PROFORMA: B

PRADHAN MANTRI GRAM SADAK YOJNA


PACKAGE SUMMARY

PACKAGE NO:
JK-0357

STAGE:II

STATE: JAMMU & KASHMIR


S.
No

Name of Road

DISTRICT: BARAMULLA
Type of Proposed
Cost of
No. of
Proposal
Length
Pavement CD
Works

From

To

N/U

Kms

BANDI

MACHIKR
AND

4.00

In Lacs

BLOCK: URI
Cost of
CD
Works

Nos In Lacs

<

Misc.Cost

Total
Estimated
Cost

Average
Cost/Km

In Lacs

In Lacs

In Lacs

<

Total Estimated Cost of Package:


Maintenance Cost for 5 Years
Grand Total
*N-New

*U-Upgradation

Prepared By:
Signature
Name:
Er.Hasheem Din Malik
Designation: Assistant ExecutiveEngineer

Technical Scrutiny
Signature:

Checked By:
Signature:
Name:
Er.Pervaiz Ahmad Naqash
Designation: Executive Engineer

Scrutinized by:
Signature:
Name:
Er.Pervaiz Maqbool Fazili

Co-ordinator:
STA
Name:

Designation: Superintending Engineer

8. Base year traffic volume


Bus/ Truck

LCV/ Mini Bus/Tractor


Trailer

Cars/ Vans/ jeeps

Three
wheele
rs

Two wheelers

Cycle
Rickshaw

Cycles

Bus/ Truck

LCV/ Mini Bus/Tractor


Trailer

La Unladen
de
n

Laden

Unladen

15 15

10

10

9.

Cars/ Vans/ jeeps

15

Growth rate adopted (6%):

10. Sub grade CBR


Chainage
Design CBR(%)

11.
Cost
Details
A. Clearing and Grubbing
Cost in
Rs.
B. Pavement
Components
D Thickness Cost
es (mm)
(Rs).
cr
ip
tio
n
of
th
e
la
ye
r

Three
wheele
rs

Two wheelers

15

Projected Traffic:

Cycle
Rickshaw

Cycles

40 CVPD

Ea
rth
w
or
k
an
d
Su
b
gr
ad
e
Pr
ep
ar
ati
on
*

Gr
an
ul
ar
Su
b
Ba
se

So
il
+
A
gg
re
ga
te
M
ix
W
B
M
-1

W
B
M
-2
W
B
M
-3
C. Bituminous Layers
Pr
im
e
C
oa
t
Ta
ck
C
oa
t
M
P
M
Su
rfa
ce
Dr
es
si
ng

P
M
C
wi
th
Se
al
C
oa
t

D.
C
e
m
en
t
C
on
cr
et
e
R
oa
d

E. CD Works
No. of Existing CD Works:
Do they require any
improvement
Yes / No
If Yes, cost of
improvement
Rs.
No. of proposed CD
Works with
Classification
(# PC, SC, BC, MB,
CW, Major Bridge etc.)

Cost of Proposed CD
Works
Rs.
F. Protection Works
Length:
Cost:
G. Pucca Side Drains (if
provided)
Length:
Cost:
(Kucha unlined side
drains form part of
Earthwork.)

H. Road Logo, other


Road Furniture
Cost:
I. Five Year Routine
maintenance:
Ye
ar

Cost in
lakhs

% of
Const.
Cost

I
II
III
IV
V
Total cost of the project:

* In case of hill roads, the formation and cutting may be filled against Earthwork and Sub grade Preparatio
# PC- Pipe Culvert, SC- Slab Culvert, BC- Box Culvert, MB- Minor Bridge, CW- Causeway

12. Whether the


road has
Geometrics as
per Rural
Roads Manual
YES / NO
(RRM)
Whether CD
works /
Protection
works are
provided as per
YES / NO
RRM
Whether the
Cost estimates
are as per
standard data
analysis and
YES / NO
S.S.R
Certified that information
provided is true

Pr
ep
ar
ed
B
y:

Checked By:

