STATUS DRAWING FOR CONSTRUCTION

Date : Feb-12-2016
Item

Status
Description

2Nd Drawing No.

No.
I

As
IFA AFC
Built

Date of Revision

Result by BP

Not
Approved
Approved

Comment
from BP

3:53
Remarks

Vehicle Wash Bay


CIVIL WORK

Layout Washbay and Shelter

350-LAY-CV-PID-!001

18/10/10 28/10/10 04/11/10

18/01/11

Front View and Side View

350-DWG-CV-PID-!001

18/10/10 04/11/10 18/01/11

Section A-A and Section B-B

350-DWG-CV-PID-!002

18/10/10 28/10/10 16/12/10 18/01/11

Foundation and Column plan

350-LAY-CV-PID-!003

04/11/10 16/12/10 18/01/11

Foundation detail and section

350-DWG-CV-PID-!004

28/11/10 16/12/10 18/01/11

Drainage detail and concrete slab detail

350-DWG-CV-PID-!005

04/11/10 16/12/10 18/01/11

Steel Roof Frame plan

350-DWG-CV-PID-!006

04/11/10 16/12/10 18/01/11

Metal roof plan

350-DWG-CV-PID-!007

04/11/10 16/12/10 18/01/11

Steel Structure detail

350-DWG-CV-PID-!008

04/11/10 16/12/10 18/01/11

10

Oil Trap Plan dection and detail

350-DWG-CV-PID-!009

04/11/10 16/12/10 18/01/11

11

Settling pond plan and view

350-DWG-CV-PID-!010

04/11/10 16/12/10 18/01/11

12

Settling pond plan,section and detail

350-DWG-CV-PID-!011

04/11/10 16/12/10 18/01/11

13

Detail perimeter ditch

350-DWG-CV-PID-!011a

04/11/10

14

Detail perimeter ditch

350-DWG-CV-PID-!011b

18/01/11

15

Back view and side view

16

Concrete slab for entrance

17

Perimeter ditch plan

18

Detail handrail

19

Walkway plan

20

Walkway detail and section

21

Architectural layout plan and elevation

22

Detail Shop drawing

DUTA HITA JAYA

ELECTRIC WORK
1

Lighting Layout

350-DWG-EL-PID-!001

18/11/10

Socket outlet Layout

350-DWG-EL-PID-!002

18/11/10

Three Line diagram 350-DPN-0001


350-DWG-EL-PID-!003
(Palletized Material Storage Panel )

18/11/10

Wiring Diagram

18/11/10

350-DWG-EL-PID-!003

Three Line diagram 350-DPN-0001


350-DWG-EL-PID-!004
(Palletized Material Storage Panel )

18/11/10

Cable Tray Layout

350-DWG-EL-PID-!005

18/11/10

Piping water Line layout

350-LAY-MP-PID-!001

18/11/10

II

Note :

Prepared By,

Checked By,

Reviewed By,

STATUS MATERIAL SCOPE OF WORK


Date : Feb-12-2016
Item

Request of date
Description

No.

Material

QTY

Transmittal No.
Ist

2Nd

3Rd

Document No.
(PID)

Result by BP
P.O No.

Not
Approved
Approved

Comment
from BP

3:53
Remarks

Note :

Prepared By,

Checked By,

Reviewed By,

DOCUMENT AND DRAWING TRACKING LIST


PT. PRIMA GROUP

BP LNG Tangguh
Update :
No

Description identification

Document / Drawing No.

