15
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
9N-AKW
Nomenclature
Position
Inspect LH and RH bottom skin fasteners at
main landing gear rib 5 footprint location for
migrated or missing fastener
Removal of Battery Line contactor
Installation of the Aircraft Protection Euipments
Ground Run during parking
Inspect LH and RH bottom skin fasteners at
main landing gear rib 5 footprint location for
migrated or missing fastener
Ground Run during parking
Ground Run during parking
Insta. Of Decals on portable O2 Bottle
Insta. Of Decals on portable fire extinguisher bottle
Ground Run during parking
Removal of the Aircraft Protection Equipments
Connection of the Battery Connecters
Ground Run During parking
Uploading of the FM Data
Crossloading of the FM Data
Drain IDG Oil System, discard filter elements and replenish
Check IDG Oil Level and differential pressure indicator
Remov. & Inst. Of Red line placard on both engines
Rem. Inspect for contamination and rep.main fuel filter
Inspection of all fasteners tails/nuts indentified on the outboard
Inspection of all fasteners tails/nuts indentified on the inboard
Upload & download of flight management data
with the portable Data Loader
Cleaning of the vacuum waste lines with chemical
Cleaning agent and crushed Ice
Operational Test of Logics Activating ELAC 1&2, &
sec STBY PWR SPLY & Abililty of SEC 1&2 Achiev pitch
& ability of sidestrick priority function
Update NAV Data RNA11504.01
MLG Door Actuator PN 114122014 Greasing and A320
Family ATA320 Door actuator
MLG Door Actuator PN 114122014 Greasing
MLG Door Actuator PN 114122014 Greasing
MLG Door Actuator PN 114122014 Greasing
Ground Run during parking
Due Hrs
During the WI
Check
At the Earliest
300 FH
Urgent
With in 150 FH
Urgent
400 AFH
750 FH
Due Date
13-Feb-15
13-Feb-15
13-Feb-15
14-Feb-15
14-Feb-15
13-Feb-15
13-Feb-15
22-Feb-15
16-Feb-15
22-Feb-15
16-Feb-15
19-Feb-15
20-Feb-15
20-Feb-15
22-Feb-15
25-Feb-15
25-Feb-15
16-Feb-15
18-Feb-15
19-Feb-15
19-Feb-15
21-Feb-15
22-Feb-15
22-Feb-15
16-Feb-15
19-Feb-15
20-Feb-15
20-Feb-15
25-Feb-15
26-Feb-15
26-Feb-15
26-Feb-15
26-Feb-15
9-Mar-15
9-Apr-15
26-Feb-15
26-Feb-15
9-Mar-15
12-Mar-15
12-Mar-15
13-Mar-15
13-Mar-15
13-Mar-15
26-Feb-15
26-Feb-15
9-Mar-15
15-Jun-15
16-Apr-15
12-Apr-15
Remark
12-Apr-15
By BCT 235
modified MJO of A320-006
By BCT 235, modified MJO of A320-006
17-Mar-15
6-Apr-15
24-Mar-15
27-Apr-15
24-Mar-15
25-Apr-15
BY BCT 208
1-Apr-15
29-Mar-15
31-Mar-15
BY BCT 208
1-Apr-15
1-Apr-15
1-Apr-15
BY BCT 208
8-Apr-15
10-Apr-15
17-Apr-15
21-Apr-15
5-Apr-15
12-Apr-15
17-Apr-15
20-Apr-15
6-Apr-15
12-Apr-15
17-Apr-15
21-Apr-15
BY BCT 235
By BCT 235 , MJO received on 12th April,2015
BY BCT 235
By BCT 208
22-Apr-15
21-Apr-15
21-Apr-15
By BCT 235
24-Apr-15
30-Apr-15
6-Jun-15
1-May-15
23-Apr-15
27-Apr-15
27-Apr-15
30-Apr-15
24-Apr-15
29-Apr-15
By BCT 235
By BCT 208
1-May-15