Escolar Documentos
Profissional Documentos
Cultura Documentos
PACKAGE NO:
JK-0357
STAGE:II
Name of Road
DISTRICT: BARAMULLA
Type of Proposed
Cost of
No. of
Proposal
Length
Pavement CD
Works
From
To
N/U
Kms
BANDI
MACHIKR
AND
4.00
In Lacs
BLOCK: URI
Cost of
CD
Works
Nos In Lacs
<
Misc.Cost
Total
Estimated
Cost
Average
Cost/Km
In Lacs
In Lacs
In Lacs
<
*U-Upgradation
Prepared By:
Signature
Name:
Er.Hasheem Din Malik
Designation: Assistant ExecutiveEngineer
Technical Scrutiny
Signature:
Checked By:
Signature:
Name:
Er.Pervaiz Ahmad Naqash
Designation: Executive Engineer
Scrutinized by:
Signature:
Name:
Er.Pervaiz Maqbool Fazili
Co-ordinator:
STA
Name:
Three
wheele
rs
Two wheelers
Cycle
Rickshaw
Cycles
Bus/ Truck
La Unladen
de
n
Laden
Unladen
15 15
10
10
9.
15
11.
Cost
Details
A. Clearing and Grubbing
Cost in
Rs.
B. Pavement
Components
D Thickness Cost
es (mm)
(Rs).
cr
ip
tio
n
of
th
e
la
ye
r
Three
wheele
rs
Two wheelers
15
Projected Traffic:
Cycle
Rickshaw
Cycles
40 CVPD
Ea
rth
w
or
k
an
d
Su
b
gr
ad
e
Pr
ep
ar
ati
on
*
Gr
an
ul
ar
Su
b
Ba
se
So
il
+
A
gg
re
ga
te
M
ix
W
B
M
-1
W
B
M
-2
W
B
M
-3
C. Bituminous Layers
Pr
im
e
C
oa
t
Ta
ck
C
oa
t
M
P
M
Su
rfa
ce
Dr
es
si
ng
P
M
C
wi
th
Se
al
C
oa
t
D.
C
e
m
en
t
C
on
cr
et
e
R
oa
d
E. CD Works
No. of Existing CD Works:
Do they require any
improvement
Yes / No
If Yes, cost of
improvement
Rs.
No. of proposed CD
Works with
Classification
(# PC, SC, BC, MB,
CW, Major Bridge etc.)
Cost of Proposed CD
Works
Rs.
F. Protection Works
Length:
Cost:
G. Pucca Side Drains (if
provided)
Length:
Cost:
(Kucha unlined side
drains form part of
Earthwork.)
Cost in
lakhs
% of
Const.
Cost
I
II
III
IV
V
Total cost of the project:
* In case of hill roads, the formation and cutting may be filled against Earthwork and Sub grade Preparatio
# PC- Pipe Culvert, SC- Slab Culvert, BC- Box Culvert, MB- Minor Bridge, CW- Causeway
Pr
ep
ar
ed
B
y:
Checked By:
Scrutin
ized
By:
A.
E
E.E
S.E
o be filled by S.T.A
Name of the STA:
15. Is the Proposed Road e Yes / No
16. If the proposal is for new connectivity
o
Yes / No
Road is a part of the Core Network
o Is the unconnected habitation(s)
part of
Yes / No
list of unconnected Habitations as per CN-6
o Does the Proposal ensure full connectivity of
the Target Habitation
Yes / No
a) If No, the name of Unconnected Habitation
up to which it is connected
b) Is such Unconnected Habitation eligible
Under PMGSY
Yes / No
17. Are you satisfied with the following
o Engineering Surveys
Yes / No
o
o
o
Yes / No
Yes / No
Yes / No
Certified that the Design and Estimation for the Proposed Road work are based on the data and SSR provide
Technical Scrutiny:
Done by
Signature
Name
Coordinator:
S.T. A
Signature
Name
Total
Bullock Carts
Motorized
Non-motorized
Bullock Carts
0 CVPD
Motorized
Non-motorized
ub grade Preparation.
ata and SSR provided by Engineers. The Proposal after final Correction is entered on the OMMS. The Proposal may be c
Signature:
ignature:
Proforma C
Block:Uri
SALAMABAD TO GOHALAN
In Built up area : 4.0 Km
Item
Pavement
CD
Misc.