Target Date

Revision
5

Submitted date to BP
0

BP Response
5

Status
6

Closing
date

30 June 2011

PIC

STATUS

Remarks

DOCUMENT PROCEDURE

Quality Control Procedure

900-PRC-QC-PID-1001

10-Dec-10

DAM

in progress

HSE Management Plan

901-PRC-HS-PID-1001

9-Dec-10

SAS

in progress

Document Control Procedure

Open

Project Control procedure

Open

Engineering Procedure

Open

B
1

DRAWING
GENERAL INFORMATION
IRU

in progress

Drawing List
2

13-Oct-10

18-Nov-10

1-Dec-10

22-Mar-11

20-Apr-11

7-Oct-10

Waiting BP Response

Modification Work in Fire Station Building


General Lay Out

082
082-LAY-AR-PID-1001

10-Dec-10

11-Dec-10

WDA

in progress

Waiting BP Response

Panel Load Schedule and Single Line Diagram

082-DWG-EL-PID-1001

18-Nov-10

28-Dec-10

11-Apr-11

7-Feb-11

Comment

DAM

in progress

Waiting BP Response

Lighting System Lay out

082-DWG-EL-PID-1002

18-Nov-10

28-Dec-10

11-Apr-11

7-Feb-11

Comment

DAM

in progress

Waiting BP Response

Socket Outlet System Lay out

082-DWG-EL-PID-1003

18-Nov-10

28-Dec-10

11-Apr-11

7-Feb-11

Comment

DAM

in progress

Waiting BP Response

HVAC Power System Lay out

082-DWG-EL-PID-1004

18-Nov-10

28-Dec-10

11-Apr-11

7-Feb-11

Comment

DAM

in progress

Waiting BP Response

Single Line Diagram For HVAC Power Supply

082-DWG-EL-PID-1005

18-Nov-10

28-Dec-10

11-Apr-11

7-Feb-11

Comment

DAM

in progress

Waiting BP Response

Fire Alarm System Lay out

082-DWG-EL-PID-1006

18-Nov-10

28-Dec-10

11-Apr-11

2-Apr-11

DAM

in progress

Waiting BP Response

082-DWG-AR-PID-1001
082-DWG-AR-PID-1002
082-DWG-AR-PID-1003

10-Dec-10

11-Dec-10

WDA
WDA
WDA

0
0
0

1
1
1

in progress
in progress
in progress

0
0
0

Waiting BP Response
Waiting BP Response
Waiting BP Response

Lay Out
Door Detail
Celling Plan
Foundation and Slab Plan
Detail & Sections ( Foundations & Slab )
Steel Roof Frame Plan & Metal Roof Plan
Section
Detail
HVAC Power system Layout
Single Line diagram for HVAC Power Supply

082-LAY-AR-PID-1003
082-DWG-AR-PID-1002
082-DWG-AR-PID-1003
082-DWG-CV-PID-1001
082-DWG-CV-PID-1002
082-DWG-CV-PID-1003
082-DWG-CV-PID-1004
082-DWG-CV-PID-1005
082-DWG-EL-PID-1004
082-DWG-EL-PID-1005

23-Oct-10
29-Dec-10

28-Oct-10
22-Mar-11

29-Dec-10
29-Dec-10

28-Oct-10
23-Oct-10

29-Dec-10
28-Oct-10

22-Mar-11
29-Dec-10

23-Oct-10
28-Oct-10

28-Oct-10
29-Dec-10

29-Dec-10
29-Dec-10

29-Dec-10
29-Dec-10

22-Mar-11
22-Mar-11

29-Dec-10
29-Dec-10

20-Nov-10

3-Jan-10

11-Apr-11

7-Feb-11

20-Nov-10

3-Jan-10

11-Apr-11

7-Feb-11

WDA
WDA
WDA
WDA
WDA
WDA
WDA
WDA
DAM
DAM

0
0
0
0
0
0
0
0
0
0

1
1
1
1
1
1
1
1
1
1

in
in
in
in
in
in
in
in
in
in

progress
progress
progress
progress
progress
progress
progress
progress
progress
progress

0
0
0
0
0
0
0
0
0
0

Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response

Fire Alarm System Layout

082-DWG-EL-PID-1006

20-Nov-10

3-Jan-10

11-Apr-11

DAM

Fire Alarm Layout at Compressor Room, Drying Room & Store Room

082-DWG-MP-PID-1003

3-Jan-10

11-Apr-11

082-LAY-AR-PID-1004
082-DWG-AR-PID-1004
082-DWG-AR-PID-1005

5-Jan-11

2.1 Modify the existing Looker room become Breathing Apparatus Storage Room
Plan and Sections
Sceme Rack, Front View & Isometric
Cover and Partition Box