Scrutin
ized
By:

A.
E

E.E

S.E

o be filled by S.T.A
Name of the STA:
15. Is the Proposed Road e Yes / No
16. If the proposal is for new connectivity
o
Yes / No
Road is a part of the Core Network
o Is the unconnected habitation(s)
part of
Yes / No
list of unconnected Habitations as per CN-6
o Does the Proposal ensure full connectivity of
the Target Habitation
Yes / No
a) If No, the name of Unconnected Habitation
up to which it is connected
b) Is such Unconnected Habitation eligible
Under PMGSY
Yes / No
17. Are you satisfied with the following
o Engineering Surveys

Yes / No

o
o
o

Soil / Material Investigation


Traffic Surveys / Estimation
Hydraulic Studies

Yes / No
Yes / No
Yes / No

18. In case, Traffic is projected beyond 45 CVPD;


are you satisfied with the reason g Yes / No
19. In case, sub grade CBR is less than 3;
has Soil Stabilization etc. be Yes / No
20. Is the design of the following elements as per Rural Roads Manual:
o Alignment & Geometric
Yes / No
o Pavement Design
Yes / No
o CD works and protection MeasuresYes / No
o Side drains
Yes / No
o Integration for Cross and Longitudinal
Drainage
Yes / No
21. Does the Estimation conform to
Yes / No
Standard rate analysis and SSR
22. Does the proposal have provision for
Yes / No
o Km/ Hm Stones
Yes / No
o Guard Stones (where necessary) Yes / No
(as necessary)
Yes / No

23. Specific remarks, if any, by STA

Certified that the Design and Estimation for the Proposed Road work are based on the data and SSR provide

Technical Scrutiny:
Done by
Signature
Name

Coordinator:
S.T. A
Signature
Name

Total
Bullock Carts

Motorized

Non-motorized

Bullock Carts

0 CVPD

Motorized

Non-motorized

ub grade Preparation.

ata and SSR provided by Engineers. The Proposal after final Correction is entered on the OMMS. The Proposal may be c

Signature:

MMS. The Proposal may be considered for clearance.

ignature:

Proforma C

Pradhan Mantri Gram Sadak Yojana (PMGSY)


CHECK LIST FOR P.I.U & S.T.A

1. Location: State: J&K


2. Package No:JK 0357
3.Name of the Road:
4. Length Total:11.7 Km

(For Individual Road works)


To be filled by PIU.
District: Baramulla

Block:Uri

SALAMABAD TO GOHALAN
In Built up area : 4.0 Km

Item
Pavement
CD
Misc.
Total
6. Type of Proposal:New connectivity/ Up gradation
o If the proposed road is a New connectivity
- Is the road a part of core network
If yes, Through/Link RouteYES
Number
TName of the Unconnected Target Habitation(to be cross checked with

GOHALAN

1093

with CN-6) with population

- List of Habitations connected enroute


- Population sub served by the proposed road
- Does the Proposed Road lead up to the Habitation for
which it is supposed to provide connectivity (In other
words are you sure that the road is not being made
partially?)

Nowpora(546),Jabla(1598),Sangna(358
3598
YES

- Does the Proposed Road connect the unconnected Habitation to


(a) Another Habitation having All- weather road.
(Connected status)
(b) Directly to an All weather road.
If (b), indicate the nature of road to which the proposed road
leads.
o If the proposal is for up gradation
- Is the road a part of the core network
- Is it associated Through Route or not
- PCI value
- Age of the Road
- Is it certified that there are no other Unconnected
Habitations in the district.
7. a) Whether the Proposed Road has the desired
carriageway width,Roadway width and Road Land Width
(RLW)
b) Indicate the actual widths adopted for the Proposed
road.