Total
6. Type of Proposal:New connectivity/ Up gradation
o If the proposed road is a New connectivity
- Is the road a part of core network
If yes, Through/Link RouteYES
Number
TName of the Unconnected Target Habitation(to be cross checked with
GOHALAN
1093
Nowpora(546),Jabla(1598),Sangna(358
3598
YES
(a)
RR
MDR
YES / NO
YES / NO
YES / NO
YES/NO
Built Up Area(m)
a) Carriageway
3.00
5.00
6.00
b) Roadway
INDEX
MAP
(Not to
scale)
R
O
A
D H1
CD1
H2
0.9
CD
1.5Y
2
Z
2.1
H3
2.8H1,
H2, H3 3.2
km
Habitation
CD1,
sCD2
Cross
Drainage
Cross
Works
Section
Details
a)
C
r
o
ss
S
ec
ti
o
n
of
t
h
e
b
e
)xi
st
C
rin
go
rss
o
S
aec
d
ti
os
h
n
oof
tw
in
h
ge
di
p
ff
r
er
o
e
p
n
o
tse
c
d
or
Proforma C
Block:Uri
BAD TO GOHALAN
In Open Area : 7.7 Km
onnectivity/ Up gradation
vity
N
YES
OR
GOHALAN
L-042
1093
Nowpora(546),Jabla(1598),Sangna(358)
3598
YES
onnected Habitation to
(b)
MDR
SH
NH
YES / NO
YES / NO
YES / NO
YES/NO
Open Area(m)
3.00
5.50
6.50
Cars/
LCV/Mini
Three
Two
Cycle
Bullock
Non
Vans/
Cycles
Motorized
Bus/Tractor Trailer
Wheeler Wheeler Rickshaw
Carts
motorized
Jeeps
10
47
15
Km 4-6
3%
Km 7-12
4%
Cost in (Lacs)
Thickness in (mm)
Cost (Lacs)
300
7.74
214.80
75
58.23
C: Bituminous Layers
Prime Coat
Tack Coat
50MM Bit.Macadam
Tack Coat
20 MM OGPC with seal coat
12.20
50
26
D:Earthen Shoulders
E: CD Works
No of existing CD Works:
Do they require any improvement
If Yes,Cost of Improvement
No of Proposed CD Works with classification
(PC.SC,BC,MB,CW,Major Bridge etc)
Cost of Proposed CD works
114.56
3.62
61.05
14.47
YES/NO
8
PC
F: Protection Works:
Length:1300 RM
G: Stone Pitched Side Drain/Catch water Dr
12700 RM
H:Road Logo/Other Road Furniture
40.63
TOTAL
527.30
Cost: 120.65
Cost: 50.64
8.25
706.84 LACS
Year
% of const.Cost
First Year
0.45 of total cost
Second Year
0.75 of total cost
Third Year
1.05 of total cost
Fourth Year
1.25 of total cost
Fifth Year
1.65 of total cost
Total Cost for Five Years @ 5.15% of the Total
Cost in Lacs
3.17
5.28
7.39
8.79
11.61
36.24
743.08 LACS
In Case of the hill roads the formation and cutting may be filled against earthwork and
sub grade preparation.
PC=Pipe Culvert,SC=Slab Culvert,BC= Box Culvert ,MB=Minor Bridge,CW=
Causway
12 Whether the Road has Geometrics as per Rural Roads Manual (RRM)
YES/NO
YES/NO
Whether the cost estimates are as per standard data analysis and S.S.R
YES/NO
Sruitinized By:
S.E