8-Apr-11
8-Apr-11

2.2 Compressor Room, Drying Room & Workshop

2.3 Modify existing toilet became pantry cancel, change with new build pantry.
Pantry lay out
Section A-A & B-B
Section C-C & D-D

22-Mar-11

31-Oct-10

22-Mar-11

31-Oct-10
31-Oct-10

22-Mar-11

31-Oct-10

Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved

in progress

Waiting BP Response

DAM

in progress

Waiting BP Response

WDA
WDA
WDA

0
0
0

1
1
1

in progress
in progress
in progress

0
0
0

Waiting BP Response
Waiting BP Response
Waiting BP Response

Approved
Approved
Approved

WDA
WDA
WDA

0
0
0

1
1
1

Closed
Closed
Closed

1
1
1

Approved By BP
Approved By BP
Approved By BP

Approved

WDA

Closed

Approved By BP

Approved

WDA
DAM

0
0

1
1

Closed
in progress

1
0

Approved By BP
Waiting BP Response

DAM
WDA
DAM
DAM
DAM
DAM
DAM
DAM
DAM

0
0
0
0
0
0
0
0
0

1
1
1
1
1
1
1
1
1

in
in
in
in
in
in
in
in
in

0
0
0
0
0
0
0
0
0

Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response

Approved
Approved

5-Jan-11
5-Jan-11

Training Plat form Cancel change with fence


3

Bundwall For Oil Water Tank & CPI


Bundwall lay out
Section and detail
Foundation Plan & Detail

087
087-DWG-CV-PID-1001
087-DWG-CV-PID-1002
087-DWG-CV-PID-1003

Laboratory and Main Control Building


New 40 Ft Storage Container
Elevation Storage Container
New 20 Ft Storage Container
General Lay Out

130
130-DWG-CV-PID-1003
130-DWG-CV-PID-1004
420-DWG-CV-PID-1001
130-LAY-CV-PID-1001

Steel Frame Plan , Section and Detail


Walkway layout, section and detail
General Elecrtical Layout
Power Socket Outlet &Lighting Layout
Cable Feeder Layout
Fire Alarm System Layout
HVAC Lay Out and Elevations
Panel Load Schedule & Single Line
Isometric Perspective Gas Line Pipe

130-DWG-CV-PID-1001
130-DWG-CV-PID-1002
130-LAY-EL-PID-1001
130-DWG-EL-PID-1001
130-DWG-EL-PID-1002
130-DWG-EL-PID-1003
130-DWG-EL-PID-1004
130-DWG-EL-PID-1005
130-DWG-EL-PID-1001

4.1

22-Mar-11
22-Mar-11
22-Mar-11

22-Mar-11

6-Apr-11

22-Mar-11

6-Apr-11

22-Mar-11

5-Apr-11

22-Mar-11
22-Mar-11
22-Mar-11
19-Nov-10

11-Apr-11

7-Feb-11

19-Nov-10
19-Nov-10

11-Apr-11
11-Apr-11

7-Feb-11
7-Feb-11

Comment
Comment
Comment

19-Nov-10
19-Nov-10
19-Nov-10

11-Apr-11
11-Apr-11
11-Apr-11

2-Apr-11
7-Feb-11
7-Feb-11

Comment
Comment

19-Nov-10

11-Apr-11

130-LAY-CV-PID-1002

23-Nov-10

22-Dec-10

27-Jan-10

26-Feb-11

130-DWG-CV-PID-1003
130-DWG-CV-PID-1004
130-DWG-CV-PID-1005
130-DWG-CV-PID-1006

23-Nov-10

22-Dec-10

27-Jan-10

26-Feb-11

23-Nov-10
23-Nov-10

22-Dec-10
22-Dec-10

27-Jan-10
27-Jan-10

26-Feb-11
26-Feb-11

23-Nov-10

22-Dec-10

27-Jan-10

26-Feb-11

Bicycle Shelter
Lay Out Bicycle Shelter
PLAN OF FOUND, SECT. AND DET.
PLAN OF CONC SLAB. SECT. AND DET
STEEL ROOF FRAME AND METAL ROOFING
SECT. E-E, Sect F-F, Sect G-G, Sect H-H
VSAT Antenna Pad
VSAT Lay Out