(a)
RR

MDR

YES / NO
YES / NO

YES / NO
YES/NO

Built Up Area(m)

a) Carriageway

3.00
5.00

c) Road Land Width

6.00

b) Roadway

INDEX
MAP
(Not to
scale)
R
O
A
D H1
CD1
H2

0.9
CD
1.5Y
2
Z
2.1
H3
2.8H1,
H2, H3 3.2

km
Habitation

CD1,
sCD2
Cross
Drainage
Cross
Works
Section
Details

a)
C
r
o
ss
S
ec
ti
o
n
of
t
h
e
b
e
)xi
st
C
rin
go
rss
o
S
aec
d
ti
os
h
n
oof
tw
in
h
ge
di
p
ff
r
er
o
e
p
n
o
tse
c
d
or

Proforma C

ri Gram Sadak Yojana (PMGSY)

K LIST FOR P.I.U & S.T.A

or Individual Road works)


To be filled by PIU.
ct: Baramulla

Block:Uri

BAD TO GOHALAN
In Open Area : 7.7 Km

Cost per Km in Lacs


56.24
3.47
0.71
60.42

onnectivity/ Up gradation
vity

N
YES
OR
GOHALAN

L-042
1093

Nowpora(546),Jabla(1598),Sangna(358)
3598
YES

onnected Habitation to
(b)
MDR

SH

NH

YES / NO
YES / NO

YES / NO
YES/NO

Open Area(m)

3.00
5.50
6.50

Base Year Traffic Volume


Total
Bus/Truck

Cars/
LCV/Mini
Three
Two
Cycle
Bullock
Non
Vans/
Cycles
Motorized
Bus/Tractor Trailer
Wheeler Wheeler Rickshaw
Carts
motorized
Jeeps

Laden Unladen Laden Unladen


6
6
10
10

9. Growth Rate Adopted (6%)


10 Subgrade CBR
Chainage
Design CBR (%)

10

47

15

Projected Traffic: 44 CVPD


Km 1-3
5%

11. Cost Details:


A: Clearing & Grubbing
B: Pavement Components
Description of the Layer

Km 4-6
3%

Km 7-12
4%

Cost in (Lacs)
Thickness in (mm)

E/work and sub grade preparation


Granular Sub Base (Grade I & Grade II)
Soil + Agg. Mix
WBM -I
WBM-II
WBM -III

Cost (Lacs)

300

7.74
214.80

75

58.23

C: Bituminous Layers
Prime Coat
Tack Coat
50MM Bit.Macadam
Tack Coat
20 MM OGPC with seal coat

12.20
50
26

D:Earthen Shoulders
E: CD Works
No of existing CD Works:
Do they require any improvement
If Yes,Cost of Improvement
No of Proposed CD Works with classification
(PC.SC,BC,MB,CW,Major Bridge etc)
Cost of Proposed CD works

114.56
3.62
61.05
14.47

YES/NO
8
PC

F: Protection Works:
Length:1300 RM
G: Stone Pitched Side Drain/Catch water Dr
12700 RM
H:Road Logo/Other Road Furniture

40.63

TOTAL
527.30
Cost: 120.65
Cost: 50.64
8.25

TOTAL COST OF THE PROJECT

706.84 LACS

Year
% of const.Cost
First Year
0.45 of total cost
Second Year
0.75 of total cost
Third Year
1.05 of total cost
Fourth Year
1.25 of total cost
Fifth Year
1.65 of total cost
Total Cost for Five Years @ 5.15% of the Total

Cost in Lacs
3.17
5.28
7.39
8.79
11.61
36.24

I: Five Year Routine Maintenance

TOTAL COST OF PROJECT INCL.MAINTENANCE

743.08 LACS

In Case of the hill roads the formation and cutting may be filled against earthwork and
sub grade preparation.
PC=Pipe Culvert,SC=Slab Culvert,BC= Box Culvert ,MB=Minor Bridge,CW=
Causway
12 Whether the Road has Geometrics as per Rural Roads Manual (RRM)

YES/NO

Whether CD Works/Protection Works Are Provided as per RRM

YES/NO

Whether the cost estimates are as per standard data analysis and S.S.R

YES/NO

Certified that the information provided is true.

Prepared By: A.E

Checked By: E.E

Sruitinized By:
S.E