340
340-LAY-CV-PID-1001

10-Nov-10

26-Feb-11

22-Mar-11

Section and detail


Grounding Cable Lay-out

340-DWG-CV-PID-1001
340-DWG-EL-PID-1001

10-Nov-10
20-Nov-10

26-Feb-11
12-Apr-11

22-Mar-11

General Layout ( new PVC grounding Pipe )

340-LAY-EL-PID-1001

20-Nov-10

12-Apr-11

Dark Room Modification


Layout Locations Dark Room
Layout Detail And Elevations
Water Layout And Elevations

341
341-LAY-AR-PID-1001
341-DWG-AR-PID-1001
341-DWG-MP-PID-1001

20-Nov-10

26-Feb-11

22-Mar-11

11-Nov-10
20-Nov-10

26-Feb-11

22-Mar-11

"1" Floor Security - Marine Building

346

General Electrical Layout

346 - LAY - EL - PID - 1001


346 - DWG - EL - PID - 1001

19-Nov-10

12-Apr-11

7-Feb-11

Custom & Security Office Building 1st Floor, General Power Socket Outlet Layout

19-Nov-10

12-Apr-11

Custom & Security Office Building 1st Floor, General Power Socket Outlet Layout

346 - DWG - EL - PID - 1002

19-Nov-10

12-Apr-11

Clinic Building( Modification )

349

General Electrical Lay out

349-LAY-EL-PID-1001

22-Nov-10

12-Apr-11

General And power socket outlet layout

349-DWG-EL-PID-1001

Lighting & Medical Equipment Panel Load Schedule and single line 1/2

16-Dec-10

Approved

WDA

in progress

Waiting BP Response

22-Mar-11

16-Dec-10

22-Mar-11
22-Mar-11

16-Dec-10
16-Dec-10

22-Mar-11

16-Dec-10

Approved
Approved
Approved
Approved

WDA
WDA
WDA
WDA

0
0
0
0

1
1
1
1

in progress
in progress
in progress
in progress

0
0
0
0

Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response

Approved

WDA

Closed

Approved By BP

7-Feb-11

Approved
Approved

WDA
DAM

0
0

1
1

Closed
Closed

1
1

Approved By BP
Approved By BP

7-Feb-11

Approved

DAM

Closed

Approved By BP

Approved
Approved
Approved

WDA
WDA
DAM

0
0
0

1
1
1

in progress
in progress
in progress

0
0
0

Waiting BP Response
Waiting BP Response
Waiting BP Response

7-Feb-11

Comment
Comment

DAM
DAM

0
0

1
1

in progress
in progress

0
0

Waiting BP Response
Waiting BP Response

7-Feb-11

Comment

DAM

in progress

Waiting BP Response

7-Feb-11

Comment

DAM

in progress

Waiting BP Response

19-Nov-10

12-Apr-11

7-Feb-11

Comment

DAM

in progress

Waiting BP Response

349-DWG-EL-PID-1002

19-Nov-10

12-Apr-11

7-Feb-11

Comment

DAM

in progress

Waiting BP Response

Lighting & Medical Equipment Panel Load Schedule and single line 2/2

349-DWG-EL-PID-1003

19-Nov-10

12-Apr-11

7-Feb-11

Comment

DAM

in progress

Waiting BP Response

Lighting Fixture Layout

349-DWG-EL-PID-1004

19-Nov-10

12-Apr-11

7-Feb-11

Comment

DAM

in progress

Waiting BP Response

HVAC Layout
Fire Alarm System Layout

349-DWG-EL-PID-1005
349-DWG-EL-PID-1006

19-Nov-10
19-Nov-10

12-Apr-11
12-Apr-11

7-Feb-11
2-Apr-11

Comment

DAM
DAM

0
0

1
1

in progress
in progress

0
0

Waiting BP Response
Waiting BP Response

349-LAY-AR-PID-1001
349-LAY-AR-PID-1002

24-Nov-10
26-Feb-11

26-Feb-11
22-Mar-11

3-Apr-11
3-Apr-11

Approved
Approved

WDA
WDA

0
0

1
1

in progress
in progress

0
0

Waiting BP Response
Waiting BP Response

349-DWG-CV-PID-1001
349-DWG-CV-PID-1002
349-DWG-CV-PID-1003
349-DWG-CV-PID-1004

24-Nov-10

26-Feb-11

22-Mar-11

3-Apr-11

3-Apr-11

24-Nov-10
24-Nov-10

26-Feb-11
26-Feb-11

22-Mar-11
22-Mar-11

3-Apr-11
3-Apr-11

3-Apr-11
3-Apr-11

24-Nov-10

26-Feb-11

22-Mar-11

3-Apr-11

3-Apr-11

WDA
WDA
WDA
WDA

0
0
0
0

1
1
1
1

in progress
in progress
in progress
in progress

0
0
0
0

Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response

Comment
Comment
Comment
Comment
Comment
Comment
Comment
Comment
Comment

WDA
WDA
WDA
WDA
WDA
WDA
WDA
WDA
WDA

0
0
0
0
0
0
0
0
0

1
1
1
1
1
1
1
1
1

in
in
in
in
in
in
in
in
in

progress
progress
progress
progress
progress
progress
progress
progress
progress

0
0
0
0
0
0
0
0
0

Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response

Comment

WDA

in progress

Waiting BP Response

Comment
Comment
Comment
Comment
Comment
Comment
Comment
Comment

WDA
WDA
WDA
WDA
WDA
WDA
WDA
WDA

0
0
0
0
0
0
0
0

1
1
1
1
1
1
1
1

in
in
in
in
in
in
in
in

progress
progress
progress
progress
progress
progress
progress
progress

0
0
0
0
0
0
0
0

Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response

Comment
Comment

WDA
WDA

0
0

1
1

in progress
in progress

0
0

Waiting BP Response
Waiting BP Response

Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved
Approved

WDA
WDA
WDA
WDA
WDA
WDA
WDA
WDA
WDA
WDA
WDA
WDA

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

in
in
in
in
in
in
in
in
in
in
in
in

progress
progress
progress
progress
progress
progress
progress
progress
progress
progress
progress
progress

0
0
0
0
0
0
0
0
0
0
0
0

Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response

DAM
DAM
DAM
DAM
DAM
DAM

0
0
0
0
0
0

1
1
1
1
1
1

in
in
in
in
in
in

progress
progress
progress
progress
progress
progress

0
0
0
0
0
0

Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response
Waiting BP Response

Approved
Approved
Approved

WDA
WDA
WDA

0
0
0

1
1
1

in progress
in progress
in progress

0
0
0

Waiting BP Response
Waiting BP Response
Waiting BP Response

Approved
Approved
Approved

WDA
WDA
WDA

0
0
0

1
1
1

in progress
in progress
in progress

0
0
0

Waiting BP Response
Waiting BP Response
Waiting BP Response

Comment
Comment

WDA
WDA

0
0

1
1

in progress
in progress

0
0

Waiting BP Response
Waiting BP Response

105

TOTAL

8.1 Modify the exisiting garden-1 become meeting room, doctor room, medical room
General Lay Out
Medical Room, Doctor Room and Administration Room (Garden-1)
Coulumn Plan & Detail
Roof Plan
Sections
Section & Detail

22-Mar-11
3-Apr-11

3-Apr-11

8.2 Modify the exisiting garden-2


Layout Room
Sect A-A
Sect B-B
Sect C-C
Sect D-D
Sect Det & Sect
Steel Roof Plan
Metal Roofing Plan
Door Det.Type 2

349-LAY-AR-PID-1003
349-DWG-CV-PID-1007
349-DWG-CV-PID-1008
349-DWG-CV-PID-1009
349-DWG-CV-PID-1010
349-DWG-CV-PID-1011
349-DWG-CV-PID-1012
349-DWG-CV-PID-1013
349-DWG-CV-PID-1014

16-Nov-10

25-Nov-10

26-Feb-11

22-Mar-11

16-Nov-10
16-Nov-10

25-Nov-10
25-Nov-10

26-Feb-11
26-Feb-11

22-Mar-11
22-Mar-11

16-Nov-10
16-Nov-10

25-Nov-10
25-Nov-10

26-Feb-11
26-Feb-11

22-Mar-11
22-Mar-11

16-Nov-10
16-Nov-10

25-Nov-10
25-Nov-10

26-Feb-11
26-Feb-11

22-Mar-11
22-Mar-11

16-Nov-10
16-Nov-10

25-Nov-10
25-Nov-10

26-Feb-11
26-Feb-11

22-Mar-11
22-Mar-11

8.3 Laboratory & Storage Room for Malaria Control


General Lay Out

349-LAY-AR-PID-1001

30-Nov-10

26-Feb-11

22-Mar-11

349-DWG-CV-PID-1017
349-DWG-CV-PID-1018
349-DWG-CV-PID-1019
349-DWG-CV-PID-1020
349-DWG-CV-PID-1021
349-DWG-CV-PID-1022
349-DWG-CV-PID-1023
349-DWG-CV-PID-1024

30-Nov-10
30-Nov-10

26-Feb-11
26-Feb-11

22-Mar-11
22-Mar-11

30-Nov-10
30-Nov-10

26-Feb-11
26-Feb-11

22-Mar-11
22-Mar-11

30-Nov-10
30-Nov-10

26-Feb-11
26-Feb-11

22-Mar-11
22-Mar-11

30-Nov-10
30-Nov-10

26-Feb-11
26-Feb-11

22-Mar-11
22-Mar-11

349-LAY-AR-PID-1001
349-DWG-AR-PID-1014

2-Dec-10
2-Dec-10

28-Oct-10
4-Nov-10

4-Nov-10
26-Feb-11

18-Oct-10
4-Nov-10

28-Oct-10
16-Dec-10

28-Oct-10
4-Nov-10

16-Dec-10
16-Dec-10

Foundations Plan
Det, Found & Sections
Coulum & Sloof Plan
Steel Of Coulum Plan
Steel Roof Frame Plan
Metal Roof Plan
Sections A-A
Sections and Detail
8.4 Nurse Station
General Lay Out
Nurse room
9

progress
progress
progress
progress
progress
progress
progress
progress
progress

VEHICLE WAS BAY


General Lay Out Vehicle Was Bay
Front & side view
Section A-A and Section B-B
Foundation Plan
Foundation Detail
Detail Concrete Slab & drainage
Steel Roof Frame Plan
Metal Roof Plan
Steel Structure Detail
Oil Trap Plan sections and Detail
Settling Pond Plan section and Detail
Settling Pond Concrete and Detail

350
350-LAY-CV-PID-1001
350-DWG-CV-PID-1001
350-DWG-CV-PID-1002
350-DWG-CV-PID-1003
350-DWG-CV-PID-1004
350-DWG-CV-PID-1005
350-DWG-CV-PID-1006
350-DWG-CV-PID-1007
350-DWG-CV-PID-1008
350-DWG-CV-PID-1009
350-DWG-CV-PID-1010
350-DWG-CV-PID-1011

Lighting Fixture Layout


Socket Outlet Layout
Three Line Diagram
Three Line Diagram
Cable Tray Lay out
Piping Water Line layout

350-DWG-EL-PID-1001
350-DWG-EL-PID-1002
350-DWG-EL-PID-1003
350-DWG-EL-PID-1004
350-DWG-EL-PID-1005
350-DWG-MP-PID-1001

10 Pit for Radiocative


General Lay Out
Steel roof plan dan roof plan
Foundations Plan and Detail

350
350-LAY-CV-PID-1002
350-DWG-CV-PID-1012
350-DWG-CV-PID-1013

Foundation plan and Detail


fence View
Fence detail

350-DWG-CV-PID-1003
350-DWG-CV-PID-1014
350-DWG-CV-PID-1015

Accessroad and sections


Plan , section and detail

350-DWG-CV-PID-1016
350-DWG-CV-PID-1017

Note: Design Drawing should be re-sent used final revision drawing.

18-Oct-10
18-Oct-10

1-Apr-11

2-Dec-10
2-Dec-10

26-Feb-11
22-Mar-11

22-Mar-11

29-Oct-10
18-Nov-10

18-Nov-10

16-Dec-10
26-Feb-11

26-Feb-11
22-Mar-11

22-Mar-11

29-Oct-10
18-Nov-10

18-Nov-10

26-Feb-11
26-Feb-11

22-Mar-11
22-Mar-11

29-Oct-10
18-Nov-10

18-Nov-10

4-Nov-10
4-Nov-10

16-Dec-10
16-Dec-10

26-Feb-11
26-Feb-11

22-Mar-11
22-Mar-11

28-Oct-10
4-Nov-10
4-Nov-10

4-Nov-10
16-Dec-10
16-Dec-10

16-Dec-10
26-Feb-11
26-Feb-11

26-Feb-11
22-Mar-11
22-Mar-11

4-Nov-10

16-Dec-10

26-Feb-11

22-Mar-11

18-Nov-10
18-Nov-10
22-Mar-11

29-Oct-10
18-Nov-10
18-Nov-10
18-Nov-10

18-Nov-10
18-Nov-10

20-Apr-11
20-Apr-11

18-Nov-10
18-Nov-10

20-Apr-11
20-Apr-11

18-Nov-10
18-Nov-10

20-Apr-11
20-Apr-11

9-Nov-10
29-Oct-10

26-Feb-11
9-Nov-10

26-Feb-11
26-Feb-11

22-Mar-11
22-Mar-11

29-Oct-10

9-Nov-10

26-Feb-11

15-Mar-11

22-Mar-11

1-Nov-10

29-Oct-10

9-Nov-10

26-Feb-11

22-Mar-11

22-Mar-11

1-Nov-10

29-Oct-10
29-Oct-10

9-Nov-10
9-Nov-10

26-Feb-11
26-Feb-11

22-Mar-11
22-Mar-11

22-Mar-11
22-Mar-11

1-Nov-10
1-Nov-10

9-Nov-10

26-Feb-11

15-Mar-11

9-Nov-10

26-Feb-11

1-Nov-10

18-Nov-10

3%
90%
8%
100%

Open
In Progress
Closed
Total

3
105
9
117

Case
Case
Case
Case

STATUS OF CALCULATION DRAWING


Date :
Item
Job Description

QTY

Transmittal No.

Document No.
(PID)

No.

Feb-12-2016

Result by BP
Not
Approved

Approved

Date

3:53

Comment
from BP

BUND WALL

149-TRM-PID-BP

087-CAL-CV-PID-1001

May 11

Comment

BICYCLE SHELTER

149-TRM-PID-BP

130-CAL-ST-PID-1001

May 25

Comment

VEHICLE WASHBAY

149-TRM-PID-BP

350-CAL-CV-PID-1001

May 25

Comment

PIT RADIOAKTIVE

149-TRM-PID-BP

350-CAL-ST-PID-1001

May 15

review by Bp

FIRE STATION

149-TRM-PID-BP

082-CAL-ST-PID-1001

May 25

Comment

VSAT ANTENA

149-TRM-PID-BP

340-CAL-CV-PID-1001

May 15

Done

CLINIC GARDEN-1

149-TRM-PID-BP

349-CAL-ST-PID-1001

May 15

review by Bp

CLINIC GARDEN-2

149-TRM-PID-BP

349-CAL-CU-PID-1001

May 15

review by Bp

CLINIC MALARIA CONTROL

149-TRM-PID-BP

349-CAL-CV-PID-1001

May 15

review by Bp

Note :

Prepared By,

Checked By,

Reviewed By,

CALCULATION DRAWING
Feb-12-2016

3:53
Status
Remarks
Review By P Gunawant

REV-3

Review By P Gunawant

REV-3

Review By P Gunawant

REV-5

Last Rev allready sent informal to Eng BP

REV-3

Review By P Gunawant

REV-3

Last Rev allready sent informal to Eng BP

REV-3

Last Rev allready sent informal to Eng BP

REV-3

Last Rev allready sent informal to Eng BP

REV-3

Você também pode gostar